CN104314362A - All-prefabricated fence - Google Patents

All-prefabricated fence Download PDF

Info

Publication number
CN104314362A
CN104314362A CN201410571973.0A CN201410571973A CN104314362A CN 104314362 A CN104314362 A CN 104314362A CN 201410571973 A CN201410571973 A CN 201410571973A CN 104314362 A CN104314362 A CN 104314362A
Authority
CN
China
Prior art keywords
building block
fence
prefabricated
enclosure wall
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410571973.0A
Other languages
Chinese (zh)
Other versions
CN104314362B (en
Inventor
张玉恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410571973.0A priority Critical patent/CN104314362B/en
Publication of CN104314362A publication Critical patent/CN104314362A/en
Application granted granted Critical
Publication of CN104314362B publication Critical patent/CN104314362B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/16Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
    • E04H17/168Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames using panels fitted in grooves of posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/22Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like

Abstract

The invention discloses an all-prefabricated fence having two kinds, namely a see-through fence and a plate fence. The all-prefabricated see-through fence comprises foundation piles (1), bearing steel rings (2), core columns (3), bearing plates (4), slotted blocks (5), fence plates (6), column blocks (7), barriers (8) and column cap blocks (9), and the all-prefabricated plate fence comprises foundation piles (1), steel ring type brackets (10), core columns (3), bearing plates (4), slotted blocks (5), fence plates (6), column cap blocks (9) and copings (11). All the components of the all-prefabricated fence are prefabricated in factories, and the all-prefabricated fence is quick to assemble on site, less in temporary land occupation, few in construction procedures, short in project cycle, good in apparent quality, high in seismic performance, environment friendly and pollution free.

Description

Fully-prefabricated assembled enclosure wall
Technical field
The invention belongs to building walling technical field, be specifically related to one fully-prefabricated assembled enclosure wall.
Background technology
As everyone knows, traditional building enclosing wall mostly is the form such as entity enclosure wall, transmission enclosure wall.Entity enclosure wall has placed rockfill, cemented rock, grouted brick body and concrete block etc.Transmission enclosure wall then takes masonry and fence to be combined to form.Its construction method mostly is on-the-spot masonry method, through on-the-spot line setting, the excavation foundation earthwork, build blinding concrete, installation foundation template, colligation reinforcement foundation, pouring base concrete, build (or building) column or body of wall by laying bricks or stones, fence is installed, covers with paint, lacquer, colour wash, etc. exterior wall, all multiple operation such as to inspect for acceptance.Its shortcoming is that interim occupation of land is many, working procedure is many, construction period is long, apparent mass is poor, generation waste material is many, contaminated environment is large, and the body of wall basis on unfavorable foundation easily produces differential settlement, thus cause wall body slit, and even topple, its poor seismic behavior.
beijing Hong Tangchuan generation Science and Technology Ltd.cooperate with Japanese Waseda University and Japanese Ye Ze Co., Ltd., bring AS assembled architecture system into China.For many years, the said firm successively under Jiangsu Ling Kou, Datong, Fujian the ground such as cloud, Hebei Xingtang, Guangxi emerald built up partial precast Assembled enclosing wall.This partial precast Assembled enclosing wall, the basis of its whole enclosure wall and column are on-the-spot shuttering and build shaping,only has curtain wall penel and bear down on one part and upright post cap are prefabrication and assembly constructions.
beiJing TaiKeLi High and New Technology Co., Ltdresearch and develop and produce cement based Assembled enclosing wall, beared down on one formed by basis (cup-shaped and bar shaped), column (H type and U-shaped), curtain wall penel (width modulus 600mm, 500mm, 300mm), cap, enclosure wall.Curtain wall penel is the high-strength light cement based extrusion moulding curtain wall penel adopting equipment Imported From German EMH Company to produce, this product thoroughly solves the shortcomings such as the intensity of foamed concrete ALC plate is low and regularity is poor, it has, and body of wall appearance effect is good, service life long (30-50), maintenance cost low (substantially maintenance-free), the distinguishing feature such as construction period short (saving the duration 50% compared with traditional masonry enclosure wall), anti-seismic performance be strong.This cement based Assembled enclosing wall is at project applications such as Ulan hada-root of kudzu vine mausoleum 66KV transformer station, Changchun Can Hua 66KV transformer station, Western Hills garden, Zhangjiakou 110KV transformer stations.But, the construction of this cement based Assembled enclosing wall still needs earth excavationjust can bury cup-shaped or strip foundation prefabricated section part underground.
On April 24th, 2013, Patent Office of State Intellectual Property Office discloses the Assembled enclosing wall (application number CN201310037917.4) of Guo Xueming, Li Qingshan application of extensive region, Shenyang million modern architecture industrial park Co., Ltd.A kind of Assembled enclosing wall of this disclosure of the invention, primarily of the component composition of cylinder and wallboard, cylinder and wall plate member site assembly form enclosure wall.Component is mould molding in the factory, then transports to job site assembling, convenient and quick construction, and not by the restriction in season.The Assembled enclosing wall of this invention adopts different combinations to form the enclosure wall of various fancy.Component, in plant produced, is then transported to job site assembling, Assembling simple and fast, is shortened construction period.Product waste material is few, precision is high, pattern is many.Produce and be not subject to seasonal restrictions, winter also can produce, and solves winter construction problem.There is a certain amount of deformability between assembling cylinder and wallboard, this addresses the problem the problem of body of wall due to temperature generation crack.But, this Assembled enclosing wall of this disclosure of the invention, its basis is still the strip foundation of cast-in-situ concrete, therefore, this Assembled enclosing wall also partial precast Assembled enclosing wall is belonged to, neither prefabricated, complete fabricated enclosure wall entirely.
Prestressed concrete pipe pile is widely used in the Foundation Design of modern architecture, especially for the building built on unstable soil layer or Soft Soil Layer and infrastructure projects, prestressed concrete pipe pile is by being passed on the stable bearing stratum of underground by the load of building, thus support of buildings, guarantee its safety and stablization.
Summary of the invention
the object of the invention is to:a kind of fully-prefabricated assembled enclosure wall is provided, make full use of the characteristic of prestressed concrete pipe pile, with modern mechanical rapid construction pipe pile foundation substitutesthe bar shaped of hand excavation's earthwork of tradition enclosure wall is concrete cast-in-place basis, variable cross-section pile tube is adopted to make pile foundation and the column integration of enclosure wall, take simple beam structure curtain wall penel, pass through sugarcoated haws string datacylinder, form one prefabricated, complete fabricated enclosure wall entirely, its whole element factoryization is prefabricated, on-the-spot rapid-assembling, and various shapes, and temporary site is few, and working procedure is few, and construction period is short, and apparent mass is good, and anti-seismic performance is strong, environment friendly and pollution-free.
technical solution of the present invention is: shouldfully-prefabricated assembled enclosure wall
There are transmission enclosure wall and two kinds, plate body enclosure wall; fully-prefabricated assembled transmission enclosure wallcomprise foundation pile 1, support steel loop 2, post core 3, supporting plate 4, fluting building block 5, curtain wall penel 6, cylinder building block 7, fence 8 and cap building block 9, foundation pile 1, support steel loop 2 and post core about 3 are connected as a single entity formation variable cross-section pile tubesupporting plate 4, fluting building block 5 and cylinder building block 7 vertically-displacable are sleeved on post core 3 successively, the two ends of curtain wall penel 6 are inserted into the interior also freely-supported of notch of fluting building block 5 on supporting plate 4, the bottom backstay of fence 8 inserts in preformed hole corresponding on curtain wall penel 6, the backstay at the two ends of fence 8 is pressed in the puzzle joint between corresponding two pieces of cylinder building blocks 7, and cap building block 9 is installed on the top of post core 3; fully-prefabricated assembled plate body enclosure wallcomprise foundation pile 1, steel loop type bracket 10, post core 3, supporting plate 4, fluting building block 5, curtain wall penel 6, cap building block 9 and coping 11, foundation pile 1, steel loop type bracket 10 and post core about 3 are connected as a single entity formation variable cross-section pile tubesupporting plate 4, fluting building block 5 vertically-displacable are sleeved on post core 3 successively, the two ends of curtain wall penel 6 are inserted into the interior also freely-supported of notch of fluting building block 5 on supporting plate 4, the curtain wall penel 6 superposing corresponding modulus is high to design wall, coping 11 is installed at the top of curtain wall penel 6, and cap building block 9 is installed on the top of post core 3.
wherein, the crest level of supporting plate 4 is equal with ground elevation.
Wherein, the fluting building block 5 of the corner of enclosure wall is prefabricated into the special-shaped block with respective angles according to the angle of corner, the one-sided fluting of fluting building block of enclosure wall end.
Wherein, cylinder building block is the building block of vertically-displacable Semi separation, and the mode replaced in length and breadth by adjacent two building blocks splicing puzzle joints is built by laying bricks or stones.
Wherein, modify with masonry of cement mortar, embedding gap jointing between component.
Wherein, shouldthe manufacturing process of fully-prefabricated assembled enclosure wall is as follows:
(1) variable cross-section pile tube: willfoundation pile 1, support steel loop 2 or steel loop type bracket 10 and post core about 3 are connected as a single entity formation variable cross-section pile tubepipe diameter size and embedded depth thereof are determined by Design calcu-lation according to the on-site geology of enclosure wall and the factor such as soil condition, body of wall deadweight, height and appearance moulding are selected by design according to user's request, and arrangement of reinforcement is determined by design according to structure stress, and concrete strength adopts C60 concrete;
(2) supporting plate and fluting building block: supporting plate 4 and fluting building block 5 adopt reinforced concrete prefabricated, and its arrangement of reinforcement is determined by design according to structure stress, and its concrete strength adopts C25-C30 concrete;
(3) cylinder building block and cap building block: cylinder building block 7 and cap building block 9 adopt aerated light concrete prefabricated, its concrete strength adopts C20-C25 concrete;
(4) curtain wall penel: curtain wall penel 6 adopts light reinforced concrete prefabricated, its arrangement of reinforcement is determined by design according to structure stress, and its concrete strength adopts C25-C30 concrete;
(5) fence: fence 8 adopts customed product is hot galvanized steel pipe plastic-blasting fence or stainless steel fence or alloy cast iron fence;
(6) packaging and transport: variable cross-section prestressed concrete prefabricated tubular pile installs gum sleeve additional, to balance supporting & stablizings different because of stake footpath when the superposition of its level is placed, prevent pile body from fractureing, other prefabricated units are without the need to packaging, and the transport of whole prefabricated units both can take land transportation mode also can take water transport mode;
(7) site assembly formula construction: first, surveying and locating is carried out at scene, determines center line and the stake position of enclosure wall; Secondly, adopt piling or sinking apparatus to be squeezed into design altitude by root by variable cross-section prestressed concrete prefabricated tubular pile, and strict control pile body inclining degree and adjacent between pilespacing within construction error; In addition, small crane is adopted successively will supporting plate 4 and slot building block 5, curtain wall penel 6, cylinder building block 7installation in position piece by piece on the pile tube accomplished fluently, synchronously installs fence 8, by corresponding for each reserved rod member press-in at the two ends of fence two cylinder building block 7between, every root of the bottom of fence is reserved rod member and insert curtain wall penel 6preformed hole in; And then, will cap building block 9be arranged on variable cross-section pile tubetop; In whole installation process, with masonry of cement mortar between each prefabricated component, and by cement mortar grouting joint seal gap, strictly control simultaneously enclosure wallelevation, verticality construction error; Finally, cement mortar is adopted to carry out jointing modification to building block, until whole enclosure wall engineering construction is complete.
Wherein, in above-mentioned C20 concrete, C25 concrete, C30 concrete its cement consumption of admixture 10% superfined flyash.
the present invention has the following advantages:
1, structure stress is steady:the present invention make full use of the characteristic of prestressed concrete pipe pile, with modern mechanical rapid construction pipe pile foundation substitutesthe bar shaped of hand excavation's earthwork of tradition enclosure wall is concrete cast-in-place basis, utilize variable cross-section pile tube(lower thick upper thin) make pile foundation and the column integration of enclosure wall, and take sugarcoated haws string dataassembled building block, play with building blocks formula's curtain wall penel, make enclosure wall stability under loading, firm durable.
2, speed of application is fast:the fully-prefabricated assembled enclosure wall of the present invention is because of the structure of its uniqueness, and novel combination, for site operation creates the advantage of quick assembling, thus made that site operation speed is fast, the duration is short, can save the duration more than 50% compared with the construction period of traditional enclosure wall.
3, shock resistance is strong:the present invention is particularly useful for needs and builds building enclosing wall on unstable soil layer or Soft Soil Layer, is passed on the stable bearing stratum of underground by the load of body of wall by prestressed concrete pipe pile, guarantees enclosure wall safety and stability, has stronger shock resistance.
4, labour intensity is low:the fully-prefabricated assembled enclosure wall of the present invention adopts batch production Prefabrication, site assembly rapid construction, and do mechanization operation degree is high, and without the need to operations such as digging in-situ foundation ditch, concretings, labour intensity is low, and production efficiency is high.
5, environment friendly and pollution-free:the fully-prefabricated assembled enclosure wall of the present invention is a kind of novel wall replacing traditional solid clay brick enclosure wall, and site operation takes up an area few temporarily, it is a kind of novel environment friendly product economized the land resource, owing to being the component and fitting adopting air-entrained concrete building block to produce, its bulk density is (400-700) kg/m3, be equivalent to 1/3 of solid clay brick, 1/5 of ordinary concrete, alleviate body of wall deadweight, save constructional materials and engineering cost, and product itself adopts without radiation inorganic material, pernicious gas can not be produced, environment friendly and pollution-free, without the need to digging in-situ foundation ditch, the operations such as concreting, adopt hydraulic machinery sinking construction technology, not construct the pollution of dust and noise yet.
6, the scope of application is wide:fully-prefabricated assembled transmission enclosure wall or plate body enclosure wall are widely used in the unit such as industrial enterprise, machine-operated school and build enclosure, fully-prefabricated assembled plate body enclosure wall is applicable to the noise barrier that speedway both sides are arranged, its product can carry out according to customer demand the enclosure wall that design customization produces different shaping, dissimilar concrete component can also be produced by the cement of blending different proportion, breeze, aggregate, additive and admixture, produce enclosure wall, the noise barrier of varying strength and durability degree.
Accompanying drawing explanation
Fig. 1 is the structural representation of fully-prefabricated assembled transmission enclosure wall.
Fig. 2 is the structural representation of fully-prefabricated assembled plate body enclosure wall.
In figure: 1 foundation pile, 2 support steel loops, 3 post cores, 4 supporting plates, 5 fluting building blocks, 6 curtain wall penels, 7 cylinder building blocks, 8 fence, 9 cap building blocks, 10 steel loop type brackets, 11 copings.
Detailed description of the invention
Further illustrate technical solution of the present invention below in conjunction with the drawings and specific embodiments, these embodiments can not be interpreted as it is restriction to technical scheme.
as shown in Figure 1, fully-prefabricated assembled transmission enclosure wallcomprise foundation pile 1, support steel loop 2, post core 3, supporting plate 4, fluting building block 5, curtain wall penel 6, cylinder building block 7, fence 8 and cap building block 9, foundation pile 1, support steel loop 2 and post core about 3 are connected as a single entity formation variable cross-section pile tubesupporting plate 4, fluting building block 5 and cylinder building block 7 vertically-displacable are sleeved on post core 3 successively, the two ends of curtain wall penel 6 are inserted into the interior also freely-supported of notch of fluting building block 5 on supporting plate 4, the bottom backstay of fence 8 inserts in preformed hole corresponding on curtain wall penel 6, the backstay at the two ends of fence 8 is pressed in the puzzle joint between corresponding two pieces of cylinder building blocks 7, and cap building block 9 is installed on the top of post core 3.
As shown in Figure 2, fully-prefabricated assembled plate body enclosure wallcomprise foundation pile 1, steel loop type bracket 10, post core 3, supporting plate 4, fluting building block 5, curtain wall penel 6, cap building block 9 and coping 11, foundation pile 1, steel loop type bracket 10 and post core about 3 are connected as a single entity formation variable cross-section pile tubesupporting plate 4, fluting building block 5 vertically-displacable are sleeved on post core 3 successively, the two ends of curtain wall penel 6 are inserted into the interior also freely-supported of notch of fluting building block 5 on supporting plate 4, the curtain wall penel 6 superposing corresponding modulus is high to design wall, coping 11 is installed at the top of curtain wall penel 6, and cap building block 9 is installed on the top of post core 3.
wherein, the crest level of supporting plate 4 is equal with ground elevation.
Wherein, the fluting building block 5 of the corner of enclosure wall is prefabricated into the special-shaped block with respective angles according to the angle of corner, the one-sided fluting of fluting building block of enclosure wall end.
Wherein, cylinder building block 7 is the building block of vertically-displacable Semi separation, and the mode replaced in length and breadth by adjacent two building blocks splicing puzzle joints is built by laying bricks or stones.
embodiment:certain company is investment construction chemical plant in salt & chemical industry garden, Huai'an, Jiangsu Province, project land used 75 mu, needs to build plant area's enclosure wall 885rice, adopts the fully-prefabricated assembled transmission enclosure wall of the application.
One, each part dimension of enclosure wall is as follows:
1, variable cross-section pile tube: select customization C60 hybrid reinforcement prestressed concrete pipe pile Φ 300 X 100; Pile tube external diameter 30 centimetres, pile tube internal diameter 10 centimetres, squeezes into ground 200-250 centimetre, and pile tube center distance is 250 centimetres; 20 centimetres, pile tube top is overstriking section, its external diameter 40 centimetres, internal diameter 10 centimetres; Downward 20 centimetres of overstriking section is changeover portion, is transitioned into Φ 300 X 100 by Φ 400 X 100; Overstriking section, changeover portion strengthen arrangement of reinforcement; Retainer ring is the retainer ring of shirt rim in addition, and its external diameter 40 centimetres, internal diameter 30 centimetres, select the hot bending plate of Q235B steel, thick 20 millimeters;
2, post core: post core Φ 200 X 50 selecting the C60 hybrid reinforcement prestressed concrete pipe pile of design customization, post core external diameter 20 centimetres, 10 centimetres, post in-core footpath (the same with pile tube internal diameter), 250 centimetres above ground level of post core, the center distance of adjacent pillars core is 250 centimetres (identical with pile tube center to center distance);
3, supporting plate :select prefabricated C25 reinforced concrete prefabricated board, length 90 centimetres, width 50 centimetres, thickness 20 centimetres, diameter of center hole 22 centimetres;
4, fluting building block: select the shaped grooved prefabricated section of prefabricated C25 steel concrete, length 90 centimetres, width 50 centimetres, thickness 30 centimetres, diameter of center hole 22 centimetres, two ends notch size is long dark 30 centimetres of 15 centimetres of wide 15 centimetres of * of *;
5, cylinder building block: select prefabricated C20 coagulating cement earth building blocks, it is of a size of 50 centimetres * 50 centimetres * 30 centimetres, diameter of center hole 22 centimetres;
6, cap building block: select prefabricated C20 coagulating cement earth building blocks, it is of a size of (lower floor 50*50*10+ upper strata 30*30*10) centimetre, lower floor's diameter of center hole 22 centimetres;
7, curtain wall penel: select prefabricated C25 reinforced concrete hollow slab, long 180 centimetres, high 60 centimetres, thick 12 centimetres, the hollow aperture of hollowcore slab is 5 centimetres, and adjacent hole center to center distance is 10 centimetres;
8, transmission fence: select custom heat zinc-plated square steel pipe plastic-blasting fence, long 200 centimetres of fence, high 150 centimetres, transmission flower pattern is selected by owner;
Two, the unit consumption of each parts of whole enclosure wall and total consumption: enclosure wall all parts scale (being a unit between two column center lines)
Sequence number Component names Unit Unit consumption Total consumption
1 C60 concrete column foundation pile Root 1 355
2 C60 concrete column core Root 1 355
3 C25 concrete vertically-displacable supporting plate Block 1 355
4 The building block of C25 concrete vertically-displacable fluting Block 2 710
5 The building block of C20 concrete vertically-displacable column Block 5 1775
6 C20 concrete bears down on one the building block of formula cap Block 1 355
7 C25 concrete curtain wall penel Block 1 355
8 Galvanizing square steel pipe plastic-blasting fence Part 1 355
9 Connect auxiliary Group 1 355
Three, site assembly construction: construction method and step as follows:
1, surveying and locating is carried out at scene, determines center line and the stake position of enclosure wall;
2, adopt piling or sinking apparatus to be squeezed into design altitude by root by variable cross-section prestressed concrete prefabricated tubular pile, and strict control pile body inclining degree and adjacent between pilespacing within construction error;
3, small crane is adopted successively will supporting plate and slot building block, curtain wall penel, cylinder building blockinstallation in position piece by piece on post core on the pile tube accomplished fluently, synchronously installs fence, and by corresponding for each reserved rod member press-in at fence two ends two cylinder building blockbetween, every root bottom fence reserves rod member and inserts curtain wall penelpreformed hole in;
4, will cap building blockbe arranged on the top of post core;
5, in whole installation process, with masonry of cement mortar between each prefabricated component, by cement mortar grouting joint seal gap, strictly control well simultaneously curtain wall penel and fenceelevation, verticality construction and installation error;
6, cement mortar is adopted to carry out jointing modification to building block, until whole enclosure wall engineering construction is complete.
Four, enclosure wall forcing checking: carry out analytical calculation with a unit
1, pile tube (the steel loop type bracket containing the long 400mm of the external diameter 400mm*) deadweight of external diameter 300mm internal diameter 100mm: (3.14*0.20*0.20-3.14*0.05*0.05) * 0.30*2.50+(3.14*0.15*0.15-3.14*0.05*0.05) * 1.70*2.50=0.38(ton)
2, the post core deadweight of external diameter 200mm internal diameter 100mm:
(3.14*0.10*0.10-3.14*0.05*0.05) * 2.50*2.50=0.15(ton)
3, supporting plate deadweight: 0.90*0.50*0.20*2.50=0.23(ton)
4, building block of slotting is conducted oneself with dignity:
(0.90*0.50*0.30-0.15*0.15*0.30) * 2.50=0.32(ton)
5, column building block deadweight: 0.50*0.50*0.30*2.30=0.17(ton)
6, cap building block deadweight:
(0.50*0.50*0.10+0.30*0.30*0.10) * 2.30=0.08(ton)
7, curtain wall penel deadweight:
(1.80*0.60*0.12-0.05*0.05*1.8*5) * 2.50=0.27(ton)
8, the galvanizing square steel pipe plastic-blasting fence deadweight of long 2.00 meters of high 1.50 meters of *: ( zinc steel pipe plastic-blasting is by 20 kilograms/every square meter)
20 kilograms/every square meter * 3.00 square meters=0.060(ton)
9, unit deadweight summary sheet
Sequence number Component names Unit Unit consumption Unit weight
1 C30 upright post basic pile tube Root 1 0.38t
2 Long 250 centimetres of C30 column core Root 1 0.15t
3 C25 vertically-displacable supporting plate Block 1 0.23t
4 The building block of C25 vertically-displacable fluting Block 2 0.64t
5 The building block of C20 vertically-displacable column Block 5 0.85t
6 C20 bears down on one the building block of formula cap Block 1 0.08t
7 C25 curtain wall penel Block 1 0.27t
8 Cast iron fence Part 1 0.06t
9 Connect auxiliary Group 1 Ignore
Add up to 2.66t
10, bearing capacity of single pile checking computations:
A, design data
1. Pile integrity parameter
Pile-formation process: prestressed concrete prefabricated tubular pile
Design of Bearing Capacity parameter value: table look-up according to building pile foundation specification
Ground level 0.00 m
High-0.20 m of stake top mark
Pile body intended diameter: d=0.30 m
Pile body length: l=2.00 m
2. design parameter of rock soil
3. design considerations:
" technical code for building pile foundation " (JGJ 94-94) is hereinafter referred to as Pile Foundation Code
" Code for design of building " (GB 50007-2002) is hereinafter referred to as basic norm
B, single pile vertical resistance pressure bearing capacity estimation
1. calculating parameter table
2. pile body girth U, stake end area Ap calculate
U = ∏*0.40 = 1.26 m
Ap=∏ * R*R=3.14*0.20*0.20=0.13 (square meter)
3. single pile vertical resistance pressure bearing capacity estimation
Be calculated as follows according to Pile Foundation Code 5.2.8
Quk = Qsk + Qpk
Total ultimate frictional resistance standard value of soil is:
qsikli = 1.26 × (17 × 2.00 ) = 43 kN
Total standard ultimate bearing capacity is:
Qpk = qpkAp = 0.13 × 1300 = 169 KN
Vertical allowable load capacity of single pile standard value is:
Quk = Qsk + Qpk = 43 + 169 = 212 KN
Vertical bearing capacity of single pile characteristic value Ra calculates, according to basic norm annex Q provision Q.0.10 the 7th article of regulation
Ra = Quk/2 = 212 KN/ 2 = 106 KN > 26.6KN
Five, unit enclosure wall (long 2.50 meters) materials estimated cost measuring and calculating:
Sequence number Component names Unit Consumption Unit price Conjunction valency (unit)
1 PC300(400)A100-2.0 GB13476 M 2.00 110 220
2 PC200 A100-2.5 GB13476 M 2.50 70 175
3 C25 vertically-displacable supporting plate M3 0.09 450 41
4 The building block of C25 vertically-displacable fluting M3 0.13 450 59
5 The building block of C20 vertically-displacable column M3 0.37 350 130
6 C20 bears down on one the building block of formula cap M3 0.04 350 14
7 C25 curtain wall penel M3 0.11 450 50
8 Zinc steel plastic-blasting fence Kg 60 4 240
9 Connect auxiliary Group 1 Ignore
Add up to 929
Enclosure wall unit price is 929 yuan/2.50 meters=371.6 yuan/every linear meter(lin.m.).
Six, the whole enclosure wall total cost in this chemical plant is:
371.6 yuan/every linear meter(lin.m.) * 885 meters=328866 yuan.
Seven, the whole enclosure wall in this chemical plant in June, 2014 site assembly constructed, 20 working days are only used in site assembly construction, and be delivered for use so far through final acceptance of construction, workmanship is good.

Claims (7)

1. fully-prefabricated assembled enclosure wall, shouldfully-prefabricated assembled enclosure wall has transmission enclosure wall and two kinds, plate body enclosure wall; It is characterized in that: fully-prefabricated assembled transmission enclosure wallcomprise foundation pile (1), support steel loop (2), post core (3), supporting plate (4), fluting building block (5), curtain wall penel (6), cylinder building block (7), fence (8) and cap building block (9), foundation pile (1), support steel loop (2) and post core (3) are connected as a single entity formation up and down variable cross-section pile tubesupporting plate (4), fluting building block (5) and cylinder building block (7) vertically-displacable are sleeved on post core (3) successively, the two ends of curtain wall penel (6) are inserted into the interior also freely-supported of notch of fluting building block (5) on supporting plate (4), the bottom backstay of fence (8) inserts in the upper corresponding preformed hole of curtain wall penel (6), the backstay at the two ends of fence (8) is pressed in the puzzle joint between corresponding two pieces of cylinder building blocks (7), and cap building block (9) is installed on the top of post core (3); fully-prefabricated assembled plate body enclosure wallcomprise foundation pile (1), steel loop type bracket (10), post core (3), supporting plate (4), fluting building block (5), curtain wall penel (6), cap building block (9) and coping (11), foundation pile (1), steel loop type bracket (10) and post core (3) are connected as a single entity formation up and down variable cross-section pile tubesupporting plate (4), fluting building block (5) vertically-displacable are sleeved on post core (3) successively, the two ends of curtain wall penel (6) are inserted into the interior also freely-supported of notch of fluting building block (5) on supporting plate (4), the curtain wall penel (6) superposing corresponding modulus is high to design wall, coping (11) is installed at the top of curtain wall penel (6), and cap building block (9) is installed on the top of post core (3).
2. fully-prefabricated assembled enclosure wall according to claim 1, it is characterized in that: the crest level of supporting plate (4) is equal with ground elevation.
3. fully-prefabricated assembled enclosure wall according to claim 1, it is characterized in that:the fluting building block (5) of the corner of enclosure wall is prefabricated into the special-shaped block with respective angles according to the angle of corner, the one-sided fluting of fluting building block of enclosure wall end.
4. fully-prefabricated assembled enclosure wall according to claim 1, is characterized in that: cylinder building block (7) is the building block of vertically-displacable Semi separation, and the mode replaced in length and breadth by adjacent two building blocks splicing puzzle joints is built by laying bricks or stones.
5. fully-prefabricated assembled enclosure wall according to claim 1, it is characterized in that:modify with masonry of cement mortar, embedding gap jointing between component.
6. fully-prefabricated assembled enclosure wall according to claim 1, it is characterized in that thisthe manufacturing process of fully-prefabricated assembled enclosure wall is as follows:
(1) variable cross-section pile tube: willfoundation pile (1), support steel loop (2) or steel loop type bracket (10) and post core (3) are connected as a single entity formation up and down variable cross-section pile tubepipe diameter size and embedded depth thereof are determined by Design calcu-lation according to the on-site geology of enclosure wall and the factor such as soil condition, body of wall deadweight, height and appearance moulding are selected by design according to user's request, and arrangement of reinforcement is determined by design according to structure stress, and concrete strength adopts C60 concrete;
(2) supporting plate and fluting building block: supporting plate (4) and fluting building block (5) adopt reinforced concrete prefabricated, and its arrangement of reinforcement is determined by design according to structure stress, and its concrete strength adopts C25-C30 concrete;
(3) cylinder building block and cap building block: cylinder building block (7) and cap building block (9) adopt aerated light concrete prefabricated, and its concrete strength adopts C20-C25 concrete;
(4) curtain wall penel: curtain wall penel (6) adopts light reinforced concrete prefabricated, and its arrangement of reinforcement is determined by design according to structure stress, and its concrete strength adopts C25-C30 concrete;
(5) fence: fence (8) adopts customed product is hot galvanized steel pipe plastic-blasting fence or stainless steel fence or alloy cast iron fence;
(6) packaging and transport: variable cross-section prestressed concrete prefabricated tubular pile installs gum sleeve additional, to balance supporting & stablizings different because of stake footpath when the superposition of its level is placed, prevents pile body from fractureing;
Other prefabricated units are without the need to packaging, and the transport of whole prefabricated units both can take land transportation mode also can take water transport mode;
(7) site assembly formula construction: first, surveying and locating is carried out at scene, determines center line and the stake position of enclosure wall; Secondly, adopt piling or sinking apparatus to be squeezed into design altitude by root by variable cross-section prestressed concrete prefabricated tubular pile, and strict control pile body inclining degree and adjacent between pilespacing within construction error; In addition, small crane is adopted successively will supporting plate (4) and slot building block (5), curtain wall penel (6), cylinder building block (7)installation in position piece by piece on the pile tube accomplished fluently, synchronously installs fence (8), by corresponding for each reserved rod member press-in at the two ends of fence two cylinder building block (7)between, every root of the bottom of fence is reserved rod member and insert curtain wall penel (6)preformed hole in; And then, will cap building block (9)be arranged on variable cross-section pile tubetop; In whole installation process, with masonry of cement mortar between each prefabricated component, and by cement mortar grouting joint seal gap, strictly control simultaneously enclosure wallelevation, verticality construction error; Finally, cement mortar is adopted to carry out jointing modification to building block, until whole enclosure wall engineering construction is complete.
7. fully-prefabricated assembled enclosure wall according to claim 6, it is characterized in that:in above-mentioned C20 concrete, C25 concrete, C30 concrete its cement consumption of admixture 10% superfined flyash.
CN201410571973.0A 2014-10-24 2014-10-24 Fully-prefabricated assembled enclosure wall Active CN104314362B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410571973.0A CN104314362B (en) 2014-10-24 2014-10-24 Fully-prefabricated assembled enclosure wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410571973.0A CN104314362B (en) 2014-10-24 2014-10-24 Fully-prefabricated assembled enclosure wall

Publications (2)

Publication Number Publication Date
CN104314362A true CN104314362A (en) 2015-01-28
CN104314362B CN104314362B (en) 2016-06-22

Family

ID=52369660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410571973.0A Active CN104314362B (en) 2014-10-24 2014-10-24 Fully-prefabricated assembled enclosure wall

Country Status (1)

Country Link
CN (1) CN104314362B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150191A (en) * 2015-04-15 2016-11-23 吴方华 A kind of full ground form assembled light bounding wall system and construction method
CN106593079A (en) * 2016-12-15 2017-04-26 中国能源建设集团广东省电力设计研究院有限公司 Finished product assembly type solid enclosing wall
CN106760936A (en) * 2017-01-24 2017-05-31 赤峰市建筑科学研究院有限公司 A kind of light-duty Assembled enclosing wall of post-tensioned prestressing
CN109339564A (en) * 2018-11-27 2019-02-15 国网冀北电力有限公司经济技术研究院 It is a kind of for protecting the device of land use range
CN110424814A (en) * 2019-08-07 2019-11-08 广西科技大学 A kind of prefabricated enclosure wall
CN113445816A (en) * 2021-07-14 2021-09-28 辽宁工程技术大学 Recyclable enclosure with expanded end and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003172048A (en) * 2001-12-03 2003-06-20 Sekisui House Ltd Dry block structure
DE202008009765U1 (en) * 2008-02-29 2008-10-09 Hilgenberg, Reiner Easy Tree Auer System
US20120018692A1 (en) * 2010-07-21 2012-01-26 Garden Zone Llc Fence rail support system
CN103061579A (en) * 2013-01-31 2013-04-24 沈阳兆寰现代建筑产业园有限公司 Assembly type bounding wall
CN103225444A (en) * 2013-04-17 2013-07-31 中国十七冶集团有限公司 Large and light-weight stereo type construction temporary boundary wall and construction method thereof
CN203361759U (en) * 2013-01-21 2013-12-25 耿少军 Assembly type prefabricated environment-friendly enclosure wall
CN203374067U (en) * 2013-07-13 2014-01-01 闫利俊 Shear force fence pile foundation for civil engineering
CN204152303U (en) * 2014-10-24 2015-02-11 张玉恒 Fully-prefabricated assembled enclosure wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003172048A (en) * 2001-12-03 2003-06-20 Sekisui House Ltd Dry block structure
DE202008009765U1 (en) * 2008-02-29 2008-10-09 Hilgenberg, Reiner Easy Tree Auer System
US20120018692A1 (en) * 2010-07-21 2012-01-26 Garden Zone Llc Fence rail support system
CN203361759U (en) * 2013-01-21 2013-12-25 耿少军 Assembly type prefabricated environment-friendly enclosure wall
CN103061579A (en) * 2013-01-31 2013-04-24 沈阳兆寰现代建筑产业园有限公司 Assembly type bounding wall
CN103225444A (en) * 2013-04-17 2013-07-31 中国十七冶集团有限公司 Large and light-weight stereo type construction temporary boundary wall and construction method thereof
CN203374067U (en) * 2013-07-13 2014-01-01 闫利俊 Shear force fence pile foundation for civil engineering
CN204152303U (en) * 2014-10-24 2015-02-11 张玉恒 Fully-prefabricated assembled enclosure wall

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150191A (en) * 2015-04-15 2016-11-23 吴方华 A kind of full ground form assembled light bounding wall system and construction method
CN106593079A (en) * 2016-12-15 2017-04-26 中国能源建设集团广东省电力设计研究院有限公司 Finished product assembly type solid enclosing wall
CN106760936A (en) * 2017-01-24 2017-05-31 赤峰市建筑科学研究院有限公司 A kind of light-duty Assembled enclosing wall of post-tensioned prestressing
CN109339564A (en) * 2018-11-27 2019-02-15 国网冀北电力有限公司经济技术研究院 It is a kind of for protecting the device of land use range
CN110424814A (en) * 2019-08-07 2019-11-08 广西科技大学 A kind of prefabricated enclosure wall
CN113445816A (en) * 2021-07-14 2021-09-28 辽宁工程技术大学 Recyclable enclosure with expanded end and construction method thereof

Also Published As

Publication number Publication date
CN104314362B (en) 2016-06-22

Similar Documents

Publication Publication Date Title
CN104314362B (en) Fully-prefabricated assembled enclosure wall
CN102635120B (en) Circular deep foundation ditch is without Construction of Supporting structure and construction method
CN106703028B (en) Large-diameter Manual Excavation Pile precast splice type steel retaining wall and its construction technology
CN204370431U (en) A kind of occlusion long-short pile space enclosing structure
CN103924710A (en) Steel plate welding node structure of low-layer assembly type composite wall house
CN103993679A (en) Bolt connecting joint structure of low-rise fabricated composite wall house
CN110700248A (en) Miniature steel pipe pile for grouting small and medium-sized span bridge, pile foundation and construction method
CN113431082B (en) Fast-assembly retaining wall structure and construction method thereof
CN103590486B (en) Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method
CN102912808A (en) Spiral CFG pile and cement stirring pile combined composite foundation construction method
CN102535495A (en) U-shaped groove base for prefabricated building and construction method thereof
CN206571248U (en) A kind of Assembled enclosing wall
CN204152303U (en) Fully-prefabricated assembled enclosure wall
CN106836274B (en) Dry-piling type recycled concrete ecological retaining wall building block and construction method thereof
CN102767290A (en) Construction method for retention position of constructional column of self-insulation sand aerated concrete block exterior wall
CN207122021U (en) Assembled bolt connection concrete-filled steel tube shear wall
CN210685594U (en) Fully prefabricated assembly type enclosure wall based on prestressed concrete hollow square pile technology
CN206352289U (en) Adjustable composite guide wall of underground continuous wall template
CN105951885B (en) A kind of assembled work well standard knot and its installation method in new construction
CN206693266U (en) concrete pipe gallery module
CN205636642U (en) Prefabricated drainage type net roof beam
CN102677671B (en) Construction method of precast pile in thick-slag-stone-layer field
CN103993672A (en) Tenon type connecting joint structure of low-rise fabricated composite wall house
CN110552702B (en) Underground excavation construction method for assembled corrugated steel plate underground comprehensive pipe gallery
CN203145011U (en) Anchor rod structure with anti-floating capacity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant