CN104312598B - semicoke production system - Google Patents

semicoke production system Download PDF

Info

Publication number
CN104312598B
CN104312598B CN201410602066.8A CN201410602066A CN104312598B CN 104312598 B CN104312598 B CN 104312598B CN 201410602066 A CN201410602066 A CN 201410602066A CN 104312598 B CN104312598 B CN 104312598B
Authority
CN
China
Prior art keywords
semicoke
water
production system
cold
discharging opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410602066.8A
Other languages
Chinese (zh)
Other versions
CN104312598A (en
Inventor
侯鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Coal to Liquid Chemical Co Ltd
Shenhua Group Corp Ltd
Beijing Engineering Branch of China Shenhua Coal to Liquid Chemical Co Ltd
Original Assignee
China Shenhua Coal to Liquid Chemical Co Ltd
Shenhua Group Corp Ltd
Beijing Engineering Branch of China Shenhua Coal to Liquid Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Coal to Liquid Chemical Co Ltd, Shenhua Group Corp Ltd, Beijing Engineering Branch of China Shenhua Coal to Liquid Chemical Co Ltd filed Critical China Shenhua Coal to Liquid Chemical Co Ltd
Priority to CN201410602066.8A priority Critical patent/CN104312598B/en
Publication of CN104312598A publication Critical patent/CN104312598A/en
Application granted granted Critical
Publication of CN104312598B publication Critical patent/CN104312598B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B39/00Cooling or quenching coke
    • C10B39/04Wet quenching
    • C10B39/06Wet quenching in the oven
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B39/00Cooling or quenching coke
    • C10B39/02Dry cooling outside the oven
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B39/00Cooling or quenching coke
    • C10B39/04Wet quenching
    • C10B39/08Coke-quenching towers

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Coke Industry (AREA)

Abstract

The invention discloses a kind of semicoke production system.The semicoke production system includes distillation system, Water spray cooling device, dry coke quenching auxiliary and semicoke collection device;Wherein, distillation system has semicoke outlet;Water spray cooling device has the first hot semicoke charging aperture that the semicoke outlet with distillation system is connected, and the first cold semicoke discharging opening and water-gas exhaust outlet;Dry coke quenching auxiliary has the second hot semicoke charging aperture being connected with the first cold semicoke discharging opening, and the second cold semicoke discharging opening and quenching gas feed;And semicoke collection device has the collection charging aperture being connected with the second cold semicoke discharging opening.The system sets Water spray cooling device before dry coke quenching auxiliary, makes hot semicoke advanced water-filling spraying cooling before dry coke quenching.Two step quenchings can effectively improve the cooling effectiveness of hot semicoke.Meanwhile, hot semicoke is cooled down using spray mode, moreover it is possible to prevent hot semicoke from occurring rupture under quenching and producing a large amount of smalls.The system realizes closed quenching, can reduce environmental pollution.

Description

Semicoke production system
Technical field
The present invention relates to coal chemical technology, in particular to a kind of semicoke production system.
Background technology
China's energy resource structure is rich in coal and poor in oil, and the low rank coal organic C storage such as lignite, jet coal, dross coal accounts for China's coal The half of carbon gross reserves, is seeking to substitute under the promotion of petroleum-based energy and Efficient Development using low rank coal carbon resource trend, low The development of low temperature distillation technology is accelerated in coal rank coal, and particularly lignite, jet coal low temperature distillation achieves certain commercial Application Achievement, just progressively moves to maturity.After lignite semi-coke after destructive distillation comes out from carbonization reactor temperature can reach 400 DEG C with On, and activity is high, if spontaneous combustion is not occurred easily, is caused the accident for its rapid cooling.The semicoke bosher of traditional semicoke industry Skill is more ripe, is broadly divided into two kinds of coke wet quenching, dry coke quenching, and red Jiao of high temperature is directly discharged into coke quenching pool and is cooled to by the former, Quenching pool inner water has certain liquid level again, it is ensured that the water-gas during quenching will not overflow;The latter utilizes cold inert gas (nitrogen or cycle flue gas) is cooled in dry put out in equipment with red burnt heat exchange.
However, for this high activity of lignite semi-coke, the semicoke of low mechanical strength, according to coke wet quenching technique except , also there is following defect in the defect of the low and high water consume of utilization rate of waste heat:1. after red burnt chance water quenching, the red burnt part hair of one side Raw reaction, causes semicoke product charcoal to lose;The quenching of another aspect semicoke ruptures, block Jiao's yield reduction, and produces a large amount of ends Coal;2. during quenching, the organic matter such as tar, phenol is dissolved in water, and contains a large amount of coal dusts, water process difficulty pole in waste water Greatly;3. lignite semi-coke hole is flourishing, exists and substantially relapse, influence product quality;4. coke wet quenching process is difficult to realize closed, occupation Hygienic conditions are poor, and easily environment is polluted.Though the defect of coke wet quenching technology is being overcome using dry coke quenching to a certain degree, Because lignite semi-coke is different from active high, easy spontaneous combustion, the low self-characteristic of mechanical strength of other semicokes, dry coke quenching technique is used There is also defect:1. to ensure heat exchange efficiency, coke quenching auxiliary is more huge, and single complete equipment disposal ability is relatively low, equipment investment is high; 2. dry coke quenching process control is complex, coke discharging temperature is high, especially for the lignite semi-coke of high activity, if temperature is unable to reach Less than 50 DEG C, still easily occurs spontaneous combustion;3. after gas-solid heat exchange, recuperated gas easily carries a large amount of superfine powders, follow-up dust pelletizing system Intractability increase;4. requiring supplementation with supporting indifferent gas supplements (steam or nitrogen) and waste-heat recovery device, investment increases, Influence Project Economy Benefit.In a word, there is the problem of equipment cost is high, cooling effect is poor in existing semicoke cooling technique.
To overcome the defect of both the above technique, the present invention intends providing a kind of low cost, cooling effect higher semicoke life Production system.
The content of the invention
The present invention is intended to provide a kind of semicoke production system, with solve in the prior art semicoke production system to the cold of semicoke But the problem of effect is poor.
To achieve these goals, according to an aspect of the invention, there is provided a kind of semicoke production system, it includes dry Evaporate system, Water spray cooling device, dry coke quenching auxiliary and semicoke collection device;Wherein, distillation system has semicoke outlet;Water sprays Drench the first hot semicoke charging aperture that there is cooling device the semicoke outlet with distillation system to be connected, and the first cold semicoke discharging opening With water-gas exhaust outlet;Dry coke quenching auxiliary has the second hot semicoke charging aperture being connected with the first cold semicoke discharging opening, Yi Ji Two cold semicoke discharging openings and quenching gas feed;And semicoke collection device has the collection being connected with the second cold semicoke discharging opening Charging aperture.
Further, Water spray cooling device includes fixed body of heater, fire grate, water spray system and coal moving plate;Wherein, it is fixed Body of heater is provided with the first hot semicoke charging aperture, the first cold semicoke discharging opening and water-gas exhaust outlet;Axle of the fire grate along fixed body of heater The heart can be rotatably set in stationary furnace body, between the first hot semicoke charging aperture and the first cold semicoke discharging opening, fire grate tool There is to accept and convey the stone or metal plate for standing a stove on as a precaution against fire of the hot semicoke entered by the first hot semicoke charging aperture, and be arranged on stone or metal plate for standing a stove on as a precaution against fire, and with the The corresponding coke outlet of one cold semicoke discharging opening;Water spray system is provided with the mouth spray for extending to fixed furnace interior, is used for To the hot semicoke spraying cooling water on fire grate;Coal moving plate is arranged on the top of fire grate in fixed body of heater, is welded on stationary furnace On body, coal moving plate, which is located at, forms hot semicoke circulation between coke outlet and the first cold semicoke discharging opening, and between coal moving plate and fire grate Passage.
Further, the axle center of coke outlet and the first cold semicoke discharging opening along fixed body of heater is accordingly set.
Further, fire grate also includes the discharge pipe being connected with coke outlet, and discharge pipe discharges through the first cold semicoke Mouth extends to the outside of fixed body of heater.
Further, coal moving plate is multiple, and traffic direction of multiple coal moving plates along hot semicoke above fire grate is set gradually.
Further, sealed in fire grate between the inwall of the outside of stone or metal plate for standing a stove on as a precaution against fire and fixed body of heater using water seal.
Further, Water spray cooling device also includes motor, and motor is connected with fire grate, driving fire grate rotation Turn.
Further, dry coke quenching auxiliary is the quenching gas feed in drag conveyor, dry coke quenching auxiliary and distillation system Outer smokejack gas outlet be connected.
Further, semicoke production system also includes water-gas purifier, and entrance and the water of water-gas purifier spray The water-gas exhaust outlet for drenching cooling device is connected.
Further, water-gas purifier includes coal dust washer and steam condenser;Wherein, coal dust washer has Washer air inlet and washer exhaust outlet, washer air inlet are connected with water-gas exhaust outlet;Steam condenser has steam Condenser air inlet and condenser exhaust gas mouthful, steam condenser air inlet are connected with washer exhaust outlet, condenser exhaust gas mouth and Water-gas collecting tank air inlet is connected.
Further, condenser exhaust gas mouthful is connected with the heating plant import of distillation system.
Further, semicoke production system also includes technique water treatment facilities, and technique water treatment facilities has the first feed liquor Mouth, the second inlet, the first liquid outlet, the second liquid outlet and coal dust discharging opening;Wherein:First inlet and coal dust washer Coal dust washing water out is connected, and the first liquid outlet is connected with the washing water inlet of coal dust washer;Second inlet and steam are cold The condensation-water drain of condenser is connected;Second liquid outlet is connected with the water spray system of Water spray cooling device.
Further, semicoke production system also includes Coal Briquetting System, for will be produced in semicoke and/or technique water treatment facilities Raw coal dust filter residue carries out moulded coalification.
Using the semicoke production system of the present invention.Above-mentioned semicoke production system, is provided with water spray before dry coke quenching auxiliary Drench cooling device so that hot semicoke can be introduced into Water spray cooling device before dry coke quenching auxiliary progress dry coke quenching is entered Middle progress Water spray cooling.Such two steps extinguishing technique can effectively improve the cooling effectiveness of hot semicoke.Meanwhile, compared to general Hot semicoke is placed directly within for the method that immersion cooling is carried out in cooling water, hot semicoke is cooled down by the way of spray, except energy Enough significantly to save outside water consumption, also helping prevents hot semicoke from being ruptured under the situation of quenching, produces a large amount of smalls Problem.In addition, above-mentioned semicoke production system can also be such that quenching process is carried out in closed environment, environment is advantageously reduced dirty Dye.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing a further understanding of the present invention, and of the invention shows Meaning property embodiment and its illustrate be used for explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the semicoke production system cooling device in one embodiment of the present invention;And
Fig. 2 shows the Water spray cooling device in the semicoke production system in one embodiment of the present invention.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
As background section is introduced, there is the problem of cooling effect is poor in existing semicoke cooling technique.In order to This problem is solved, inventor provides a kind of semicoke production system, as shown in figure 1, it includes distillation system 10, water Spray cooling device 20, dry coke quenching auxiliary 30 and semicoke collection device 40;Wherein, distillation system 10 has semicoke outlet 110;Water Spray cooling device 20 has the first hot semicoke charging aperture 211 that the semicoke outlet 110 with distillation system 10 is connected, and first Cold semicoke discharging opening 212 and water-gas exhaust outlet 213;Dry coke quenching auxiliary 30 has what is be connected with the first cold semicoke discharging opening 212 Second hot semicoke charging aperture, and the second cold semicoke discharging opening and quenching gas feed 330;And semicoke collection device 40 has The collection charging aperture being connected with the second cold semicoke discharging opening.
Above-mentioned semicoke production system provided by the present invention, is provided with Water spray cooling device before dry coke quenching auxiliary 30 20 so that hot semicoke can be introduced into Water spray cooling device 20 before the progress dry coke quenching of dry coke quenching auxiliary 30 is entered Water-filling spraying cooling.Such two steps extinguishing technique can effectively improve the cooling effectiveness of hot semicoke.Meanwhile, compared to by heat half Jiao is placed directly within for the method that immersion cooling is carried out in cooling water, hot semicoke is cooled down by the way of spray, except can be big Width is saved outside water consumption, and also helping prevents hot semicoke from being ruptured under the situation of quenching, the problem of producing a large amount of smalls. In addition, above-mentioned semicoke production system can also be such that quenching process is carried out in closed environment, environmental pollution is advantageously reduced.
Above-mentioned Water spray cooling device 20 provided by the present invention can use arbitrary water spray system, as long as can be to Hot semicoke provides spraying cooling water.In a preferred embodiment, as shown in Fig. 2 it includes:Fixed body of heater 210, Fire grate 220, water spray system 230 and coal moving plate 240;Wherein, fixed body of heater 210 is provided with the first hot semicoke charging aperture 211, first Cold semicoke discharging opening 212 and water-gas exhaust outlet 213;Axle center of the fire grate 220 along fixed body of heater 210 can be rotatably set in solid Determine in body of heater 210, between the first cold semicoke discharging opening 212 of hot semicoke charging aperture 211 and first, fire grate 220, which has, to be used to Accept and convey the stone or metal plate for standing a stove on as a precaution against fire of the hot semicoke entered by the first hot semicoke charging aperture 211, and be arranged on stone or metal plate for standing a stove on as a precaution against fire, and with it is first cold The corresponding coke outlet 221 of semicoke discharging opening 212;Water spray system 230 is provided with the spray extended to inside fixed body of heater 210 Mouthfuls 231, for the hot semicoke spraying cooling water on fire grate 220;Coal moving plate 240 is arranged on fire grate in fixed body of heater 210 220 top, is welded on fixed body of heater 210, coal moving plate 240 be located at the first hot semicoke charging aperture 211 and coke outlet 221 it Between, and hot semicoke circulation passage is formed between coal moving plate 240 and fire grate 220.
In above-mentioned Water spray cooling device 20 provided by the present invention, it can be carried by water spray system 230 to hot semicoke Cooling Water.For hot semicoke, which is placed directly within, carries out the method for immersion cooling in cooling water, by the way of spray Hot semicoke is cooled down, in addition to it significantly can save water consumption, also helping prevents hot semicoke from being broken under the situation of quenching Split, the problem of producing a large amount of smalls.Meanwhile, the rotatable fire grate 220 in said apparatus can make the stone or metal plate for standing a stove on as a precaution against fire positioned at fire grate 220 Diverse location on hot semicoke by than more uniform cooling, and enable to the cold semicoke formed after cooling to pass through fire grate 220 rotation is moved to the coke outlet 221 of fire grate 220, and then can be reduced because external force acts on the semicoke pulverizing problem occurred.Dial Coal plate 240 is welded on fixed body of heater 210, and when fire grate 220 rotates, hot semicoke can be relatively evenly laid on by coal moving plate 240 On fire grate, it is possible to hot semicoke is delivered into center coke outlet 212 by outside and discharged, by control rotating speed can faster by Hot semicoke discharge.In addition, in the presence of coal moving plate 240, the hot semicoke being deposited on fire grate 120 can be spread out rapidly, be made Hot semicoke being capable of equably radiating and cooling.Meanwhile, these coal moving plates 240 can also make the semicoke after cooling along fire grate 220 Outer lateral coke outlet 221 is moved, and semicoke is continuously cooled, is discharged.In addition, by coal moving plate 240 with rotation fire grate 220 Used cooperatively, the active force produced to semicoke is smaller, and action direction is fixed, and can reduce the pulverization rate of semicoke.Specifically, By being maintained a certain distance between coal moving plate 240 and fire grate 220, hot semicoke thickness of feed layer is adjusted, control device is exerted oneself.More than Many factors are conducive to improving the cooling effectiveness and cooling quality of semicoke, meanwhile, the appliance arrangement is simple, operation side Just, it is adaptable to the large-scale continuous production of semicoke.
To make semicoke more easily spread out, coal moving plate 240 is multiple, and multiple coal moving plates 240 are along the hot semicoke in the top of fire grate 220 Traffic direction set gradually.Herein multiple refer to be more than one.Those skilled in the art have the ability to select multiple coal moving plates 240 specific set-up mode, such as, the direction of motion that can be by multiple coal moving plates 240 along hot semicoke change at different angles Set.Preferably, axle center of the cold semicoke discharging opening 212 of coke outlet 221 and first along fixed body of heater 210 is accordingly set.For It is easy to cold semicoke to be moved to coke outlet 221, more preferably stone or metal plate for standing a stove on as a precaution against fire, which has, by the outer lateral direction of coke outlet 221 is increasingly towards cold semicoke The inclined surface that discharging opening 212 extends.
According to the above-mentioned teaching of the present invention, those skilled in the art have the ability to select the specific discharge method of cold semicoke.It is excellent Selection of land, above-mentioned fire grate 220 also includes the discharge pipe being connected with coke outlet 221, and discharge pipe passes through the first cold semicoke discharging opening 212 extend to the outside of fixed body of heater 210.More preferably, in fire grate 220 outside of stone or metal plate for standing a stove on as a precaution against fire and fixed body of heater 210 inwall it Between sealed using water seal 222.The stone or metal plate for standing a stove on as a precaution against fire of fire grate 220 and the fixed inwall of body of heater 210 are sealed using water seal 222, it is possible to increase stove Internal portion's sealing, while prevent hot semicoke spontaneous combustion, additionally it is possible to fire grate 220 is more successfully rotated.In addition, Water spray is cooled down Device 20 also includes motor, and motor is connected with fire grate 220, and driving fire grate 220 rotates.
In the above-mentioned Semi-coke cooling device of the present invention, the injection flow rate of water spray system 230 is higher, the cooling velocity of hot semicoke It is faster, but water consumption is higher, semicoke water content is also higher;The rotating speed of fire grate 220 is higher, and semicoke is close to the coke outlet of fire grate 220 221 speed is faster, and the temperature of semicoke is higher during discharging.For the consideration of balance water consumption, semicoke water content and temperature of the discharging of the coke, Above-mentioned fire grate 220 is rotated under motor driving.And by going out to set in the cold semicoke discharging opening 212 of coke outlet 221 or the first Temperature sensing device, to the rotating speed and the injection flow rate of water spray system 230 by the temperature control fire grate 220 that discharges of the coke.Art technology Personnel have the ability to select specific temperature sensing device, such as, are set preferably at the cold semicoke discharging opening 212 of coke outlet 221 or the first Thermocouple, the temperature of the discharging of the coke to measure semicoke.According to the temperature of the discharging of the coke, the injection flow rate and fire grate of water spray system 230 are adjusted 220 rotary speed.
Above-mentioned semicoke production system provided by the present invention, further increase is dry after above-mentioned Water spray cooling device 20 Coke quenching device 30, can further be cooled so that the temperature of semicoke to the cold semicoke formed after cooling water spraying temp lowering It is further reduced to lower temperature.This is conducive to further preventing semicoke easy spontaneous combustion problems caused by temperature is too high.Particularly pair For the higher lignite semi-coke of activity, cooling again advantageously ensures that the yield of semicoke and the security of production.Meanwhile, use Spray quenching and dry coke quenching two ways are cooled down to hot semicoke jointly, can further balance cooling water water consumption, cold half Burnt water content and temperature of the discharging of the coke.Specifically, the dry coke quenching dress that dry coke quenching auxiliary 30 can be well known to those skilled in the art Put, it is preferable that as shown in figure 1, the dry coke quenching auxiliary 30 is drag conveyor, in order to further reduce semicoke temperature, this is dry to put out Cooling jacket is carried on coke installation 30, cooling water enters from the water inlet 310 of cooling jacket, from the delivery port 320 of cooling jacket Out.It is highly preferred that the quenching gas feed 330 and the outer smokejack gas of distillation system 10 in dry coke quenching auxiliary 30 export phase Even.The outer smokejack gas is discharged after the entrance of quenching gas feed 330 from quenching gas vent 340.The outer row of distillation system 10 Contain more moisture content in flue gas, utilize it as quenching gas, can further improve the cooling effect of semicoke.Meanwhile, Flue gas by heat exchange has higher temperature, and this advantageously reduces the corrosiveness of its external smoke evacuation chimney.
Using the above-mentioned semicoke production system of the present invention, it becomes possible to reduce the production cost of semicoke, semicoke production is improved Efficiency.In a preferred embodiment, as shown in figure 1, above-mentioned semicoke production system also includes water-gas purifier, water The entrance of gas cleaning device is connected with the water-gas exhaust outlet 213 of Water spray cooling device 20.With 230 pairs of water spray system When hot semicoke carries out spraying cooling, inevitable that the cooling water of the higher semicoke of a part of temperature and spray occurs instead Should, generate water-gas.Purified treatment is carried out to water-gas using water-gas purifier, the attrital coal in water-gas can be removed Powder so that water-gas has higher degree, is used with being recovered as him.
In the above-mentioned semicoke production system of the present invention, the water-gas purifier of use can be those skilled in the art institute Usual water-gas purifier.It is a kind of preferred embodiment in, above-mentioned water-gas purifier include coal dust washer 50 With steam condenser 60, coal dust washer 50 has washer air inlet and washer exhaust outlet, washer air inlet and water coal Gas exhaust outlet 213 is connected;Steam condenser 60 has steam condenser air inlet and condenser exhaust gas mouthful 620, steam condenser Air inlet is connected with washer exhaust outlet, and condenser exhaust gas mouthful 620 is connected with water-gas collecting tank air inlet.Coal dust washer 50 For removing the coal dust in the water-gas that the water-gas exhaust outlet 213 of Semi-coke cooling device 10 is discharged, steam condenser 60 is used for Remove the water vapour in water-gas.After the process that coal dust is removed and vapor is removed, the purity of water-gas is able to effectively carry It is high.During practical operation, recirculated cooling water can be set in steam condenser 60, it is cooled down from steam condenser Water inlet 640 enters, and is discharged from steam condenser cooling water outlet 630.
Obtained water-gas is purified from above-mentioned water-gas purifier can directly to reclaim, and is used as clean energy resource. It is a kind of preferred embodiment in, above-mentioned condenser exhaust gas mouthful 620 is connected with the heating plant import 120 of distillation system 10, use In to the supplemental heat source of distillation system 10.In addition, for the consideration for saving the energy, above-mentioned semicoke production system also includes at process water Device 70 is managed, there is technique water treatment facilities 70 first inlet 710, the second inlet 720, the first liquid outlet 730, second to go out Liquid mouthful 740 and coal dust discharging opening 750;Wherein, the coal dust of the first inlet 710 and coal dust washer 50 washs the phase of water out 530 Even, the first liquid outlet 730 is connected with the washing water inlet 520 of coal dust washer 50;Second inlet 720 and steam condenser 60 Condensation-water drain 610 be connected;Second liquid outlet 740 is connected with the spray water system 230 of Water spray cooling device 20.It is above-mentioned to set The coal dust washings discharged in coal dust washer 50 and the condensed water discharged in steam condenser 60 can be recycled back to by putting Receipts are used, to reduce water consumption.So as to reduce energy resource consumption, production cost is reduced.During continuous operation, it can also enter One step carries out the supplement of cooling water and/or coal dust washings by the 3rd inlet 760.
After hot semicoke enters Water spray cooling device 20 and dry coke quenching auxiliary 30 carries out cooling processing, obtained cold semicoke It is used directly for preparing moulded coal.Preferably, above-mentioned semicoke production system also includes Coal Briquetting System 80, for by semicoke and/or The coal dust filter residue produced in technique water treatment facilities 70 carries out moulded coalification.
The present invention is described in further detail below in conjunction with specific embodiment, these embodiments are it is not intended that limit this Invent scope claimed.
Embodiment 1:
Lignite semi-coke is produced using semicoke production system.Wherein, the overall diameter for body of heater being fixed in Water spray cooling device is 7000mm, height (containing feed and exhaust tube) is 7200mm;It is provided with stationary furnace body in rotatable fire grate, fire grate and stationary furnace body Wall water seal is sealed, and two coal moving plates are provided with above fire grate;The main material of Semi-coke cooling device is ordinary carbon steel+fire proofed wood Material, about 80 tons of gross weight.
The temperature that distillation system is produced is 460 DEG C, and particle size range is thrown cold to Water spray for 10~23m lignite semi-coke But device is cooled down.The temperature obtained after cooling is placed again into drag conveyor for 97 DEG C of semicoke carry out it is cold again But, the lignite semi-coke that temperature is 46 DEG C is obtained as the dry coke quenching gas in drag conveyor using distillation system discharged gas fume.
Above-mentioned 46 DEG C of lignite semi-coke being carried out to, spontaneous combustion does not occur in accumulating, storage and transport process.After testing, finished product semicoke contains Water be 6~9wt%, low heat valve be 5500~6000 kilocalories/kilogram, particle size range be 5~20m.Semicoke cooling procedure Middle water consumption is 30~60 kg/ton.For measuring as 362~450 kgs/hr outside water-gas, water-gas temperature is 90 DEG C, component For:CO:22wt%, CH4:12wt%, not solidifying combustion gas:14wt%.Single set Semi-coke cooling device design treatment ability is 500 Ton day, year disposal ability be 150,000 tons/year.
Embodiment 2:
Lignite semi-coke is produced using semicoke production system.Wherein, the overall diameter for body of heater being fixed in Water spray cooling device is 18000mm, height (containing feed and exhaust tube) is 12200mm;Rotatable fire grate, fire grate and fixed body of heater are provided with stationary furnace body Inwall water seal is sealed, and four coal moving plates are provided with above fire grate;The main material of Semi-coke cooling device is ordinary carbon steel+fire proofed wood Material, the material of fire grate is 304 stainless steels, about 475 tons of gross weight.
The temperature that distillation system is produced is 535 DEG C, and particle size range is thrown to semicoke cooling for 13~20m lignite semi-coke Device is cooled down.The semicoke that the temperature obtained after cooling is 107 DEG C is placed again into drag conveyor and cooled down again, Using distillation system discharged gas fume as the dry coke quenching gas in drag conveyor, the lignite semi-coke that temperature is 47 DEG C is obtained.
Above-mentioned 47 DEG C of lignite semi-coke being carried out to, spontaneous combustion does not occur in accumulating, storage and transport process.After testing, finished product semicoke contains Water be 7~10wt%, low heat valve be 5500~6000 kilocalories/kilogram, particle size range be 7~13m.Semicoke cooling procedure Middle water consumption is 90~110 kg/ton.For measuring as 1600~1800 kgs/hr outside water-gas, water-gas temperature is 97 DEG C, Component is:CO:21wt%, CH4:15wt%, not solidifying combustion gas:13wt%.List covers Semi-coke cooling device design treatment ability 2000 ton days, year disposal ability be 1,500,000 tons/year.
In data description more than, it can be seen that using Semi-coke cooling device provided by the present invention to lignite semi-coke Cooled down, cooling effectiveness is higher, water consumption is relatively low.Meanwhile, using semicoke production system provided by the present invention, utilize spray Cooling and drag conveyor cool down is combined again, and the lignite semi-coke prepared has a relatively low water content, higher granularity and Higher low heat valve.Show that lignite semi-coke has higher quality.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (12)

1. a kind of semicoke production system, it is characterised in that including:
Distillation system (10), (110) are exported with semicoke;
Water spray cooling device (20), with the first hot semicoke being connected with the semicoke of the distillation system (10) outlet (110) Charging aperture (211), and the first cold semicoke discharging opening (212) and water-gas exhaust outlet (213);
Dry coke quenching auxiliary (30), with the second hot semicoke charging aperture being connected with the described first cold semicoke discharging opening (212), and Second cold semicoke discharging opening and quenching gas feed (330);And
Semicoke collection device (40), with the collection charging aperture being connected with the described second cold semicoke discharging opening;
The Water spray cooling device (20) includes:
Fixed body of heater (210), provided with the described first hot semicoke charging aperture (211), the first cold semicoke discharging opening (212) and The water-gas exhaust outlet (213);
Fire grate (220), can be rotatably set in the fixed body of heater (210) along the axle center of the fixed body of heater (210), is located at Between the first hot semicoke charging aperture (211) and the first cold semicoke discharging opening (212), the fire grate (220), which has, to be used To accept and convey the stone or metal plate for standing a stove on as a precaution against fire of the hot semicoke entered by the described first hot semicoke charging aperture (211), and it is arranged on the stone or metal plate for standing a stove on as a precaution against fire The upper and coke outlet (221) corresponding with the described first cold semicoke discharging opening (212);
Water spray system (230), is provided with and extends to the internal mouth spray (231) of the fixed body of heater (210), for positioned at Hot semicoke spraying cooling water on the fire grate (220);
Coal moving plate (240), is arranged on the top of fire grate (220) described in the fixed body of heater (210), is fixed on the stationary furnace On body (210), the coal moving plate (240) is located between the coke outlet (221) and the first hot semicoke charging aperture (211), And hot semicoke circulation passage is formed between the coal moving plate (240) and the fire grate (220).
2. semicoke production system according to claim 1, it is characterised in that the coke outlet (221) and described first cold Axle center of the semicoke discharging opening (212) along the fixed body of heater (210) is accordingly set.
3. semicoke production system according to claim 1, it is characterised in that the fire grate (220) also include with it is described go out Discharge pipe connected Jiao Kou (221), the discharge pipe extends to described solid through the described first cold semicoke discharging opening (212) Determine the outside of body of heater (210).
4. semicoke production system according to claim 1, it is characterised in that the coal moving plate (240) is multiple, Duo Gesuo Traffic direction of the coal moving plate (240) along hot semicoke above the fire grate (220) is stated to set gradually.
5. semicoke production system according to claim 1, it is characterised in that in the fire grate (220) outside of stone or metal plate for standing a stove on as a precaution against fire with Sealed between the inwall of the fixed body of heater (210) using water seal (222).
6. semicoke production system according to claim 1, it is characterised in that the Water spray cooling device (20) also includes Motor, the motor is connected with the fire grate (220), drives fire grate (220) rotation.
7. semicoke production system according to any one of claim 1 to 6, it is characterised in that the dry coke quenching auxiliary (30) it is drag conveyor, the quenching gas feed (330) in the dry coke quenching auxiliary (30) and the distillation system (10) Outer smokejack gas outlet is connected.
8. semicoke production system according to claim 1, it is characterised in that the semicoke production system also includes water-gas Purifier, the entrance of the water-gas purifier and the water-gas exhaust outlet (213) of the Water spray cooling device (20) It is connected.
9. semicoke production system according to claim 8, it is characterised in that the water-gas purifier includes:
Coal dust washer (50), with washer air inlet and washer exhaust outlet, the washer air inlet and the water coal Gas exhaust outlet (213) is connected;
Steam condenser (60), with steam condenser air inlet and condenser exhaust gas mouthful (620), the steam condenser air inlet Mouth is connected with the washer exhaust outlet, and the condenser exhaust gas mouthful (620) is connected with water-gas collecting tank air inlet.
10. semicoke production system according to claim 9, it is characterised in that the condenser exhaust gas mouthful (620) with it is described The heating plant import (120) of distillation system (10) is connected.
11. semicoke production system according to claim 9, it is characterised in that the semicoke production system also includes technique Water treatment facilities (70), the technique water treatment facilities (70) has the first inlet (710), the second inlet (720), first Liquid outlet (730), the second liquid outlet (740) and coal dust discharging opening (750);Wherein:
First inlet (710) is connected with the coal dust washing water out (530) of the coal dust washer (50), and described first Liquid outlet (730) is connected with the washing water inlet (520) of the coal dust washer (50);
Second inlet (720) is connected with the condensation-water drain (610) of the steam condenser (60);
Second liquid outlet (740) is connected with the water spray system (230) of the Water spray cooling device (20).
12. semicoke production system according to claim 11, it is characterised in that the semicoke production system also includes moulded coal System (80), the coal dust filter residue for will be produced in semicoke and/or the technique water treatment facilities (70) carries out moulded coalification.
CN201410602066.8A 2014-10-30 2014-10-30 semicoke production system Active CN104312598B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410602066.8A CN104312598B (en) 2014-10-30 2014-10-30 semicoke production system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410602066.8A CN104312598B (en) 2014-10-30 2014-10-30 semicoke production system

Publications (2)

Publication Number Publication Date
CN104312598A CN104312598A (en) 2015-01-28
CN104312598B true CN104312598B (en) 2017-08-01

Family

ID=52367920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410602066.8A Active CN104312598B (en) 2014-10-30 2014-10-30 semicoke production system

Country Status (1)

Country Link
CN (1) CN104312598B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107779216B (en) * 2016-08-24 2020-05-01 北京三聚环保新材料股份有限公司 Biomass retort and biochar preparation method
CN107189832B (en) * 2017-06-20 2019-02-26 新奥科技发展有限公司 A kind of preparation method of water coke slurry
CN109593533A (en) * 2019-01-30 2019-04-09 陕西煤业化工技术研究院有限责任公司 A kind of dry quenching system and method
CN110184083A (en) * 2019-05-29 2019-08-30 中国成达工程有限公司 A kind of coal oil residue treatment technique and processing unit
CN110835539A (en) * 2019-11-28 2020-02-25 陕西北元化工集团股份有限公司 Semi-dry coke quenching system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204162653U (en) * 2014-10-30 2015-02-18 神华集团有限责任公司 semicoke production system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2880828Y (en) * 2006-03-07 2007-03-21 刘心灵 Quenching device of red coke stewing keeping health dry method
JP4938043B2 (en) * 2009-03-05 2012-05-23 新日本製鐵株式会社 Coke dry fire extinguishing method
CN201770652U (en) * 2010-08-16 2011-03-23 王东辉 Semi-coke dry quenching system
CN102191065B (en) * 2011-03-29 2013-06-05 山西星宇舟焦化工程设计有限公司 Dry-wet combined coke quenching device
CN203741270U (en) * 2013-12-27 2014-07-30 湖南华银能源技术有限公司 Quality-lifting processing device for low-rank coal

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204162653U (en) * 2014-10-30 2015-02-18 神华集团有限责任公司 semicoke production system

Also Published As

Publication number Publication date
CN104312598A (en) 2015-01-28

Similar Documents

Publication Publication Date Title
CN104312598B (en) semicoke production system
CN103014202B (en) Device and method for recovering high-temperature sensible heat of liquid blast furnace slag
CN101749688B (en) Steam recycle device for utilization and treatment of heat energy of blast furnace slag
CN105087835B (en) System and method for recycling high-temperature slag waste heat in coal gasification manner
CN103196124B (en) Slag disposing technology device by evaporating pot method
CN106435068A (en) Blast furnace molten slag dry method treatment device based on high-temperature slag waste heat recovery
CN106753569A (en) Low pressure dry powder coal gasifying process
CN205999329U (en) A kind of wet quenching system
CN105063259B (en) A kind of blast furnace cinder heat reclaim unit and application method
CN105834442B (en) Liquid alloy dry granulation and methane vapor reforming waste-heat recovery device and method
CN103215393B (en) Metallurgical liquid-state slag treatment process and equipment
CN204162653U (en) semicoke production system
CN103614152B (en) Lignite upgrading device
CN110272069B (en) Vanadium pentoxide integrates stoving deamination oxidation melting film-making system
CN107841348A (en) It is pyrolyzed the system and method for raw coke oven gas dedusting and oil cooling recovery tar
CN106966446B (en) Device and method for treating coking wastewater by using blast furnace slag
CN106041108B (en) Dilval dry granulation and methane vapor reforming waste-heat recovery device and method
CN104192799A (en) Device for preparing hydrogen-rich gas by gasifying biomass under catalysis of high-temperature metallurgical slag particles and method
CN201436536U (en) Cooling device for high temperature calcined coke in carbon rotary kiln
CN205974384U (en) Pyrolysis device and gas -based shaft -furnace combined system
CN206188829U (en) Comprising a cooling box,
CN204918630U (en) Slag water smoke granulating device
CN103599681A (en) Tail gas continuous processing device utilizing alkaline activation to prepare activated carbon and tail gas continuous processing method thereof
CN105668978A (en) Iron-containing oily sludge treatment device and method
CN205473314U (en) Iron content sludge treatment device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant