CN104310509B - Pin-connected panel sewage disposal device - Google Patents
Pin-connected panel sewage disposal device Download PDFInfo
- Publication number
- CN104310509B CN104310509B CN201410624553.4A CN201410624553A CN104310509B CN 104310509 B CN104310509 B CN 104310509B CN 201410624553 A CN201410624553 A CN 201410624553A CN 104310509 B CN104310509 B CN 104310509B
- Authority
- CN
- China
- Prior art keywords
- several
- main body
- sewage disposal
- pin
- disposal device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Water Supply & Treatment (AREA)
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
The invention provides a kind of pin-connected panel sewage disposal device, comprise several strip footings, base, skeleton, the casing of cuboid, several linings, several flashing wells, several aerators, floating stuffing, packing support plate and filler cover plate, inside and outside wall board and skeleton are split as some unit by this pin-connected panel sewage disposal device, and the ingenious structure of range site can be in erecting bed according to the construction demand of different scales assembling combination neatly, dismantle also very convenient, be applicable to the housing assembling of various sewage treatment process, assembled volume can be from several cubes to several thousand cubes, be widely used in structure and the application of sewage disposal system, the sewage disposal complete set of equipments of the relatively passing welding assembly form of material usage is saved more than 40%, there is investment little, be not subject to the restriction of traffic condition, the advantages such as the construction period is short.
Description
Technical field
The present invention relates to technical field of sewage, relate in particular to a kind of pin-connected panel sewage disposal device, be applicable to the sewage disposal needs of various scales.
Background technology
Traditional integrated combination of the general employing of sewage disposal complete set of equipments, reduce to a certain extent space requirement, automaticity is high, easy to operate, management is simple, and treatment effect is stable, as required, capable of regulating dissolved-air pressure and dissolved air water reflux ratio, can provide single air-dissolving apparatus or two air-dissolving apparatus according to different water quality and technological requirement. But owing to being integrated combination, while dispatching from the factory, just assembled completely, and fixed by welding, so just cannot be according to the processing water yield need to carry out again dilatation, after assembling, equipment volume is larger, long-distance transport is very inconvenient, and weld seam easily damage in transport, installation and long-term use, causes sealing-off, repair inconvenience, material is large usage quantity also, causes weight excessive, has increased greatly transport and strange land installation difficulty and cost.
Summary of the invention
The technical problem to be solved in the present invention is: adopt integrated combination in order to solve sewage disposal complete set of equipments of the prior art, the problem that the difficulty that install in transport and strange land is large, cost is higher, the invention provides a kind of pin-connected panel sewage disposal device and can solve the problems referred to above according to the on-the-spot flexible assembling of different scales.
The technical solution adopted for the present invention to solve the technical problems is: a kind of pin-connected panel sewage disposal device, comprise several strip footings, base, skeleton, the casing of cuboid, several linings, several flashing wells, several aerators, floating stuffing, packing support plate and filler cover plate, described several strip footing parallel equidistant are arranged and are fixed on the ground, described base is fixed in described several strip footings, described casing is arranged on described base, on described casing, be provided with water inlet end and water side, described skeleton is arranged in described casing and casing is fixedly connected with, in the described skeleton of described packing support plate installation parallel with filler cover plate, described floating stuffing is arranged between packing support plate and filler cover plate, described several linings are fixedly connected with described skeleton, described several flashing wells and several aerators are all arranged in described casing, the coil pipe of described aerator arranges near the bottom of described casing, escape pipe stretches out from described upper cover plate, described casing is fixedly formed by several exterior wall unit spliceds, in same plane, adjacent two exterior wall unit spliceds form the V-type groove of notch towards described box house, described skeleton is fixedly formed by several outer osteons and several in-seam unit spliceds, described outer osteon has the triangular hill matching with described V-type groove, described triangular hill embeds in described V-type groove.
As preferably, described exterior wall unit comprises the first rectangular slab, four equicrural ladder plates and at least two the second rectangular slabs, four limits of described the first rectangular slab are connected as a single entity with the upper base of described four equicrural ladder plates respectively, a long limit of each described the second rectangular slab is connected as a single entity with going to the bottom of a described equicrural ladder plate respectively, described equicrural ladder plate and described the first rectangular slab have angle, and described the second rectangular slab is perpendicular to described the first rectangular slab;
In same plane, two described equicrural ladder plates that belong to respectively any two adjacent exterior wall unit are spliced to form described V-type groove, and two described the second rectangular slabs that belong to respectively any two adjacent exterior wall unit are fixedly connected with;
At the seamed edge place of described casing, two described equicrural ladder plates that belong to respectively the exterior wall unit of any two right angles connection are close to and are fixedly connected with.
As preferably, four equicrural ladder plates of each described exterior wall unit and the angle of described the first rectangular slab are 45 °.
As preferably, in same plane, belong to respectively on two described the second rectangular slabs of any two adjacent exterior wall unit corresponding offer several for be fixed by outer bolt connection the first through hole, at the seamed edge place of described casing, belong to respectively corresponding on two described equicrural ladder plates of the described exterior wall unit that any two right angles connect and offer several for be fixed the second through hole of connection by outer bolt.
As preferably, described outer osteon comprises that cross section is first main body of " work " font, on the first end face of described the first main body, there is between two parties the first rectangle chimb, described the first rectangle chimb together extends longitudinally perpendicular to described the first end face and with described the first main body, described triangular hill is arranged between two parties on the second end face of described the first main body and together extends longitudinally with described the first main body, the two ends, middle part of described the first main body all offer 2 ~ 4 third through-holes, the described outer osteon that any two right angles connect is fixed by two corner braces and internal-flange bolt.
As preferably, described interior osteon comprises that cross section is that the inside and outside contour of hollow is as foursquare the second main body, four sides of described the second main body have respectively a second rectangle chimb between two parties, and four described the second rectangle chimbs together extend longitudinally perpendicular to described four sides and with described the second main body respectively.
As preferably, on the first end face of the first main body vertically arranging, be longitudinally arranged at intervals with several the first projections, the interior profile of the outline of described the first projection and described the second main body matches.
As preferably, on four sides of the second main body vertically arranging, be longitudinally arranged at intervals with several the second projections, the interior profile of the outline of described the second projection and described the second main body matches.
As preferably, on described skeleton, the described outer osteon of cross connecting place is fixedly connected with outer bolt by a connecting plate with four corresponding exterior wall unit.
Concrete, in described skeleton, there is several grid unit grooves, described packing support plate comprises several support units, described filler cover plate comprises several cover plate units, described several linings are vertically arranged on respectively in multiple described grid unit grooves, and described several support units and several cover plate units are vertically arranged on respectively in multiple described grid unit grooves.
The invention has the beneficial effects as follows, inside and outside wall board and skeleton are split as some unit by this pin-connected panel sewage disposal device, and the ingenious structure of range site can be in erecting bed according to the construction demand of different scales assembling combination neatly, dismantle also very convenient, be applicable to the housing assembling of various sewage treatment process, assembled volume can be from several cubes to several thousand cubes, be widely used in structure and the application of sewage disposal system, between unit, be bolted, not fragile, repair also very convenient, the sewage disposal complete set of equipments of the relatively passing welding assembly form of material usage is saved more than 40%, there is investment little, be not subject to the restriction of traffic condition, the advantages such as the construction period is short.
Brief description of the drawings
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is the structural representation of the optimum embodiment of pin-connected panel sewage disposal device of the present invention.
Fig. 2 is the structural representation of exterior wall unit.
Fig. 3 is two structural representations that exterior wall unit is direct-connected.
Fig. 4 is the structural representation of outer osteon.
Fig. 5 is the structural representation of interior osteon.
Fig. 6 is the structural representation of outer osteon.
Fig. 7 is the structural representation of interior osteon.
Fig. 8 is the structural representation of interior osteon.
Fig. 9 is the structural representation of grid unit groove.
Figure 10 is the structural representation that outer osteon is connected with exterior wall unit.
Figure 11 is the structural representation that between outer osteon, right angle connects.
In figure 1, strip footing, 2, base, 3, skeleton, 4, casing, 5, lining, 6, flashing well, 7, aerator, 8, corner brace, 9, support unit, 10, connecting plate, 31, outer osteon, 32, interior osteon, 41, exterior wall unit, 311, the first main body, 312, the first rectangle chimb, 313, triangular hill, 314, the first projection, 321, the second main body, 322, the second rectangle chimb, 323, the second projection, 324, groove, 411, the first rectangular slab, 412, equicrural ladder plate, 413, the second rectangular slab, 414, the first through hole, 415, the second through hole, 416, V-type groove.
Detailed description of the invention
In conjunction with the accompanying drawings, the present invention is further detailed explanation. These accompanying drawings are the schematic diagram of simplification, and basic structure of the present invention is only described in a schematic way, and therefore it only shows the formation relevant with the present invention.
As shown in Figure 1, the invention provides a kind of pin-connected panel sewage disposal device, comprise several strip footings 1, base 2, skeleton 3, the casing 4 of cuboid, several linings 5, several flashing wells 6, several aerators 7, floating stuffing, packing support plate and filler cover plate, several strip footing 1 parallel equidistant are arranged and are fixed on the ground, strip footing 1 is concrete material, the base 2 being spliced by some glass fibre reinforced plastic channel steels is fixed in several strip footings 1, casing 4 is arranged on base 2, on the front side Side fascia of casing 4, there is water inlet end, on rear side Side fascia, there is water side, the lower end of all flashing wells 6 extends on the bottom of casing 4 always, upper end is uncovered, a water intake end is extended forward in the upper end of flashing well 6, be arranged on the other lining 5 of the water intake end of flashing well 6 and there is an opening, except the water intake end of a flashing well 6 is communicated with water inlet end and fixes by internal-flange bolt with front side Side fascia, the water intake end of other flashing well 6 all fix by internal-flange bolt with the lining 5 on its side and with corresponding open communication, internal-flange bolt is glass steel material, outer bolt is unified stainless steel or the Dacroment corrosion-resistant bolt of adopting, aerator 7 is all arranged in casing 4, the coil pipe of aerator 7 arranges near the bottom of casing 4, escape pipe stretches out from upper cover plate, floating stuffing is arranged between packing support plate and filler cover plate, packing support plate and filler cover plate all offer the opening passing for flashing well 6.
Casing 4 is spliced fixedly and is formed by several exterior wall unit 41, and exterior wall unit 41 is to be formed by the manufacture of SMC mould pressing technology by unsaturated polyester resin and alkali-free Non-twisting glass fibre yarn, as shown in Fig. 2 ~ 3, exterior wall unit 41 comprises the first rectangular slab 411 being connected as a single entity, four equicrural ladder plates 412 and four the second rectangular slabs 413, the upper base of four equicrural ladder plates 412 is connected as a single entity with the four edges of the first rectangular slab 411 respectively, go to the bottom and be connected as a single entity with a limit of four the second rectangular slabs 413 respectively, equicrural ladder plate 412 and the first rectangular slab 411 have angle, two isosceles trapezoids that belong to respectively so adjacent two exterior wall unit 41 in same plane are spliced to form V-type groove 416, two adjacent 413 of second rectangular slabs of these two exterior wall unit 41 are close together, on two the second rectangular slabs 413, correspondence offers several the first through holes 414, with just these two exterior wall unit 41 being fixed up with the outer bolt of the first through hole 414 equal numbers, and at the seamed edge place of casing 4, two 41 of exterior wall unit of connection, right angle are that their equicrural ladder plate 412 is close to, and correspondence is offered several the second through holes 415 on these two equicrural ladder plates 412 of being close to, the exterior wall unit 41 that by outer bolt, these two right angles is connected is again fixing, owing to being right angle connection, two equicrural ladder plates 412 must be spliced into right angle, and two equicrural ladder plates 412 that are combined into V-type groove 416 should be symmetrical, therefore manufacture and afterwards assembled for convenient, angle unification between four equicrural ladder plates 412 and the first rectangular slab 411 is decided to be to 45 °, it should be noted that, the second rectangular slab 413 only just plays the effect being connected and fixed in the time that two exterior wall unit, 41 planes connect, therefore can save at the second rectangular slab 413 of junction, right angle, but, for unified molding, four the second rectangular slabs 413 in the present embodiment, are still selected to be provided with on each exterior wall unit 41.
Skeleton 3 by several outer osteons 31 and in several osteon 32 splice fixedly and form, outer osteon 31 and interior osteon 32 are glass steel material, as shown in Figure 4, outer osteon 31 comprises that cross section is first main body 311 of " work " font, on the first end face of the first main body 311, there is between two parties the first rectangle chimb 312, the first rectangle chimb 312 together extends longitudinally perpendicular to the first end face and with the first main body 311, triangular hill 313 is arranged between two parties on the second end face of the first main body 311 and together extends longitudinally with the first main body 311, the cross section of triangular hill 313 is right angled isosceles triangle, corresponding with V-type groove 416, the two ends, middle part of the first main body 311 all offer 2 ~ 4 third through-holes, and the outer osteon 31 that any two right angles connect is coordinated and is fixed with third through-hole by two corner braces 8 and internal-flange bolt, as shown in Figure 5, interior osteon 32 comprises that cross section is that the inside and outside contour of hollow is as foursquare the second main body 321, four sides of the second main body 321 have respectively a second rectangle chimb 322 between two parties, four the second rectangle chimbs 322 together extend longitudinally perpendicular to four sides and with the second main body 321 respectively, and the width of the first rectangle chimb 312 is consistent with the width of the second rectangle chimb 322, in the time of assembling skeleton 3, first the outer osteon 31 of skeleton 3 bottoms is fixedly connected with by corner brace 8, in skeleton 3 bottoms, the end cross of the first main body 311 of four outer osteons 31 is connected, their first rectangle chimbs 312 separately leave one end distance with end, form the space that just in time allows the lower end of interior osteon 32 steadily place, after the interior osteon vertically arranging 32 is steadily placed, the outer osteon 31 of 3 four sides of skeleton is installed fixing by corner brace 8, the outer osteon 31 vertically arranging is all identical with the height of casing 4 with the length of interior osteon 32, and be longitudinally arranged at intervals with several the first projections 314 on the first end face of the first main body 311 of the outer osteon 31 vertically arranging, as shown in Figure 6, the interior profile of the outline of the first projection 314 and the second main body 321 matches, each splicing Nodes in skeleton 3, all relating to multiple interior osteons 32 is connected with outer osteon 31, coordinate object closely in order to allow them reach, and make the Stability Analysis of Structures of whole skeleton 3, form the cell of uniform specification, the end construction of so interior osteon 32 and outer osteon 31 need to carry out accommodation, specifically, outside on osteon 31, the first projection 314 leaves the spacing equating with the inside and outside thickness of the second main body 321 between the first rectangle chimb 312 of surrounding and the first projection 314 up and down, and the end face that is sleeved on four the second rectangle chimbs 322 on the interior osteon 32 in the first projection 314 and the second main body 321 has the distance of first rectangle chimb 312 width, so far in this, osteon 32 just can be sleeved in the first projection 314 smoothly, and closely cooperate with the outer osteon 31 of surrounding, as shown in Figure 7, or can also be in this longitudinally respectively offer a groove 324 on four sides of the link of osteon 32, the consistency of thickness of the width of groove 324 and the first rectangle chimb 312, the degree of depth is consistent with the width of the first rectangle chimb 312, and the first projection 314 just can leave distance again with the first rectangle chimb 312 of surrounding, as shown in Figure 8, on four sides of the second main body 321 vertically arranging, be longitudinally arranged at intervals with several the second projections 323, the interior profile of the outline of the second projection 323 and the second main body 321 matches, the two ends of horizontally disposed interior osteon 32 are sleeved in the second projection 323 and realize and connecting, and finally the outer osteon 31 on skeleton 3 tops are installed fixing by corner brace 8.
In skeleton 3, there is several grid unit grooves, as shown in Figure 9, grid unit groove is by four interior osteons 32 or is together made up of interior osteon 32 and outer osteon 31, wherein bottom land is by the first rectangle chimb 312 or have the first rectangle chimb 312 and the second rectangle chimb 322 together forms, and trough rim is by the second main body 321 or have the second main body 321 and the first main body 311 together surrounds; Grid unit groove is vertical state and level is evenly distributed in skeleton 3, lining 5 vertically arranges in grid unit groove, the base abuts of lining 5 is lived bottom land, agree with mutually with trough rim four sides, packing support plate comprises several support units 9, and filler cover plate comprises several cover plate units, and support unit 9 and cover plate unit are all to lie in a horizontal plane in grid unit groove, their bottom is subject to the support of bottom land, and four sides and trough rim closely cooperate.
As shown in figure 10, for further ruggedized equipment, on skeleton 3, on the outer osteon 31 of cross join, offer four through holes, four through holes are specifically distributed on the second end face near cross connected node, on four angles that four exterior wall unit 41 on relevant position are close together, also offered four through holes, and on four angles of foursquare connecting plate 10, had equally four through holes, outer osteon 31 is interior, connecting plate 10 outside, is fixedly connected with them with nut by four outer bolt.
Inside and outside wall board and skeleton 3 are split as some unit by this pin-connected panel sewage disposal device, and the ingenious structure of range site can be in erecting bed according to the construction demand of different scales assembling combination neatly, dismantle also very convenient, be applicable to the housing assembling of various sewage treatment process, assembled volume can be from several cubes to several thousand cubes, be widely used in structure and the application of sewage disposal system, the sewage disposal complete set of equipments of the relatively passing welding assembly form of material usage is saved more than 40%, there is investment little, be not subject to the restriction of traffic condition, the advantages such as the construction period is short.
Taking above-mentioned foundation desirable embodiment of the present invention as enlightenment, by above-mentioned description, relevant staff can, not departing from the scope of this invention technological thought, carry out various change and amendment completely. The technical scope of this invention is not limited to the content on description, must determine its technical scope according to claim scope.
Claims (10)
1. a pin-connected panel sewage disposal device, comprise several strip footings, base, skeleton, the casing of cuboid, several linings, several flashing wells, several aerators, floating stuffing, packing support plate and filler cover plate, described several strip footing parallel equidistant are arranged and are fixed on the ground, described base is fixed in described several strip footings, described casing is arranged on described base, on described casing, be provided with water inlet end and water side, described skeleton is arranged in described casing and with casing and is fixedly connected with, in the described skeleton of described packing support plate installation parallel with filler cover plate, described floating stuffing is arranged between packing support plate and filler cover plate, described several linings are fixedly connected with described skeleton, described several flashing wells and several aerators are all arranged in described casing, the coil pipe of described aerator arranges near the bottom of described casing, escape pipe stretches out from the upper surface of described casing, it is characterized in that: described casing is fixedly formed by several exterior wall unit spliceds, in same plane, adjacent two exterior wall unit spliceds form the V-type groove of notch towards described box house, described skeleton is fixedly formed by several outer osteons and several in-seam unit spliceds, described outer osteon has the triangular hill matching with described V-type groove, described triangular hill embeds in described V-type groove.
2. pin-connected panel sewage disposal device as claimed in claim 1, it is characterized in that: described exterior wall unit comprises the first rectangular slab, four equicrural ladder plates and at least two the second rectangular slabs, four limits of described the first rectangular slab are connected as a single entity with the upper base of described four equicrural ladder plates respectively, a long limit of each described the second rectangular slab is connected as a single entity with going to the bottom of a described equicrural ladder plate respectively, described equicrural ladder plate and described the first rectangular slab have angle, and described the second rectangular slab is perpendicular to described the first rectangular slab;
In same plane, two described equicrural ladder plates that belong to respectively any two adjacent exterior wall unit are spliced to form described V-type groove, and two described the second rectangular slabs that belong to respectively any two adjacent exterior wall unit are fixedly connected with;
At the seamed edge place of described casing, two described equicrural ladder plates that belong to respectively the exterior wall unit of any two right angles connection are close to and are fixedly connected with.
3. pin-connected panel sewage disposal device as claimed in claim 2, is characterized in that: four equicrural ladder plates of each described exterior wall unit and the angle of described the first rectangular slab are 45 °.
4. pin-connected panel sewage disposal device as claimed in claim 3, it is characterized in that: in same plane, belong to respectively corresponding on two described the second rectangular slabs of any two adjacent exterior wall unit and offer several for be fixed the first through hole of connection by outer bolt, at the seamed edge place of described casing, belong to respectively corresponding on two described equicrural ladder plates of the described exterior wall unit that any two right angles connect and offer several for be fixed the second through hole of connection by outer bolt.
5. pin-connected panel sewage disposal device as claimed in claim 3, it is characterized in that: described outer osteon comprises that cross section is first main body of " work " font, on the first end face of described the first main body, there is between two parties the first rectangle chimb, described the first rectangle chimb together extends longitudinally perpendicular to described the first end face and with described the first main body, described triangular hill is arranged between two parties on the second end face of described the first main body and together extends longitudinally with described the first main body, the two ends, middle part of described the first main body all offer 2~4 third through-holes, the described outer osteon that any two right angles connect is fixed by two corner braces and internal-flange bolt.
6. pin-connected panel sewage disposal device as claimed in claim 5, it is characterized in that: described interior osteon comprises that cross section is that the inside and outside contour of hollow is foursquare the second main body, four sides of described the second main body have respectively a second rectangle chimb between two parties, and four described the second rectangle chimbs together extend longitudinally perpendicular to described four sides and with described the second main body respectively.
7. pin-connected panel sewage disposal device as claimed in claim 6, it is characterized in that: on the first end face of the first main body vertically arranging, be longitudinally arranged at intervals with several the first projections, the interior profile of the outline of described the first projection and described the second main body matches.
8. pin-connected panel sewage disposal device as claimed in claim 7, it is characterized in that: on four sides of the second main body vertically arranging, be longitudinally arranged at intervals with several the second projections, the interior profile of the outline of described the second projection and described the second main body matches.
9. pin-connected panel sewage disposal device as claimed in claim 8, is characterized in that: on described skeleton, the described outer osteon of cross connecting place is fixedly connected with outer bolt by a connecting plate with four corresponding exterior wall unit.
10. pin-connected panel sewage disposal device as claimed in claim 6, it is characterized in that: in described skeleton, there is several grid unit grooves, described packing support plate comprises several support units, described filler cover plate comprises several cover plate units, described several linings are vertically arranged on respectively in multiple described grid unit grooves, and described several support units and several cover plate units are vertically arranged on respectively in multiple described grid unit grooves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410624553.4A CN104310509B (en) | 2014-11-07 | 2014-11-07 | Pin-connected panel sewage disposal device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410624553.4A CN104310509B (en) | 2014-11-07 | 2014-11-07 | Pin-connected panel sewage disposal device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104310509A CN104310509A (en) | 2015-01-28 |
CN104310509B true CN104310509B (en) | 2016-05-11 |
Family
ID=52365863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410624553.4A Expired - Fee Related CN104310509B (en) | 2014-11-07 | 2014-11-07 | Pin-connected panel sewage disposal device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104310509B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106517521A (en) * | 2016-12-26 | 2017-03-22 | 云南傲远环保科技有限公司 | Sewage treatment device box body combination method |
CN106477723A (en) * | 2016-12-26 | 2017-03-08 | 云南傲远环保科技有限公司 | A kind of combined type sewage treatment equipment casing |
CN109485136B (en) * | 2018-11-22 | 2020-08-18 | 河海大学 | Combined farmland non-point source sewage purification device, purification process and application thereof |
CN110030241B (en) * | 2019-03-05 | 2020-12-08 | 德清县诚达金属材料有限公司 | Outer bone unit for assembly type sewage equipment with permanent magnet adhesion and dual reinforcement |
JP6829450B1 (en) * | 2020-06-17 | 2021-02-10 | 株式会社水循環エンジニアリング | Flexible wastewater treatment equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101264946A (en) * | 2008-03-20 | 2008-09-17 | 深圳市碧宝环保科技有限公司 | Iron-carbon pipe component capable of purifying waste water, integrated magnetoelectric oxidation biological filter chamber and application system |
CN201288097Y (en) * | 2008-09-08 | 2009-08-12 | 洛阳绿潮科技开发有限公司 | Assembled modular type high-efficiency anaerobic baffling reaction unit |
CN201288109Y (en) * | 2008-09-08 | 2009-08-12 | 洛阳绿潮科技开发有限公司 | Assembling modular domestic wastewater treating plant case body |
CN101519242A (en) * | 2009-04-16 | 2009-09-02 | 湖南融城环保技术有限公司 | Modular trickling filter bioreactor for sewage treatment |
CN201343482Y (en) * | 2009-01-23 | 2009-11-11 | 洛阳绿潮科技开发有限公司 | Modularized assembled glass reinforced plastic septic tank |
CN204173937U (en) * | 2014-11-07 | 2015-02-25 | 江苏金梓环境科技有限公司 | Piecing assembly sewage disposal device |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013028747A2 (en) * | 2011-08-22 | 2013-02-28 | Ecologix Environmental Systems Llc | Systems and methods for mobile fracking water treatment |
-
2014
- 2014-11-07 CN CN201410624553.4A patent/CN104310509B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101264946A (en) * | 2008-03-20 | 2008-09-17 | 深圳市碧宝环保科技有限公司 | Iron-carbon pipe component capable of purifying waste water, integrated magnetoelectric oxidation biological filter chamber and application system |
CN201288097Y (en) * | 2008-09-08 | 2009-08-12 | 洛阳绿潮科技开发有限公司 | Assembled modular type high-efficiency anaerobic baffling reaction unit |
CN201288109Y (en) * | 2008-09-08 | 2009-08-12 | 洛阳绿潮科技开发有限公司 | Assembling modular domestic wastewater treating plant case body |
CN201343482Y (en) * | 2009-01-23 | 2009-11-11 | 洛阳绿潮科技开发有限公司 | Modularized assembled glass reinforced plastic septic tank |
CN101519242A (en) * | 2009-04-16 | 2009-09-02 | 湖南融城环保技术有限公司 | Modular trickling filter bioreactor for sewage treatment |
CN204173937U (en) * | 2014-11-07 | 2015-02-25 | 江苏金梓环境科技有限公司 | Piecing assembly sewage disposal device |
Also Published As
Publication number | Publication date |
---|---|
CN104310509A (en) | 2015-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104310509B (en) | Pin-connected panel sewage disposal device | |
TWI577275B (en) | Building wall structure | |
CN102484972A (en) | Three-dimensional green planting trough used overhead | |
CN104737849A (en) | Combined type movable climbing plant viaduct column greening device and method | |
CN204173937U (en) | Piecing assembly sewage disposal device | |
CN204184670U (en) | Pin-connected panel water storage apparatus | |
CN104369949B (en) | Pin-connected panel water storage apparatus | |
CN105625466A (en) | Assembled prefabricated comprehensive pipe gallery | |
CN104310510B (en) | The exterior wall unit that pin-connected panel sewage disposal device is used | |
CN204097123U (en) | The exterior wall unit of piecing assembly sewage disposal device | |
CN204097122U (en) | The outer osteon of piecing assembly sewage disposal device | |
CN104276613B (en) | The outer osteon of piecing assembly sewage disposal device | |
CN204162454U (en) | The interior osteon of piecing assembly sewage disposal device | |
CN205557825U (en) | Novel steel construction bracket and steel structure support structure | |
CN209194774U (en) | A kind of light energy conservation wall being easily installed | |
CN205272271U (en) | Assembled tongue -and -groove template that goes up | |
CN111549822A (en) | Inspection well maintenance reinforcement and road structure layer layering synchronous construction structure | |
CN107548788A (en) | A kind of structure for vegetated wall | |
CN104326517B (en) | The interior osteon that pin-connected panel sewage disposal device is used | |
KR200384474Y1 (en) | Prefabricated Precast Concrete Culvert | |
CN220953492U (en) | Assembled detachable turnover deep foundation pit water retaining table | |
CN203429826U (en) | Modularized building and modularized wall | |
CN203213150U (en) | Glass reinforced plastic inspection well | |
JP3199748U (en) | Assembly type water storage tank | |
CN104213655A (en) | Modular building and modular wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 213130 No. 60 Airport South Road, Xinbei District, Jiangsu, Changzhou Patentee after: JIANGSU JINZI ENVIRONMENTAL SCIENCE & TECHNOLOGY CO.,LTD. Address before: 213000, -60, South Airport Road, Luo Luo town, Xinbei District, Jiangsu, Changzhou Patentee before: Jiangsu Jinzi Environment Technology Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160511 Termination date: 20211107 |