CN104300541A - 一种有源电力滤波器控制延时动态预测补偿方法 - Google Patents

一种有源电力滤波器控制延时动态预测补偿方法 Download PDF

Info

Publication number
CN104300541A
CN104300541A CN201410465757.8A CN201410465757A CN104300541A CN 104300541 A CN104300541 A CN 104300541A CN 201410465757 A CN201410465757 A CN 201410465757A CN 104300541 A CN104300541 A CN 104300541A
Authority
CN
China
Prior art keywords
sfr
current
active power
time delay
sequence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410465757.8A
Other languages
English (en)
Other versions
CN104300541B (zh
Inventor
许胜�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou University
Original Assignee
Taizhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou University filed Critical Taizhou University
Priority to CN201410465757.8A priority Critical patent/CN104300541B/zh
Publication of CN104300541A publication Critical patent/CN104300541A/zh
Application granted granted Critical
Publication of CN104300541B publication Critical patent/CN104300541B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/01Arrangements for reducing harmonics or ripples
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/20Active power filtering [APF]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种有源电力滤波器控制延时动态预测补偿方法,一,定义abc坐标系到 n 次( n ≥1,正序或负序)SFR的变换公式:二, t k时刻,采样三相负载电流 i a、 i b、 i c,并运用将 i a、 i b、 i c变换到 n 次SFR中;三,利用低通滤波器(LPF)滤除SFR中dq轴上的交流分量,获得直流分量;四,计算电流线性误差值;五,计算 t k+1时刻电流预测值, t k+1 t k= T s, T s为采样周期:六,SFR超前移相;七,运用,将变换到abc坐标系中,实时获得 n 次谐波电流动态预测值 i an、 i bn、 i cn;八,以 i an、 i bn、 i cn作为指令电流,控制APF输出该次谐波补偿电流。

Description

一种有源电力滤波器控制延时动态预测补偿方法
技术领域
本发明涉及一种有源电力滤波器控制延时动态预测补偿方法。
背景技术
目前,随着计算机控制技术的发展,数字控制技术由于具有抗干扰能力强、控制算法实现灵活便捷以及集成度高等诸多优点,而逐步取代了模拟控制技术成为有源电力滤波器(APF)控制系统的主要实现手段。但数字化控制系统的固有缺点是存在延时,在APF控制系统中,延时主要来自AD采样保持与转换、控制算法实现等,由于延时的存在降低了APF谐波补偿的动静态性能。针对上述问题,近几年来,人们进行了大量研究并发展了许多延时补偿方法,其中,基于灰色预测理论、重复预测原理以及自适应等理论的延时补偿方法算法复杂,在实际工程中很少采用;实际工程中应用较多的为基于相移控制的延时补偿方法,该算法实现简单,主要原理是通过同步旋转坐标系(Synchronous Reference Frame,SFR)的相位移动,实现对该次SFR上的同步谐波电流的预测补偿。该算法当负载电流处于稳定状态时,能够准确预测下个时刻(对应补偿相位)的谐波电流,而当负载电流动态变化时,所预测到的谐波电流就会存在误差。
发明内容
本发明提供了一种有源电力滤波器控制延时动态预测补偿方法,它利用APF控制延时动态预测补偿方法,在对SFR移相的同时,根据微变线性化原理,对SFR上同步谐波电流在dq轴上所呈现的直流量进行线性预测,从而实现对控制系统延时的动态预测补偿。该方法能够实时响应负载变化,精确补偿控制延时,且算法简单,易于工程实现。
本发明采用了以下技术方案:一种有源电力滤波器控制延时动态预测补偿方法,它包括以下步骤:
步骤一,定义abc坐标系到n次(n≥1,正序或负序)SFR的变换公式:
其中ω为基波角频率;
步骤二,t k时刻,采样三相负载电流i ai bi c,并运用i ai bi c变换到n次SFR中;
步骤三,利用低通滤波器(LPF)滤除SFR中dq轴上的交流分量,获得直流分量
步骤四,计算电流线性误差值:
步骤五,计算t k+1时刻电流预测值,t k+1 t k= T sT s为采样周期:
步骤六,SFR超前移相,定义移相后n次(n≥1,正序或负序)SFR到abc坐标系的变换公式为:
步骤七,运用,将变换到abc坐标系中,实时获得n次谐波电流动态预测值i ani bni cn
步骤八,以i ani bni cn作为指令电流,控制APF输出该次谐波补偿电流。
本发明具有以下有益效果:采用了以上技术方案后,本发明在对SFR移相的同时,根据微变线性化原理,对SFR上同步谐波电流在dq轴上所呈现的直流量进行线性预测,从而实现对控制系统延时的动态预测补偿,该方法能够实时响应负载变化,精确补偿控制延时,且算法简单,易于工程实现。
附图说明
图1为本发明实施例一n次正序谐波电流控制延时动态预测补偿原理框图。
具体实施方式
本发明提供了一种有源电力滤波器控制延时动态预测补偿方法,它包括以下步骤:
步骤一,定义abc坐标系到n次(n≥1,正序或负序)SFR的变换公式:
其中ω为基波角频率;
步骤二,t k时刻,采样三相负载电流i ai bi c,并运用i ai bi c变换到n次SFR中;
步骤三,利用低通滤波器(LPF)滤除SFR中dq轴上的交流分量,获得直流分量
步骤四,计算电流线性误差值:
步骤五,计算t k+1时刻电流预测值,t k+1 t k= T sT s为采样周期:
步骤六,SFR超前移相,定义移相后n次(n≥1,正序或负序)SFR到abc坐标系的变换公式为:
步骤七,运用,将变换到abc坐标系中,实时获得n次谐波电流动态预测值i ani bni cn
步骤八,以i ani bni cn作为指令电流,控制APF输出该次谐波补偿电流。
下面通过实施例进一步说明本发明。
实施例一,在图1中,下面以n次正序谐波电流控制延时补偿为例分析该发明方法原理及其实施方式,n次负序实现原理相同,其中n次SFR同步旋转相位信息,为移相角度。
将三相三线制任意负载电流运用对称分量法表示为:
                                          (1)
式中:k=a、b、c,m为谐波次数(m≥1,这里将基波电流看成次数为1的谐波分量),分别表示m次谐波电流正、负序分量。
展开如下式:
                              (2)
                               (3)
式中:分别表示第m次谐波电流正、负序分量的幅值和初相角。
定义abc坐标系到n次(n≥1)正序SFR的变换公式:
            (4)
式中ω为基波角频率。
运用将(2)和(3)式表示的三相谐波电流变换到n次正序SFR中:
               (5)
               (6)
式中:表示第m次正序电流在n次正序SFR中d、q轴上各分量; 表示第m次负序电流在n次正序SFR中d、q轴上各分量。
分析式(5)、式(6)可见,在n次正序SFR中,只有n次正序谐波电流为直流量,其他都为交流量。
定义n次正序谐波电流在n次正序SFR中d、q轴上所呈现的直流量为
                                      (7)
利用低通滤波器(LPF)滤除dq轴上交流分量,检测出直流量
对SFR进行超前移相,即按照SFR旋转方向移相,移相角度为T s为采样周期。
定义移相后n次(n≥1)正序SFR到abc坐标系的变换公式为:
    (8)
设当前采样时刻t k获得的dq轴上直流量为,上一采样时刻t k-1获得的dq轴上直流量为,定义电流误差值为:
                                    (9)
根据微变线性化原理,在很小的变化范围内,非线性变化负载可以等效为线性变化负载,由于通常APF采样周期T s较小,以10kHz采样频率为例,T s仅为100us,因此在2T s范围内,可对SFR中dq轴上直流量进行线性化等效。根据上述原则,可以预测t k+1时刻dq轴上直流量:
                                  (10)
利用,对式(10)进行反变换,获得预测补偿后的n次三相正序谐波电流:
                              (11)
以该三相电流作为谐波补偿指令电流,采用合适的控制算法控制APF输出该次谐波补偿电流。

Claims (1)

1.一种有源电力滤波器控制延时动态预测补偿方法,它包括以下步骤:
步骤一,定义abc坐标系到n次(n≥1,正序或负序)SFR的变换公式:
其中ω为基波角频率;
步骤二,t k时刻,采样三相负载电流i ai bi c,并运用i ai bi c变换到n次SFR中;
步骤三,利用低通滤波器(LPF)滤除SFR中dq轴上的交流分量,获得直流分量
步骤四,计算电流线性误差值:
步骤五,计算t k+1时刻电流预测值,t k+1 t k= T sT s为采样周期:
步骤六,SFR超前移相,定义移相后n次(n≥1,正序或负序)SFR到abc坐标系的变换公式为:
步骤七,运用,将变换到abc坐标系中,实时获得n次谐波电流动态预测值i ani bni cn
步骤八,以i ani bni cn作为指令电流,控制APF输出该次谐波补偿电流。
 
CN201410465757.8A 2014-09-15 2014-09-15 一种有源电力滤波器控制延时动态预测补偿方法 Active CN104300541B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410465757.8A CN104300541B (zh) 2014-09-15 2014-09-15 一种有源电力滤波器控制延时动态预测补偿方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410465757.8A CN104300541B (zh) 2014-09-15 2014-09-15 一种有源电力滤波器控制延时动态预测补偿方法

Publications (2)

Publication Number Publication Date
CN104300541A true CN104300541A (zh) 2015-01-21
CN104300541B CN104300541B (zh) 2017-04-26

Family

ID=52320171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410465757.8A Active CN104300541B (zh) 2014-09-15 2014-09-15 一种有源电力滤波器控制延时动态预测补偿方法

Country Status (1)

Country Link
CN (1) CN104300541B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771507A (zh) * 2017-01-20 2017-05-31 泰州学院 基于电压基准分相同步的无功电流快速检测方法
CN108226637A (zh) * 2017-01-04 2018-06-29 中国矿业大学(北京) 一种具有频率变化适应性的任意次序分量检测方法
CN110137965A (zh) * 2019-05-17 2019-08-16 清华大学 高压级联h桥式svg直流脉动自适应滤波方法
CN111222093A (zh) * 2020-01-16 2020-06-02 大连地铁运营有限公司 用于电能质量控制器的计算负载预测电流装置及其方法
CN113315126A (zh) * 2021-05-31 2021-08-27 华中科技大学 一种有源电力滤波器指定次谐波抑制二次采样方法及系统
CN114924587A (zh) * 2022-05-27 2022-08-19 江苏科技大学 一种无人机路径规划方法
WO2023024029A1 (zh) * 2021-08-26 2023-03-02 宁德时代新能源科技股份有限公司 永磁同步电机的控制方法、装置及永磁同步电机控制系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1402406A (zh) * 2002-09-06 2003-03-12 清华大学 有源滤波器谐波电流检测的延迟时间的补偿方法及系统
CN101102048A (zh) * 2007-06-29 2008-01-09 清华大学 一种用于补偿控制延时的谐波电流预测方法
US7352597B2 (en) * 2005-07-18 2008-04-01 Xi'an Jiaotong University Comprehensive power quality controller for substation in power system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1402406A (zh) * 2002-09-06 2003-03-12 清华大学 有源滤波器谐波电流检测的延迟时间的补偿方法及系统
US7352597B2 (en) * 2005-07-18 2008-04-01 Xi'an Jiaotong University Comprehensive power quality controller for substation in power system
CN101102048A (zh) * 2007-06-29 2008-01-09 清华大学 一种用于补偿控制延时的谐波电流预测方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘俊岭等: "数字化有源滤波器时延补偿方法的分析和验证", 《电力电子技术》 *
王 灏等: "可选择谐波型有源滤波器的检测及其闭环控制", 《清华大学学报(自然科学版)》 *
王莉娜等: "有源滤波器参考电流无延时的生成方法", 《电力电子技术》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108226637A (zh) * 2017-01-04 2018-06-29 中国矿业大学(北京) 一种具有频率变化适应性的任意次序分量检测方法
CN106771507B (zh) * 2017-01-20 2020-02-14 泰州学院 基于电压基准分相同步的无功电流快速检测方法
CN106771507A (zh) * 2017-01-20 2017-05-31 泰州学院 基于电压基准分相同步的无功电流快速检测方法
CN110137965A (zh) * 2019-05-17 2019-08-16 清华大学 高压级联h桥式svg直流脉动自适应滤波方法
CN110137965B (zh) * 2019-05-17 2020-03-13 清华大学 高压级联h桥式svg直流脉动自适应滤波方法
CN111222093B (zh) * 2020-01-16 2023-10-13 大连地铁集团有限公司 用于电能质量控制器的计算负载预测电流装置及其方法
CN111222093A (zh) * 2020-01-16 2020-06-02 大连地铁运营有限公司 用于电能质量控制器的计算负载预测电流装置及其方法
CN113315126A (zh) * 2021-05-31 2021-08-27 华中科技大学 一种有源电力滤波器指定次谐波抑制二次采样方法及系统
CN113315126B (zh) * 2021-05-31 2022-07-05 华中科技大学 一种有源电力滤波器指定次谐波抑制二次采样方法及系统
WO2023024029A1 (zh) * 2021-08-26 2023-03-02 宁德时代新能源科技股份有限公司 永磁同步电机的控制方法、装置及永磁同步电机控制系统
US11894786B2 (en) 2021-08-26 2024-02-06 Contemporary Amperex Technology Co., Limited Permanent-magnet synchronous machine control method and device, and permanent-magnet synchronous machine control system
CN114924587A (zh) * 2022-05-27 2022-08-19 江苏科技大学 一种无人机路径规划方法
CN114924587B (zh) * 2022-05-27 2024-03-19 江苏科技大学 一种无人机路径规划方法

Also Published As

Publication number Publication date
CN104300541B (zh) 2017-04-26

Similar Documents

Publication Publication Date Title
CN104300541B (zh) 一种有源电力滤波器控制延时动态预测补偿方法
Xie et al. DC offset rejection improvement in single-phase SOGI-PLL algorithms: Methods review and experimental evaluation
CN105429484B (zh) 基于任意周期延时的pwm整流器预测功率控制方法及系统
Geng et al. A novel hardware-based all-digital phase-locked loop applied to grid-connected power converters
Ghoshal et al. A method to improve PLL performance under abnormal grid conditions
Kalla et al. Normalised adaptive linear element‐based control of single‐phase self excited induction generator feeding fluctuating loads
Sharma et al. Real-time implementation of shunt active power filter with reduced sensors
Meral Improved phase-locked loop for robust and fast tracking of three phases under unbalanced electric grid conditions
Panigrahi et al. A robust extended complex kalman filter and sliding-mode control based shunt active power filter
Ahmad et al. A new simple structure PLL for both single and three phase applications
CN104184148A (zh) 一种同步旋转坐标系中谐波电流分次控制方法
CN105759119B (zh) Sdft基波正序分量相位同步方法及系统
Guo et al. Simple synchronisation technique for three‐phase grid‐connected distributed generation systems
CN104502674B (zh) 一种三相电压有效值检测方法及检测装置
Nwobu et al. Grid voltage synchronization for unbalanced voltages using the energy operator
Safayet et al. Grid harmonics and voltage unbalance effect elimination for three-phase PLL grid synchronization algorithm
Ko et al. A new PLL system using full order observer and PLL system modeling in a single phase grid-connected inverter
Wu et al. A Frequency-Adaptive Delay Signal Cancelation Based Filter to Reduce Position Estimation Error for Sensorless IPMSM Drives
CN109547016B (zh) 基于虚拟三相算法的频率自适应单相锁相环
CN111740633A (zh) 一种不平衡网压条件下并网逆变器的改进数字控制方法
Chattopadhyay et al. Phase-angle balance control for harmonic filtering of a three-phase shunt active filter system
Shi et al. Adaptive quadrant filter based phase locked loop system
CN104410075B (zh) 一种谐波电流超前校正方法及其应用设备
CN107831366B (zh) 获得电网单相电压相位的方法
Wang et al. Phase-lock loop of Grid-connected Voltage Source Converter under non-ideal grid condition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant