CN104295803B - Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and installation method - Google Patents

Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and installation method Download PDF

Info

Publication number
CN104295803B
CN104295803B CN201410494004.XA CN201410494004A CN104295803B CN 104295803 B CN104295803 B CN 104295803B CN 201410494004 A CN201410494004 A CN 201410494004A CN 104295803 B CN104295803 B CN 104295803B
Authority
CN
China
Prior art keywords
tube
polyethylene
crosslinked polyethylene
prefabricated direct
insulation layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410494004.XA
Other languages
Chinese (zh)
Other versions
CN104295803A (en
Inventor
张居山
赖贞澄
庄须文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Langge Site Energy Saving Technology Co Ltd
Original Assignee
Harbin Langge Site Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Langge Site Energy Saving Technology Co Ltd filed Critical Harbin Langge Site Energy Saving Technology Co Ltd
Priority to CN201410494004.XA priority Critical patent/CN104295803B/en
Publication of CN104295803A publication Critical patent/CN104295803A/en
Application granted granted Critical
Publication of CN104295803B publication Critical patent/CN104295803B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/12Rigid pipes of plastics with or without reinforcement
    • F16L9/127Rigid pipes of plastics with or without reinforcement the walls consisting of a single layer
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/02Shape or form of insulating materials, with or without coverings integral with the insulating materials
    • F16L59/028Composition or method of fixing a thermally insulating material

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Insulation (AREA)

Abstract

Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and preparation method.At present, what the country was used for that triple tube net cold and heat supply generally to use is all steel insulating pipe bend manufacture craft, substantial amounts of economic loss is generated from construction cost, occurs substantial amounts of unnecessary loss in thermal losses, in terms of pipelined there is get rusty operation troubles the problems such as, not reach the performance standard of prefabricated direct-buried thermal insulation pipe crosslinked polyethylene instrumentation tubes technology much in environmental protection, energy-conservation, stability etc..A kind of intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube, its composition include:Cross-linked polyethylene variable diameter working tube(1), described cross-linked polyethylene variable diameter working tube and heat-insulation layer(4)Connection, described heat-insulation layer respectively with alarming line(2), outer protection tube(3)Connection.Present invention is mainly applied to the triple tube net Covering domain of city cold and heat supply.

Description

Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and installation method
Technical field:
The present invention relates to a kind of intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and fabrication and installation method, It is mainly used in the triple tube net Covering domain of city cold and heat supply.
Background technology:
It is at present, domestic that be used for that triple tube net cold and heat supply generally to use is all steel insulating pipe bend manufacture craft, Need continuous intercept to weld when being installed in cell unit corridor and add substantial amounts of construction cost, produced from construction cost Substantial amounts of economic loss has been given birth to, has occurred substantial amounts of unnecessary loss in thermal losses, there is get rusty for pipelined aspect The problems such as operation troubles, original technology and technique, will much reach in environmental protection, energy-conservation, economic, safe and stable property etc. in a word Less than the performance standard of prefabricated direct-buried thermal insulation pipe crosslinked polyethylene instrumentation tubes technology.
The content of the invention:
It is an object of the invention to provide a kind of intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and making Method.
Above-mentioned purpose is realized by following technical scheme:
A kind of intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube, its composition include:2 crosslinked polyethylenes Reducing instrumentation tubes, described cross-linked polyethylene variable diameter working tube are connected with heat-insulation layer, described heat-insulation layer respectively with alarming line, outer Pillar connects.
Described intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube, described heat-insulation layer are protected for polyurethane Warm layer, described outer protection tube are polyethylene layer.
Described intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube, described crosslinked polyethylene reducing work Make the surface parcel polyurethane foam of pipe.
Described intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube, described alarming line are installed in parallel in In the heat-insulation layer of cross-linked polyethylene variable diameter working tube, described cross-linked polyethylene variable diameter working tube is installed in parallel in polyurethane heat-insulation In layer.
Described intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube, described outer protection tube pass through parcel Mode is wrapped in insulation layer surface.
Described prefabricated direct-buried crosslinked polyethylene reducing work insulating tube, described crosslinked polyethylene work pipe surface are passed through Cleaning treatment.
Described prefabricated direct-buried crosslinked polyethylene reducing work insulating tube preparation method:It is prefabricated straight that the present invention is different from tradition Insulating tube is buried, is taken with existing crosslinked polyethylene pipe for the work of original steel prefabricated direct-buried thermal insulation pipe, and by being crosslinked The two-tube steel single tube return instead of original old traditional tube of polyethylene, the loop being had by oneself in a pipe is formed, will be handed over After connection polyethylene pipe installs support, formed by the hdpe pipe of high-precision PE welding guns different angle prefabricated The outer protection tube of direct-buried thermal insulation pipe crosslinked polyethylene work tube reducing, pipe ends are then installed into foaming guard seal and stayed There is exhaust sieve, finally foamed by foaming machine spray foam, end face finishing processing is carried out after curing, be shape after the completion of the above Into final finished.
Beneficial effects of the present invention:
1. the present invention uses crosslinked polyethylene as pipeline foundation raw materials, it is instrumentation tubes by crosslinked polyethylene pipe, is being crosslinked The surface parcel polyurethane foam of polyethylene, outer protection tube use high density polyethylene materials, are fabricated to prefabricated direct-buried thermal insulation pipe friendship Join polyethylene instrumentation tubes.
The convenience that the present invention installs is far longer than traditional insulation pipe, and thermal losses can be saved in terms of heat loss quality 34%, year cost-effective 34% can be reached in terms of operating cost, 34% can be reduced in terms of carbon emission amount is reduced, make It can be met international standards minimum 30 years with life-span aspect, 54% can be saved in integrated operation cost.
The present invention selects high density polyethylene (HDPE) to have good leakage performance, rigidity as anticorrosive coat in outer protection tube And hydraulic performance, having very high mechanical strength and excellent decay resistance, it can protect tubing transporting, install and making Not by destruction caused by extraneous factor during.
The present invention is provided with two leakage alarm lines in heat-insulation layer, once seepage occurs for pipeline somewhere, passes through alarming line Conduction, utilidor infiltration, the size of the accurate location of leak and leak magnitude can be shown in dedicated test instrument, To notify inspection personnel to handle the pipeline section of leak rapidly, ensure the safe operation of heating network.
Brief description of the drawings:
Accompanying drawing 1 is the structural representation of the present invention.
Accompanying drawing 2 is the front view of accompanying drawing 1.
Accompanying drawing 3 is the left view of accompanying drawing 1.
Accompanying drawing 4 is the right view of accompanying drawing 1.
Embodiment:
Embodiment 1:
A kind of intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube, its composition include:2 crosslinked polyethylenes Reducing instrumentation tubes 1, described cross-linked polyethylene variable diameter working tube are connected with heat-insulation layer 4, described heat-insulation layer respectively with alarming line 2nd, outer protection tube 3 connects.
Embodiment 2:
Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube according to embodiment 1, described insulation Layer is polyurethane insulation coating, and described outer protection tube is polyethylene layer.
Embodiment 3:
Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube according to embodiment 1 or 2, described friendship Join the surface parcel polyurethane foam of polyethylene reducing instrumentation tubes.
Embodiment 4:
Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube according to embodiment 1 or 2 or 3, it is described Alarming line be installed in parallel in the heat-insulation layer of cross-linked polyethylene variable diameter working tube, described cross-linked polyethylene variable diameter working tube is put down Row is arranged in polyurethane insulation coating.
Embodiment 5:
Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube according to embodiment 1 or 2 or 3 or 4, institute The outer protection tube stated is wrapped in insulation layer surface by way of parcel.
Embodiment 6:
Prefabricated direct-buried crosslinked polyethylene reducing work insulating tube according to embodiment 1 or 2 or 3 or 4 or 5, its feature It is:Described crosslinked polyethylene work pipe surface passes through cleaning treatment.
Embodiment 7:Prefabricated direct-buried crosslinked polyethylene reducing work according to embodiment 1 or 2 or 3 or 4 or 5 or 6 is protected Wen Guan, described outer jacket selection high density polyethylene anticorrosive coating.
Embodiment 8:
A kind of making of prefabricated direct-buried crosslinked polyethylene reducing work insulating tube described in one of embodiment 1-7(Installation) Method:The present invention is different from traditional prefabricated buried insulation pipe, with existing crosslinked polyethylene double tube take for original steel without Slit-tube is the work of prefabricated direct-buried thermal insulation pipe, and the loop pipe of original old traditional tube is replaced by crosslinked polyethylene double tube Road, the loop being had by oneself in a pipe is formed, after crosslinked polyethylene pipe is installed into support, passes through high-precision PE welding guns difference The hdpe pipe of angle forms the outer protection tube of prefabricated direct-buried thermal insulation pipe crosslinked polyethylene work tube reducing, then will Pipe ends install foaming guard seal and leave exhaust sieve, are finally foamed by foaming machine spray foam, after curing End face finishing processing is carried out, final finished is formed after the completion of the above.

Claims (1)

  1. A kind of 1. prefabricated direct-buried crosslinked polyethylene reducing work insulating tube making side applied to city cold and heat supply triple tube net Method, it is characterized in that:After cross-linked polyethylene variable diameter working tube is installed into support, pass through high-precision PE welding guns different angle Hdpe pipe formed prefabricated direct-buried thermal insulation pipe cross-linked polyethylene variable diameter working tube part reducing outer protection tube, then will Outer protection tube pipe ends install foaming guard seal and leave exhaust sieve, are finally foamed by foaming machine spray foam, End face finishing processing is carried out after curing, final finished is formed after the completion of the above;
    Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube, its composition include made from this method:2 crosslinkings Polyethylene reducing instrumentation tubes, described cross-linked polyethylene variable diameter working tube are connected with heat-insulation layer, described heat-insulation layer respectively with report Alert line, outer protection tube connection;
    Described heat-insulation layer is polyurethane insulation coating, and described outer protection tube is polyethylene layer;
    The surface parcel polyurethane foam of described cross-linked polyethylene variable diameter working tube;
    Described alarming line is installed in parallel in the heat-insulation layer of cross-linked polyethylene variable diameter working tube, described crosslinked polyethylene reducing Instrumentation tubes are installed in parallel in polyurethane insulation coating;
    Described outer protection tube is wrapped in insulation layer surface by way of parcel;
    Cleaning treatment is passed through on described cross-linked polyethylene variable diameter working tube surface;
    Two leakage alarm lines are installed in heat-insulation layer, alarming line can directly turn on water in itself, and the water of seepage is by two Alarming line is turned on, once seepage occurs for pipeline somewhere, by the conduction of alarming line, guarantor can be shown in dedicated test instrument The size of warm pipeline infiltration, the accurate location of leak and leak magnitude.
CN201410494004.XA 2014-09-25 2014-09-25 Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and installation method Expired - Fee Related CN104295803B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410494004.XA CN104295803B (en) 2014-09-25 2014-09-25 Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410494004.XA CN104295803B (en) 2014-09-25 2014-09-25 Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and installation method

Publications (2)

Publication Number Publication Date
CN104295803A CN104295803A (en) 2015-01-21
CN104295803B true CN104295803B (en) 2017-12-05

Family

ID=52315654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410494004.XA Expired - Fee Related CN104295803B (en) 2014-09-25 2014-09-25 Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and installation method

Country Status (1)

Country Link
CN (1) CN104295803B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9907557D0 (en) * 1999-04-06 1999-05-26 Stb Eng Ltd Wear-warning device
US20030037596A1 (en) * 2001-06-28 2003-02-27 Sorensen Peter K. Leakage detection system for gas pipelines
DE202006009337U1 (en) * 2006-06-14 2006-08-17 Brugg Rohr Ag, Holding Heat-insulated pipe used in a heating system and in drinking water and effluent lines comprises an inner pipe, a heat insulating layer surrounding the inner pipe, a film surrounding the heat insulating layer and a corrugated outer pipe
CN202660059U (en) * 2012-05-30 2013-01-09 北京豪特耐管道设备有限公司 Mounting bracket for high density polyethylene (HDPE) prefabricated direct-buried thermal insulation pipe
CN102777973A (en) * 2012-07-20 2012-11-14 天津天地龙管业有限公司 Directly buried pipeline alarm device
CN103557405B (en) * 2013-11-06 2015-10-14 北京豪特耐管道设备有限公司 With prefabricated thermal isolated pipe production technology and the sash weight thereof of leakage monitoring system
CN204127495U (en) * 2014-09-25 2015-01-28 哈尔滨朗格斯特节能科技有限公司 The prefabricated direct-buried crosslinked polyethylene of intelligence two-tube reducing work thermal insulation pipe

Also Published As

Publication number Publication date
CN104295803A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN202746792U (en) Pipeline with compound heat-preservation mouth repairing structure in permafrost region
CN109027525A (en) A kind of aerial thermal insulating structure of steam pipeline and its construction method
CN207740609U (en) A kind of direct burial threeway reinforcing heat distribution pipeline
CN204127495U (en) The prefabricated direct-buried crosslinked polyethylene of intelligence two-tube reducing work thermal insulation pipe
CN104295803B (en) Intelligent prefabricated direct buried crosslinked polyethylene double tube reducing work insulating tube and installation method
CN106764256A (en) A kind of heavy caliber high compressive strength insulating tube and its manufacture craft
CN204922351U (en) Steel bushing steel direct -burried steam insulating tube compensator
CN204717239U (en) A kind of modified phenolic foam thermal insulation pipe
CN104295844A (en) Crosslinked polyethylene pipe fitting parallel tee joint for intelligent prefabricated directly-buried insulating pipe and manufacturing method thereof
CN105257917A (en) Variable-diameter type corrosion-preventing high-temperature-resisting buried composite thermal insulation pipeline and mounting method
CN203404562U (en) Polyurethane foaming plastic thermal insulation pipeline
CN216408186U (en) Prefabricated polyurethane heat-preservation fixed heat-insulation pipe bracket
CN205207940U (en) Anticorrosive compound incubation pipeline that buries of diameter -variable high temperature resistantly
CN206522577U (en) A kind of heavy caliber high compressive strength insulating tube
CN104295842B (en) Intelligent prefabricated direct-buried heat preservation pipe cross-linked polyethylene double-pipe reducing tee joint and installation method
CN109058663A (en) Pattern low energy consumption long heat transport net is slided in a kind of
CN104455878A (en) Working steel tube double-tube tube fitting bend of intelligent prefabricated direct buried heating insulating tube and manufacturing method
CN204213553U (en) Heat preservation pipe prefabricated and pipeline tracing system
CN210179174U (en) Anticorrosive structure of buried pipeline junction
CN206429797U (en) The band prefabricated direct-buried heat insulation elbow of the seamless polyethylene of straight length
CN207961774U (en) A kind of constructional engineering composite tube
CN205244638U (en) Heavy -calibre beta - compound pipe of PPR heat preservation
CN206429798U (en) The band prefabricated direct-buried heat-preserving bent pipe of the seamless polyethylene of straight length
CN206221902U (en) A kind of preforming insulated piping
CN206230996U (en) A kind of steel strip reinforced pvc pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

Termination date: 20210925

CF01 Termination of patent right due to non-payment of annual fee