CN104295243B - Oil gas well completion tubing string and well-completing process - Google Patents

Oil gas well completion tubing string and well-completing process Download PDF

Info

Publication number
CN104295243B
CN104295243B CN201310523164.8A CN201310523164A CN104295243B CN 104295243 B CN104295243 B CN 104295243B CN 201310523164 A CN201310523164 A CN 201310523164A CN 104295243 B CN104295243 B CN 104295243B
Authority
CN
China
Prior art keywords
buckle joint
inner oil
tube
well
tubing string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310523164.8A
Other languages
Chinese (zh)
Other versions
CN104295243A (en
Inventor
吴信荣
强彦龙
韩进
边江
刘晶
严霞霞
李英
王伟燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Oil Production Technology Research Institute of Sinopec Zhongyuan Petroleum Engineering Co Ltd
Original Assignee
China Petroleum and Chemical Corp
Oil Production Technology Research Institute of Sinopec Zhongyuan Petroleum Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Oil Production Technology Research Institute of Sinopec Zhongyuan Petroleum Engineering Co Ltd filed Critical China Petroleum and Chemical Corp
Priority to CN201310523164.8A priority Critical patent/CN104295243B/en
Publication of CN104295243A publication Critical patent/CN104295243A/en
Application granted granted Critical
Publication of CN104295243B publication Critical patent/CN104295243B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Pipeline Systems (AREA)
  • Pipe Accessories (AREA)

Abstract

The invention discloses a kind of oil gas well completion tubing string and well-completing process, belong to petroleum production engineering completion tubular column technical field, it is made up of inner oil tube, safety valve, liquid controling pipe line, change buckle joint is connected through a screw thread on safety valve top, become buckle joint and be provided with stepped interior shoulder and connection screw thread, it is connected respectively with inner oil tube and outer tube, through hole is provided with shoulder becoming in buckle joint;Annular space of the liquid controling pipe line between inner oil tube and outer tube, and the through hole in change buckle joint on shoulder is passed through, sealed by seal.Described inner oil tube is fixed with liquid controling pipe line by snap ring.The present invention realizes the completion tubular column of snubbing serving lower band storm valve, reduces hydrocarbon contamination in Completion Operations, effectively protects reservoir;The process costs are low, tubing string sealed reliable, well-completing process are simple, do not change former tubing string internal structure and function and snubbing serving, wide adaptation range can be achieved.

Description

Oil gas well completion tubing string and well-completing process
Technical field
The invention belongs to petroleum production engineering completion tubular column technical field, is related to a kind of oil gas well completion tubing string and well-completing process.
Background technology
During oil gas well completion operation, to balance down-hole pressure, gas blowout accident is prevented, well killing fluid kill-job need to be used, due to pressure Well liquid is chemical agent, easily pollutes reservoir, influences oil gas well production.Particularly development late stage, the relatively low well of strata pressure, pressure Well liquid is easily missed into stratum, it is easier to which reservoir is polluted.In order to reduce the pollution to reservoir, generally such well needs to adopt With snubbing serving mode, i.e., in the case where not irrigating well killing fluid, removed using well head snubbing serving device band pressure row Tubing string carries out completion practice.
Gas storage well, high sour gas well, offshore oil gas well require high due to safe coefficient, and completion tubular column is close to well head Position is mounted on storm valve.There is a 1/4 " circular metal liquid controling pipe line to be close to oil-pipe external wall extension on storm valve To well head, and receive the fluid control pressure on ground(Switch order), when serious accident, as well head is out of control, underground occur for ground Can rapid closing well, realize that being perfectly safe for Oil/gas Well is controllable.
Current snubbing serving device can only seal the circular tubing string of rule, but due to installing the tubing string of storm valve A liquid controling pipe line also be present outside, can not be realized during snubbing serving the pipe external seal of this irregular shape, so as to Cause the snubbing serving technology of maturation can not be applied in this kind of completion practice with downhole safety valve pit.And existing completion Tubing string and well-completing process can not solve the problem, and completion practice can only be carried out by the way of kill-job, is unfavorable for Completion Operations Mesolow reservoir protection.
The content of the invention
The invention aims to overcome the completion tubular column for using snubbing serving device lower band storm valve to seal The technological deficiency of poor performance, there is provided a kind of to adapt to wide, simple and easy completion tubular column and well-completing process.
The present invention is realized by the following technical programs:
The present invention is made up of inner oil tube, safety valve, liquid controling pipe line, and change buckle joint is connected through a screw thread on safety valve top, Become buckle joint and be provided with stepped interior shoulder and connection screw thread, be connected respectively with inner oil tube and outer tube, become in buckle joint on shoulder It is provided with through hole;Annular space of the liquid controling pipe line between inner oil tube and outer tube, and the through hole in change buckle joint on shoulder is passed through, by close Seals.
Described inner oil tube is fixed with liquid controling pipe line by snap ring.
The technique of tripping in completion tubular column is as follows:
The first step, the flowing pipe nipple on safety valve top is connected with variable buckle joint screw thread, liquid controling pipe line passes through change buckle joint Through hole on interior shoulder is connected with safety valve, and inner oil tube, outer tube are connected with variable buckle joint screw thread respectively.
Second step, outer tube, G.I.H are blocked by no killing well device, then alternately connect inner oil tube and outer tube successively to well Mouthful.
3rd step, boll-weevil hanger is threadedly coupled inner oil tube, and is seated in well head four-way, realize completion under snubbing serving Pipe string technology.
The beneficial effects of the present invention are:
1st, the present invention realizes the completion tubular column of snubbing serving lower band storm valve, reduces oil gas in Completion Operations Layer pollution, effectively protects reservoir.
2nd, cost of the present invention is low, tubing string sealed reliable, well-completing process are simple, does not change former tubing string internal structure and function i.e. Snubbing serving, wide adaptation range can be achieved.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Embodiment
Specific description is done to the present invention below in conjunction with the accompanying drawings:
From accompanying drawing 1, the present invention is made up of inner oil tube 2, safety valve 8 and liquid controling pipe line 3, passed through on the top of safety valve 8 Threaded connection become buckle joint 4, become buckle joint 4 be provided with stepped interior shoulder and connection screw thread, can respectively with inner oil tube 2 and outer tube 1 Connection, through hole 5 is provided with shoulder becoming in buckle joint 4;Annular space of the liquid controling pipe line 3 between inner oil tube 2 and outer tube 1, and wear More become the through hole 5 in buckle joint 4 on shoulder, sealed by seal 6.
Described inner oil tube 2 is fixed with liquid controling pipe line 3 by snap ring.
Well head uses snubbing serving device, when lower completion tubular column is to storm valve precalculated position, by the top of safety valve 8 Flowing pipe nipple 7 be threadedly coupled with becoming buckle joint 4, liquid controling pipe line 3 passes through the through hole 5 and safety valve 8 become in buckle joint 4 on shoulder Connection, inner oil tube 2, outer tube 1 are threadedly coupled with becoming buckle joint 4 respectively, and outer tube 1 is blocked by no killing well device, G.I.H, then according to Secondary alternately connection inner oil tube 2 and outer tube 1 by boll-weevil hanger threaded connection inner oil tube 2, and are seated in well head four-way, in fact to well head Completion tubular column technique under existing snubbing serving.

Claims (3)

  1. A kind of 1. oil gas well completion tubing string, by inner oil tube(2), safety valve(8)And liquid controling pipe line(3)Composition, it is characterized in that:Pacifying Full valve(8)Top is connected through a screw thread change buckle joint(4)Bottom, become buckle joint(4)Provided with stepped interior shoulder and connection spiral shell Line, interior shoulder upper end are provided with the first internal thread, and interior shoulder lower end is provided with the second internal thread, the first internal thread and outer tube(1)Connection, Second internal thread and inner oil tube(2)Connection, becoming buckle joint(4)Through hole is provided with interior shoulder(5);Liquid controling pipe line(3)Positioned at interior Oil pipe(2)And outer tube(1)Between annular space, and pass through change buckle joint(4)Through hole on interior shoulder(5), by seal(6)It is close Envelope.
  2. 2. oil gas well completion tubing string according to claim 1, it is characterized in that:Described inner oil tube(2)With liquid controling pipe line(3) Fixed by snap ring.
  3. 3. a kind of oil gas well completion pipe string technology, it is characterised in that comprise the steps of:The first step, by safety valve(8)Top Flow pipe nipple(7)With becoming buckle joint(4)Threaded connection, liquid controling pipe line(3)Pass through change buckle joint(4)Through hole on interior shoulder(5) With safety valve(8)Connection, inner oil tube(2), outer tube(1)Respectively with becoming buckle joint(4)Threaded connection;
    Second step, outer tube is blocked by no killing well device(1), G.I.H, then inner oil tube is alternately connected successively(2)And outer tube(1) To well head;
    3rd step, boll-weevil hanger is threadedly coupled inner oil tube(2), and well head four-way is seated in, realize completion under snubbing serving Pipe string technology.
CN201310523164.8A 2013-10-29 2013-10-29 Oil gas well completion tubing string and well-completing process Active CN104295243B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310523164.8A CN104295243B (en) 2013-10-29 2013-10-29 Oil gas well completion tubing string and well-completing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310523164.8A CN104295243B (en) 2013-10-29 2013-10-29 Oil gas well completion tubing string and well-completing process

Publications (2)

Publication Number Publication Date
CN104295243A CN104295243A (en) 2015-01-21
CN104295243B true CN104295243B (en) 2018-02-06

Family

ID=52315160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310523164.8A Active CN104295243B (en) 2013-10-29 2013-10-29 Oil gas well completion tubing string and well-completing process

Country Status (1)

Country Link
CN (1) CN104295243B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401537A (en) * 2016-11-16 2017-02-15 中国石油大学(华东) Well completion pipe string of underground gas storage well and well completion method
CN109826586B (en) * 2019-01-04 2021-03-26 中国石油集团川庆钻探工程有限公司 Well completion process method with pressure for gas well
CN113513278A (en) * 2021-07-23 2021-10-19 托普威尔石油技术股份公司 Oil pipe with built-in hydraulic channel on pipe wall for controlling underground safety valve

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6688386B2 (en) * 2002-01-18 2004-02-10 Stream-Flo Industries Ltd. Tubing hanger and adapter assembly
US7748465B2 (en) * 2006-09-09 2010-07-06 Rattler Tools, Llc Production tubing hydraulic release mechanism and method of use
CN201202447Y (en) * 2008-04-29 2009-03-04 中国海洋石油总公司 Composite concentric tube column for liquor drainage gas production process
US8573294B2 (en) * 2009-07-31 2013-11-05 Schlumberger Technology Corporation Cable bypass and method for controlled entry of a tubing string and a cable adjacent thereto
CN202544824U (en) * 2012-03-27 2012-11-21 中国海洋石油总公司 Concentric double-pipe hierarchical injection pipe column
CN203547561U (en) * 2013-10-29 2014-04-16 中国石油化工股份有限公司 Completion string for oil and gas well

Also Published As

Publication number Publication date
CN104295243A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN104295243B (en) Oil gas well completion tubing string and well-completing process
CN203452734U (en) Integrated production and wax removing and prevention pipe column for high-pressure gas well
CN103061707B (en) Underground circulating switch valve
CN203626759U (en) Production pipe column with electric submersible pump and jet pump jointly lifted
CN102747979A (en) Bidirectional self-locking type external casing packer
CN205577937U (en) But blanking plug in recovery type oil pipe
CN204754881U (en) Double -barrelled gas well flow string parallels
CN204532255U (en) Ground hydraulic open-type down-hole drainage device
CN205117297U (en) Concentric double -barrelled gas well flow string
CN104879098B (en) A kind of concentric double pipe gas well liquid loading tubing string
CN204532299U (en) Underground layered ball throwing and collecting tool
CN203547561U (en) Completion string for oil and gas well
CN104153740B (en) Differential oil jacket coupling cock
CN107120072A (en) A kind of steel pipe type cable traversing device
CN204782960U (en) Integrated tubular column of water water injection sand control is adopted to individual well
CN202125283U (en) High-pressure filling type rotary sliding well head
CN201723196U (en) Self-sealing setting ball seat
CN205422628U (en) But water inflation packer is met to backwash well
CN105201443B (en) A kind of blanking plug in oil pipe launched for steel wire
CN203285391U (en) Pressure-differential oil jacket communication valve
CN204327054U (en) The stepless flow control device of hydraulic intelligent
CN202832382U (en) Safety valve of ground hydraulic control water injection well
CN101881142B (en) Self-sealing setting ball seat
CN108222883B (en) Double-pipe cock device
CN203403850U (en) Underground sediment filtering device for hydraulic packer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant