CN106401537A - Well completion pipe string of underground gas storage well and well completion method - Google Patents

Well completion pipe string of underground gas storage well and well completion method Download PDF

Info

Publication number
CN106401537A
CN106401537A CN201611020795.8A CN201611020795A CN106401537A CN 106401537 A CN106401537 A CN 106401537A CN 201611020795 A CN201611020795 A CN 201611020795A CN 106401537 A CN106401537 A CN 106401537A
Authority
CN
China
Prior art keywords
oil pipe
string
well
gas storage
relief valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611020795.8A
Other languages
Chinese (zh)
Inventor
刘铭刚
杨秀娟
闫怡飞
闫相祯
闫行
韩生超
骆佳楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN201611020795.8A priority Critical patent/CN106401537A/en
Publication of CN106401537A publication Critical patent/CN106401537A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention belongs to the field of construction of underground gas storage wells of oil-gas field development engineering and particularly relates to a well completion pipe string of an underground gas storage well. The ell completion pipe string of the underground gas storage well comprises a casing string and a tubing string. The tubing string is located in the casing string, and the tubing string is located in a shaft formed by virtue f a drilling process, wherein the casing string comprises a cement ring and a casing pipe. The casing pipe is connected to the stratum around the shaft through the cement ring. The tubing string located in the casing pipe is connected and assembled by an underground tool. On the premise of not affecting normal operation and distribution output of the underground gas storage well, a bidirectional double-safety valve string cluster is designed, the mounting modes of a well completion string cluster and underground safety valves are optimized, the loss of the shaft, the string cluster and the whole gas storage well is reduced to the minimum if accidents happen at the mouth of the well and under the shaft of the underground gas storage well, for example, explosion, leakage and overload, the stability of the string in an operating working condition is improved, and long-term safe operation of the underground gas storage well is guaranteed.

Description

Underground natural gas storage tank well completion tubular column and completion method
Technical field
A kind of the invention belongs to Oil-Gas Field Development Engineering underground natural gas storage tank well construction field, in particular it relates to underground gas storage Storehouse well completion tubular column and completion method.
Background technology
Underground natural gas storage tank has that gas-storing capacity is big, safety coefficient is high, fire probability is little, good in economic efficiency, compared with LNG technology Gas storage low cost and other advantages.Additionally, supply-demand relationship and peak regulation can be coordinated in underground natural gas storage tank, Implementation Strategy deposit is it is ensured that supply Reliability and seriality, and can help to optimize the operation of production system and gas line network, for national security and region sky So gas uses and has extremely important effect.
Because gas storage injection-production well takes the operating type adopting by force injection, in its well, natural gas is two-way flow, and inject, Extraction pressure and temperature is continually changing, and the service life of well is not limited by recoverable reserves, and must ensure service life 30 years More than, so putting forward higher requirement to the intensity of completion tubular string, sealing etc..Often consider during tubing string string design at present Day note is adopted speed and is designed greatly, has blindness.
First, actual yield of joining is continually changing with social need, peak regulation needs etc., the current design side of gas storage well tubing string Method is difficult to updated strain.
Secondly, the Seasonal Peak Shaving function of underground natural gas storage tank determines that it allows for bearing high speed, high pressure gas at short notice The erosion of body, the erosion problem of especially safe valve position and seal failure are particularly evident.The general root of relief valve design at this stage Selected according to oil pipe specification, but exceeded expected setting when joining yield, or gas storage well is occurred leakage accident to lead to note to adopt stream When speed is excessive, safe valve position was it may happen that feature lost efficacy, or even caused gas storage well to reveal, stops production, or even scrapped and wait sternly Weight accident.
In addition, the two-way operation that underground natural gas storage tank well had not only been noted but also adopted is so that the one-way relief valves of current gas well effect design The demand for security of gas storage well operation can not be met.Especially in gas injection process, the accident reaction of one-way relief valves can not moment The injection process of cut-out natural gas, or even cause safe defective valve because injection gas pressure is excessive, cause more massive accident.
Accordingly, it would be desirable to invent a kind of improved underground natural gas storage tank well completion tubular column and well-completing process.
Content of the invention
For the defect overcoming prior art to exist, a kind of present invention offer underground natural gas storage tank well completion tubular column and completion side Method.
For achieving the above object, the present invention adopts following proposal:
Underground natural gas storage tank well completion tubular column, including casing string and tubing string, tubing string is located in casing string, and casing string is located at In the pit shaft being formed by drilling technology by stratum;Wherein:
Described sleeve pipe post includes:Cement sheath and sleeve pipe, sleeve pipe is connected with pit shaft surrounding formation by cement sheath;
Described tubing string is located in sleeve pipe, and tubing string is linked and packed by downhole tool and forms;Described downhole tool, including: Tubing hanger, join long pipe nipple, upper flowing joint, upper relief valve, middle flowing joint, lower relief valve, lower flowing joint, airtight oil sealing Pipe, circulation slide sleeve, top oil pipe, packer, milling exntension tubs, bottom oil pipe, it is located joint, screen casing, guide shoe;Guide shoe, bottom Oil pipe, screen casing, bottom oil pipe, it is located joint, bottom oil pipe, milling exntension tubs, bottom oil pipe, packer, top oil pipe, circulation Sliding sleeve, top oil pipe, airtight sealed tube, lower flowing joint, top oil pipe, lower relief valve, top oil pipe, middle flowing joint, on Portion's oil pipe, upper relief valve, top oil pipe, upper flowing joint, top oil pipe, join long pipe nipple, top oil pipe, tubing hanger from bottom to top Assembling, is connected by variable buckle pipe nipple between above-mentioned downhole tool.
Preferably, described upper relief valve adopts self-balancing storm valve, and described lower relief valve adopts self-balancing down-hole to pacify Full valve, upper relief valve can be turned on and off from ground control.
Above-mentioned underground natural gas storage tank well completion method, including following construction procedure:Prepare before completion construction, (two) completion;Complete Well construction process includes (1) and rises to be acidified tubing string, and (2) well head and christmas tree pressure testing enter under (3) completion tubular column;Described (3) completion Enter work progress under tubing string and comprise storm valve work progress.
With respect to prior art, the present invention has the advantages that:Do not affect underground natural gas storage tank well normal operation and On the premise of joining yield, novelty devise two-way double safety valve tubing string string, optimize completion tubular column string and storm valve peace Dress mode it is ensured that there is well head, downhole safety accident in underground natural gas storage tank well, such as blast, reveal, overload when, pit shaft, tubing string and whole The loss of individual gas storage well is reduced to minimum, raising stability under working condition for the tubing string, ensures the length of underground natural gas storage tank well Phase safe operation.
Brief description
Fig. 1 is underground natural gas storage tank well completion tubular column structural representation;
Fig. 2 is underground natural gas storage tank well completion tubular column storm valve connection line schematic diagram;
In figure:1. cement sheath, 10. sleeve pipe, 11. tubing hangers, 12. join long pipe nipple, and flow on 13. joint, safety on 14. Valve, flow in 15. joint, 16. times relief valve, 17. times flowing joints, 18. airtight sealed tubes, 19. circulation slide sleeves, 110. tops Oil pipe, 111. packers, 112. milling exntension tubs, 113. bottom oil pipes, 114. are located joint, 115. screen casings, 116. guide shoes; 21. pit shafts, 22. control circuits, 23. pressure transducers, 24. data storages, 25. pressure transducer terminals, 26. connection in series-parallel collection Line device, 27. users, 28. computers
Specific embodiment
As shown in figure 1, underground natural gas storage tank well completion tubular column, including casing string and tubing string, tubing string is located in casing string, Casing string is located in the pit shaft 21 being formed by drilling technology by stratum;Wherein:
Described sleeve pipe post includes:Cement sheath 1 and sleeve pipe 10, sleeve pipe 10 is connected with pit shaft 21 surrounding formation by cement sheath 1.
Described tubing string is located in sleeve pipe 10, and tubing string is linked and packed by downhole tool and forms;Described downhole tool, bag Include:Tubing hanger 11, join long pipe nipple 12, upper flowing joint 13, upper relief valve 14, middle flowing joint 15, lower relief valve 16, lower flowing Joint 17, airtight sealed tube 18, circulation slide sleeve 19, top oil pipe 110, packer 111, milling exntension tubs 112, bottom oil pipe 113rd, it is located joint 114, screen casing 115, guide shoe 116;Guide shoe 116, bottom oil pipe 113, screen casing 115, bottom oil pipe 113, it is located Joint 114, bottom oil pipe 113, milling exntension tubs 112, bottom oil pipe 113, packer 111, top oil pipe 110, circulation slide sleeve 19th, top oil pipe 110, airtight sealed tube 18, lower flowing joint 17, top oil pipe 110, lower relief valve 16, top oil pipe 110, Middle flowing joint 15, top oil pipe 110, upper relief valve 14, top oil pipe 110, upper flowing joint 13, top oil pipe 110, join length Pipe nipple 12, top oil pipe 110, tubing hanger 11 are assembled from bottom to top, are connected by variable buckle pipe nipple between above-mentioned downhole tool.
Described upper relief valve 14 adopts self-balancing storm valve, and described lower relief valve 16 adopts self-balancing downhole safety Valve, upper relief valve can be turned on and off from ground control.
Above-mentioned underground natural gas storage tank well completion method includes following construction procedure:
(1) prepare before completion construction, (two) completion;
Prepare work progress before completion construction and adopt general construction method in current industry, refer to industry standard;
Completion work progress includes (1) and rises to be acidified tubing string, and (2) well head and christmas tree pressure testing enter under (3) completion tubular column; (1) in above-mentioned (two) completion work progress is risen to be acidified tubing string work progress, (2) well head and christmas tree pressure testing work progress and is adopted With general construction method in current industry, refer to industry standard, the present invention is not specifically described;Described (3) completion tubular column Under enter work progress and comprise storm valve work progress.
Below in conjunction with specific embodiment, underground natural gas storage tank according to the present invention well completion method is described:
(1) prepare work progress before completion construction:
(1) oil pipe four-way is installed, and is molded pressure testing.
(2) well-control equipment is installed, carries out blowout prevention and kill-job work.Preferably, ground high pressure line water-stop pressure testing value is extremely Few be more than estimated operation pressure 1.2 times.
(3) replace mud.Lower external upset tubing tail band horn mouth, clear water replaces mud in pit shaft.
(4) drifting.Lower external upset tubing tail band drift size gauge tool, drifting is to artificial bottom of a well, and tags.
(5) scraping sleeve pipe.Lower external upset tubing tail band scraper in scraping three times repeatedly of packer neighbouring position well section, directly To the phenomenon that is no hampered.
(6) well-flushing.With clear water huge discharge anti-flushing well, import and export fluidity consistent.
(7) pressure testing.Preferably, wellbore pressure test 20MPa, it is qualified for meet 30min pressure drop being less than 0.5MPa, then bores blind Plate, secondary well-flushing, perforation.
(8) Operating Pressure equipment is installed.
(9) it is acidified.
(2) completion work progress:
(1) rise to be acidified tubing string.
(2) well head and christmas tree pressure testing.
(3) enter under completion tubular column.
(3) enter work progress under completion tubular column:
(1) check whether the outward appearance of all instruments is intact, carries out site pressure survey to upper relief valve 14 and lower relief valve 16 Examination, check packer 111 whether set pin quantity accurate.
(2) enter guide shoe 116+ under and be located joint 114+ screen casing 115 tool string.
(3) enter airtight sealed tube 18 under.
(4) enter to be located joint 114 under.
(5) enter airtight sealed tube 18 under.
(6) enter packer assembly under:Milling exntension tubs 112+ packer 111 tool string.Preferably, fashionable centralizing tool under Well is put into, finding is hampered checks immediately, above carries 1-2 rice, is hampered and must not exceed 2 tons under string is slow.Preferably, under packer 111 Pure every oil pipe of running speed 40-60 second will be controlled after entering.
(7) enter airtight sealed tube 18 under.
(8) enter circulation slide sleeve 19 under.Circulation slide sleeve 19 hangs on to be prevented from during drill bit colliding with, under the fashionable protection tearing flowing hole Film, draws button when being connected with airtight sealed tube 18.
(9) enter airtight sealed tube 18 under.
(10) enter top oil pipe 110 under.
(11) enter safety valve complement under:Under relief valve 16+ under flowing joint 15+ in relief valve 14+ on upper flowing joint 13+ Flowing joint 17 tool string.
(12) enter airtight sealed tube 18 under.
(13) during 1 tubing length position, carry out electrical measurement school deeply, check tubing string data to before precalculated position under tubing string, Adjustment is joined long pipe nipple 12 and is accurately determined packer 111 setting position.
(14) preferred, sit pipe hanger 11 checking tubing seal of draining the oil.In sliding sleeve upslide blanking plug, 35MPa suppressed by pump truck, Keep 15min, it is qualified that pressure drop is less than 0.5MPa.
(15) set packer 111.It is being located joint 114 upslide blanking plug, suppressing set packer 111 step by step.Preferably , suppress 10MPa and keep 10min, 20MPa keeps 10min, 30MPa keeps 10min, 40MPa keeps 10min, 50MPa keeps 10min, 60MPa keep 10min.Set slow pressure release after finishing.
(16) check wellhead sealing.Relief valve 14 is closed in pass and lower relief valve 16 observes whether oil jacket pressure changes, such as Fruit has pressure, and then slow pressure release, to zero, keeps 30 minutes, oil jacket pressure tears kill-job open when no longer changing after oil jacket pressure all zero Implement, preventer, install christmas tree.
(17) check packer 111 sealing.Preferably, open relief valve 14 and lower relief valve 16, suppress in annular space 10MPa keeps 10 minutes, and it is qualified that pressure drop is less than 0.5MPa, salvages blanking plug after verifying.
(18) inject annular protective liquid.
(19) completion completes.
(4) completion tubular column relief valve work progress:
(1) upper relief valve 14, the test of lower relief valve 16 floor switches.Hydraulic oil is added, oil mass is handlance in handlance Volume 2/3.Control circuit 22 is put into upper relief valve 14, lower relief valve 16 interface position, injects relief valve with handlance oil extraction In piston, discharge air in piston, connect control circuit 22 on upper relief valve 14 and lower relief valve 16, slowly suppressed. In confirmation relief valve 14 and lower relief valve 16 all can normally-open after carry out pressure discharge operations.Dismantle handlance.
(2) flowing joint 17 under, detain on lower relief valve 16.GB/T 28259-2012 assembling pressed by lower relief valve 16, and setting is adopted Gas direction is its work operating mode.
(3) under, relief valve 16 connects to tubing string, the interface of reserved control circuit 22.
(4) upper flowing joint 13, detain on upper relief valve 14.Upper relief valve 14 presses GB/T 28259-2012 assembling, setting note Gas operating mode is its work operating mode, installs connection in series-parallel hub 26, the interface of reserved control circuit 22 in upper relief valve 14 bottom.
(5) upper relief valve 14 connects to tubing string, and will be described to upper relief valve 14 interface and step (3) using control circuit The interface of control circuit 22 connects.
(6) transfer tubing string, and connect relief valve 14 interface and control circuit 22.
(7) handlance and pressure gauge are connected to control circuit 22, handlance hydraulic oil filling, oil mass is handlance volume 3/4. Control circuit 22 is put into lower relief valve 16 interface position, discharges air in lower relief valve 16 using handlance, connect control line Lower relief valve 16 is arrived on road 22, and the described control circuit 22 of Connection Step (6) arrives connection in series-parallel hub 26.
(8) first time pressure testing.Preferably, under base area, gas storage well maximum gas production operating pressure determines pressure test pressure, control Voltage stabilizing processed 20 minutes, it is qualified that pressure drop is not more than 0.8MPaPa.
(9) releasing hand pressure pump pressure makes in lower relief valve 16 pressure to ambient pressure.
(10) control circuit 22 is put into upper relief valve 14 interface position, is discharged using handlance empty in upper relief valve 14 Gas.Control circuit 22 is connected with the spare interface of connection in series-parallel hub 26.
(11) second pressure testing.Preferably, under base area, gas storage well maximum gas injection operating pressure determines pressure test pressure, control Voltage stabilizing processed 20 minutes, it is qualified that pressure drop is not more than 0.8MPa.
(12) put relief valve 14 under and lower relief valve 16 arrives and specifies well depth position.Preferably, let out hand pressure after pressure testing is qualified Pump pressure, to 30MPa, keeps it turned on decentralization relief valve, and control circuit 22 is transferred with oil pipe simultaneously, and in each oil pipe knot Hoop position setting control circuit 22 protector.
(13) control circuit 22 passes through tubing hanger 11.Tubing hanger 11 is connected to after tubing string handlance pressure release to zero.Oil pipe Hang 11 bottoms and pass through hole seal nipple through in control circuit 22, keep control circuit 22 to grow straight state, control circuit 22 is worn More tubing hanger 11, hole seal nipple is passed through through in control circuit 22 in tubing hanger 11 top, tightens seal nipple.
(14) control circuit 22 passes through christmas tree.Control circuit 22 is passed through hole from production tree pass, connect production tree with The complementary connector of control circuit 22.Preferably, above-mentioned complementary connector is carried out with pressure testing, well head test pressure before test pressure and installation Power is identical, voltage stabilizing 20 minutes, and it is qualified, pressure release that pressure drop is not more than 0.8MPa.
(15) control circuit 22 is connected to the ground the computer 28 of face control system.During the well test of underground natural gas storage tank, connect Ground control circuit 22 arrives production tree needle-valve;Underground natural gas storage tank well production period, ground control circuit 22 is connected to ground control Computer 28.
(16) pass through above-mentioned work progress, described tubing string realizes following functions:Upper relief valve 14 is adopted with lower relief valve 16 Connected with control circuit 22, control circuit 22 is connected to connection in series-parallel hub 26, the upper relief valve 14 of pressure transducer 23 measurement with The pressure data of the joint of top oil pipe 110 and lower relief valve 16 and the joint of top oil pipe 110, pressure data is by counting Record according to memorizer 24, then ground-based computer 28 is uploaded to by pressure transducer terminal 25.User 27 is controlled by computer 28 Connection in series-parallel hub 26 processed carries out gas production, the switching of gas injection operating mode.
(17) pass through above-mentioned work progress, upper relief valve 14 and lower relief valve 16 are realized two-way series and installed.Downhole safety Valve all can react under gas injection and gas production operating mode in time, and in closure tubing string, gas is allowed to erupt up or down.When adopting When gas operation occurs down-hole, well head accident, lower relief valve 16 starts emergency reaction, so that natural gas to be adopted is sealed it is ensured that well Cylinder safety;When gas injection operation occurs down-hole, well head accident, upper relief valve 14 starts emergency reaction with lower relief valve 16 simultaneously, Form closed section it is ensured that natural gas injection and the natural gas injecting promptly isolates between upper relief valve and lower relief valve, Protection tubular column structure complete it is ensured that pit shaft safety.
Preferably, the present invention is used for the gas injection of underground natural gas storage tank well, gas production operating mode.But the invention is not restricted to be only applied to ground Lower gas storage well, all there is gas injection, the gas well of gas production function all can be applied.
Embodiment described above is merely to illustrate the present invention, is not limited to the range of application of the present invention.Any ability The technical staff in domain, the structure made on the premise of the design without departing from the present invention and principle, connected mode etc. change and repair Change, the scope of protection of the invention all should be belonged to.

Claims (3)

1. a kind of underground natural gas storage tank well completion tubular column, including casing string and tubing string, tubing string is located in casing string, casing string position In the pit shaft being formed by drilling technology by stratum;It is characterized in that:
Described sleeve pipe post includes:Cement sheath and sleeve pipe, sleeve pipe is connected with pit shaft surrounding formation by cement sheath;
Described tubing string is located in sleeve pipe, and tubing string is linked and packed by downhole tool and forms;Described downhole tool, including:Oil pipe Hang, join long pipe nipple, upper flowing joint, upper relief valve, middle flowing joint, lower relief valve, lower flowing joint, airtight sealed tube, follow Ring sliding sleeve, top oil pipe, packer, milling exntension tubs, bottom oil pipe, it is located joint, screen casing, guide shoe;Guide shoe, bottom oil pipe, Screen casing, bottom oil pipe, be located joint, bottom oil pipe, milling exntension tubs, bottom oil pipe, packer, top oil pipe, circulation slide sleeve, Top oil pipe, airtight sealed tube, lower flowing joint, top oil pipe, lower relief valve, top oil pipe, middle flowing joint, top oil Pipe, upper relief valve, top oil pipe, upper flowing joint, top oil pipe, join long pipe nipple, top oil pipe, tubing hanger fill from bottom to top Join, connected by variable buckle pipe nipple between above-mentioned downhole tool.
2. underground natural gas storage tank according to claim 1 well completion tubular column it is characterised in that:Described upper relief valve is using certainly flat Weighing apparatus storm valve, described lower relief valve adopts self-balancing storm valve, and upper relief valve can be turned on and off from ground control.
3. well completion method in underground natural gas storage tank described in claim 1 or 2 is it is characterised in that include following construction procedure:Completion is applied Prepare before work, (two) completion;
Completion work progress includes (1) and rises to be acidified tubing string, and (2) well head and christmas tree pressure testing enter under (3) completion tubular column;Described (3) enter work progress under completion tubular column and comprise storm valve work progress.
CN201611020795.8A 2016-11-16 2016-11-16 Well completion pipe string of underground gas storage well and well completion method Pending CN106401537A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611020795.8A CN106401537A (en) 2016-11-16 2016-11-16 Well completion pipe string of underground gas storage well and well completion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611020795.8A CN106401537A (en) 2016-11-16 2016-11-16 Well completion pipe string of underground gas storage well and well completion method

Publications (1)

Publication Number Publication Date
CN106401537A true CN106401537A (en) 2017-02-15

Family

ID=58069082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611020795.8A Pending CN106401537A (en) 2016-11-16 2016-11-16 Well completion pipe string of underground gas storage well and well completion method

Country Status (1)

Country Link
CN (1) CN106401537A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060703A (en) * 2017-06-28 2017-08-18 中国石油集团渤海钻探工程有限公司 Multiple expansion sand control screen well completion technique tubular pile in a kind of sleeve pipe
CN112081535A (en) * 2019-06-14 2020-12-15 中国石油化工股份有限公司 Ultra-deep high-sulfur-content gas well completion pipe string and construction method thereof
CN114000868A (en) * 2020-07-13 2022-02-01 中国石油天然气股份有限公司 Method and device for determining airtightness of oil pipe of high-pressure gas well

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775977A (en) * 2010-01-22 2010-07-14 中国石油化工股份有限公司 Dual-tube injection well safety production string
CN202645521U (en) * 2012-06-25 2013-01-02 中国石油天然气股份有限公司 Horizontal well injecting and extracting pipe column of gas reservoir
CN202900175U (en) * 2012-07-26 2013-04-24 中国石油天然气股份有限公司 Gas storage suspending pressure meter manometry completion pipe string
CN103089199A (en) * 2011-11-03 2013-05-08 大港油田集团有限责任公司 Depleted oil-gas reservoir underground gas storage injection-production string and operating method thereof
CN104295243A (en) * 2013-10-29 2015-01-21 中国石油化工股份有限公司 Completion pipe column and completion technology for oil-gas well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775977A (en) * 2010-01-22 2010-07-14 中国石油化工股份有限公司 Dual-tube injection well safety production string
CN103089199A (en) * 2011-11-03 2013-05-08 大港油田集团有限责任公司 Depleted oil-gas reservoir underground gas storage injection-production string and operating method thereof
CN202645521U (en) * 2012-06-25 2013-01-02 中国石油天然气股份有限公司 Horizontal well injecting and extracting pipe column of gas reservoir
CN202900175U (en) * 2012-07-26 2013-04-24 中国石油天然气股份有限公司 Gas storage suspending pressure meter manometry completion pipe string
CN104295243A (en) * 2013-10-29 2015-01-21 中国石油化工股份有限公司 Completion pipe column and completion technology for oil-gas well

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060703A (en) * 2017-06-28 2017-08-18 中国石油集团渤海钻探工程有限公司 Multiple expansion sand control screen well completion technique tubular pile in a kind of sleeve pipe
CN112081535A (en) * 2019-06-14 2020-12-15 中国石油化工股份有限公司 Ultra-deep high-sulfur-content gas well completion pipe string and construction method thereof
CN114000868A (en) * 2020-07-13 2022-02-01 中国石油天然气股份有限公司 Method and device for determining airtightness of oil pipe of high-pressure gas well
CN114000868B (en) * 2020-07-13 2023-10-27 中国石油天然气股份有限公司 Method and device for determining air tightness of oil pipe of high-pressure gas well

Similar Documents

Publication Publication Date Title
CN101586462B (en) Method of suspending, completing and working over a well
CN105545221B (en) A kind of shale gas well no killing well is not with pressure to remove flow string and construction method
CN202900205U (en) Multifunctional formation testing well completion integral pipe column
CN201908632U (en) Offshore self-blowout and artificial lifting integrated well completion tubular column
CN101975041B (en) Well cementing method for avoiding coal bed and device thereof
CN207080207U (en) A kind of oil field is every excavating technology tubing string
CN109630060A (en) A kind of complete well operation tubing string of repeatable no killing well and construction technology
CN106401537A (en) Well completion pipe string of underground gas storage well and well completion method
CN108868734A (en) Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method
CN105114003A (en) Multifunctional oil testing well completion pipe string and method for well prone to blowout and leakage
CN108625830A (en) Ball-throwing type selective sand control process pipe string and its method
CN206668234U (en) A kind of ball-throwing type selective sand control process pipe string
CN205422562U (en) Not kill -job of shale gas well is not taken and has been pressed down flow string
CN110242257A (en) A kind of gas hydrates underground pilot production process pipe string
CN207526432U (en) A kind of retrievable tie back liner device of anchoring
CN205605156U (en) Workover device is pressed in oil gas field area
CN203939477U (en) A kind of formation testing and completion practice integrated pipe column
CN206158709U (en) Support formula water injection string
CN112081535A (en) Ultra-deep high-sulfur-content gas well completion pipe string and construction method thereof
CN104563872B (en) Blockage resisting self-filling-type float collar
CN101839117B (en) Annulus safety valve
CN207144900U (en) A kind of oil jacket annular pressure automatic protecting control device
CN208564457U (en) A kind of horizontal well multistage fracturing tubing string
CN203347718U (en) Running tool for hydraulic packer
CN205172513U (en) Bridging plug device based on expandable casing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170215

WD01 Invention patent application deemed withdrawn after publication