CN104294833A - 岩堆整体补强加固结构 - Google Patents
岩堆整体补强加固结构 Download PDFInfo
- Publication number
- CN104294833A CN104294833A CN201410563094.3A CN201410563094A CN104294833A CN 104294833 A CN104294833 A CN 104294833A CN 201410563094 A CN201410563094 A CN 201410563094A CN 104294833 A CN104294833 A CN 104294833A
- Authority
- CN
- China
- Prior art keywords
- talus
- vertical baffle
- support anchors
- integral reinforcement
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/202—Securing of slopes or inclines with flexible securing means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Abstract
本发明提供一种岩堆整体补强加固结构,包括防护网,还包括支撑锚杆和立式挡板,支撑锚杆沿竖向设置,且支撑锚杆固定在立式挡板上,支撑锚杆的下端伸在立式挡板的外侧,防护网的一侧固定在立式挡板的上端,防护网上固定有锚钉。以解决现有锚杆加固方法仅能加固岩堆外围处,难以使岩堆形成一个整体,加固效果有限,而采用抗滑桩加固虽然效果显著,但其会明显的增加工程的成本投资和工期投入的问题。本发明属于岩堆防护治理领域。
Description
技术领域
本发明涉及加固装置,属于岩堆治理领域。
背景技术
地质灾害防治工程中通常遇到岩堆的治理问题。岩堆是指陡峻斜坡上的岩体,因物理风化作用形成的岩块碎屑,崩落在坡脚形成的疏松、架空的岩块堆积体。对于岩堆体,工程中常用的主动治理方式有加固或清除等措施。加固措施常用的有锚杆加固、抗滑桩等。然而,对于一些已趋停止或已停止发展的中小型岩堆,因其内部结构松散,表面起伏不平,现有锚杆加固是将锚杆沿斜向插入岩堆内,再沿锚杆向内注浆,采用普通的锚杆加固措施难以使岩堆形成一个大的整体,从而达不到有效的治理效果,且锚杆钻孔也难以成孔,注浆过程中也可能面临漏浆问题;采用抗滑桩措施虽然加固效果显著,但其会明显的增加工程的成本投资和工期投入。而如果采取清除处理措施,则清除的部分块石会对岩堆下方的重要建筑物、交通线、旅游场地等产生安全威胁,且如何运输和堆放新产生的大量块石也是必须考虑的问题。因此,如何采取一种安全经济有效的方案治理这类形式的岩堆体,是地质灾害防治工程中需要考虑的问题。
发明内容
本发明的目的在于:提供一种岩堆整体补强加固结构,以解决现有锚杆加固方法仅能加固岩堆外围处,难以使岩堆形成一个整体,加固效果有限,而采用抗滑桩加固虽然效果显著,但其会明显的增加工程的成本投资和工期投入的问题。
本发明的方案如下:岩堆整体补强加固结构,包括防护网,还包括支撑锚杆和立式挡板,支撑锚杆沿竖向设置,且支撑锚杆固定在立式挡板上,支撑锚杆的下端伸在立式挡板的外侧,防护网的一侧固定在立式挡板的上端,防护网上固定有锚钉。
还包括有分布筋,所述立式挡板为混凝土结构,支撑锚杆的上端以及分布筋均设置在立式挡板的内部,分布筋与支撑锚杆交错设置。
所述支撑锚杆与分布筋相互垂直,且二者相搭接,分布筋沿竖直方向均匀分布,支撑锚杆与分布筋组成网格形加强结构。
支撑锚杆的上端伸在立式挡板的上端处。
立式挡板的下端设置有贯通立式挡板的泄水孔,泄水孔内插有泄水管。
还包括钢绳锚杆,所述防护网通过钢绳锚杆固定在立式挡板的上端。
所述锚钉在防护网上均匀分布设置。
本发明与现有技术相比,主要优点是通过立式挡板阻挡岩堆的侧面,支撑锚杆的下端嵌入地面,用于加固立式挡板,防止立式挡板倒塌或侧滑,有效地阻挡岩堆向侧面扩散/坍塌,同时,采用防护网盖在岩堆表面,通过锚钉将防护网固定在岩堆表面,为岩堆表面加固,防止表面岩堆滚落,使得岩堆整体都得以加固,加固效果比单纯的锚杆加固好得多,而加固装置整体相比抗滑桩又简化很多,耗材少,同时也能满足侧面加固的强度要求,降低了成本和工期投入。
附图说明
图1是本发明在使用时的剖面结构示意图;
图2是本发明在使用时的主视结构示意图。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,下面将对本发明作进一步地详细描述,
本发明实施例提供岩堆整体补强加固结构,包括:
防护网1、支撑锚杆2、立式挡板3和分布筋5,立式挡板3为混凝土结构(也可采用其他挡板形/墙体等结构),支撑锚杆2沿竖向设置,支撑锚杆2的上端以及分布筋5均固定设置在立式挡板3的内部,分布筋5与支撑锚杆2交错设置,支撑锚杆2的下端伸在立式挡板3的外侧(固定在立式挡板3内部的支撑锚杆2部分为支挡段,伸在立式挡板3外侧的部分为嵌固段,嵌固段垂直嵌固于岩堆前沿的基岩基座中,嵌固深度不小于1.5米),防护网1的一侧固定在立式挡板3的上端,具体地是防护网1通过钢绳锚杆8固定在立式挡板3的上端,防护网1上固定有锚钉4,锚钉4在防护网1上均匀分布设置,防护网1用于覆盖在岩堆表面,将锚钉4固定在岩堆体的石块中,锚钉在布置时可根据实际地形及岩堆体的块石分布情况作适当调整,其锚固深度为100-200毫米,锚杆注浆体为M30水泥砂浆。防护网1主要起防止岩堆上的石块滚落的作用。
优选地,所述支撑锚杆2与分布筋5相互垂直,且二者相搭接,分布筋5沿竖直方向均匀分布,支撑锚杆2与分布筋5组成网格形加强结构,支撑锚杆2的上端伸在立式挡板3的上端处,分布筋5和支撑锚杆2的上端部分(支挡段)起到加强混凝土结构的立式挡板3的作用,而立式挡板3又能对分布筋5和支撑锚杆2的上端起到保护作用。
优选地,立式挡板3的下端设置有贯通立式挡板3的泄水孔6,泄水孔6内插有泄水管7,泄水管7可选用Φ50PVC管,方便排出岩堆中的积水,防止积水长时间浸泡使得立式挡板3发生垮塌。
Claims (7)
1.岩堆整体补强加固结构,包括防护网(1),其特征在于:还包括支撑锚杆(2)和立式挡板(3),支撑锚杆(2)沿竖向设置,且支撑锚杆(2)固定在立式挡板(3)上,支撑锚杆(2)的下端伸在立式挡板(3)的外侧,防护网(1)的一侧固定在立式挡板(3)的上端,防护网(1)上固定有锚钉(4)。
2.根据权利要求1所述岩堆整体补强加固结构,其特征在于:还包括有分布筋(5),所述立式挡板(3)为混凝土结构,支撑锚杆(2)的上端以及分布筋(5)均设置在立式挡板(3)的内部,分布筋(5)与支撑锚杆(2)交错设置。
3.根据权利要求2所述岩堆整体补强加固结构,其特征在于:所述支撑锚杆(2)与分布筋(5)相互垂直,且二者相搭接,分布筋(5)沿竖直方向均匀分布,支撑锚杆(2)与分布筋(5)组成网格形加强结构。
4.根据权利要求1所述岩堆整体补强加固结构,其特征在于:支撑锚杆(2)的上端伸在立式挡板(3)的上端处。
5.根据权利要求1所述岩堆整体补强加固结构,其特征在于:立式挡板(3)的下端设置有贯通立式挡板(3)的泄水孔(6),泄水孔(6)内插有泄水管(7)。
6.根据权利要求1所述岩堆整体补强加固结构,其特征在于:还包括钢绳锚杆(8),所述防护网(1)通过钢绳锚杆(8)固定在立式挡板(3)的上端。
7.根据权利要求1所述岩堆整体补强加固结构,其特征在于:所述锚钉(4)在防护网(1)上均匀分布设置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410563094.3A CN104294833A (zh) | 2014-10-22 | 2014-10-22 | 岩堆整体补强加固结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410563094.3A CN104294833A (zh) | 2014-10-22 | 2014-10-22 | 岩堆整体补强加固结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104294833A true CN104294833A (zh) | 2015-01-21 |
Family
ID=52314763
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410563094.3A Pending CN104294833A (zh) | 2014-10-22 | 2014-10-22 | 岩堆整体补强加固结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104294833A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107893428A (zh) * | 2017-11-22 | 2018-04-10 | 清华大学 | 一种竖直锚杆挡土墙设计方法 |
CN111945749A (zh) * | 2020-07-25 | 2020-11-17 | 重庆六零七工程勘察设计有限公司 | 一种危岩撑及应用其的支护治理方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1978790A (zh) * | 2005-12-09 | 2007-06-13 | 法策公司 | 用于岩崩保护或者稳定土壤层的保护网 |
CN102031760A (zh) * | 2010-12-17 | 2011-04-27 | 河南省新开元路桥工程咨询有限公司 | 岩堆地段路基的防落石方法 |
US20130115015A1 (en) * | 2008-02-27 | 2013-05-09 | Ooficine Maccaferri S.P.A. | Structure for preventing rockfall, a rockfall prevention method, and a method for designing said structure |
CN203361033U (zh) * | 2013-05-27 | 2013-12-25 | 中铁工程设计咨询集团有限公司 | 一种路堑拦落石防护装置 |
CN203559430U (zh) * | 2013-10-22 | 2014-04-23 | 青岛理工大学 | 悬臂式垂向锚杆复合挡土墙 |
CN204112348U (zh) * | 2014-10-22 | 2015-01-21 | 贵州正业工程技术投资有限公司 | 岩堆整体补强加固结构 |
-
2014
- 2014-10-22 CN CN201410563094.3A patent/CN104294833A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1978790A (zh) * | 2005-12-09 | 2007-06-13 | 法策公司 | 用于岩崩保护或者稳定土壤层的保护网 |
US20130115015A1 (en) * | 2008-02-27 | 2013-05-09 | Ooficine Maccaferri S.P.A. | Structure for preventing rockfall, a rockfall prevention method, and a method for designing said structure |
CN102031760A (zh) * | 2010-12-17 | 2011-04-27 | 河南省新开元路桥工程咨询有限公司 | 岩堆地段路基的防落石方法 |
CN203361033U (zh) * | 2013-05-27 | 2013-12-25 | 中铁工程设计咨询集团有限公司 | 一种路堑拦落石防护装置 |
CN203559430U (zh) * | 2013-10-22 | 2014-04-23 | 青岛理工大学 | 悬臂式垂向锚杆复合挡土墙 |
CN204112348U (zh) * | 2014-10-22 | 2015-01-21 | 贵州正业工程技术投资有限公司 | 岩堆整体补强加固结构 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107893428A (zh) * | 2017-11-22 | 2018-04-10 | 清华大学 | 一种竖直锚杆挡土墙设计方法 |
WO2019100870A1 (zh) * | 2017-11-22 | 2019-05-31 | 清华大学 | 一种竖直锚杆挡土墙设计方法 |
CN111945749A (zh) * | 2020-07-25 | 2020-11-17 | 重庆六零七工程勘察设计有限公司 | 一种危岩撑及应用其的支护治理方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510540B (zh) | 浆砌片石挡土墙加固施工方法及其结构 | |
CN104674802B (zh) | 预应力碎石锚拉桩及其滑坡治理施工方法 | |
CN203393530U (zh) | 一种抗浮轻质高路堤结构 | |
CN103882869A (zh) | 一种用于基坑围护的斜向支撑桩结构及其施工方法 | |
CN204112348U (zh) | 岩堆整体补强加固结构 | |
CN102330436B (zh) | 一种用于半岩土层超深圆形旋流池的组合支护结构及方法 | |
CN105200879A (zh) | 一种透水泡沫混凝土桩复合地基 | |
CN204825928U (zh) | 一种基坑支护 | |
CN104120736A (zh) | 一种钢筋混凝土挡土墙的施工方法 | |
CN104594297B (zh) | 一种双层面板堆石坝及其施工方法 | |
CN103806451B (zh) | 一种锚碇型基坑加固结构及其施工方法 | |
CN102002953A (zh) | 一种基坑围护肋板换撑的方法 | |
CN106149733B (zh) | 桥隧相接段深基坑支护结构及施工方法 | |
CN105421449A (zh) | 钉型活性材料塑料套管混凝土劲芯复合桩施工方法 | |
CN102704497A (zh) | 一种用于处理高填方边坡的rpw法技术 | |
CN107090837A (zh) | 一种坑中坑钢筋砼挡墙复合支护结构及其施工方法 | |
CN104294833A (zh) | 岩堆整体补强加固结构 | |
CN107165177A (zh) | 一种边坡支护施工方法 | |
CN103758132A (zh) | 一种结合放坡的悬臂排桩支护结构的施工工艺 | |
CN202730796U (zh) | 既有挡土墙肋板式卸荷加固结构 | |
CN101793027A (zh) | 一种桩心注浆静压锚杆桩 | |
CN208545745U (zh) | 带分级扩大头的碎石注浆桩 | |
CN208363106U (zh) | 一种基坑支护结构 | |
CN206529881U (zh) | 承台及地梁结构的施工装置 | |
CN206956707U (zh) | 一种用于富水砂层地层中超深基坑围护的地连墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150121 |
|
RJ01 | Rejection of invention patent application after publication |