CN104264675A - 高层建筑基础大体积混凝土质量控制方法 - Google Patents
高层建筑基础大体积混凝土质量控制方法 Download PDFInfo
- Publication number
- CN104264675A CN104264675A CN201410499295.1A CN201410499295A CN104264675A CN 104264675 A CN104264675 A CN 104264675A CN 201410499295 A CN201410499295 A CN 201410499295A CN 104264675 A CN104264675 A CN 104264675A
- Authority
- CN
- China
- Prior art keywords
- concrete
- temperature
- building foundation
- thermometer
- thermometric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)
- Measuring Temperature Or Quantity Of Heat (AREA)
Abstract
本发明公开了高层建筑基础大体积混凝土质量控制方法,通过埋管对混凝土不同层次进行测温,并对混凝土定时进行测温控制,及时记录数据并反馈给相应技术人员以便及时发现问题,并针对于混凝土开裂进行有效的防治措施;本发明采用测温管对不同层的混凝土进行温度检测,发现问题点及时采取相应的补救技术措施,且针对于混凝土在浇筑过程中出现的开裂情况,采用硅酸盐水泥提高混凝土的密实度,浇筑裂缝时按1:6的坡度平行推进,根据温差调整保温及养护措施,使混凝土的温度梯度和湿度不致过大,以有效控制裂缝的出现。
Description
技术领域
本发明涉及混凝土质量控制方法,具体地说是高层建筑基础大体积混凝土质量控制方法。
背景技术
目前,随着经济建设规模的迅速发展,现代建筑业向着高、大、深以及复杂结构方向拓展,其中常涉及到大体积混凝土,如高层建筑或大型设备基础,桩基础的超厚超大承台,水工结构等。它的主要特点是体积大,水泥水化热量大,极易引起混凝土由于内外部温度差超过25℃而开裂,影响结构的安全使用,延长施工工期。目前在现有技术没有针对混凝土的特性进行质量检测,导致混凝土出现不同程度的质量问题。
发明内容
本发明的目的在于提供高层建筑基础大体积混凝土质量控制方法,以解决建筑工程施工过程中大基础施工过程中的难题,从而确保施工安全和施工质量,及克服现有技术的不足。
为了解决背景技术问题,本发明采用以下技术方案:高层建筑基础大体积混凝土质量控制方法,包括以下操作步骤:
a埋管:利用镀锌铁皮成φ立25mm的测温管,下端封闭,布设于上、中、下三层,在浇筑混凝土时,将测温管埋进混凝土中,上口高出混凝土面2cm~3cm,并用棉花塞紧;
b温度控制:根据现场混凝土配合比和施工中的气候情况和养护方案,在混凝土预埋要温度测温孔,深度分别为1.2m、0.65m、0.2m,利用专用温度计进行监测;
c测温:
1)由于混凝土浇筑后3d内混凝土水化热最大,在混凝土强度达到4Mpa前,每2h~4h测一次,以后每8h测一次;
2)由于施工已经进入冬季昼夜温差大,测温时,应将温度计与外界气温相隔离,用保温材料将温管上口塞住,测温计停留在测温孔内要达3min~5min,方可读数,并做好测温记录,并把测温记录及时反馈给相应技术人员以便及时发现问题,采取相应的技术措施;
d混凝土裂缝的防治:采用普通42.5级硅酸盐水泥,并掺加外加剂提高混凝土的密实度,调整级配,石子含泥量小于1%,砂的含泥量小于3%,并加强振捣,掺加外加剂,延长混凝土初凝时间,推迟水化热的峰值期,掺加膨胀剂,使混凝土补偿收缩,减少混凝土的温度应力;浇筑裂缝时按1:6的坡度平行推进,浇筑完毕后,立即覆盖塑料布及阻燃毛毯,使混凝土缓缓降温,保证养护时间大于14d,加强测温和温度测温监测与管理,随时控制混凝土内的温度变化,内外温差控制在25℃以内,若有超温现象及时上报技术室,根据温差调整保温及养护措施,使混凝土的温度梯度和湿度不致过大,以有效控制裂缝的出现。
综上所述,此发明有益效果如下:本发明采用测温管对不同层的混凝土进行温度检测,发现问题点及时采取相应的补救技术措施,且针对于混凝土在浇筑过程中出现的开裂情况,采用硅酸盐水泥提高混凝土的密实度,浇筑裂缝时按1:6的坡度平行推进,根据温差调整保温及养护措施,使混凝土的温度梯度和湿度不致过大,以有效控制有寄存器裂缝的出现。
具体实施方式
高层建筑基础大体积混凝土质量控制方法,包括以下操作步骤:
a埋管:
利用镀锌铁皮成φ立25mm的测温管,下端封闭,布设于上、中、下三层,在浇筑混凝土时,将测温管埋进混凝土中,上口高出混凝土面3cm,并用棉花塞紧;
b温度控制:
根据现场混凝土配合比和施工中的气候情况和养护方案,在混凝土预埋要温度测温孔,深度分别为1.2m、0.65m、0.2m,利用专用温度计进行监测;
c测温:
1)由于混凝土浇筑后3天内混凝土水化热最大,在混凝土强度达到4Mpa前,每2h测一次,以后每8h测一次;
2)由于施工已经进入冬季昼夜温差大,测温时,应将温度计与外界气温相隔离,用保温材料将温管上口塞住,测温计停留在测温孔内要达3min,方可读数,并做好测温记录,并把测温记录及时反馈给相应技术人员以便及时发现问题,采取相应的技术措施;
d混凝土裂缝的防治:
采用普通42.5级硅酸盐水泥,并掺加外加剂提高混凝土的密实度,调整级配,石子含泥量为0.5%,砂含量2.5%,并加强振捣,掺加外加剂,延长混凝土初凝时间,推迟水化热的峰值期,掺加膨胀剂,使混凝土补偿收缩,减少混凝土的温度应力;浇筑裂缝时按1:6的坡度平行推进,浇筑完毕后,立即覆盖塑料布及阻燃毛毯,使混凝土缓缓降温,保证养护时间为17d,加强测温和温度测温监测与管理,随时控制混凝土内的温度变化,内外温差控制在23度,若有超温现象及时上报技术室,根据温差调整保温及养护措施,使混凝土的温度梯度和湿度不致过大,以有效控制裂缝的出现。
Claims (4)
1.高层建筑基础大体积混凝土质量控制方法,其特征在于包括以下操作步骤:
a埋管:
将下端封闭的镀锌铁皮成φ立25mm的测温管,在浇筑混凝土时,将测温管埋进混凝土中,上口高出混凝土面2cm~3cm;
b温度控制:
根据现场混凝土配合比和施工中的气候情况和养护方案,在混凝土预埋要温度测温孔;
c测温:
1)在混凝土浇筑后3天内,且混凝土强度不大于4Mpa时,每隔2h~4h测一次,以后每8h测一次;
2)当施工已经进入冬季昼夜温差大,将温度计与外界气温相隔离,温度计停留在测温孔内达3min~5min后,做好测温记录并把测温记录及时反馈给相应技术人员以便及时发现问题,采取相应的技术措施;
d混凝土裂缝的防治:
采用硅酸盐水泥,并掺加外加剂提高混凝土的密实度,加入石子与砂并加强振捣,掺加外加剂,延长混凝土初凝时间,掺加膨胀剂,使混凝土补偿收缩,加强测温和温度测温监测与管理,随时控制混凝土内的温度变化,内外温差不超过25℃。
2.根据权利要求1所述的高层建筑基础大体积混凝土质量控制方法,其特征在于:所述的测温管的测温点分为上,中,下三层,且上端用保暖材料封闭,所述的测温孔深度分别为1.2m、0.65m、0.2m,并用温度计分别进行监测。
3.根据权利要求1所述的高层建筑基础大体积混凝土质量控制方法,其特征在于:所述的混凝土裂缝的防治采用的硅酸盐水泥为普通42.5级,且石子含泥量小于1%,砂的含泥量小于3%。
4.根据权利要求1所述的高层建筑基础大体积混凝土质量控制方法,其特征在于:在浇筑混凝土裂缝时按1:6的坡度平行推进,浇筑完毕后,立即覆盖塑料布及阻燃毛毯,使混凝土缓缓降温,保证养护时间大于14天。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410499295.1A CN104264675A (zh) | 2014-09-25 | 2014-09-25 | 高层建筑基础大体积混凝土质量控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410499295.1A CN104264675A (zh) | 2014-09-25 | 2014-09-25 | 高层建筑基础大体积混凝土质量控制方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104264675A true CN104264675A (zh) | 2015-01-07 |
Family
ID=52156239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410499295.1A Pending CN104264675A (zh) | 2014-09-25 | 2014-09-25 | 高层建筑基础大体积混凝土质量控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104264675A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107246924A (zh) * | 2017-04-29 | 2017-10-13 | 中国能源建设集团安徽电力建设第工程有限公司 | 一种风机基础混凝土的温度监测和控制方法 |
CN108867649A (zh) * | 2018-07-13 | 2018-11-23 | 苏州园林发展股份有限公司 | 一种混凝土温度控制浇注技术 |
CN109577336A (zh) * | 2018-11-28 | 2019-04-05 | 上海宝冶冶金工程有限公司 | 大体积混凝土施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102979307A (zh) * | 2012-12-12 | 2013-03-20 | 新疆生产建设兵团金来建设工程技术研发有限责任公司 | 一种混凝土结构温控防裂施工方法 |
CN202895448U (zh) * | 2012-11-19 | 2013-04-24 | 天津众业石化建筑安装工程有限公司 | 一种大体积混凝土保温养护结构 |
CN203145017U (zh) * | 2013-04-17 | 2013-08-21 | 中天建设集团有限公司 | 一种深基坑内浇筑大体积混凝土的大型溜槽装置 |
CN103498557A (zh) * | 2013-09-29 | 2014-01-08 | 范洁群 | 一种纤维混凝土墙体裂缝的控制方法 |
US20140088756A1 (en) * | 2012-09-25 | 2014-03-27 | Romeo Ilarian Ciuperca | Method for electronic temperature controlled curing of concrete and accelerating concrete maturity or equivalent age of precast concrete structures and objects and apparatus for same |
CN103913514A (zh) * | 2013-01-05 | 2014-07-09 | 山东三箭建设工程管理有限公司 | 大体积混凝土温度梯度裂缝监测方法 |
-
2014
- 2014-09-25 CN CN201410499295.1A patent/CN104264675A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140088756A1 (en) * | 2012-09-25 | 2014-03-27 | Romeo Ilarian Ciuperca | Method for electronic temperature controlled curing of concrete and accelerating concrete maturity or equivalent age of precast concrete structures and objects and apparatus for same |
CN202895448U (zh) * | 2012-11-19 | 2013-04-24 | 天津众业石化建筑安装工程有限公司 | 一种大体积混凝土保温养护结构 |
CN102979307A (zh) * | 2012-12-12 | 2013-03-20 | 新疆生产建设兵团金来建设工程技术研发有限责任公司 | 一种混凝土结构温控防裂施工方法 |
CN103913514A (zh) * | 2013-01-05 | 2014-07-09 | 山东三箭建设工程管理有限公司 | 大体积混凝土温度梯度裂缝监测方法 |
CN203145017U (zh) * | 2013-04-17 | 2013-08-21 | 中天建设集团有限公司 | 一种深基坑内浇筑大体积混凝土的大型溜槽装置 |
CN103498557A (zh) * | 2013-09-29 | 2014-01-08 | 范洁群 | 一种纤维混凝土墙体裂缝的控制方法 |
Non-Patent Citations (1)
Title |
---|
寥金元: "大体积混凝土施工技术及测温管理", 《科技创新与应用》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107246924A (zh) * | 2017-04-29 | 2017-10-13 | 中国能源建设集团安徽电力建设第工程有限公司 | 一种风机基础混凝土的温度监测和控制方法 |
CN108867649A (zh) * | 2018-07-13 | 2018-11-23 | 苏州园林发展股份有限公司 | 一种混凝土温度控制浇注技术 |
CN109577336A (zh) * | 2018-11-28 | 2019-04-05 | 上海宝冶冶金工程有限公司 | 大体积混凝土施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207526123U (zh) | 一种新型混凝土智能温控装置 | |
CN105133615B (zh) | 一种青藏高原地区大温差环境大体积混凝土冷却循环水温控施工方法 | |
CN101413251B (zh) | 高墩大跨连续刚构桥0号块防裂施工方法 | |
CN100572710C (zh) | 无网聚苯板现浇混凝土外墙保温施工方法 | |
CN102323396B (zh) | 大体积混凝土实体模拟试验装置及其试验施工方法 | |
CN103266772A (zh) | 一种用于冬季公路工程施工混凝土的养护方法 | |
CN103696571B (zh) | 墙体结构的喷淋养护方法及系统 | |
CN104264678B (zh) | 大体积混凝土防裂纹施工工艺 | |
CN104264675A (zh) | 高层建筑基础大体积混凝土质量控制方法 | |
CN104690815B (zh) | 一种大体积混凝土的多功能养护箱 | |
CN108951636A (zh) | 一种高寒地区地铁车站混凝土施工保温方法 | |
CN109403312A (zh) | 一种含水软弱地层高温固化支护方法 | |
CN112854748A (zh) | 一种悬浇箱梁冬季施工用养护方法 | |
Hu et al. | A comparative study of temperature of mass concrete placed in August and November based on on-site measurement | |
CN104499716A (zh) | 一种砼冬期施工的保温装置 | |
CN109518714A (zh) | 大型热轧混凝土box基础的无缝施工方法 | |
CN109030794A (zh) | 一种混凝土温升快速检测方法 | |
CN207714261U (zh) | 一种高寒地区大体积混凝土临时越冬保温装置 | |
CN207159822U (zh) | 一种桥墩大体积混凝土控温装置 | |
CN202119771U (zh) | 大体积混凝土实体模拟试验装置 | |
CN108868143A (zh) | 高寒地区低温季节混凝土施工工法 | |
CN204546742U (zh) | 一种大体积混凝土的多功能养护箱 | |
KR20090008991A (ko) | 터널 라이닝폼의 거푸집 보온양생장치 | |
CN114263466A (zh) | 高寒地区钻井井壁冬季预制施工温度裂缝控制方法 | |
CN210037681U (zh) | 一种土壤水热耦合运移试验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150107 |
|
RJ01 | Rejection of invention patent application after publication |