CN104264587A - Mounting method of PBL (perfobond leiste) shear keys inside steel box girder for reinforced concrete composite segment - Google Patents

Mounting method of PBL (perfobond leiste) shear keys inside steel box girder for reinforced concrete composite segment Download PDF

Info

Publication number
CN104264587A
CN104264587A CN201410484866.4A CN201410484866A CN104264587A CN 104264587 A CN104264587 A CN 104264587A CN 201410484866 A CN201410484866 A CN 201410484866A CN 104264587 A CN104264587 A CN 104264587A
Authority
CN
China
Prior art keywords
pbl shear
shear connector
sections
beam body
pbl
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410484866.4A
Other languages
Chinese (zh)
Other versions
CN104264587B (en
Inventor
任世朋
孙小猛
徐登云
闫明赛
欧阳石
温朝斌
王克礼
李鹏程
黄爱民
姜泛金
赵伟
郭庄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Railway Group Co Ltd
Second Engineering Co Ltd of CTCE Group
Original Assignee
China Railway Corp
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Corp, Second Engineering Co Ltd of CTCE Group filed Critical China Railway Corp
Priority to CN201410484866.4A priority Critical patent/CN104264587B/en
Publication of CN104264587A publication Critical patent/CN104264587A/en
Application granted granted Critical
Publication of CN104264587B publication Critical patent/CN104264587B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a mounting method of PBL shear keys inside a steel box girder for a reinforced concrete composite segment. The method comprises the following steps of dividing the PBL shear keys of the reinforced concrete composite segment into a plurality of PBL shear key segments; threading the PBL shear key segments and then preassembling the segments into a partially-assembled reinforced concrete composite segment steel box girder according to designated positions; adjusting the positions of the PBL shear key segments during the assembling process of the reinforced concrete composite segment steel box girder; after assembly of bridge positions of the composite segment steel box girder is completed, connecting the PBL shear key segments through straight thread sleeves. The mounting method of the PBL shear keys inside the steel box girder for the reinforced concrete compost segment has the advantages of being applicable to complex reinforced concrete composite segment structures, capable of freely adjusting the length of the PBL shear key segments according to structural features and high in flexibility. Besides, the mounting method of the PBL shear keys inside the steel box girder for the reinforced concrete compost segment is simple in process, high in construction efficiency, short in field operation time and easy to meet relevant norms and requirements on construction quality.

Description

A kind of mounting method for PBL shear connector in the steel box-girder of toughened internal stress
Technical field
The present invention relates to a kind of bridge building operations, be specifically related to a kind of mounting method for PBL shear connector in the steel box-girder of toughened internal stress.
Background technology
Along with domestic bridge develops, steel box-girder and concrete box girder adapter section form of structure are used widely.Toughened internal stress is the structure position that solution steel-mixed stiffness transition is therebetween smooth-going, all even steel of Stress transmit-mixed combination reliably connects.
Tradition toughened internal stress PBL shear connector length is long, rigidity is large, should not weld, construction precision requirement is high, and current toughened internal stress PBL shear connector construction does not still have ripe method.
In concrete construction, the PBL shear connector method with regard to first installing before being typically employed in adapter section steel box girder assembling is constructed or PBL shear connector is cut into the method installation that little sections installs rear welding or sleeve connection after adapter section steel box girder assembling completes.The former brings a lot of inconvenience, narrow space to toughened internal stress steel box girder assembling, welding and detection, causes part weld seam to be difficult to welding; PBL shear connector is cut to short and small sections by the latter, and single PBL shear connector divides that sections is many, joint is many, is difficult to meet code requirement, and construction quality potential risk is comparatively outstanding.
Summary of the invention
The technical problem to be solved in the present invention is: propose a kind of easy construction, the assembled quick PBL shear connector mounting method effective with being connected shearing resistance.
The present invention is the technical scheme solving the problems of the technologies described above proposition: 1, a kind of mounting method for PBL shear connector in the steel box-girder of toughened internal stress, described steel box-girder is welded by the three sections of beam bodies being divided into left width beam body, stage casing beam body and right width beam body are assembled, multiple spaced biography shears are comprised respectively in described left width beam body, stage casing beam body and right width beam body, often open to pass and spaced apartly on shear be provided with multiple PBL shear connector installing hole, described PBL shear connector position of mounting hole respectively relatively, forms many group PBL shear connectors and installs duct; Comprise following characteristics step:
A, according to the structure of steel box-girder and length, segmentation blanking is carried out to PBL shear connector and make PBL shear connector sections, and at the end mantle fiber of described PBL shear connector sections;
B, install in duct and wear installation two sections of PBL shear connector sections often organizing PBL shear connector, left width beam body is avoided in the installation site of described PBL shear connector sections, position while welding reserved between stage casing beam body and right width beam body, the adjacent end portion juxtaposition of described two sections of PBL shear connector sections, fixes with the interim colligation of iron wire;
C, described left width, stage casing and right width beam body carried out assembledly be welded into entirety;
The iron wire of d, dismounting colligation PBL shear connector sections, adopt straight screw sleeve to be connected by adjacent two sections of PBL shear connector sections successively, the PBL shear connector block sections being divided into some sections the most at last connects into entirety.
Further, both sides, described steel box-girder bottom surface form turning successively, described turning lays respectively at described left width beam body and Liang Ti junction, stage casing and right width beam body and Liang Ti junction, described stage casing, a described left side, be connected by turning PBL shear connector sections between PBL shear connector sections with PBL shear connector sections in the beam body of stage casing in right width beam body, the length of turning PBL shear connector sections is less than biography shear spacing, the bending angle of described turning PBL shear connector sections and two ends mantle fiber consistent with described corner angle, at described left width, stage casing and right width beam body are welded into overall rear turning PBL shear connector sections and are just installed into biography shear, straight screw sleeve is used to be connected with both sides PBL shear connector sections.
The invention has the beneficial effects as follows:
Can not only adapt to complicated toughened internal stress structure for the mounting method of PBL shear connector in the steel box-girder of toughened internal stress, can freely adjust PBL shear connector section length and the high feature of flexibility according to design feature in the present invention, also have that technique is simple, efficiency of construction is high, the field operation time is short and construction quality easily reaches the feature of the economic aspects such as related specifications requirement.
Mounting method for PBL shear connector in the steel box-girder of toughened internal stress provided by the invention, solves the difficult problem that the toughened internal stress PBL shear connector installation time is long, efficiency is low, construction quality should not control.Meanwhile, in the steel box-girder that the application study innovatively carried out for this field is used in toughened internal stress, the mounting method of PBL shear connector has more wide promotional value.
Accompanying drawing explanation
Below in conjunction with accompanying drawing to being described further for the mounting method of PBL shear connector in the steel box-girder of toughened internal stress in the present invention.
Fig. 1 is for assembled toughened internal stress steel box-girder (1/2) structural representation.
Fig. 2 be assembled after the structural representation of toughened internal stress steel box-girder.
Fig. 3 be PBL shear connector and straight screw sleeve in conjunction with schematic diagram.
Fig. 4 is the segmentation of PBL shear connector and the scheme of installation that intersects.
Detailed description of the invention
Embodiment
According to Fig. 1, Fig. 2 and Fig. 3, a kind of mounting method for PBL shear connector in the steel box-girder 1 of toughened internal stress, steel box-girder 1 is welded by the three sections of beam bodies being divided into left width beam body 3, stage casing beam body 4 and right width beam body 5 are assembled, multiple spaced biography shears are comprised respectively in left width beam body 3, stage casing beam body 4 and right width beam body 5, often open to pass and spaced apartly on shear be provided with multiple PBL shear connector installing hole, PBL shear connector position of mounting hole respectively relatively, forms many group PBL shear connectors and installs duct;
Comprise the following steps:
A, segmentation blanking is carried out to PBL shear connector make PBL shear connector sections 2 according to the structure of steel box-girder 1, length characteristic, and at the end mantle fiber of PBL shear connector sections 2; In the present invention, PBL shear connector is made up of reinforcing bar.
B, install in duct and wear installation two sections of PBL shear connector sections 2 often organizing PBL shear connector, left width beam body 3 is avoided in the installation site of PBL shear connector sections 2, position while welding reserved between stage casing beam body 4 and right width beam body 5, as shown in Figure 4, the adjacent end portion juxtaposition of two sections of PBL shear connector sections 2, fixes with the interim colligation of iron wire;
C, left width beam body 3, stage casing beam body 4 and right width beam body 5 carried out assembledly be welded into entirety;
The iron wire of d, dismounting colligation PBL shear connector sections 2, adopt straight screw sleeve 6 to be connected by adjacent two sections of PBL shear connector sections 2 successively, the PBL shear connector block sections being divided into some sections the most at last connects into entirety.
Both sides, steel box-girder 1 bottom surface form turning successively, turning lays respectively at left width beam body 3 and beam body 4 junction, stage casing and right width beam body 5 and beam body 4 junction, stage casing, left, be connected by turning PBL shear connector sections 7 between PBL shear connector sections 2 with PBL shear connector sections 2 in stage casing beam body 4 in right width beam body 5, the length of turning PBL shear connector sections 7 is less than biography shear spacing, the bending angle of turning PBL shear connector sections 2 and two ends mantle fiber consistent with corner angle, at left width, stage casing and right width beam body 5 are welded into overall rear turning PBL shear connector sections 7 and are just installed into biography shear, straight screw sleeve 6 is used to be connected with both sides PBL shear connector sections 2.
Of the present inventionly be not limited to above-described embodiment, the technical scheme of each embodiment above-mentioned of the present invention combined crosswise can form new technical scheme each other, and all employings are equal to the technical scheme of replacing and being formed in addition, all drop in the protection domain of application claims.

Claims (2)

1. the mounting method for PBL shear connector in the steel box-girder of toughened internal stress, described steel box-girder is welded by the three sections of beam bodies being divided into left width beam body, stage casing beam body and right width beam body are assembled, multiple spaced biography shears are comprised respectively in described left width beam body, stage casing beam body and right width beam body, often open to pass and spaced apartly on shear be provided with multiple PBL shear connector installing hole, described PBL shear connector position of mounting hole respectively relatively, forms many group PBL shear connectors and installs duct; Comprise following characteristics step:
A, according to the structure of steel box-girder and length, segmentation blanking is carried out to PBL shear connector and make PBL shear connector sections, and at the end mantle fiber of described PBL shear connector sections;
B, install in duct and wear installation two sections of PBL shear connector sections often organizing PBL shear connector, left width beam body is avoided in the installation site of described PBL shear connector sections, position while welding reserved between stage casing beam body and right width beam body, the adjacent end portion juxtaposition of described two sections of PBL shear connector sections, fixes with the interim colligation of iron wire;
C, described left width, stage casing and right width beam body carried out assembledly be welded into entirety;
The iron wire of d, dismounting colligation PBL shear connector sections, adopt straight screw sleeve to be connected by adjacent two sections of PBL shear connector sections successively, the PBL shear connector block sections of some sections connects into entirety the most at last.
2. according to claim 1 for the mounting method of PBL shear connector in the steel box-girder of toughened internal stress, it is characterized in that: both sides, described steel box-girder bottom surface form turning successively, described turning lays respectively at described left width beam body and Liang Ti junction, stage casing and right width beam body and Liang Ti junction, described stage casing, a described left side, be connected by turning PBL shear connector sections between PBL shear connector sections with PBL shear connector sections in the beam body of stage casing in right width beam body, the length of turning PBL shear connector sections is less than biography shear spacing, the bending angle of described turning PBL shear connector sections and two ends mantle fiber consistent with described corner angle, at described left width, stage casing and right width beam body are welded into overall rear turning PBL shear connector sections and are just installed into biography shear, straight screw sleeve is used to be connected with both sides PBL shear connector sections.
CN201410484866.4A 2014-09-22 2014-09-22 A kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section Active CN104264587B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410484866.4A CN104264587B (en) 2014-09-22 2014-09-22 A kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410484866.4A CN104264587B (en) 2014-09-22 2014-09-22 A kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section

Publications (2)

Publication Number Publication Date
CN104264587A true CN104264587A (en) 2015-01-07
CN104264587B CN104264587B (en) 2016-05-04

Family

ID=52156151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410484866.4A Active CN104264587B (en) 2014-09-22 2014-09-22 A kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section

Country Status (1)

Country Link
CN (1) CN104264587B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105937204A (en) * 2016-05-24 2016-09-14 安徽省交通建设有限责任公司 Large-span steel box girder rigidity coordination type composite bridge deck pavement layer structure and construction method thereof
CN106638265B (en) * 2016-12-21 2018-11-30 中铁第四勘察设计院集团有限公司 A kind of steel reinforced concrete beam rigid framed structure arch bridge
JP2020084547A (en) * 2018-11-22 2020-06-04 株式会社ハナミズキ・ブリッジ・プランニング Steel floor slab pavement structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413247A (en) * 2008-12-03 2009-04-22 中交公路规划设计院有限公司 Streamline steel-concrete folding case beam
KR20100109988A (en) * 2009-04-02 2010-10-12 박상현 Concrete-steel composite beamstructure which combined steel plate web and concrete with closed stirrups
CN202116971U (en) * 2011-04-08 2012-01-18 湖北省交通规划设计院 Structure of prefabricated split profile steel-concrete hybrid beam combined part
CN102767141A (en) * 2012-07-27 2012-11-07 中铁十一局集团有限公司 Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork
CN203188112U (en) * 2013-04-19 2013-09-11 林同棪国际工程咨询(中国)有限公司 Steel-concrete rigid-connection combined beam
CN103669218A (en) * 2013-11-22 2014-03-26 中铁四局集团有限公司 Novel steel-concrete combined section steel box girder module and assembling method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413247A (en) * 2008-12-03 2009-04-22 中交公路规划设计院有限公司 Streamline steel-concrete folding case beam
KR20100109988A (en) * 2009-04-02 2010-10-12 박상현 Concrete-steel composite beamstructure which combined steel plate web and concrete with closed stirrups
CN202116971U (en) * 2011-04-08 2012-01-18 湖北省交通规划设计院 Structure of prefabricated split profile steel-concrete hybrid beam combined part
CN102767141A (en) * 2012-07-27 2012-11-07 中铁十一局集团有限公司 Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork
CN203188112U (en) * 2013-04-19 2013-09-11 林同棪国际工程咨询(中国)有限公司 Steel-concrete rigid-connection combined beam
CN103669218A (en) * 2013-11-22 2014-03-26 中铁四局集团有限公司 Novel steel-concrete combined section steel box girder module and assembling method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张细敏等: "铁路混合梁斜拉桥钢-混结合段创新技术", 《中国铁路》, no. 9, 15 September 2014 (2014-09-15) *
李鹏程等: "甬江特大桥钢混结合段钢箱梁模块吊拼滑移技术", 《安徽建筑》, no. 4, 20 August 2014 (2014-08-20) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105937204A (en) * 2016-05-24 2016-09-14 安徽省交通建设有限责任公司 Large-span steel box girder rigidity coordination type composite bridge deck pavement layer structure and construction method thereof
CN106638265B (en) * 2016-12-21 2018-11-30 中铁第四勘察设计院集团有限公司 A kind of steel reinforced concrete beam rigid framed structure arch bridge
JP2020084547A (en) * 2018-11-22 2020-06-04 株式会社ハナミズキ・ブリッジ・プランニング Steel floor slab pavement structure

Also Published As

Publication number Publication date
CN104264587B (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN104500095B (en) Class rectangular shield duct piece connector structure
CN104264587A (en) Mounting method of PBL (perfobond leiste) shear keys inside steel box girder for reinforced concrete composite segment
CN201943193U (en) Linear screw thread sleeve connecting structure of steel reinforced concrete beam column node area
CN102616366A (en) Connection of stiffening frames between an aircraft fuselage and a wing box
CN102587506A (en) Method for realizing butt joint of steel pipes by aid of axial cross plug board and butt joint part
CN103306382B (en) A kind of linkage of composite material node and assemble method thereof
CN104594533A (en) Adjustable flexible connecting structure for masonry filler wall and frame column
CN204934980U (en) Bar splicing plumb joint assistor
CN103527576A (en) Bent connector
CN105443031A (en) Detachable cat ladder for hydraulic engineering
CN209874258U (en) Pre-buried shaped steel girder support node of reinforced concrete
CN103669597A (en) Connecting structure for prefabricated reinforced concrete longitudinal beam and prefabricated reinforced concrete transverse beam
CN210049441U (en) T-shaped joint of T-shaped steel and threaded sleeve assembled and connected type steel concrete combined pipe
CN102744298B (en) A kind of bending method of part
CN103982190B (en) Bored tunnel variable cross-section stress conversion construction method
CN104775526A (en) Novel method for connecting steel bar and section steel column connector
CN204941576U (en) A kind of tunnel lining reinforcing steel bar system
CN204608982U (en) A kind of curved girt strip splicing structure
CN103953198B (en) The syndeton of connecting traverse under section steel beam
CN110005095A (en) A kind of prefabricated steelframe partition wall
CN204804374U (en) Reinforced structure of shear force wall
CN204511283U (en) The detachable U-shaped cat ladder of a kind of hydraulic engineering
CN103924778B (en) Concreting plate device and template fixing method
CN204252171U (en) The rubber fastening band at basement shrinkage joint installs fixing special tool
CN204456876U (en) A kind of two-part split bolt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant