CN104264587B - A kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section - Google Patents
A kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section Download PDFInfo
- Publication number
- CN104264587B CN104264587B CN201410484866.4A CN201410484866A CN104264587B CN 104264587 B CN104264587 B CN 104264587B CN 201410484866 A CN201410484866 A CN 201410484866A CN 104264587 B CN104264587 B CN 104264587B
- Authority
- CN
- China
- Prior art keywords
- shear connector
- pbl shear
- sections
- beam body
- pbl
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
Abstract
The present invention relates to a kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section, comprise the following steps: first steel reinforced concrete adapter section PBL shear connector is divided into some PBL shear connector sections; After again sections being completed to mantle fiber, be contained in advance partly and complete in assembled steel reinforced concrete adapter section steel case beam by assigned address; Then in steel reinforced concrete adapter section steel box girder assembling process, adjust sections PBL shear connector position; After adapter section steel box girder bridge hyte has been spelled; Finally use straight screw sleeve that PBL shear connector sections is connected. The installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section in the present invention not only can adapt to complicated steel reinforced concrete adapter section structure, can freely adjust PBL shear connector section length and the high feature of flexibility according to design feature, also has that technique is simple, efficiency of construction is high, the field operation time is short and construction quality easily reaches related specifications requirement.
Description
Technical field
The present invention relates to a kind of bridge construction construction, be specifically related to a kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section.
Background technology
Along with domestic bridge development, steel case beam and concrete box girder adapter section version are used widely. Steel reinforced concrete adapter section is that solution steel-mixed rigidity transition between the two is smooth-going, all even steel of stress transmission-mixed in conjunction with the reliable structure position connecting.
Tradition steel reinforced concrete adapter section PBL shear connector length is long, rigidity is large, should not weld, construction precision requirement is high, and steel reinforced concrete adapter section PBL shear connector construction at present does not still have ripe method.
In concrete construction, the method that conventionally adopts the PBL shear connector method construction of just first installing or PBL shear connector is cut into trifle section after adapter section steel box girder assembling completes welding after installing or sleeve to connect before adapter section steel box girder assembling is installed. The former brings a lot of inconvenience to steel reinforced concrete adapter section steel box girder assembling, welding and detection, and narrow space causes part weld seam to be difficult to welding; PBL shear connector is cut to short and small sections by the latter, and single PBL shear connector division sections is many, joint is many, be difficult to meet code requirement, and construction quality potential risk is comparatively outstanding.
Summary of the invention
The technical problem to be solved in the present invention is: propose a kind of easy construction, the assembled quick PBL shear connector installation method effective with being connected shearing resistance.
The present invention is that the technical scheme that solves the problems of the technologies described above proposition is: 1, a kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section, described steel case beam is by three sections of assembled being welded of beam body that are divided into left width beam body, stage casing beam body and right width beam body, in described left width beam body, stage casing beam body and right width beam body, comprise respectively multiple spaced biography shears, every passes and spaced apartly on shear is provided with multiple PBL shear connector installing holes, described PBL shear connector position of mounting hole respectively relatively, forms many group PBL shear connectors duct is installed; Comprise following characteristics step:
A, according to the structure of steel case beam and length, PBL shear connector is carried out to segmentation blanking and make PBL shear connector sections, and at the end mantle fiber of described PBL shear connector sections;
B, in every group of PBL shear connector installed in duct, wear two sections of PBL shear connector sections are installed, reserved position while welding between left width beam body, stage casing beam body and right width beam body is avoided in the installation site of described PBL shear connector sections, the adjacent end portion juxtaposition of described two sections of PBL shear connector sections, fixes with the interim colligation of iron wire;
C, described left width, stage casing and right width beam body are carried out to the assembled entirety that is welded into;
The iron wire of d, dismounting colligation PBL shear connector sections, adopts straight screw sleeve successively adjacent two sections of PBL shear connector sections to be connected, and the PBL shear connector piece sections that is divided into the most at last some sections connects into entirety.
Further, both sides, described steel case soffit form turning successively, described turning lays respectively at described left width beam body and Liang Ti junction, stage casing and right width beam body and Liang Ti junction, described stage casing, a described left side, in right width beam body, in PBL shear connector sections and stage casing beam body, between PBL shear connector sections, be connected by turning PBL shear connector sections, the length of turning PBL shear connector sections is less than biography shear spacing, the bending angle of described turning PBL shear connector sections and two ends mantle fiber consistent with described corner angle, at described left width, after stage casing and right width beam body are welded into entirety, turning PBL shear connector sections is just installed into biography shear, use straight screw sleeve to be connected with both sides PBL shear connector sections.
The invention has the beneficial effects as follows:
The installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section in the present invention not only can adapt to complicated steel reinforced concrete adapter section structure, can freely adjust PBL shear connector section length and the high feature of flexibility according to design feature, also has that technique is simple, efficiency of construction is high, the field operation time is short and construction quality easily reaches the feature of the economic aspects such as related specifications requirement.
Installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section provided by the invention, has solved the difficult problem that the steel reinforced concrete adapter section PBL shear connector installation time is long, efficiency is low, construction quality should not be controlled. Meanwhile, the installation method that the application study innovatively of carrying out for this field is used in PBL shear connector in the steel case beam of steel reinforced concrete adapter section has more wide promotional value.
Brief description of the drawings
Below in conjunction with accompanying drawing, the installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section in the present invention is described further.
Fig. 1 is for assembled steel reinforced concrete adapter section steel case beam (1/2) structural representation.
Fig. 2 is the structural representation of the steel reinforced concrete adapter section steel case beam after assembled.
Fig. 3 is the combination schematic diagram of PBL shear connector and straight screw sleeve.
Fig. 4 is the segmentation of PBL shear connector and the scheme of installation that intersects.
Detailed description of the invention
Embodiment
Shown in Fig. 1, Fig. 2 and Fig. 3, a kind of installation method of the steel case beam 1 interior PBL shear connector for steel reinforced concrete adapter section, steel case beam 1 is by three sections of assembled being welded of beam body that are divided into left width beam body 3, stage casing beam body 4 and right width beam body 5, in left width beam body 3, stage casing beam body 4 and right width beam body 5, comprise respectively multiple spaced biography shears, every passes and spaced apartly on shear is provided with multiple PBL shear connector installing holes, PBL shear connector position of mounting hole respectively relatively, forms many group PBL shear connectors duct is installed;
Comprise the following steps:
A, according to the structure of steel case beam 1, length feature, PBL shear connector is carried out to segmentation blanking and make PBL shear connector sections 2, and at the end mantle fiber of PBL shear connector sections 2; In the present invention, PBL shear connector is to be made up of reinforcing bar.
B, in every group of PBL shear connector installed in duct, wear two sections of PBL shear connector sections 2 are installed, reserved position while welding between left width beam body 3, stage casing beam body 4 and right width beam body 5 is avoided in the installation site of PBL shear connector sections 2, as shown in Figure 4, the adjacent end portion juxtaposition of two sections of PBL shear connector sections 2, fixes with the interim colligation of iron wire;
C, left width beam body 3, stage casing beam body 4 and right width beam body 5 are carried out to the assembled entirety that is welded into;
The iron wire of d, dismounting colligation PBL shear connector sections 2, adopts straight screw sleeve 6 successively adjacent two sections of PBL shear connector sections 2 to be connected, and the PBL shear connector piece sections that is divided into the most at last some sections connects into entirety.
Steel case beam 1 both sides, bottom surface form turning successively, turning lays respectively at left width beam body 3 and beam body 4 junctions, stage casing and right width beam body 5 and beam body 4 junctions, stage casing, left, between the interior PBL shear connector sections 2 of right width beam body 5 and the interior PBL shear connector sections 2 of stage casing beam body 4, be connected by turning PBL shear connector sections 7, the length of turning PBL shear connector sections 7 is less than biography shear spacing, the bending angle of turning PBL shear connector sections 2 and two ends mantle fiber consistent with corner angle, at left width, after stage casing and right width beam body 5 are welded into entirety, turning PBL shear connector sections 7 is just installed into biography shear, use straight screw sleeve 6 to be connected with both sides PBL shear connector sections 2.
The above-described embodiment that is not limited to of the present invention, the technical scheme of above-mentioned each embodiment of the present invention can combined crosswise form new technical scheme each other, and all employings are equal to the technical scheme of replacing formation in addition, all drop in the protection domain of requirement of the present invention.
Claims (2)
1. the installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section, described steel case beam is by three sections of assembled being welded of beam body that are divided into left width beam body, stage casing beam body and right width beam body, in described left width beam body, stage casing beam body and right width beam body, comprise respectively multiple spaced biography shears, every passes and spaced apartly on shear is provided with multiple PBL shear connector installing holes, described PBL shear connector position of mounting hole respectively relatively, forms many group PBL shear connectors duct is installed; Comprise following characteristics step:
A, according to the structure of steel case beam and length, PBL shear connector is carried out to segmentation blanking and make PBL shear connector sections, and at the end mantle fiber of described PBL shear connector sections;
B, in every group of PBL shear connector installed in duct, wear two sections of PBL shear connector sections are installed, reserved position while welding between left width beam body, stage casing beam body and right width beam body is avoided in the installation site of described PBL shear connector sections, the adjacent end portion juxtaposition of described two sections of PBL shear connector sections, fixes with the interim colligation of iron wire;
C, described left width, stage casing and right width beam body are carried out to the assembled entirety that is welded into;
The iron wire of d, dismounting colligation PBL shear connector sections, adopts straight screw sleeve successively adjacent two sections of PBL shear connector sections to be connected, and the PBL shear connector sections of some sections connects into entirety the most at last.
2. according to claim 1 for the installation method of PBL shear connector in the steel case beam of steel reinforced concrete adapter section, it is characterized in that: both sides, described steel case soffit form turning successively, described turning lays respectively at described left width beam body and Liang Ti junction, stage casing and right width beam body and Liang Ti junction, described stage casing, a described left side, in right width beam body, in PBL shear connector sections and stage casing beam body, between PBL shear connector sections, be connected by turning PBL shear connector sections, the length of turning PBL shear connector sections is less than biography shear spacing, the bending angle of described turning PBL shear connector sections and two ends mantle fiber consistent with described corner angle, at described left width, after stage casing and right width beam body are welded into entirety, turning PBL shear connector sections is just installed into biography shear, use straight screw sleeve to be connected with both sides PBL shear connector sections.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410484866.4A CN104264587B (en) | 2014-09-22 | 2014-09-22 | A kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410484866.4A CN104264587B (en) | 2014-09-22 | 2014-09-22 | A kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104264587A CN104264587A (en) | 2015-01-07 |
CN104264587B true CN104264587B (en) | 2016-05-04 |
Family
ID=52156151
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410484866.4A Active CN104264587B (en) | 2014-09-22 | 2014-09-22 | A kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104264587B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105937204B (en) * | 2016-05-24 | 2017-09-08 | 安徽省交通建设股份有限公司 | A kind of Large-span Steel Box Beam rigidity cooperative type composite deck is mated formation Rotating fields and its construction method |
CN106638265B (en) * | 2016-12-21 | 2018-11-30 | 中铁第四勘察设计院集团有限公司 | A kind of steel reinforced concrete beam rigid framed structure arch bridge |
JP6499802B1 (en) * | 2018-11-22 | 2019-04-10 | 株式会社ハナミズキ・ブリッジ・プランニング | Steel slab pavement structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101413247A (en) * | 2008-12-03 | 2009-04-22 | 中交公路规划设计院有限公司 | Streamline steel-concrete folding case beam |
KR20100109988A (en) * | 2009-04-02 | 2010-10-12 | 박상현 | Concrete-steel composite beamstructure which combined steel plate web and concrete with closed stirrups |
CN202116971U (en) * | 2011-04-08 | 2012-01-18 | 湖北省交通规划设计院 | Structure of prefabricated split profile steel-concrete hybrid beam combined part |
CN102767141A (en) * | 2012-07-27 | 2012-11-07 | 中铁十一局集团有限公司 | Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork |
CN203188112U (en) * | 2013-04-19 | 2013-09-11 | 林同棪国际工程咨询(中国)有限公司 | Steel-concrete rigid-connection combined beam |
CN103669218A (en) * | 2013-11-22 | 2014-03-26 | 中铁四局集团有限公司 | Novel steel and concrete combined section steel box girder block and assembling and splicing method thereof |
-
2014
- 2014-09-22 CN CN201410484866.4A patent/CN104264587B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101413247A (en) * | 2008-12-03 | 2009-04-22 | 中交公路规划设计院有限公司 | Streamline steel-concrete folding case beam |
KR20100109988A (en) * | 2009-04-02 | 2010-10-12 | 박상현 | Concrete-steel composite beamstructure which combined steel plate web and concrete with closed stirrups |
CN202116971U (en) * | 2011-04-08 | 2012-01-18 | 湖北省交通规划设计院 | Structure of prefabricated split profile steel-concrete hybrid beam combined part |
CN102767141A (en) * | 2012-07-27 | 2012-11-07 | 中铁十一局集团有限公司 | Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork |
CN203188112U (en) * | 2013-04-19 | 2013-09-11 | 林同棪国际工程咨询(中国)有限公司 | Steel-concrete rigid-connection combined beam |
CN103669218A (en) * | 2013-11-22 | 2014-03-26 | 中铁四局集团有限公司 | Novel steel and concrete combined section steel box girder block and assembling and splicing method thereof |
Non-Patent Citations (2)
Title |
---|
甬江特大桥钢混结合段钢箱梁模块吊拼滑移技术;李鹏程等;《安徽建筑》;20140820(第4期);第141-143页 * |
铁路混合梁斜拉桥钢-混结合段创新技术;张细敏等;《中国铁路》;20140915(第9期);第79-81页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104264587A (en) | 2015-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104264587B (en) | A kind of installation method for PBL shear connector in the steel case beam of steel reinforced concrete adapter section | |
CN104500095B (en) | Class rectangular shield duct piece connector structure | |
CN204919996U (en) | Pre -buried connection structure of secondary structure reinforcing bar sleeve | |
CN102926466B (en) | A kind of method that Steel Tube Joint collar extension pasting board is strengthened | |
CN204252623U (en) | A kind of easy-to-mount bracing wire sheath | |
CN106853577A (en) | A kind of assembly method of roofing rigid tie bar | |
CN204199538U (en) | A kind of strength type concrete steel column and stirrup linkage | |
CN203960729U (en) | A kind of precast segment spliced girder body structure that steel sleeve elasticity shear tenon is set | |
CN103669597B (en) | Prefabricated reinforced concrete longeron and beam connecting structure | |
CN105443031A (en) | Detachable cat ladder for hydraulic engineering | |
CN103527576A (en) | Bent connector | |
CN204464754U (en) | Punching type lightning rod clamp | |
CN209211934U (en) | A kind of reinforced steel concrete framed floor structure | |
CN204941424U (en) | A kind of well head ruggedized construction | |
CN204511283U (en) | The detachable U-shaped cat ladder of a kind of hydraulic engineering | |
CN203393906U (en) | Steel bar and steel structural part connecting device | |
CN106641475A (en) | Production method for acidic fluid conveying pipeline | |
CN103953198B (en) | The syndeton of connecting traverse under section steel beam | |
CN202510900U (en) | Hydraulic oil pipe for engineering machinery | |
CN204551805U (en) | A kind of construction wall steel structure frame | |
RU2473832C2 (en) | Method of compensation for deflections in assembly of pipeline systems | |
CN204804374U (en) | Reinforced structure of shear force wall | |
CN102817377A (en) | Double plug pin type fore shaft pipe | |
DE102015013562A1 (en) | Flexible connecting element gas / water for mains and domestic connections in the ground | |
CN207615425U (en) | A kind of device for being bent round water, conduit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |