CN104261305A - Transport truck and transport method for outer protection tube of prefabricated directly-buried thermal-insulation tube - Google Patents
Transport truck and transport method for outer protection tube of prefabricated directly-buried thermal-insulation tube Download PDFInfo
- Publication number
- CN104261305A CN104261305A CN201410494866.2A CN201410494866A CN104261305A CN 104261305 A CN104261305 A CN 104261305A CN 201410494866 A CN201410494866 A CN 201410494866A CN 104261305 A CN104261305 A CN 104261305A
- Authority
- CN
- China
- Prior art keywords
- buried thermal
- thermal insulation
- outer pillar
- insulation pipe
- buggy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F7/00—Lifting frames, e.g. for lifting vehicles; Platform lifts
- B66F7/10—Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks
- B66F7/12—Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by mechanical jacks
- B66F7/14—Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by mechanical jacks screw operated
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F7/00—Lifting frames, e.g. for lifting vehicles; Platform lifts
- B66F7/28—Constructional details, e.g. end stops, pivoting supporting members, sliding runners adjustable to load dimensions
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a transport truck and a transport method for the outer protection tube of a prefabricated directly-buried thermal-insulation tube. At present, a crane is always used for transport in the aspect of transport for outer protection tubes, and the outer protection tubes still need to be hold by people after being transported to a saw bench to carry out a cutting operation, and unnecessary losses are generated in the aspect of production efficiency. From composition, the transport truck for the outer protection tube of the prefabricated directly-buried thermal-insulation tube comprises a rubber cushion block (1), wherein the rubber cushion block is connected with a rubber block support frame (2); the rubber block support frame is connected with a lifting support (3); the lifting support is connected with a jackscrew (4); the jackscrew is connected with a vertical column (5); the vertical column is connected with an inclined bracing (6); the inclined bracing is connected with a base frame (8); the base frame is connected with universal wheels (7). The transport truck and the transport method disclosed by the invention are mainly applied to transport for the outer protection tubes.
Description
technical field:
the present invention relates to the outer pillar transfer car(buggy) of a kind of prefabricated direct-buried thermal insulation pipe, be applicable to the outer pillar transport field in region among a small circle.
background technology:
at present, the aspect of pillar transport always outside is and uses crane to transport, still need personnel holding up and can carrying out cutting operation after being transported to buck, unnecessary loss is created in production efficiency, when family pipe tubing lifting outside and handling, can cause landing not steady, frequent phenomenon of colliding with, when unloading, automobile loads and transports, and adopts vertical lifting mode, loader-unloader coordinating operation, tubing is stacked, and uses ironware to prize or steel rope directly bundlees outer tube and easily causes the factors such as dangerous and unstable, causes serious consequence.
summary of the invention:
the object of this invention is to provide the outer pillar transfer car(buggy) of a kind of prefabricated direct-buried thermal insulation pipe.
above-mentioned object is realized by following technical scheme:
the outer pillar transfer car(buggy) of a kind of prefabricated direct-buried thermal insulation pipe, its composition comprises: rubber cushion blocks, described rubber cushion blocks is connected with rubber block bracing frame, described rubber block bracing frame is connected with lifting support, described lifting support is connected with jackscrew, and described jackscrew is connected with column, and described column is connected with diagonal ligament, described diagonal ligament is connected with bedframe, and described bedframe is connected with cardan wheel.
the outer pillar transfer car(buggy) of described prefabricated direct-buried thermal insulation pipe, described bedframe is provided with four cardan wheels, eachly on four described cardan wheels is provided with safety lock.
the outer pillar transfer car(buggy) of described prefabricated direct-buried thermal insulation pipe, two described rubber cushion blocks are parallel to be placed on two rubber block bracing frames.
the outer pillar transfer car(buggy) of described prefabricated direct-buried thermal insulation pipe, described rubber block bracing frame is the angle connection of 90 degree.
the outer pillar transfer car(buggy) of described prefabricated direct-buried thermal insulation pipe, four described diagonal ligaments are 45 jiaos with bedframe and are connected, and the other end and column are that miter angle is connected.
the outer pillar transfer car(buggy) of described prefabricated direct-buried thermal insulation pipe, described cardan wheel is polyurethane cardan wheel, and described bedframe is high-quality structural steel.
the method of work of the outer pillar transfer car(buggy) of described prefabricated direct-buried thermal insulation pipe, prefabricated direct-buried thermal insulation pipe outer family pipe is placed on rubber cushion blocks, outer pillar is supported by rubber cushion blocks bracing frame, undertaken moving, transporting by cardan wheel, lifting support and jackscrew are by regulating the transport highly having carried out outer pillar.
beneficial effect of the present invention:
1. the present invention gets for original crane lifting conveying arrangement, the bedframe of the outer pillar transfer car(buggy) of direct-buried thermal insulation pipe processed is constituted by four cardan wheels, bedframe is equipped with adjustable lifting support, and support one end is made up of V-type dash plate, solve outer pillar decreases human and material resources unnecessary waste when buck cuts thus.
the present invention can pillar transport outside and the aspect such as cutting operation, increases work efficiency, reduces waste of human resource, simple to operate, has saved the work-hours of staff, also assures that quality while ensureing speed.
the present invention is provided with lifting support, and lifting support is provided with jackscrew, the height of the outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe can be regulated to regulate the need of work come under different occasion by jackscrew and the cooperation of lifting support.
the present invention is provided with four everything wheels under bedframe, and each cardan wheel is provided with safety lock, fixing system the outer pillar transfer car(buggy) of covered pipe directly can be firmly buried when work, in order to avoid because cause cardan wheel Free-rolling in jiggly place, cause unnecessary loss and trouble to camp site.
accompanying drawing illustrates:
accompanying drawing 1 is structural representation of the present invention.
accompanying drawing 2 is birds-eye vieies of accompanying drawing 1.
accompanying drawing 3 is left views of accompanying drawing 1.
detailed description of the invention:
embodiment 1:
the outer pillar transfer car(buggy) of a kind of prefabricated direct-buried thermal insulation pipe, its composition comprises: rubber cushion blocks 1, described rubber cushion blocks is connected with rubber block bracing frame 2, described rubber block bracing frame is connected with lifting support 3, described lifting support is connected with jackscrew 4, and described jackscrew is connected with column 5, and described column is connected with diagonal ligament 6, described diagonal ligament is connected with bedframe 8, and described bedframe is connected with cardan wheel 7.
embodiment 2:
the outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe according to embodiment 1, described bedframe is provided with four cardan wheels, eachly on four described cardan wheels is provided with safety lock.
embodiment 3:
according to embodiment 1 or 2 or the outer pillar transfer car(buggy) of described prefabricated direct-buried thermal insulation pipe, two described rubber cushion blocks are parallel to be placed on two rubber block bracing frames.
embodiment 4:
the outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe according to embodiment 1 or 2 or 3, described rubber block bracing frame is the angle connection of 90 degree.
embodiment 5:
the outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe according to embodiment 1 or 2 or 3 or 4, four described diagonal ligaments are 45 jiaos with bedframe and are connected, and the other end and column are that miter angle is connected.
embodiment 6:
the outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe according to embodiment 1 or 2 or 3 or 4 or 5, described cardan wheel is polyurethane cardan wheel, and described bedframe is high-quality structural steel.
embodiment 7:
one utilizes the outer pillar transfer car(buggy) of the described prefabricated direct-buried thermal insulation pipe of one of embodiment 1-6 to carry out the method for transporting, prefabricated direct-buried thermal insulation pipe outer family pipe is placed on rubber cushion blocks, outer pillar is supported by rubber cushion blocks bracing frame, undertaken moving, transporting by cardan wheel, lifting support and jackscrew are by regulating the transport highly having carried out outer pillar.
Claims (7)
1. the outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe, its composition comprises: rubber cushion blocks, it is characterized in that: described rubber cushion blocks is connected with rubber block bracing frame, described rubber block bracing frame is connected with lifting support, described lifting support is connected with jackscrew, and described jackscrew is connected with column, and described column is connected with diagonal ligament, described diagonal ligament is connected with bedframe, and described bedframe is connected with cardan wheel.
2. the outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe according to claim 1 and 2, is characterized in that: described bedframe is provided with four cardan wheels, eachly on four described cardan wheels is provided with safety lock.
3. the outer pillar transfer car(buggy) of the prefabricated direct-buried thermal insulation pipe according to claim 1 or 2 or 3, is characterized in that: two described rubber cushion blocks are parallel to be placed on two rubber block bracing frames.
4. the outer pillar transfer car(buggy) of the prefabricated direct-buried thermal insulation pipe according to claim 1 or 2 or 4, is characterized in that: described rubber block bracing frame is the angle connection of 90 degree.
5. the outer pillar transfer car(buggy) of the prefabricated direct-buried thermal insulation pipe according to claim 1 or 2 or 3 or 4 or 5, is characterized in that: four described diagonal ligaments are 45 jiaos with bedframe and are connected, and the other end and column are that miter angle is connected.
6. the outer pillar transfer car(buggy) of the prefabricated direct-buried thermal insulation pipe according to claim 1 or 2 or 3 or 4 or 5 or 6, it is characterized in that: described cardan wheel is polyurethane cardan wheel, described bedframe is high-quality structural steel.
7. the transfer method of the outer pillar of the prefabricated direct-buried thermal insulation pipe that one of claim 1-6 is described, prefabricated direct-buried thermal insulation pipe outer family pipe is the steps include: to be placed on rubber cushion blocks, outer pillar is supported by rubber cushion blocks bracing frame, undertaken moving, transporting by cardan wheel, lifting support and jackscrew are by regulating the transport highly having carried out outer pillar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410494866.2A CN104261305A (en) | 2014-09-25 | 2014-09-25 | Transport truck and transport method for outer protection tube of prefabricated directly-buried thermal-insulation tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410494866.2A CN104261305A (en) | 2014-09-25 | 2014-09-25 | Transport truck and transport method for outer protection tube of prefabricated directly-buried thermal-insulation tube |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104261305A true CN104261305A (en) | 2015-01-07 |
Family
ID=52152936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410494866.2A Pending CN104261305A (en) | 2014-09-25 | 2014-09-25 | Transport truck and transport method for outer protection tube of prefabricated directly-buried thermal-insulation tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104261305A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111498743A (en) * | 2020-04-30 | 2020-08-07 | 王辉 | Direct-buried heat-insulation pipeline installation construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08133333A (en) * | 1994-11-11 | 1996-05-28 | Tokyo Gas Co Ltd | Pipe packaging device |
CN102649507A (en) * | 2011-02-25 | 2012-08-29 | 上海西重所重型机械成套有限公司 | Integrated pipe-transferring trolley |
CN203171188U (en) * | 2013-03-14 | 2013-09-04 | 浙江博凡动力装备有限公司 | Tubular product placing frame |
CN203171193U (en) * | 2013-03-14 | 2013-09-04 | 浙江博凡动力装备有限公司 | Lifting device for prefabrication of pipeline |
CN103723169A (en) * | 2013-12-07 | 2014-04-16 | 哈尔滨朗格斯特节能科技有限公司 | Simple transferring vehicle of prefabricated direct-burial thermal insulation pipe |
CN204162354U (en) * | 2014-09-25 | 2015-02-18 | 哈尔滨朗格斯特节能科技有限公司 | The outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe |
-
2014
- 2014-09-25 CN CN201410494866.2A patent/CN104261305A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08133333A (en) * | 1994-11-11 | 1996-05-28 | Tokyo Gas Co Ltd | Pipe packaging device |
CN102649507A (en) * | 2011-02-25 | 2012-08-29 | 上海西重所重型机械成套有限公司 | Integrated pipe-transferring trolley |
CN203171188U (en) * | 2013-03-14 | 2013-09-04 | 浙江博凡动力装备有限公司 | Tubular product placing frame |
CN203171193U (en) * | 2013-03-14 | 2013-09-04 | 浙江博凡动力装备有限公司 | Lifting device for prefabrication of pipeline |
CN103723169A (en) * | 2013-12-07 | 2014-04-16 | 哈尔滨朗格斯特节能科技有限公司 | Simple transferring vehicle of prefabricated direct-burial thermal insulation pipe |
CN204162354U (en) * | 2014-09-25 | 2015-02-18 | 哈尔滨朗格斯特节能科技有限公司 | The outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111498743A (en) * | 2020-04-30 | 2020-08-07 | 王辉 | Direct-buried heat-insulation pipeline installation construction method |
CN111498743B (en) * | 2020-04-30 | 2021-10-15 | 中铁二十二局集团有限公司 | Direct-buried heat-insulation pipeline installation construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201077958Y (en) | Beam movement carriage for road and bridge construction | |
CN202336766U (en) | Double mechanical hand structure on assembly line for producing aluminum tubes and aluminum bars | |
CN101818480A (en) | Box girder transfer platform and girder transferring and girder loading working procedures thereof | |
CN103128593A (en) | Delivery method and delivery equipment of workpiece on production line for aluminum tube and aluminum bar | |
CN104801955A (en) | Method for mounting large shafts in ship and ocean engineering | |
CN204565559U (en) | A kind of servicing unit being used in the medium-and-large-sized axle class of Naval Architecture and Ocean Engineering and installing | |
CN104131519A (en) | Bridge demolishing construction method and device thereof | |
CN204754249U (en) | A transporting device that is used for indoor big flue to install | |
CN204162354U (en) | The outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe | |
CN104261305A (en) | Transport truck and transport method for outer protection tube of prefabricated directly-buried thermal-insulation tube | |
CN205256379U (en) | A simple and easy dolly for transporting slide -wire | |
CN107720609A (en) | A kind of multi-functional forest conveying arrangement | |
CN203639007U (en) | Rotary lifting mast | |
CN105084225B (en) | Pipe cutting, lifting and transporting integrated engineering van | |
CN204916856U (en) | Large -scale pipe fitting conveyer | |
CN204076754U (en) | A kind of full-automatic pipe connecting device being convenient to blanking | |
CN103287986A (en) | Curtain board transport lifting device and method for mounting curtain board by using device | |
CN203920973U (en) | A kind of Multi-functional transporting chassis for large-scale penstock installation in tunnel | |
CN105151658A (en) | Pouring ferry vehicle for production of aerated concrete | |
CN203306639U (en) | Installing guide rail mechanism for diesel engine set | |
CN105174052A (en) | Crane for aerated concrete production | |
CN206318505U (en) | A kind of bar transporter | |
CN205075863U (en) | Lightly transport shallow of pole boom man | |
CN213415146U (en) | Transverse moving vehicle device | |
CN203995903U (en) | A kind of cement electric pole conveying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150107 |
|
RJ01 | Rejection of invention patent application after publication |