CN104216009A - 一种斜井三维垂直地震剖面时间偏移的方法 - Google Patents

一种斜井三维垂直地震剖面时间偏移的方法 Download PDF

Info

Publication number
CN104216009A
CN104216009A CN201310219981.4A CN201310219981A CN104216009A CN 104216009 A CN104216009 A CN 104216009A CN 201310219981 A CN201310219981 A CN 201310219981A CN 104216009 A CN104216009 A CN 104216009A
Authority
CN
China
Prior art keywords
vsp
square
root
imaging
dimensional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310219981.4A
Other languages
English (en)
Other versions
CN104216009B (zh
Inventor
凌云
李少英
郭向宇
高军
王永军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
BGP Inc
Original Assignee
China National Petroleum Corp
BGP Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, BGP Inc filed Critical China National Petroleum Corp
Priority to CN201310219981.4A priority Critical patent/CN104216009B/zh
Publication of CN104216009A publication Critical patent/CN104216009A/zh
Application granted granted Critical
Publication of CN104216009B publication Critical patent/CN104216009B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明是斜井三维垂直地震剖面时间偏移的方法,对成像区域网格化,根据检波点的坐标,得到斜井轨迹,沿斜井轨迹从地面数据得到的均方根速度模型中提取均方根速度,移动到VSP时间偏移成像基准面,得到均方根速度体,用偏移孔径等于目的层深度乘以最大成像角度正弦的平方再加上最大井源距的一半,计算VSP数据时间偏移的孔径,利用双平方根方程得到相应道地震波总的走时,将单道的VSP波场延拓到井中检波器所在的深度,完成VSP数据的叠前时间偏移。本发明通过斜井表达的井轨迹方向的三维速度空间变化趋势和分布,三维VSP时间偏移获得更合理的构造成像,计算效率较高,实现过程简单。

Description

一种斜井三维垂直地震剖面时间偏移的方法
技术领域
本发明涉及石油地球物理勘探和地震勘探技术,具体是使用从地面数据获得的均方根速度的一种斜井三维垂直地震剖面时间偏移的方法。
技术背景
地震勘探是采用人工激发地震波寻找地下矿产的方法。通过人工激发地震波,在地表或井下使用记录设备以相应观测方式获得随地震波传播变化的数据。使用地表震源激发,在井下不同深度上使用接收器记录地震信号获得井孔附近的地下信息的过程称为垂直地震剖面(VSP)勘探技术。利用上述方式获得的数据,经过通常的数据处理,可以得到地下地质构造的图像。
Wendell Wiggins et al.(1986)根据VSPCDP转换提供的速度模型,用偏移对绕射波成像。但是,其结果精度较低。Paul Bicquart(1998)表述了3D-VSP数据Kirchhoff积分法叠前深度偏移的实现过程,认为从地面数据中难以获得准确的速度,从井中通常能够获得准确的速度-深度信息,在井附近,能够得到较好的叠前深度偏移成像。由于来自于井中的速度-深度信息不能表示速度的空间分布,因此在远井区域降低偏移成像的质量。D.A.Nasyrov和D.A.KlyashchenkoD.A.(2008)认为:使用来自地面数据的速度模型对于VSP数据成像,其精度不够,提出了通过使用不同类型波得到的界面成像更新速度模型。该方法通过迭代提高速度模型的精度,改善成像质量,但是计算量较大,效率较低。
利用井的信息能够得到正确的速度模型,但是当速度在空间存在变化时,由于从井信息获得的速度模型表示速度的一维变化,在描述速度空间分布规律时受到限制。
发明内容
本发明目的是提供一种能表示速度在斜井轨迹方向的空间分布、计算效率较高,其实现过程简单的斜井三维垂直地震剖面时间偏移的方法。
本发明具体实现步骤如下:
1)在地面用人工三维激发地震波,在井中接收,得到原始的三维VSP数据,经过去噪、反褶积等前期处理后,将三维VSP数据校正到由处理参数指定的数据基准面上(如CMP面等);
2)对三维VSP的成像区域网格化,根据检波点的坐标,得到斜井轨迹,如果斜井轨迹不在三维网格节点上,向最近的网格节点上归靠;
3)沿斜井轨迹从地面数据得到的均方根速度模型中提取均方根速度;
4)将均方根速度移动到VSP时间偏移的成像基准面,根据斜井速度梯度,得到对应时间样点的正确均方根速度,形成用于积分法三维VSP时间偏移的三维均方根速度体;
5)根据目的层深度、最大成像角度和最大井源距的值,用算式:偏移孔径等于目的层深度乘以最大成像角度正弦的平方再加上最大井源距的一半,得到VSP数据时间偏移的孔径;
6)从步骤1)三维VSP数据所在的数据基准面上,利用双平方根方程分别得到各个炮点所在位置到成像点的直射线走时,以及斜井中不同深度的检波点位置到成像点的直射线走时,将二者走时相加得到相应道地震波总的走时;
步骤6)所述的炮点所在位置到成像点的直射线走时等于成像点自激自收单程时间的平方与成像点位置到炮点位置时间平方的和的算术平方根;检波点位置到成像点的直射线走时等于成像点自激自收单程时间的平方与成像点位置到检波点位置时间平方的和的算术平方根。
7)以步骤4)速度体参数的形式得到成像基准面的值,值的大小在整个处理过程中保持一致,三维垂直地震剖面时间偏移从这个基准面的高程上开始;
8)在偏移孔径内将单道的VSP波场延拓到井中检波器所在的深度,再根据步骤6)得到的走时找到相应VSP记录的振幅乘以系数累加到成像点,对所有记录和成像点重复这一过程,完成VSP数据的叠前时间偏移。
本发明通过斜井表达的井轨迹方向的三维速度空间变化趋势,从地面数据获得的均方根速度模型中,得到积分法三维VSP时间偏移均方根速度模型的空间分布。在该速度分布下,三维VSP时间偏移能够获得更合理的构造成像。本发明计算效率较高,实现过程简单。在地下照明方面,相对扩展了VSP-CDP转换叠加的照明范围。
附图说明
图1沿井轨迹输出的三维VSP积分法叠前时间偏移剖面与地面数据叠前时间偏移多条任意线拼接图。
具体实施方式
本发明提供了一种使用地面数据获得的均方根速度实现斜井三维VSP时间偏移技术。该技术包括:(1)三维VSP的成像区域网格化。(2)沿斜井轨迹从地面数据得到的均方根速度模型中提取均方根速度。(3)根据斜井速度梯度,得到对应时间样点的正确均方根速度,形成用于积分法三维VSP时间偏移的三维均方根速度体。(4)积分法三维VSP偏移孔径计算技术。
本项发明提供一种能表示速度在斜井轨迹方向的空间分布、计算效率较高,其实现过程简单的斜井三维垂直地震剖面时间偏移的方法,其具体实施方式为:
1)在地面上通过用人工三维激发,井中接收地震波,得到原始的三维VSP数据,经过去噪、反褶积等前期处理后,将三维VSP数据校正到由处理参数指定的数据基准面上(如CMP面等)2)对三维VSP的成像区域网格化,根据检波点的坐标,得到斜井轨迹,如果斜井轨迹不在三维网格节点上,向最近的网格节点上归靠,该三维网格大小可与地面数据处理中的网格大小一致,例如:15米、25米等。
3)沿斜井轨迹从地面数据得到的均方根速度模型中提取均方根速度。
4)将均方根速度移动到VSP时间偏移的成像基准面,根据斜井速度梯度,得到对应时间样点的正确均方根速度,形成用于积分法三维VSP时间偏移的三维均方根速度体;。用临时磁盘文件的方式存储该数据。
5)根据目的层深度、最大成像角度和最大井源距的值,用算式:偏移孔径等于目的层深度乘以最大成像角度正弦的平方再加上最大井源距的一半,得到VSP数据时间偏移的孔径。
6)从步骤1)中的三维VSP数据所在的数据基准面上,利用双平方根方程分别得到各个炮点所在位置到成像点的直射线走时,以及斜井中不同深度的检波点位置到成像点的直射线走时,将二者走时相加得到相应道地震波总的走时;
步骤6)所述的炮点所在位置到成像点的直射线走时等于成像点自激自收单程时间的平方与成像点位置到炮点位置时间平方和的算术平方根;检波点位置到成像点的直射线走时等于成像点自激自收单程时间的平方与成像点位置到检波点位置时间平方和的算术平方根。将走时数据存储于磁盘中。
7)用步骤4)参数的形式得到成像基准面的值,值的大小在整个处理过程中保持一致,三维垂直地震剖面时间偏移从这个基准面的高程上开始。
8)在偏移孔径内将单道的VSP波场延拓到井中检波器所在的深度,再根据步骤6)得到的旅行时找到相应VSP记录的振幅乘以系数累加到成像点,对所有记录和成像点重复这一过程,完成VSP数据的叠前时间偏移,如图1。
9)将三维VSP数据叠前时间偏移数据计入磁盘并绘图。

Claims (2)

1.一种斜井三维垂直地震剖面时间偏移的方法,特点是实现步骤如下:
1)在地面用人工三维激发地震波,在井中接收,得到原始的三维VSP数据,经过去噪、反褶积等前期处理后,将三维VSP数据校正到由处理参数指定的数据基准面上;
2)对三维VSP的成像区域网格化,根据检波点的坐标,得到斜井轨迹,如果斜井轨迹不在三维网格节点上,向最近的网格节点上归靠;
3)沿斜井轨迹从地面数据得到的均方根速度模型中提取均方根速度;
4)将均方根速度移动到VSP时间偏移的成像基准面,根据斜井速度梯度,得到对应时间样点的正确均方根速度,形成用于积分法三维VSP时间偏移的三维均方根速度体;
5)根据目的层深度、最大成像角度和最大井源距的值,用算式:偏移孔径等于目的层深度乘以最大成像角度正弦的平方再加上最大井源距的一半,得到VSP数据时间偏移的孔径;
6)从步骤1)三维VSP数据所在的数据基准面上,利用双平方根方程分别得到各个炮点所在位置到成像点的直射线走时,以及斜井中不同深度的检波点位置到成像点的直射线走时,将二者走时相加得到相应道地震波总的走时;
7)以步骤4)参数的形式得到成像基准面的值,值的大小在整个处理过程中保持一致,三维垂直地震剖面时间偏移从这个基准面的高程上开始;
8)在偏移孔径内将单道的VSP波场延拓到井中检波器所在的深度,再根据步骤6)得到的旅行时找到相应VSP记录的振幅乘以系数累加到成像点,对所有记录和成像点重复这一过程,完成VSP数据的叠前时间偏移。
2.根据权利要求1的方法,特点是步骤6)所述的炮点所在位置到成像点的直射线走时等于成像点自激自收单程时间的平方与成像点位置到炮点位置的时间平方和的算术平方根;检波点位置到成像点的直射线走时等于成像点自激自收单程时间的平方与成像点位置到检波点位置时间平方的和的算术平方根。
CN201310219981.4A 2013-06-05 2013-06-05 一种斜井三维垂直地震剖面时间偏移的方法 Active CN104216009B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310219981.4A CN104216009B (zh) 2013-06-05 2013-06-05 一种斜井三维垂直地震剖面时间偏移的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310219981.4A CN104216009B (zh) 2013-06-05 2013-06-05 一种斜井三维垂直地震剖面时间偏移的方法

Publications (2)

Publication Number Publication Date
CN104216009A true CN104216009A (zh) 2014-12-17
CN104216009B CN104216009B (zh) 2017-03-15

Family

ID=52097704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310219981.4A Active CN104216009B (zh) 2013-06-05 2013-06-05 一种斜井三维垂直地震剖面时间偏移的方法

Country Status (1)

Country Link
CN (1) CN104216009B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107765309A (zh) * 2017-10-09 2018-03-06 中国石油集团川庆钻探工程有限公司地球物理勘探公司 一种基于垂直地震数据的钻前深度预测方法
CN109190318A (zh) * 2018-10-31 2019-01-11 中国石油化工股份有限公司 基于时间度量的斜井井轨迹计算方法
CN109541683A (zh) * 2018-12-26 2019-03-29 中国海洋石油集团有限公司 一种地下点坝倾斜地层模型网格的构建方法及系统
CN111323811A (zh) * 2018-12-13 2020-06-23 中国石油天然气集团有限公司 一种多井地震数据成像方法及系统
CN111624647A (zh) * 2020-06-05 2020-09-04 中油奥博(成都)科技有限公司 一种变偏移距vsp射线追踪积分叠前时间偏移方法和装置
CN111624648A (zh) * 2020-06-05 2020-09-04 中油奥博(成都)科技有限公司 一种起伏地表变偏移距vsp积分叠前深度偏移方法
CN113160350A (zh) * 2020-01-22 2021-07-23 中国石油天然气集团有限公司 连井剖面图的生成方法及装置
US11561313B2 (en) * 2019-07-03 2023-01-24 Saudi Arabian Oil Company Creating seismic depth grids using horizontal wells

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010092249A2 (fr) * 2009-02-12 2010-08-19 Ifp Methode de pointe-temps et d'orientation de signaux sismiques de puits a trois composantes
CN101957455A (zh) * 2010-09-20 2011-01-26 中国海洋石油总公司 三维保幅叠前时间偏移方法
CN102162859A (zh) * 2011-01-10 2011-08-24 中国海洋石油总公司 一种斜井井间地震波场的成像方法
US20110228638A1 (en) * 2010-03-16 2011-09-22 Bp Corporation North America Inc. System and method of 3d salt flank vsp imaging with transmitted waves

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010092249A2 (fr) * 2009-02-12 2010-08-19 Ifp Methode de pointe-temps et d'orientation de signaux sismiques de puits a trois composantes
US20110228638A1 (en) * 2010-03-16 2011-09-22 Bp Corporation North America Inc. System and method of 3d salt flank vsp imaging with transmitted waves
CN101957455A (zh) * 2010-09-20 2011-01-26 中国海洋石油总公司 三维保幅叠前时间偏移方法
CN102162859A (zh) * 2011-01-10 2011-08-24 中国海洋石油总公司 一种斜井井间地震波场的成像方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
凌云 等: "针对不同地质目标的叠前时间偏移成像解释评价", 《石油物探》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107765309A (zh) * 2017-10-09 2018-03-06 中国石油集团川庆钻探工程有限公司地球物理勘探公司 一种基于垂直地震数据的钻前深度预测方法
CN109190318A (zh) * 2018-10-31 2019-01-11 中国石油化工股份有限公司 基于时间度量的斜井井轨迹计算方法
CN109190318B (zh) * 2018-10-31 2022-10-14 中国石油化工股份有限公司 基于时间度量的斜井井轨迹计算方法
CN111323811B (zh) * 2018-12-13 2022-06-03 中国石油天然气集团有限公司 一种多井地震数据成像方法及系统
CN111323811A (zh) * 2018-12-13 2020-06-23 中国石油天然气集团有限公司 一种多井地震数据成像方法及系统
CN109541683B (zh) * 2018-12-26 2020-04-07 中国海洋石油集团有限公司 一种地下点坝倾斜地层模型网格的构建方法及系统
CN109541683A (zh) * 2018-12-26 2019-03-29 中国海洋石油集团有限公司 一种地下点坝倾斜地层模型网格的构建方法及系统
US11561313B2 (en) * 2019-07-03 2023-01-24 Saudi Arabian Oil Company Creating seismic depth grids using horizontal wells
CN113160350A (zh) * 2020-01-22 2021-07-23 中国石油天然气集团有限公司 连井剖面图的生成方法及装置
CN113160350B (zh) * 2020-01-22 2024-05-28 中国石油天然气集团有限公司 连井剖面图的生成方法及装置
CN111624648A (zh) * 2020-06-05 2020-09-04 中油奥博(成都)科技有限公司 一种起伏地表变偏移距vsp积分叠前深度偏移方法
CN111624648B (zh) * 2020-06-05 2022-04-01 中油奥博(成都)科技有限公司 一种起伏地表变偏移距vsp积分叠前深度偏移方法
CN111624647A (zh) * 2020-06-05 2020-09-04 中油奥博(成都)科技有限公司 一种变偏移距vsp射线追踪积分叠前时间偏移方法和装置
CN111624647B (zh) * 2020-06-05 2022-06-24 中油奥博(成都)科技有限公司 一种变偏移距vsp射线追踪积分叠前时间偏移方法和装置

Also Published As

Publication number Publication date
CN104216009B (zh) 2017-03-15

Similar Documents

Publication Publication Date Title
CN104216009B (zh) 一种斜井三维垂直地震剖面时间偏移的方法
US11360233B2 (en) Seismic image data interpretation system
CN110998369B (zh) 检测地下结构
US10295683B2 (en) Amplitude inversion on partitioned depth image gathers using point spread functions
CN106597533B (zh) 一种用于山前带地震资料处理的深度域速度建模方法
US9759826B2 (en) System and method for generating an implicit model of geological horizons
CN106094032B (zh) 一种构建地层速度模型的方法
CN102841375A (zh) 一种复杂条件下基于角度域共成像点道集的层析速度反演方法
US20100118653A1 (en) Vertical seismic profiling velocity estimation method
Malehmir et al. Planning of urban underground infrastructure using a broadband seismic landstreamer—Tomography results and uncertainty quantifications from a case study in southwestern Sweden
WO2017035104A1 (en) Velocity model seismic static correction
CN101738636B (zh) 一种三维vsp高斯束法多波联合偏移成像方法
CN111123359A (zh) 随钻测井与地层格架约束的井周地震成像探测方法及装置
CN102866422B (zh) 一种深度域地质实体模型生成方法
CN102565852B (zh) 针对储层含油气性检测的角度域叠前偏移数据处理方法
CN104459798B (zh) 一种基于rtm成像的速度建模方法
Kammann et al. Deep onshore reflection seismic imaging of the chalk group strata using a 45 kg accelerated weight-drop and combined recording systems with dense receiver spacing
CN105403917A (zh) 一种裂缝检测的方法及装置
EA030770B1 (ru) Система и способ адаптивной сейсмической оптики
CN104391319A (zh) 一种地震资料采集系统的确定方法及装置
CN104216007B (zh) 二维垂直地震剖面和三维地面数据的空间同步成像处理方法
CN105301638A (zh) 一种提取风化层底界面的方法和装置
Zhao et al. Re-Exploration Programs for Petroleum-Rich Sags in Rift Basins
Li et al. Novel strategies for complex foothills seismic imaging—Part 1: Mega-near-surface velocity estimation
RU2437124C1 (ru) Способ сейсморазведки в криволинейных скважинах

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant