CN104213663A - Floor slab with decorative surface protection layer - Google Patents

Floor slab with decorative surface protection layer Download PDF

Info

Publication number
CN104213663A
CN104213663A CN201410504561.5A CN201410504561A CN104213663A CN 104213663 A CN104213663 A CN 104213663A CN 201410504561 A CN201410504561 A CN 201410504561A CN 104213663 A CN104213663 A CN 104213663A
Authority
CN
China
Prior art keywords
concrete
floor
layer
decorative cover
cover overcoat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410504561.5A
Other languages
Chinese (zh)
Other versions
CN104213663B (en
Inventor
孙国胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410504561.5A priority Critical patent/CN104213663B/en
Publication of CN104213663A publication Critical patent/CN104213663A/en
Application granted granted Critical
Publication of CN104213663B publication Critical patent/CN104213663B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The invention discloses a floor slab with a decorative surface protection layer. The floor slab is made by a manufacturing method comprising the following process steps of paving; concrete vibrating, leveling and punning; maintaining; coarse grinding the surface of a floor slab layer to remove a laitance surface layer; forming a compact layer, wherein concrete repair solution and powder ground from the coarse grinding step are mixed; forming a strengthened layer, wherein concrete enhancer is downwards permeated for 3mm-5mm from the surface of the compact layer, and the concrete enhancer and concrete are reacted to form the strengthened layer; fine grinding and polishing; forming a protection layer, wherein permeation solution is applied to the strengthened layer and is permeated downwards, and the permeation solution and the concrete are reacted to form the protection layer. According to the floor slab with the decorative surface protection layer provided by the invention, materials can be at least saved, the overall anti-pressure ability of the floor slab layer is improved, the load and the construction cost of buildings are reduced, and meanwhile, the environment can be protected.

Description

A kind of floor with decorative cover overcoat
Technical field
The present invention relates to building engineering field, relate in particular to a kind of floor with decorative cover overcoat.
Background technology
According to the 20th page of record of GB50037-2013 < < Code of design for ground surface and floor of buildings > >, and the technique of generally applying in prior art, building floor comprises floor (concrete) deck+levelling (level) bed course+finish coat (epoxy, ceramic tile, stone material, wood flooring etc.), and the basic structure layer of ground floor is preferably surface layer, bed course and ground; The basic structure layer of floor ground is preferably surface layer and floor.When the basic structure layer of ground floor and floor ground can not meet, use or when structure requires, can set up other techonospheres such as setting course, separation layer, packed layer, leveling layer.Can find out the structure that current floor is sandwich style.
Cause the main cause of the stack way of this sandwich style to be:
1, the existing build floor technology and equipment that waters lacks effective means to the control of levelness and planeness;
Than Stone-ceramic brick texts, there is more defect (as fine and smooth compactness etc.) in the technical matters that 2, concrete building flaggy is directly processed into finish coat;
3, the innovation of the combination of above 2 shortage is attempted groping and technological improvement.
The drawback that this existing sandwich style stack way exists is obvious:
1, the way of floor+other techonosphere+surface layers causes operation to increase, and causes man-hour and waste of material.
2, deck and the actual range of floor facing design elevation and the error of levelness cause leveling layer became uneven, easily delamination hollowing cracking.
3, the design strength of leveling layer, often lower than the design strength of floor layer, causes the declines such as entire compression intensity.
4, the regulation (the above 2cm of reinforcing bar) due to reinforcement cover defines floor layer thickness, more up superpose finish coat particularly the way of leveling layer or bed course+finish coat greatly increase the weight of building load and cost.
5, finish material production and transport has power consumption (transportation waits increase carbon emission, use the finish material consumption of natural resource such as Stone-ceramic brick wood flooring, contaminated environment and irreversible non-renewable), and most facing layer material cannot accomplish and the same life-span of building floor, renovation and waste treatment are costly.
Therefore, be desirable to provide and a kind ofly can save material, improve floor layer entire compression ability, alleviate building load and cost, building floor that simultaneously can protection of the environment.
Summary of the invention
For this reason, what the present invention proposes a kind of at least a portion that can address the above problem novelly can save material, improves floor layer entire compression ability, alleviates building load and cost, the floor with decorative cover overcoat that simultaneously can protection of the environment.
According to an aspect of the present invention, provide a kind of floor with decorative cover overcoat, wherein, described floor is made by the preparation method that has comprised following processing step:
The step that paves S1100: concrete is paved at floor slab construction face;
Vibrate, levelling, compacting step S1200: by described concrete implement to vibrate, levelling, compacting construction form floor layer to designing facing calibrated altitude;
Maintenance step S1300: by the described concrete curing of described floor layer to the prescribed time-limit;
Corase grind step S1400: roughly grind the surface of described floor layer to remove laitance coating;
Form compacted zone step S1500: concrete repair liquid and the described corase grind step S1400 powder getting off of polishing is mixed mutually, repair the flaw position on closely knit described floor layer surface, thereby form compacted zone on the surface of described floor layer;
Form strengthening layer step S1600: strong concrete agent is permeated to 3mm-5mm downwards from the surface of described compacted zone, and described strong concrete agent forms strengthening layer after reacting with described concrete;
Fine grinding and polishing step S1700: the surface of strengthening layer described in fine grinding and polishing;
Form topping step S1800: adopt osmosis type solution to smear described strengthening layer, described osmosis type solution permeates downwards, after described osmosis type solution reacts with described concrete, form topping.
Alternatively, according to an embodiment of the invention, wherein, in described maintenance step S1300, the described prescribed time-limit comprises spring, summer, autumn maintenance 7-9 days, maintains 10-15 days winter.
Alternatively, according to an embodiment of the invention, wherein, in described maintenance step S1300, water every day and be no less than 2 times, every less importantly guarantee that flooring has the ponding of 11-16 minute.
Alternatively, according to an embodiment of the invention, wherein, described concrete repair liquid comprises water-borne acrylic resin class solution.
Alternatively, according to an embodiment of the invention, wherein, described strong concrete agent comprises any one in following: potassium base class strong concrete agent, sodium base class strong concrete agent and lithium base class strong concrete agent.
Alternatively, according to an embodiment of the invention, wherein, described osmosis type solution comprises the macromolecule organic silicon.
Alternatively, according to an embodiment of the invention, the described floor with decorative cover overcoat comprises strengthening layer and the 3rd bottom connecting successively from top to bottom, and described strengthening layer comprises topping and the second bottom connecting successively from top to bottom,
Described topping comprises compacted zone and the first bottom connecting successively from top to bottom.
Floor with decorative cover overcoat provided by the invention at least can be saved material, improves floor layer entire compression ability, alleviate building load and cost, simultaneously can also protection of the environment.
Accompanying drawing explanation
By reading below detailed description of the preferred embodiment, various other advantage and benefits will become cheer and bright for those of ordinary skills.Accompanying drawing is only for the object of preferred embodiment is shown, and do not think limitation of the present invention.And in whole accompanying drawing, by identical reference symbol, represent identical parts.Wherein in the accompanying drawings, a plurality of identical parts of alphabetic flag indication after reference number, when these parts of general reference, will omit its last alphabetic flag.In the accompanying drawings:
Fig. 1 shows the preparation method of the floor with decorative cover overcoat of a preferred embodiment of the invention;
Fig. 2 shows the structural representation of the floor with decorative cover overcoat of a preferred embodiment of the invention.
Fig. 3 shows the structural representation of strengthening layer in Fig. 2; And
Fig. 4 shows the structural representation of topping in Fig. 3.
Wherein: floor layer 1, compacted zone 1-1, the first bottom 1-1-1, topping 1-2, the second bottom 1-2-1, strengthening layer 1-3, the 3rd bottom 1-3-1.
The specific embodiment
The invention provides many applicable creative concepts, this creativeness concept can be reflected in a large number of in concrete context.The specific embodiment of describing in following embodiments of the present invention is only as the exemplary illustration of the specific embodiment of the present invention, and do not form limitation of the scope of the invention.
Below in conjunction with accompanying drawing and concrete embodiment, the invention will be further described.
According to the preparation method of the floor with decorative cover overcoat of a preferred embodiment of the invention shown in Fig. 1.Floor with decorative cover overcoat provided by the invention is made by the preparation method that has comprised following processing step: first enter the step S1100 that paves, enter and vibrate, levelling, compacting step S1200, enter maintenance step S1300 again, enter corase grind step S1400 subsequently, and then enter and forms compacted zone step S1500, next enter and form strengthening layer step S1600, enter and refine and polishing step S1700, finally enter and form topping step S1800 more afterwards.
Specifically as shown in Figure 1, a kind of floor with decorative cover overcoat, described floor is made by the preparation method that has comprised following processing step:
First enter the step S1100 that paves: concrete is paved at floor slab construction face.
Preferably, before paving, build front template and pay in advance, split heads support interval 1m * 1m, the above way and double-layer reinforcing bar of Φ 8mm is completely pricked, in spacing 15cm * 15cm.
Enter to vibrate afterwards, levelling, compacting step S1200: by described concrete implement to vibrate, levelling, compacting construction form floor layer to designing facing calibrated altitude.Alternatively, this step operates by laser or other technological means level of control degree principles.
Preferably, in this step, use disposable leveling apparatus by described concrete implement to vibrate, levelling, compacting construction form floor layer to designing facing calibrated altitude, thereby in construction, realize the effect that design facing one-off construction can reach calibrated altitude operation, but not first construction as traditional handicraft, and then Multiple through then out levelling reaches calibrated altitude.In this step, the use of disposable leveling apparatus not only can improve efficiency of construction, reduces construction cost simultaneously.
Preferably, with concrete laser paver, realize levelling.Particularly, concrete laser paver, by receiving the laser signal of permanent position, this machine laser system, absolute altitude with 10 above frequency Real-Time Monitoring leveling heads per second, the secret hydraulic system that has been equipped with multiple Automatic Control Component by computer control flattens automatically, guarantees that ground flat degree and the levelness of paving note is controlled effectively.Meanwhile, its powerful vibrator vibration frequency reaches 3000 times more than-5000 beats/min, guarantees that concrete vibrating is closely knit, makes floorslab concrete homogeneous, the densification of whole paving note.
Alternately, disposable leveling apparatus had both comprised what prior art provided, as described in concrete laser paver, also comprise the equipment of the identical function realized that WeiLai Technology provides.
Enter again maintenance step S1300: by the described concrete curing of described floor layer to the prescribed time-limit.
Enter subsequently corase grind step S1400: roughly grind the surface of described floor layer to remove laitance coating.In this step, can adopt dry type concrete rubbing down equipment corase grind surface removal laitance coating.
Laitance causes owing to adding the excessive reasons such as dilutional hyponatremia that add of the Admixtures such as flyash that concrete slump is excessive even emanates and generate.
Preferably, at dry type concrete rubbing down equipment, dry type abrasive disc is installed, the bruting process operation of not sprinkling water, generates without mud, utilizes dust collection equipment to collect dust.
Preferably, during corase grind surface, select metal matrix diamond disk 30 order-100 orders.
And then enter and form compacted zone step S1500: concrete repair liquid and the described corase grind step S1400 powder getting off of polishing is mixed mutually, repair the flaw position on closely knit described floor layer surface, thereby form compacted zone on the surface of described floor layer.
Preferably, adopt water-borne acrylic resin class concrete repair liquid to mix the powder of polishing and repair the flaw positions such as dense concrete surface pore and crack, form compacted zone.This compacted zone is without the visible hole of naked eyes, closely knit exquisiteness.
Next enter and form strengthening layer step S1600: strong concrete agent is permeated to 3mm-5mm downwards from the surface of described compacted zone, and described strong concrete agent forms strengthening layer after reacting with described concrete.
Alternatively, described strong concrete agent comprises any one in following: potassium base class strong concrete agent, sodium base class strong concrete agent and lithium base class strong concrete agent.
Adopt (potassium, sodium, lithium base class) strong concrete agent infiltration 3mm-5mm left and right, after reacting with concrete, form strengthening layer and can improve former concrete strength Three Estate.Concrete intensity is mainly derived from the silicon in the cement composition in concrete, the calcium silicate compound (C-S-H) that calcium generates under the effect of water, and C-S-H is exactly the material that plays main intensity effect in concrete.Contained active silicic acid radical ion (SiO in concrete curing sealing agent 3 2-) become the free calcium ions (Ca of calcium silicates with unreacted in concrete 2+) reaction generation calcium silicate hydrate (C-S-H), make the calcium ion (Ca in concrete 2+) further participate in reaction, improve by a larger margin concrete intensity and hardness.
Enter again fine grinding and polishing step S1700: strengthening surface layer by layer described in fine grinding and polishing.In this step, adopt dry type concrete rubbing down equipment (pure physics polishing) fine grinding (metal matrix diamond disk 120 orders, resin carcass diamond disk 50 order/200, order/100 orders) and polishing (resin carcass diamond disk 400 order/3000, order/1500, order/800 orders) concrete surface layer.
Finally enter and form topping step S1800: adopt osmosis type solution to smear described strengthening layer.Described osmosis type solution permeates downwards, after described osmosis type solution reacts with described concrete, forms topping.In this step, adopt (the macromolecule organic silicon) osmosis type solution to smear, after infiltration is dry, form topping, can play the effect of effective anti-soil antiseepage.
Alternatively, special aggregate effect can adopt the pre-buried or mode such as shed to implement before the rear disk that paves is received light.Color block areas effect can adopt the modes such as formwork piecemeal to implement.
Floor with decorative cover overcoat provided by the invention overcomes the following technical problem in this area:
1, overcome building floor layer one-time-concreting and controlled difficult point to levelness and the planeness of design elevation, adopt this construction technology, 200 meters of the floor left and right end span degree of take are example, and this technological level error can be controlled in 15mm, and planeness can be controlled in 2 meters of guiding ruler 6mm.
2, overcome the deficiency (as percolating water, have hole, Yi Qichen, bad contamination-proof capability, without light etc.) of concrete self finishing effect, adopt this construction technology, finished product face case hardness improves Three Estate (concrete surface hardness can be increased to 7 from mohs hardness 4), the high energy of reflectance increases to 70-90, finished surface exquisiteness is closely knit, does not play dirt, does not absorb water, anti-soil is wear-resisting, and anti-skid factor meets the safety standard (0.35-0.80) of Americans with disabilities act (ADA).
According to the structural representation of the floor with decorative cover overcoat of a preferred embodiment of the invention shown in Fig. 2, the structural representation of strengthening layer in the Fig. 2 shown in Fig. 3; And the structural representation of topping in the Fig. 3 shown in Fig. 4.Wherein: floor layer 1, compacted zone 1-1, the first bottom 1-1-1, topping 1-2, the second bottom 1-2-1, strengthening layer 1-3 and the 3rd bottom 1-3-1.
A kind of floor with decorative cover overcoat; the described floor with decorative cover overcoat comprises strengthening layer 1-3 and the 3rd bottom 1-3-1 connecting successively from top to bottom; described strengthening layer 1-3 comprises topping 1-2 and the second bottom 1-2-1 connecting successively from top to bottom, and described topping 1-2 comprises compacted zone 1-1 and the first bottom 1-1-1 connecting successively from top to bottom.
Described compacted zone 1-1 mixes concrete repair liquid and the described corase grind step powder getting off of polishing mutually, repairs the flaw position on closely knit described floor layer 1 surface, thus the structure forming on the surface of described floor layer.
Described topping 1-2 adopts osmosis type solution to smear described strengthening layer, comprises described compacted zone 1-1, and described osmosis type solution permeates downwards, and described osmosis type solution react the structure of formation afterwards with described concrete.
Described strengthening layer 1-3 permeates 3mm-5mm by strong concrete agent downwards from the surface of described compacted zone 1-1, the structure 1-3 that described strong concrete agent forms after reacting with described concrete.
After described the first bottom 1-1-1 comprises that described strong concrete agent is reacted with described concrete, then the structure forming after dry by the infiltration of osmosis type solution.
Described the second bottom 1-2-1 comprises the fine and close crystalline texture forming after described strong concrete agent is reacted with described concrete.
Described the 3rd bottom 1-3-1 comprises concrete.
Preferably, in the described floor with decorative cover overcoat, compacted zone 0.8mm-1mm, topping 2mm-3mm, strengthening layer 3mm-5mm.
Visible; floor with decorative cover overcoat provided by the invention has been realized the integrated of floor layer and finish coat; the combination of the bearing function of floor layer and the decoration functions of finish coat; in floor layer gross thickness; by concrete rubbing down equipment, adopt pure physics polishing mode to floor layer internal pressurization, to fill and permeate the finish coat of functions such as forming collection compacted zone, strengthening layer and topping, really realize integrated.
The beneficial effect compared with prior art with following aspect:
1,, without hollowing cracking risk: floor layer is built as reinforcing bar and the moulding of strong concrete one-time-concreting, there will not be hollowing cracking.
2, alleviate building deadweight: owing to going for less flat (level) bed course and finish coat, greatly alleviate building deadweight, this has important practical usage in the earthquake disaster area that takes place frequently, and can greatly reduce casualty loss and disaster relief clean-up intensity.
3, reduce construction costs: significantly the result of loss of weight Reduction of Students' Study Load can reduce the building costss such as carrying basis, simplifies working process and can reduce construction engineering cost.
4, supporting capacity strengthens greatly, and wear-resisting strong anti-damage, reprocesses without replacing, increases spatial altitude.
5, without surface decoration material (as stone material/ceramic tile/epoxy/PVC etc.), use, and following because of pollution and the resource consumption changed and renovation brings.
6, the hyperfine polishing of concrete floor there will not be at plum rain season the ponding that gets damp.
7, the hyperfine polishing of concrete floor can store heat, effectively improves efficiency, reduces the required fuel of heat supply, can secondary transfer heat energy, at whole building, provide a comfortable environment.
8, the attribute of the high reflectance on the hyperfine polishing of concrete floor coordinates concrete floor energy storage characteristic, has reduced to a certain extent the demand of illuminating lamp, demand that can less peak period refrigerating/heating electric weight.
9, the hyperfine polishing floor terrace of concrete system is unfavorable for growth and the diffusion of mould; There is not the volatilization of any VOC, build an indoor air environment healthily;
10, because floor layer is used strong concrete to build, effective after pure physics polishing, and with the same life-span of building.
11, due to can very most of alternative stone material in a lot of application scenarios, ceramic tile, timber etc., can save (non-renewable) natural resource, and exploit environment pollution and destruction that current natural resource brings.
12, due to can very most of alternative plastic cement in a lot of application scenarios, the chemical materials floors such as epoxy resin, in the time of can avoiding producing these materials and discarded (non-degradable) and process to the pollution of environment and destruction.
13, the pollution of mud, dust and the Other Waste that floor face based process in the time of can avoiding traditional secondary to build (sandblast is washed plane and rinsed cleaning) produces to environment.
Embodiment
The optional many factors of the floor with decorative cover overcoat that the present invention proposes, can design various embodiments, so specific embodiment is only as the exemplary illustration of specific implementation of the present invention, and does not form limitation of the scope of the invention.For concrete description the present invention, select following examples to carry out exemplary illustration.
Example 1: floor layer is built 1000 square meters
1, build front template and pay in advance, split heads support interval 1m * 1m, Φ 10mm way and double-layer reinforcing bar is completely pricked, spacing 10cm * 15cm;
2, slump 160mm, day pump is carried and is above paved to floor slab construction face;
3, laser controlling (level and planeness) imported mechanical laying equipment is implemented to vibrate, levelling, compacting be to designing facing absolute altitude 14cm thickness of slab;
4, hand push rod is eliminated the trace between laying equipment file trend;
5, after initial set, double plate disk photoreceiver is received light;
6, concrete is sprinkled water and keep maintenance in wetting 30 minutes 10 days for 2-3 time every day;
7, adopt dry type concrete rubbing down equipment metal matrix 60 order abrasive disc corase grind surface removal laitance coatings.
8, floor surface is coated with and spills concrete repair liquid, adopt the 120 order abrasive disc polishings of import dry type concrete rubbing down equipment metal matrix, concrete repair liquid mixes polishing powder and repairs the flaw positions such as dense concrete surface pore and crack, forms compacted zone (without the visible hole of naked eyes);
9, the infiltration of employing nothing dilution concrete potassium base hardening agent, guarantees to soak in 30 minutes, is dried and after 8 hours, reacts the rear calcium silicide strengthening layer that forms with concrete, and case hardness is promoted to Mo Shi 7 left and right (import hardness test pen) by mohs hardness 4;
10, adopt import dry type concrete rubbing down equipment resin carcass 50 orders, each mill of 100 orders together;
11, adopt without thin the spilling of dilution concrete potassium base hardening agent, every square meter consumption 0.2L, 2 hours drying times;
12, adopt import dry type concrete rubbing down equipment resin carcass 200 orders, 400 orders, 800 orders, 1500 orders, each fine grinding of 3000 orders together;
13, adopt polymer inlet organosilicon osmosis type (food security rank) super shielded liquid to smear, infiltration is dry formed topping after 6 hours;
14, adopting import dry type concrete rubbing down equipment that the clean black pad of black (animal hair) is installed cleans.
The end product surface reflection degree 80 of making according to the present embodiment, hardness Mo Shi 8, anti-skid factor 0.78; 5 millimeters of 2 meters of guiding rulers of planeness.
Example 2: floor layer is built 1000 square meters
1, build front template and pay in advance, split heads support interval 1m * 1m, Φ 10mm way and double-layer reinforcing bar is completely pricked, spacing 15cm * 15cm;
2, slump 180mm, day pump is carried and is above paved to floor slab construction face;
3, laser controlling (level and planeness) imported mechanical laying equipment is implemented to vibrate, levelling, compacting be to designing facing absolute altitude 14cm thickness of slab;
4, hand push rod is eliminated the trace between laying equipment file trend;
5, after initial set, single-deck disk photoreceiver is received light;
6, concrete is sprinkled water and keep maintenance in wetting 30 minutes 10 days for 2-3 time every day;
7, adopt import dry type concrete rubbing down equipment metal matrix 30 orders and 60 order abrasive discs to roughly grind surface removal laitance coating together with each;
8, floor surface is coated with and spills concrete repair liquid, adopt the 120 order abrasive disc polishings of import dry type concrete rubbing down equipment metal matrix, concrete repair liquid mixes polishing powder and repairs the flaw positions such as dense concrete surface pore and crack, forms compacted zone (without the visible hole of naked eyes);
9, the infiltration of employing nothing dilution lithium base concrete hardening agent, guarantees to soak in 30 minutes, is dried and after 8 hours, reacts the rear calcium silicide strengthening layer that forms with concrete, and case hardness is promoted to Mo Shi 7 left and right (import hardness test pen) by mohs hardness 4;
10, adopt import dry type concrete rubbing down equipment resin carcass 50 orders, each mill of 100 orders together;
11, adopt import dry type concrete rubbing down equipment resin carcass 200 orders, 400 orders, 800 orders, 1500 orders, each fine grinding of 3000 orders together;
12, adopt polymer inlet organosilicon osmosis type (food security rank) super shielded liquid to smear, the dry 6 rear formation toppings of infiltration;
13, adopting import dry type concrete rubbing down equipment that the clean black pad of black animal hair is installed cleans.
The end product surface reflection degree 75 of making according to the present embodiment, hardness Mo Shi 7, anti-skid factor 0.75; 6 millimeters of 2 meters of guiding rulers of planeness.
The floor of producing by above embodiment, at least realized:
1. the bonus point standard that meets 7 classifications of international LEED (green building project Verification System) V3.0 points-scoring system (building site/water-use efficiency/energy of sustainable development and air/material and resource/indoor environmental quality/design program innovation/region priority for environmental protection).
2. floor primary concreting is saved 7 days durations than traditional handicraft, and floor face based process (sandblast is washed plane and rinsed cleaning) produces while having avoided traditional secondary to build mud or dust.
3. solved building floor layer one-time-concreting and controlled difficult point to levelness and the planeness of design elevation, be applied to the building of 120 meters of floor left and right end span degree, this technological level error can be controlled in 10mm, and planeness can be controlled in two meters of guiding ruler 6mm.
4. realize without construction rubbish, the dust that polishing produces is collected after efficient dust collection equipment three-stage filtration, reclaims brickmaking (high pressure brick molding machine) 0.8 cube.
5. finished product ground wear-resistant pressure-resistant after polishing, highlighted anti-skidding, do not play dirt.
It should be noted that items of equipment that the present invention is mentioned and material include that prior art provides.
It should be noted, the present invention will be described rather than limit the invention for above-described embodiment, and those skilled in the art can design alternative embodiment in the situation that do not depart from the scope of claims.In the claims, any reference symbol between bracket should be configured to limitations on claims.Word " comprises " not to be got rid of existence and is not listed as element or step in the claims.Being positioned at word " " before element or " one " does not get rid of and has a plurality of such elements.The use of word first, second and C grade does not represent any order.Can be title by these word explanations.

Claims (7)

1. with a floor for decorative cover overcoat, wherein, described floor is made by the preparation method that has comprised following processing step:
The step that paves (S1100): concrete is paved at floor slab construction face;
Vibrate, levelling, compacting step (S1200): by described concrete implement to vibrate, levelling, compacting construction form floor layer (1) to designing facing calibrated altitude;
Maintenance step (S1300): by the described concrete curing of described floor layer (1) to the prescribed time-limit;
Corase grind step (S1400): roughly grind the surface of described floor layer (1) to remove laitance coating;
Form compacted zone step (S1500): the powder that concrete repair liquid is polished with described corase grind step (S1400) mixes mutually, repair the flaw position on closely knit described floor layer (1) surface, thereby form compacted zone (1-1) on the surface of described floor layer (1);
Form strengthening layer step (S1600): strong concrete agent is permeated to 3mm-5mm downwards from the surface of described compacted zone (1-1), and described strong concrete agent forms strengthening layer (1-3) after reacting with described concrete;
Fine grinding and polishing step (S1700): the surface of strengthening layer (1-3) described in fine grinding and polishing;
Form topping step (S1800): adopt osmosis type solution to smear described strengthening layer (1-3), described osmosis type solution permeates downwards, after described osmosis type solution reacts with described concrete, form topping (1-2).
2. the floor with decorative cover overcoat according to claim 1, wherein, in described maintenance step (S1300), the described prescribed time-limit comprises spring, summer, autumn maintenance 7-9 days, maintains 10-15 days winter.
3. the floor with decorative cover overcoat according to claim 2, wherein, in described maintenance step (S1300), waters and is no less than 2 times every day, every less importantly guarantees that flooring has the ponding of 11-16 minute.
4. the floor with decorative cover overcoat according to claim 1, wherein, described concrete repair liquid comprises water-borne acrylic resin class solution.
5. the floor with decorative cover overcoat according to claim 1, wherein, described strong concrete agent comprises any one in following: potassium base class strong concrete agent, sodium base class strong concrete agent and lithium base class strong concrete agent.
6. the floor with decorative cover overcoat according to claim 1, wherein, described osmosis type solution comprises the macromolecule organic silicon.
7. according to the floor with decorative cover overcoat described in any one in claim 1-6, wherein, the described floor with decorative cover overcoat comprises strengthening layer (1-3) and the 3rd bottom (1-3-1) connecting successively from top to bottom,
Described strengthening layer (1-3) comprises topping (1-2) and the second bottom (1-2-1) connecting successively from top to bottom,
Described topping (1-2) comprises compacted zone (1-1) and the first bottom (1-1-1) connecting successively from top to bottom.
CN201410504561.5A 2014-09-26 2014-09-26 The floor of a kind of band decorative cover protective layer Active CN104213663B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410504561.5A CN104213663B (en) 2014-09-26 2014-09-26 The floor of a kind of band decorative cover protective layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410504561.5A CN104213663B (en) 2014-09-26 2014-09-26 The floor of a kind of band decorative cover protective layer

Publications (2)

Publication Number Publication Date
CN104213663A true CN104213663A (en) 2014-12-17
CN104213663B CN104213663B (en) 2016-06-01

Family

ID=52095545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410504561.5A Active CN104213663B (en) 2014-09-26 2014-09-26 The floor of a kind of band decorative cover protective layer

Country Status (1)

Country Link
CN (1) CN104213663B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328852A (en) * 2014-09-26 2015-02-04 孙国胜 Production method for floor slab with facing protecting layer
CN105587102A (en) * 2016-03-01 2016-05-18 黑龙江泽林科技有限公司 Construction method of wet-on-wet paving type high abrasion resistance terrace
CN106150032A (en) * 2015-03-10 2016-11-23 薛家珍 A kind of construction method of the type high-wear-resistant alloy terrace that paves

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1521362A (en) * 2003-01-29 2004-08-18 中国航空港建设第二工程总队 Construction method of large-size high-performance cement concrete pavement slab
CN101016713A (en) * 2007-02-14 2007-08-15 易志坚 Color pavement formed by spraying on porous polymer concrete facing and construction method therefor
GB2460486A (en) * 2006-12-20 2009-12-09 Peter Sully Load bearing unit
CN101876162A (en) * 2009-04-30 2010-11-03 上海惠邦特种涂料有限公司 Durability traceless repair method for road and bridge concrete, color difference trimming putty and trimming material
CN102251455A (en) * 2011-05-25 2011-11-23 浙江中富建筑集团股份有限公司 Vibration-free anti-slip lane and construction method thereof
CN103306439A (en) * 2013-06-14 2013-09-18 浙江建设职业技术学院 Pouring technology for implanting high anti-leakage and anti-crack protective layer into roof structure layer

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1521362A (en) * 2003-01-29 2004-08-18 中国航空港建设第二工程总队 Construction method of large-size high-performance cement concrete pavement slab
GB2460486A (en) * 2006-12-20 2009-12-09 Peter Sully Load bearing unit
CN101016713A (en) * 2007-02-14 2007-08-15 易志坚 Color pavement formed by spraying on porous polymer concrete facing and construction method therefor
CN101876162A (en) * 2009-04-30 2010-11-03 上海惠邦特种涂料有限公司 Durability traceless repair method for road and bridge concrete, color difference trimming putty and trimming material
CN102251455A (en) * 2011-05-25 2011-11-23 浙江中富建筑集团股份有限公司 Vibration-free anti-slip lane and construction method thereof
CN103306439A (en) * 2013-06-14 2013-09-18 浙江建设职业技术学院 Pouring technology for implanting high anti-leakage and anti-crack protective layer into roof structure layer

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328852A (en) * 2014-09-26 2015-02-04 孙国胜 Production method for floor slab with facing protecting layer
CN106150032A (en) * 2015-03-10 2016-11-23 薛家珍 A kind of construction method of the type high-wear-resistant alloy terrace that paves
CN105587102A (en) * 2016-03-01 2016-05-18 黑龙江泽林科技有限公司 Construction method of wet-on-wet paving type high abrasion resistance terrace
CN105587102B (en) * 2016-03-01 2018-08-17 黑龙江泽林科技有限公司 A kind of wet construction method to the wet type high abrasion terrace that paves

Also Published As

Publication number Publication date
CN104213663B (en) 2016-06-01

Similar Documents

Publication Publication Date Title
US10648183B2 (en) Architectural concrete and method of forming the same
CN111997303B (en) Cast-in-place inorganic artificial terrazzo terrace and construction method thereof
CN102061798B (en) Construction method of epoxy self-leveling floor with concrete sealing curing agent and thereof
CN101886457B (en) Method for constructing wear-resistant and crack-resistant hardened ground
CN106836815A (en) Large area diamond dust floor structure plate and surface layer one-off construction method
CN110656753A (en) Concrete grindstone terrace
CN111608362A (en) Hollowing-proof and cracking-proof process for concrete terrace leveling layer
CN107152145A (en) A kind of stone material flooring construction method
CN210195143U (en) Large-area integral seamless epoxy grindstone artistic floor anti-cracking paving structure
CN104213663B (en) The floor of a kind of band decorative cover protective layer
CN107060271B (en) A kind of dust-proof hardened artiwear method for constructing terrace
CN102251455A (en) Vibration-free anti-slip lane and construction method thereof
CN112593671A (en) Inorganic grindstone system toughened terrace and manufacturing method thereof
CN114562087A (en) Cement-based grindstone material, concrete-integrated construction method thereof and grindstone terrace
CN203977665U (en) A kind of floor with decorative cover overcoat
US20070044685A1 (en) Mosaic marble flooring and driveway system
CN104328852B (en) A kind of manufacture method of the floor of band decorative cover overcoat
CN105544829A (en) Steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and manufacturing method thereof
CN114876155A (en) Construction process for polishing ground by using non-ignition fine stone concrete
CN105544934B (en) A kind of entirety flooring solidification construction method
CN107060174A (en) A kind of floor whole casting layer construction method
CN114562088B (en) Construction process of inorganic grinding stone on ground of high-speed railway station
CN221321607U (en) Factory building ground coating structure
CN212866728U (en) Concrete primary polishing terrace
CN204001557U (en) Assembled ceramic tile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Sun Guosheng

Inventor after: Zhang Ming

Inventor after: Xu Hongbo

Inventor before: Sun Guosheng

COR Change of bibliographic data