CN104198951B CN201410411958.XA CN201410411958A CN104198951B CN 104198951 B CN104198951 B CN 104198951B CN 201410411958 A CN201410411958 A CN 201410411958A CN 104198951 B CN104198951 B CN 104198951B
Authority
CN
China
Prior art keywords
power supply
emergency power
injection pump
safety injection
moving emergency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410411958.XA
Other languages
Chinese (zh)
Other versions
CN104198951A (en
Inventor
沈锦峄
章松林
张学文
周洪军
石全建
胥跃
周李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Lingao Nuclear Power Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Lingao Nuclear Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd, Lingao Nuclear Power Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201410411958.XA priority Critical patent/CN104198951B/en
Publication of CN104198951A publication Critical patent/CN104198951A/en
Application granted granted Critical
Publication of CN104198951B publication Critical patent/CN104198951B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

The present invention relates to the reliability verification methods of nuclear power station 380V moving emergency power supply, comprising the following steps: carries out band and carries the water injecting pump feasibility analysis of main pump axle envelope, exports feasibility analysis judging result;The test with nominal load is carried out, load capacity test parameters is exported;The load capacity of 380V moving emergency power supply is judged according to load capacity test parameters;It carries out band and carries safety injection pump axle envelope water injection test, output band carries safety injection pump axle envelope water injection capacity test parameters;Judge that the band of 380V moving emergency power supply carries safety injection pump axle envelope water injection capacity according to load safety injection pump axle envelope water injection capacity test parameters.By carrying out the test with nominal load to 380V moving emergency power supply, and simulated accident operating condition, it carries out band and carries safety injection pump axle envelope water injection test, whether the properties of comprehensive verification 380V moving emergency power supply meet design requirement, the reliability for strengthening nuclear power station 380V emergency power supply improves nuclear power station depth defense ability.

Description

The reliability verification method of nuclear power station 380V moving emergency power supply
Technical field
The present invention relates to technical field of nuclear power, more specifically to a kind of nuclear power station 380V moving emergency power supply can By property verification method.
Background technique
Currently, Chinese modified million kilowatt (1000MW) pressurized-water reactor nuclear power plant (hereinafter referred to as CPR1000 nuclear power station) In, every two generating sets are equipped with a set of LLS system (hydraulic testpump diesel generating set), mainly include the mobile bavin of 380V Oily generating set and 380V distribution board.Under normal or design basis accident operating condition, LLS system is in stand-by state, does not execute Security function.Under the super design reference operating condition that two column 6kV emergency service buses of a generating set cannot power, LLS system System, which can guarantee, provides the emergency power supply of 380VAC to hydraulic testpump, and the hydraulic testpump is to main pump (reactor coolant pump) No.1 axle envelope injects axle sealing water, to guarantee the integrality of reactor-loop;LLS system will also be to room where hydraulic testpump Ventilation is provided, and two-way 220VAC emergency power supply is provided, has the function that accident mitigation.
CPR1000 nuclear power station LLS system is generally disposed at+0.30m, and main mesolow electrical cabinet is arranged in LX workshop (mark Height+7.00m), it is contemplated that for CPR1000 nuclear power station site elevation within 10.0m, primary power distribution equipment absolute altitude is equal at present In 15.0m or more, there is certain resilience to the great water logging external event such as tsunami, flood;But LLS system absolute altitude exists The position 9.0m~10.0m, there are emergency power systems when generation major natural disasters (tsunami, flood etc.) " common mode failure " occurs Risk.
According to the improvements in security item requirement after Fukushima Nuclear Power Accident, increasing a 380V moving emergency power supply, (movable type is answered Anxious diesel generating set) supplement and standby as LLS system can be in the case where LLS system is invalid within the prescribed time-limit Start the power supply of 380V moving emergency power up, " common mode failure " risk can be reduced in a certain range, improve nuclear power station depth Defence capability.
As shown in Figure 1,380V moving emergency power supply mainly includes 380V truck diesel alternator group 1, extension 380V distribution Cabinet 2 and quick coupling 3.After 380V moving emergency power supply introduces plant area, fast quick access (is inside set by the waterproof wiring case of LLS system Head) mode, establish connection with the 380V distribution board of LLS system, manually boot the vehicle-mounted diesel generation of 380V in the state of accident Unit 1 and access power supply.
It is verified in 380V moving emergency power supply using preceding needing to carry out a series of test, confirms equipment properties Meet design basis requirement, existing main experimental content is as follows:
1, visual examination, electric insulation test and mechanical system inspection before starting to 380V truck diesel alternator group It looks into;
2, No Load Start 380V truck diesel alternator group measures its performance and parameter;
3, start 380V truck diesel alternator group, charge test, inspection are carried out to LLS system power cabinet by quick coupling Look into electric parameter.
In above-mentioned existing debugging technique scheme, lacks and the test with nominal load is carried out to 380V moving emergency power supply, It does not carry out band and carries safety injection pump axle envelope water injection test, lack the verifying and inspection of real simulation operation, therefore cannot verify completely Moving emergency power supply properties meet design requirement.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the above drawbacks of the prior art, providing a kind of energy comprehensive verification The reliability verification method of nuclear power station 380V moving emergency power supply properties.
The technical solution adopted by the present invention to solve the technical problems is:
Construct a kind of reliability verification method of nuclear power station 380V moving emergency power supply, wherein the verification method includes Following steps:
Band is carried out to 380V moving emergency power supply and carries main pump injection axle sealing water feasibility analysis, the 380V movement is exported and answers Whether urgent telegram source meets the judging result with the experimental condition for carrying main pump injection axle sealing water;
When the 380V moving emergency power supply meets with the experimental condition for carrying main pump injection axle sealing water, the 380V is moved Dynamic emergency power supply carries out the test with nominal load, exports load capacity test parameters;
Judge that the load capacity of the 380V moving emergency power supply, output band carry energy according to the load capacity test parameters Power judging result;
When the load capacity of the 380V moving emergency power supply meets the requirements, carries out band and carry the water filling examination of safety injection pump axle envelope It tests, obtains band and carry safety injection pump axle envelope water injection capacity test parameters;
Safety injection pump axle envelope water injection capacity test parameters, which is carried, according to the band judges that the band of the 380V moving emergency power supply carries Safety injection pump axle envelope water injection capacity, output band carry safety injection pump axle envelope water injection capacity judging result.
Reliability verification method of the present invention, wherein the 380V moving emergency power supply includes the vehicle-mounted diesel oil of 380V Generating set, power distribution cabinet and quick coupling.
Reliability verification method of the present invention, wherein carry out to the 380V moving emergency power supply with specified negative When the test of load, using resistance box as load.
Reliability verification method of the present invention, wherein the band carries safety injection pump axle envelope water injection capacity test parameters and is Safety injection pump rate of discharge parameter.
Reliability verification method of the present invention, wherein the step of progress band carries safety injection pump axle envelope water injection test It specifically includes:
It connects and prepares before being tested;
It detects and confirms whether the safety injection pump is correct online, when the safety injection pump is correct online, to the safety injection pump Send switch unlock instruction;
Enabling signal is sent to the 380V diesel generating set;
Simulated accident operating condition sends enabling signal to the safety injection pump;
It detects and confirms whether the safety injection pump works in preassigned pattern;
It detects and confirms whether the 380V diesel generating set, power distribution cabinet, safety injection pump are without exception;
It works in the safety injection pump in preassigned pattern, and the 380V diesel generating set, power distribution cabinet, safety injection pump are without exception When, export the safety injection pump rate of discharge parameter;
Judge that the band of the 380V moving emergency power supply carries safety injection pump axle envelope note according to the safety injection pump rate of discharge parameter Outlet capacity, output band carry safety injection pump axle envelope water injection capacity judging result.
Reliability verification method of the present invention, wherein according to safety injection pump rate of discharge parameter judgement 380V moving emergency power supply band carry safety injection pump axle envelope water injection capacity the step of include:
Judge whether the safety injection pump rate of discharge parameter reaches 6m3/ h, when the safety injection pump rate of discharge reaches 6m3/h When, export the judging result with load safety injection pump axle envelope water injection capacity qualification of the 380V moving emergency power supply.
Reliability verification method of the present invention, wherein the preassigned pattern is middle pressure safety injection tank Water supplement pattern.
Reliability verification method of the present invention, wherein described that band load main pump note is carried out to 380V moving emergency power supply Enter axle sealing water feasibility analysis and specifically include step:
Visual examination, electric insulation test and mechanical system inspection before starting to the 380V moving emergency power supply It looks into, exports apparent parameter, electric insulation test parameters and the system parameter of the 380V moving emergency power supply.
Reliability verification method of the present invention, wherein described that band load main pump note is carried out to 380V moving emergency power supply Enter axle sealing water feasibility analysis and specifically include step:
No Load Start signal is sent to the 380V truck diesel alternator group, exports the 380V truck diesel alternator Organize the measurement result of performance and parameter in the unloaded state.
Reliability verification method of the present invention, wherein described that band load main pump note is carried out to 380V moving emergency power supply Enter axle sealing water feasibility analysis and specifically include step:
Enabling signal is sent to the 380V truck diesel alternator group, by by the fast of the 380V moving emergency power supply Quick coupling connect with hydraulic testpump diesel generating set, fills to the power distribution cabinet of the hydraulic testpump diesel generating set Electric test exports electric parameter.
The beneficial effects of the present invention are: by 380V moving emergency power supply carry out the test with nominal load, and Simulated accident operating condition carries out band to 380V moving emergency power supply and carries safety injection pump axle envelope water injection test, and comprehensive verification 380V movement is answered Whether the properties in urgent telegram source meet design requirement, strengthen the reliability of nuclear power station 380V emergency power supply, improve nuclear power It stands depth defense ability.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is the 380V moving emergency power principle structural schematic diagram of the prior art;
Fig. 2 is the reliability verification method flow chart of the 380V moving emergency power supply of present pre-ferred embodiments;
Fig. 3 is the detailed of step S40 in the reliability verification method of the 380V moving emergency power supply of present pre-ferred embodiments Thin flow chart.
Specific embodiment
Reliability verification method process such as Fig. 2 institute of the nuclear power station 380V moving emergency power supply of present pre-ferred embodiments Show, this method originates in step S10;In step S20, carrying out band load main pump injection axle sealing water to 380V moving emergency power supply can Row analysis, judges whether 380V moving emergency power supply meets with the experimental condition for carrying main pump injection axle sealing water, output judgement knot Fruit;When 380V moving emergency power supply meets with the experimental condition for carrying main pump injection axle sealing water, in step s 30,380V is moved Dynamic emergency power supply carries out the test with nominal load, exports load capacity test parameters, is judged according to load capacity test parameters The load capacity of 380V moving emergency power supply exports load capacity judging result;In the load capacity of 380V moving emergency power supply When meeting the requirements, in step s 40, carries out band and carry safety injection pump axle envelope water injection test, output band carries safety injection pump axle envelope water injection capacity Test parameters judges that the band of 380V moving emergency power supply carries safety injection pump axis according to load safety injection pump axle envelope water injection capacity test parameters Water injection capacity is sealed, output band carries safety injection pump axle envelope water injection capacity judging result;This method ends at step S50.In this way by pair 380V moving emergency power supply carries out the test with nominal load and simulated accident operating condition, carries out to 380V moving emergency power supply Band carries safety injection pump axle envelope water injection test, and whether the properties of comprehensive verification 380V moving emergency power supply meet design requirement, add The strong reliability of nuclear power station 380V emergency power supply, improves nuclear power station depth defense ability.
In above-described embodiment, 380V moving emergency power supply specifically includes 380V truck diesel alternator group, power distribution cabinet and fast Quick coupling can refer to 380V moving emergency power supply shown in prior art Fig. 1.Band is being carried out to 380V truck diesel alternator group Before the test of nominal load, the quick coupling on 380V moving emergency power supply is first disconnected.
In above-described embodiment, band is carried out to 380V moving emergency power supply and carries main pump injection axle sealing water feasibility analysis, judgement 380V moving emergency power supply whether meet with carry main pump injection axle sealing water experimental condition, export judging result specific method can To be, Data Management Analysis is carried out according to collected 380V moving emergency power supply related data, its satisfaction can be preset With the reference data standard for carrying main pump injection axle sealing water experimental condition, date comprision is then carried out by computing system and is obtained As a result.Equally, the above-mentioned load capacity that 380V moving emergency power supply is judged according to load capacity test parameters exports load capacity The specific method of judging result can be, and preset the load capacity of 380V moving emergency power supply reference data mark up to standard Then standard carries out data comparison by computing system and obtains judging result.Equally, above-mentioned that safety injection pump axle envelope water filling energy is carried according to band Power test parameters judges that the band of 380V moving emergency power supply carries safety injection pump axle envelope water injection capacity, and output band carries the water filling of safety injection pump axle envelope The specific method of ability judging result can be, and the band for presetting 380V moving emergency power supply carries safety injection pump axle envelope water injection capacity Reference data standard, then by computing system carry out data comparison obtain judging result.
Preferably, in above-described embodiment, when carrying out the test with nominal load to 380V moving emergency power supply, with resistance Case is as load.When test, 380V moving emergency power supply is connect with resistance box, wherein the resistance value in resistance box access circuit can It is converted as needed, to verify 380V moving emergency power supply to the load capacity of different loads, with comprehensive verification nuclear power station The reliability of emergency power supply.
In a further embodiment, it is specifically included as shown in figure 3, carrying out band and carrying safety injection pump axle envelope water injection test: step S41, preparation is connected before being tested, that is, disconnects the connection of 380V moving emergency power supply and resistance box, while 380V movement being answered The quick coupling in urgent telegram source is connect with hydraulic testpump diesel generating set;Step S42, detection and confirm safety injection pump online whether Correctly, step S43, when safety injection pump is correct online, switch unlock instruction is sent to safety injection pump, releases the locking of safety injection pump;Step Rapid S44, enabling signal is sent to 380V diesel generating set;Step S45, simulated accident operating condition sends starting letter to safety injection pump Number;Step S46, detection and confirm whether safety injection pump works in preassigned pattern, wherein preassigned pattern preferably in pressure safety injection tank mend Aqueous mode;Step S47, detection and confirm whether 380V diesel generating set, power distribution cabinet, safety injection pump are without exception;Step S48, exist Safety injection pump works in preassigned pattern, and when 380V diesel generating set, power distribution cabinet, safety injection pump are without exception, obtains safety injection pump outlet Flow parameter;Step S49, judge that the band of 380V moving emergency power supply carries safety injection pump axle envelope note according to safety injection pump rate of discharge parameter Outlet capacity.
In above-described embodiment, safety injection pump includes but is not limited to No. 011 safety injection pump (RIS011PO) for being nuclear power station.Due to In previous test procedure, 380V moving emergency power supply is connect with resistance box, therefore carries the water filling examination of safety injection pump axle envelope carrying out band When testing, resistance box end should be opened first, switch to be connected to hydraulic testpump diesel generating set, pass through the company with quick coupling It connects, actual test 380V moving emergency Power supply belt carries main pump and injects axle sealing water, simulates true accident conditions and is drilled, comprehensively Verify the reliability of nuclear power station 380V moving emergency power supply.
In above-described embodiment, the switch unlock instruction sent to safety injection pump can be the control instruction that control system is sent, Such as high/low level signal.Equally, it is also possible to the control that control system is sent to the enabling signal that 380V diesel generating set is sent System instruction, such as high/low level signal.
In above-described embodiment, by detecting and confirming whether safety injection pump is correct online, it can be ensured that emergency power supply band carries peace note Pump Shaft Seal water injection test carries out safely, can just accomplish that simulating true accident conditions is drilled, and is more accurately tested in this way Demonstrate,prove conclusion.Wherein, the online correct step of confirmation safety injection pump includes: connection motor start-up characteristic tester, passes through motor Starting characteristic tester judges whether safety injection pump is correct online.
In above-described embodiment, safety injection pump rate of discharge parameter is specially safety injection pump rate of discharge parameter.Gone out according to safety injection pump Mouth flow parameter judges that the step of band of 380V moving emergency power supply carries safety injection pump axle envelope water injection capacity specifically includes: judgement peace is infused Whether pump discharge flow parameter reaches 6m3/ h, when safety injection pump rate of discharge reaches 6m3When/h, 380V moving emergency power supply is determined Band carries that safety injection pump axle envelope water injection capacity is qualified, and the band of output 380V moving emergency power supply carries safety injection pump axle envelope water injection capacity qualification Judging result.Otherwise, if safety injection pump rate of discharge parameter is unable to reach 6m3/ h should then improve 380V moving emergency power supply Band carries safety injection pump axle envelope water injection capacity.Wherein, 6m3/ h is the critical value that safety injection pump works under normal condition.
In above-described embodiment, judge that the band of 380V moving emergency power supply carries safety injection pump axis according to safety injection pump rate of discharge parameter Water injection capacity is sealed, after obtaining judging result, result prompt information is exported by control system.
Further, above-mentioned that band load main pump injection axle sealing water feasibility analysis is carried out to 380V moving emergency power supply, sentence Whether disconnected 380V moving emergency power supply meets specifically includes with the step of condition for carrying main pump injection axle sealing water: answering 380V movement Urgent telegram source started before visual examination, electric insulation test and mechanical system inspection, obtain 380V moving emergency power supply Apparent parameter, electric insulation test parameters and system parameter;No Load Start signal is sent to 380V truck diesel alternator group, it is defeated The measurement result of 380V truck diesel alternator group performance in the unloaded state and parameter out;To 380V truck diesel alternator Group sends enabling signal, by the way that the quick coupling of 380V moving emergency power supply to be connect with hydraulic testpump diesel generating set, Charge test is carried out to the power distribution cabinet of hydraulic testpump diesel generating set, exports electric parameter.
Above-mentioned apparent parameter, electric insulation test parameters and system parameter and 380V truck diesel alternator group are in sky Performance and parameter and charge test electric parameter under load state are to judge that 380V moving emergency Power supply belt carries main pump and injects axis The whether feasible basic parameter of water shutoff.By to the apparent parameter, electric insulation test parameters and system parameter and 380V vehicle The integrated data for carrying diesel generating set performance in the unloaded state and parameter and charge test electric parameter is calculated Analysis, to judge whether 380V moving emergency power supply meets bringing onto load experimental condition.
To sum up, the present invention is by carrying out the test with nominal load and simulated accident work to 380V moving emergency power supply Condition, to 380V moving emergency power supply carry out band carry safety injection pump axle envelope water injection test, comprehensive verification 380V moving emergency power supply it is each Whether item performance meets design requirement, strengthens the reliability of nuclear power station 380V emergency power supply, improves nuclear power station depth defense Ability.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (10)

1. a kind of reliability verification method of nuclear power station 380V moving emergency power supply, which comprises the following steps:
Band is carried out to 380V moving emergency power supply and carries the analysis of main pump axle envelope feasibility of waterflooding, exports the 380V moving emergency power supply Whether judging result with the experimental condition that carries main pump axle envelope water filling is met;
When the 380V moving emergency power supply meets with the experimental condition for carrying the water filling of main pump axle envelope, to the 380V moving emergency Power supply carries out the test with nominal load, exports load capacity test parameters;
Judge that the load capacity of the 380V moving emergency power supply, output load capacity are sentenced according to the load capacity test parameters Disconnected result;
When the load capacity of the 380V moving emergency power supply meets the requirements, carries out band and carry safety injection pump axle envelope water injection test, it is defeated Band carries safety injection pump axle envelope water injection capacity test parameters out;
Safety injection pump axle envelope water injection capacity test parameters, which is carried, according to the band judges that the band of the 380V moving emergency power supply carries peace note Pump Shaft Seal water injection capacity, output band carry safety injection pump axle envelope water injection capacity judging result.
2. reliability verification method according to claim 1, which is characterized in that the 380V moving emergency power supply includes 380V truck diesel alternator group, power distribution cabinet and quick coupling.
3. reliability verification method according to claim 2, which is characterized in that the 380V moving emergency power supply into When the capable test with nominal load, using resistance box as load.
4. reliability verification method according to claim 3, which is characterized in that the band carries safety injection pump axle envelope water injection capacity Test parameters is safety injection pump rate of discharge parameter.
5. reliability verification method according to claim 4, which is characterized in that the progress band carries the water filling of safety injection pump axle envelope The step of test, specifically includes:
It connects and prepares before being tested;
It detects and confirms whether the safety injection pump is correct online, when the safety injection pump is correct online, sent to the safety injection pump Switch unlock instruction;
Enabling signal is sent to the 380V truck diesel alternator group;
Simulated accident operating condition sends enabling signal to the safety injection pump;
It detects and confirms whether the safety injection pump works in preassigned pattern;
It detects and confirms whether the 380V truck diesel alternator group, power distribution cabinet, safety injection pump are without exception;
It works in the safety injection pump in preassigned pattern, and the 380V truck diesel alternator group, power distribution cabinet, safety injection pump are without exception When, export the safety injection pump rate of discharge parameter;
Judge that the band of the 380V moving emergency power supply carries safety injection pump axle envelope water filling energy according to the safety injection pump rate of discharge parameter Power, output band carry safety injection pump axle envelope water injection capacity judging result.
6. reliability verification method according to claim 5, which is characterized in that according to the safety injection pump rate of discharge parameter Judge that the step of band of the 380V moving emergency power supply carries safety injection pump axle envelope water injection capacity includes:
Judge whether the safety injection pump rate of discharge parameter reaches 6m3/ h, when the safety injection pump rate of discharge reaches 6m3It is defeated when/h The judging result with load safety injection pump axle envelope water injection capacity qualification of the 380V moving emergency power supply out.
7. reliability verification method according to claim 5, which is characterized in that the preassigned pattern is middle pressure safety injection tank benefit Aqueous mode.
8. reliability verification method according to claim 2, which is characterized in that described to be carried out to 380V moving emergency power supply Band carries the analysis of main pump axle envelope feasibility of waterflooding and specifically includes step:
Visual examination, electric insulation test and mechanical system inspection before starting to the 380V moving emergency power supply, it is defeated The apparent parameter of the 380V moving emergency power supply, electric insulation test parameters and system parameter out.
9. reliability verification method according to claim 8, which is characterized in that described to be carried out to 380V moving emergency power supply Band carries the analysis of main pump axle envelope feasibility of waterflooding and specifically includes step:
No Load Start signal is sent to the 380V truck diesel alternator group, the 380V truck diesel alternator group is exported and exists The measurement result of performance and parameter under light condition.
10. reliability verification method according to claim 9, which is characterized in that it is described to 380V moving emergency power supply into Row band carries the analysis of main pump axle envelope feasibility of waterflooding and specifically includes step:
Enabling signal is sent to the 380V truck diesel alternator group, by by the fast quick access of the 380V moving emergency power supply Head connect with hydraulic testpump diesel generating set, carries out charging examination to the power distribution cabinet of the hydraulic testpump diesel generating set It tests, exports electric parameter.
CN201410411958.XA 2014-08-19 2014-08-19 The reliability verification method of nuclear power station 380V moving emergency power supply Active CN104198951B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410411958.XA CN104198951B (en) 2014-08-19 2014-08-19 The reliability verification method of nuclear power station 380V moving emergency power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410411958.XA CN104198951B (en) 2014-08-19 2014-08-19 The reliability verification method of nuclear power station 380V moving emergency power supply

Publications (2)

Publication Number Publication Date
CN104198951A CN104198951A (en) 2014-12-10
CN104198951B true CN104198951B (en) 2019-01-15

Family

ID=52084263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410411958.XA Active CN104198951B (en) 2014-08-19 2014-08-19 The reliability verification method of nuclear power station 380V moving emergency power supply

Country Status (1)

Country Link
CN (1) CN104198951B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106803436B (en) * 2015-11-26 2018-08-17 大亚湾核电运营管理有限责任公司 The verification method and device of nuclear power plant's standby accident mitigation power supply accident application function
CN109976185A (en) * 2017-12-27 2019-07-05 核动力运行研究所 A kind of MAAP5 program and nuclear power plant analog machine integrated approach
CN110854994A (en) * 2019-11-08 2020-02-28 中广核研究院有限公司 Rapid access device and method for mobile diesel generator set
CN111596148B (en) * 2020-04-16 2022-08-09 岭东核电有限公司 Test method, device and equipment for starting diesel engine in case of power failure of emergency bus of nuclear power station
CN112197945B (en) * 2020-08-26 2022-04-22 中广核核电运营有限公司 Test method for testing pump output after full test of test pump

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4055189B2 (en) * 2003-02-04 2008-03-05 株式会社日立製作所 Power supply for emergency motors for power plants
CN101290342A (en) * 2008-06-17 2008-10-22 四川中鼎科技有限公司 Hydroelectric units black start-up ability verification test method
CN102195334A (en) * 2011-05-20 2011-09-21 中国广东核电集团有限公司 Method and system for improving reliability of emergency power supplies of nuclear power plant
CN202111518U (en) * 2011-05-20 2012-01-11 中国广东核电集团有限公司 Emergency power supply applied in nuclear power station hydraulic pressure test system and monitoring system after accident
CN103165201A (en) * 2011-12-14 2013-06-19 中国广东核电集团有限公司 Nuclear power station power supply detection system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4055189B2 (en) * 2003-02-04 2008-03-05 株式会社日立製作所 Power supply for emergency motors for power plants
CN101290342A (en) * 2008-06-17 2008-10-22 四川中鼎科技有限公司 Hydroelectric units black start-up ability verification test method
CN102195334A (en) * 2011-05-20 2011-09-21 中国广东核电集团有限公司 Method and system for improving reliability of emergency power supplies of nuclear power plant
CN202111518U (en) * 2011-05-20 2012-01-11 中国广东核电集团有限公司 Emergency power supply applied in nuclear power station hydraulic pressure test system and monitoring system after accident
CN103165201A (en) * 2011-12-14 2013-06-19 中国广东核电集团有限公司 Nuclear power station power supply detection system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
核电站准核级水压试验泵电源系统可靠性改进技术方案;张瑞明 等;《低压电器》;20140731;第52页-第56页

Also Published As

Publication number Publication date
CN104198951A (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN104198951B (en) The reliability verification method of nuclear power station 380V moving emergency power supply
CN106546853B (en) A kind of the check defence method and device of short-circuit of power transformer cumulative effect
CN106961248A (en) Mix the photovoltaic system fault arc detection method of quadratic form time-frequency distributions feature and the analysis of self adaptation multiplicative function
CN106782719B (en) Presurized water reactor power generator turbine, which has tripped, characterizes signal generating method
CN207440195U (en) A kind of multi-functional energizing test platform
CN113675878B (en) Offshore wind farm grid-connected performance testing method and system, computer equipment and medium
CN103076529B (en) CT secondary circuit intelligent detecting method
CN104198952B (en) The reliability verification method of nuclear power station 6.6kV moving emergency power supply
CN103760891B (en) Hardware-in-loop testing device and method for automobile non-vehicle-mounted direct-current charging control device
CN107045116A (en) The current transformer polarity detection method and device of a kind of generator protection
CN106875993B (en) Presurized water reactor power generator turbine, which has tripped, characterizes signal generating method
CN103578590B (en) Nuclear power station dead electricity accident analysis method and system
CN207366659U (en) A kind of direct-current charging post electric fault simulation system
CN107727967A (en) Large power energy storage system simulation test platform
CN205553941U (en) Control circuit of battery package voltage trouble
CN106803436B (en) The verification method and device of nuclear power plant's standby accident mitigation power supply accident application function
CN105353258B (en) A kind of test method of test transformer differential protection reactance transformer excitation surge current
CN204243431U (en) The operating means of earth connection
CN109616874B (en) Method for rebuilding and expanding intelligent substation without power outage
CN207882364U (en) High voltage direct current converter system simulates live detection complexes
CN202693726U (en) Detection circuit and detection system for electric transmission and transformation equipment
CN110554297A (en) method for checking differential protection current loop of large high-voltage motor by using low-voltage electricity
CN103207344A (en) Method used for checking substation secondary current return circuit and based on main transformer short circuit test
CN107515343A (en) A kind of off-board charger electric fault simulation system
CN105743083B (en) The method and ECS control system of power transmission are carried out to the ship that pulls in shore

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181205

Address after: 518124 Office Building of Daya Bay Nuclear Power Base Engineering Company, Pengfei Road, Dapeng New District, Shenzhen City, Guangdong Province

Applicant after: China Nuclear Power Engineering Co., Ltd.

Applicant after: China General Nuclear Power Corporation

Applicant after: Lingao Nuclear Power Co., Ltd.

Address before: 518023 No. 69 Shennan Middle Road, Futian District, Shenzhen City, Guangdong Province

Applicant before: China Nuclear Power Engineering Co., Ltd.

Applicant before: China General Nuclear Power Corporation

GR01 Patent grant
GR01 Patent grant