CN104196262B - The large rise buildings of interior climbing type removes machine - Google Patents

The large rise buildings of interior climbing type removes machine Download PDF

Info

Publication number
CN104196262B
CN104196262B CN201410494142.8A CN201410494142A CN104196262B CN 104196262 B CN104196262 B CN 104196262B CN 201410494142 A CN201410494142 A CN 201410494142A CN 104196262 B CN104196262 B CN 104196262B
Authority
CN
China
Prior art keywords
telescopic arm
climb
climbing
ascending part
under
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410494142.8A
Other languages
Chinese (zh)
Other versions
CN104196262A (en
Inventor
樊硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410494142.8A priority Critical patent/CN104196262B/en
Publication of CN104196262A publication Critical patent/CN104196262A/en
Application granted granted Critical
Publication of CN104196262B publication Critical patent/CN104196262B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to building machinery field, remove machine in particular to the large rise buildings of a kind of interior climbing type.It comprises removes owner's body, working platform and climbing device; Removing owner's body is arranged on working platform; Working platform is arranged on above climbing device; Climbing device comprise the ascending part that swashes, in climb portion and under to climb portion; Swash ascending part, in climb portion and under the portion of climbing connect together successively; To swash in ascending part, in climb in portion and under the fixed level respectively that to climb in portion be provided with telescopic arm on a pair, a centering telescopic arm and a pair time telescopic arm; Swash ascending part with in climb between portion and be connected by stretching device; In climb portion with under climb between portion and be connected by stretching device; Upper telescopic arm is provided with drill bit away from the one end of the ascending part that swashes.This apparatus structure is simple, it is simple and easy to load and unload, convenient transportation, economical and practical, and not limit by depth of building, at safe construction in radius of constructing, can not affect by building slump thing, freely to creep lifting with dismounting progress.

Description

The large rise buildings of interior climbing type removes machine
Technical field
The present invention relates to building machinery field, remove machine in particular to the large rise buildings of a kind of interior climbing type.
Background technology
Along with the modern development of world industryization, urbanization process is accelerated, and the problem of population concentrations has all appearred in a lot of city.Having to, it is more and more to build, and more and more higher highrise building comes life, the need of work of satisfied a large amount of population.But the rate of expansion in city is limited, much concentrates on intown highrise building and start old, need to eliminate; Be positioned at exurban industrial occupancy in the past also because of urban development needs, resettlement eliminated.Much old high-rise building is caused to need to remove reconstruction, as reinforced concrete building, steel building, chimney, cooling tower, industrial big frame structure, water tower etc. thus.
Explosion is one of effective ways of demolition of buildings, but the safety condition required is very harsh, implements for being difficult in the city of population and building dense.How protective demolition has become a lot of city of current puzzlement, affects a difficult problem for urban development.
Present building demolition equipment is generally based on excavator, mixes the accessory such as hydraulic hammer, hydraulic shear and carries out destruction dismounting to building iron concrete structure.What the world today was the highest highly tears building machine open is greatly exactly the large excavator that arm total length reaches 90 meters, domestic only have 30 meter Chai building machines at present, all there is a lot of practical problem in this equipment handling transport, required construction plant is also very large, to large rise buildings as removed more than the building of 150 meters of height time, the brachium tearing building machine open will reach, thus cannot remove large rise buildings.
In order to solve the problem, it is delivered to certain height by tower crane by complete machine by present dismounting chance, thus removes, but such mode, and holistic cost is higher, and also convenient not in use.
Summary of the invention
The large rise buildings of a kind of interior climbing type is the object of the present invention is to provide to remove machine, to solve the above problems.
Provide the large rise buildings of a kind of interior climbing type in an embodiment of the present invention and remove machine, comprise and remove owner's body, working platform and climbing device;
Removing owner's body is arranged on working platform;
Working platform is arranged on above climbing device;
Climbing device comprise the ascending part that swashes, in climb portion and under to climb portion;
Swash ascending part, in climb portion and under the portion of climbing connect together successively;
The ascending part internal fixtion that swashes is provided with telescopic arm on a pair;
Upper telescopic arm can stretch out swashing in ascending part;
In the portion's internal fixtion that climbs be provided with a centering telescopic arm;
Middle telescopic arm can in climb in portion and stretch out;
Under the portion's internal fixtion that climbs be provided with a pair time telescopic arm;
Lower telescopic arm can under climb in portion and stretch out;
Swash ascending part with in climb between portion and be connected by stretching device;
In climb portion with under climb between portion and be connected by stretching device;
Upper telescopic arm is provided with drill bit away from the one end of the ascending part that swashes.
Further, middle telescopic arm away from the climb one end in portion be provided with locating shaft;
Lower telescopic arm away under the climb one end in portion be provided with locating shaft.
Further, upper telescopic arm, middle telescopic arm and lower telescopic arm are on same vertical plane.
Further, the arranged outside of ascending part of swashing has protected apron;
Protected apron is arranged on the below of telescopic arm, and protected apron is angled in the horizontal direction, derives from the side of protected apron for the architecture sediment got out by drill bit, prevents from pounding telescopic arm and lower telescopic arm in below.
Further, the arranged outside in portion of climbing in has baffle plate;
Baffle plate is arranged on the top of middle telescopic arm, and the dregs got out for preventing drill bit pounds middle telescopic arm.
Further, through cat ladder is provided with in climbing device.
Further, climb under below portion and be provided with hanging basket.
Further, drill bit is rhinestone head.
The large rise buildings of interior climbing type provided by the invention removes machine, by the inside in the portion of climbing, telescopic arm is set, in one end of upper telescopic arm, drill bit is set, each telescopic arm can be fixed in hole that drill bit gets out, upper, middle and lower-ranking is climbed between portion and is connected by stretching device, realizes the function can alternately risen and decline in three portions of climbing.Structure of the present invention is simple, it is simple and easy to load and unload, convenient transportation, economical and practical, and not limit by depth of building, at safe construction in radius of constructing, can not affect by building slump thing, freely to creep lifting with dismounting progress.The present invention be a kind of can along with the novel dismounting equipment of domestic industry builing industry common development, be highly suitable in city, dismounting work is carried out in place that the building such as on-site is intensive, is urban development optimization and upgrading contribution technical force.
Accompanying drawing explanation
In order to be illustrated more clearly in the specific embodiment of the invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in detailed description of the invention or description of the prior art below, apparently, accompanying drawing in the following describes is some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation that in the present invention, the large rise buildings of climbing type removes machine;
Fig. 2 is the A direction view of Fig. 1.
In figure, 1: remove owner's body; 2: working platform; 3: swash ascending part; 4: upper telescopic arm; 5: drill bit; 6: protected apron; 7: in climb portion; 8: baffle plate; 9: middle telescopic arm; 10: locating shaft; 11: lower telescopic arm; 12: under to climb portion; 13: through cat ladder; 14: hanging basket; 15: stretching device.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearly, carry out clear, complete description by technical scheme of the present invention below.Obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, other embodiments all that those of ordinary skill in the art obtain under the prerequisite not making creative work, all belong to the scope that the present invention protects.
In describing the invention, it should be noted that, unless otherwise clearly defined and limited, term " installation ", " being connected ", " connection " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or connect integratedly; Can be mechanical connection, also can be electrical connection; Can be directly be connected, also indirectly can be connected by intermediary, can be the connection of two element internals.For the ordinary skill in the art, concrete condition above-mentioned term concrete meaning in the present invention can be understood.
As shown in drawings, the invention provides the large rise buildings of interior climbing type and remove machine, comprise and remove owner's body 1, working platform 2 and climbing device;
Removing owner's body 1 is arranged on working platform 2;
Working platform 2 is arranged on above climbing device;
Climbing device comprise the ascending part 3 that swashes, in climb portion 7 and under to climb portion 12;
Swash ascending part 3, in climb portion 7 and under portion 12 of climbing connect together successively;
Ascending part 3 internal fixtion that swashes is provided with telescopic arm 4 on a pair;
Upper telescopic arm 4 can stretch out swashing in ascending part 3;
In portion 7 internal fixtion that climbs be provided with a centering telescopic arm 9;
Middle telescopic arm 9 can in climb in portion 7 and stretch out;
Under portion 12 internal fixtion that climbs be provided with a pair time telescopic arm 11;
Lower telescopic arm 11 can under climb in portion 12 and stretch out;
Swash ascending part 3 with in climb between portion 7 and be connected by stretching device 15;
In climb portion 7 with under climb between portion 12 and be connected by stretching device 15;
Upper telescopic arm 4 is provided with drill bit 5 away from the one end of the ascending part 3 that swashes.
The large rise buildings of interior climbing type is removed owner and will be divided into climbing device and remove owner's body 1 two parts.Whole body is vertical configuration, and remove owner's body 1 and be arranged on working platform 2 upper, climbing device adopts latch to be connected lower with the below of working platform 2, and handling are simple, can transport respectively.
Removing owner's body 1 is the working link that the large rise buildings of interior climbing type removes machine, is made up of working arm, operating room, hydraulic power unit.Removing owner's body 1 is integrally provided on working platform 2, and working platform 2 is climbing device and the connecting portion removing owner's body 1, adopts the large disc type of machinery, can 360 degree of rotations voluntarily.Working arm adopts two joints or the three joint mechanical arms of excavator, can regulate length according to construction requirement.Mechanical arm root is connected with main body, mechanical arm top assembling and disassembling accessory, and allow dismounting accessory can carry out fragmentation construction at building interior, accessory generally adopts the large hydraulic fragmentation of big uncork to cut or large hydraulic quartering hammer.Operating room is positioned at above working platform 2, is control the links of work system by hydraulic power unit, comprises that working platform 2 rotates, the running of mechanical arm and the running of accessory.Hydraulic power unit is positioned at the end of whole dismounting owner body 1, and except providing power, itself deadweight can serve as the function of mechanical counterweight.Hydraulic power unit leans on electric drive motor, for hydraulic motor provides power.Electric power then utilizes the electric network source on ground, in the inaccessiable place of some electrical networks, then adopts generating set.By cable by electric power transfer to hydraulic power unit.
Climbing device is the core that the large rise buildings of interior climbing type removes machine, is made up of three portions of climbing.Have in each portion of climbing two can the flexible telescopic arm of left and right horizontal, amount to six, two telescopic arm front ends on top are provided with drill bit 5.Three flexible stretching devices 15 be made up of four built-in oil cylinders climbed between portion control, two swash ascending part 3 and in climb between portion 7, another two in climb portion 7 and under climb between portion 12.Swash the porose pin in top of ascending part 3, and for being fixedly connected with working platform 2, the hydraulic power unit of climbing device is positioned at the ascending part 3 that swashes.
Further, middle telescopic arm 9 away from the climb one end in portion 7 be provided with locating shaft 10;
Lower telescopic arm 11 away under the climb one end in portion 12 be provided with locating shaft 10.
In the outer end of middle telescopic arm 9 and lower telescopic arm 11, locating shaft 10 is all set, when climbing device upwards climbs or declines downwards, locating shaft 10 can be stretched in locating hole that the drill bit 5 on upper telescopic arm 4 gets out, so play stable climbing device and the effect that can rise or decline.
Further, upper telescopic arm 4, middle telescopic arm 9 and lower telescopic arm 11 are on same vertical plane.
Upper telescopic arm 4, middle telescopic arm 9 and lower telescopic arm 11 are arranged on same vertical plane, just only drill bit 5 can be set on upper telescopic arm 4, middle telescopic arm 9 and lower telescopic arm 11 promote or dropped to by stretching device 15 in the hole that drill bit 5 gets out, structure is comparatively simple.And if each telescopic arm is not at grade, so with regard to needing, drill bit 5 is set at the far-end of each telescopic arm, not only increases cost of material, also add the cost of energy consumption.
Further, the arranged outside of ascending part 3 of swashing has protected apron 6;
Protected apron 6 is arranged on the below of telescopic arm 4, and protected apron 6 is angled in the horizontal direction, derives from the side of protected apron 6 for the architecture sediment got out by drill bit 5, prevents from pounding telescopic arm 9 and lower telescopic arm 11 in below.
When drill bit 5 is holed to the building that will remove, a large amount of dregs can be produced, to drop in below on telescopic arm 9 and lower telescopic arm 11 when dregs falls, alignment telescopic arm 9 and lower telescopic arm 11 damage, likely can have influence on the application life of middle telescopic arm 9 and lower telescopic arm 11 time serious, cause whole climbing device to climb.
In order to avoid the appearance of above-mentioned situation, protected apron 6 is set in the below of upper telescopic arm 4.Protected apron 6 extending radially outwardly along climbing device, and have a certain degree both sides shape.When the dregs that drill bit 5 gets out falls, can all drop on protected apron 6, by tilt protected apron 6 by the dregs on protected apron 6 from side landing, avoid the middle telescopic arm 9 of below and lower telescopic arm 11 when dregs is fallen, thus alignment telescopic arm 9 and lower telescopic arm 11 play the effect of protection.
Further, the arranged outside in portion 7 of climbing in has baffle plate 8;
Baffle plate 8 is arranged on the top of middle telescopic arm 9, and the dregs for preventing drill bit 5 from getting out pounds middle telescopic arm 9.
Pound when dropping for avoiding dregs on middle telescopic arm 9 and lower telescopic arm 11, baffle plate 8 can also be set above middle telescopic arm 9, baffle plate 8 also can be set to the tilting as above-mentioned protected apron 6, is slipped in the top of the dregs dropped on baffle plate 8 therefrom telescopic arm 9, avoid directly dropping on middle telescopic arm 9, alignment telescopic arm 9 causes damage.
Protected apron 6 and baffle plate 8 can also be set to the form of stretching, and namely stretch out in use, regain when not using.
It is pointed out that two kinds of embodiments of above-mentioned two kinds of modes just protection telescopic arm, protection telescopic arm can be not limited to above-mentioned two kinds of modes, as long as it can play the effect of protection telescopic arm, as can also be arrange collection frame etc. below drill bit 5.
Further, through cat ladder 13 is provided with in climbing device.
Through cat ladder 13 is set in climbing device, staff can be enable on climbing device inside and working platform 2, to carry out activity freely, carry out as work maintenance, interval etc.
Further, climb under below portion 12 and be provided with hanging basket 14.
Under the climb below in portion 12 hanging basket 14 is set, can after whole device climbs certain altitude, be convenient to the turnover of staff when passing in and out dismounting work and various instrument as the transport etc. of service kit etc.
Further, drill bit 5 is rhinestone head 5.
Use rhinestone head 5 not only can energy conservation, and due to the effect of water, can not produce a large amount of dust when architectural boring, thus make whole working environment comparatively clean, decrease dust pollution simultaneously.
In the present invention, the use procedure of climbing type large rise buildings dismounting machine is as follows:
According to site operation needs, climbing device and dismounting owner body 1 are transported to appointed place respectively, for climbing device and dismounting owner body 1 all install self-propelling device, enter tubular building interior by building access hole.In building outside according to the contact diameter of climb spacing and the horizontal extension arm of climbing device, in building both sides, Parallel Symmetric gets out 8 holes.By the mode of outside suspension cable, utilization is gone up holes most and is promoted by dismounting owner body 1, recycles the second round by climbing device vertical-lift; Middle-end and lower end four horizontal arm extension are inserted four holes below and are fixed by climbing device; Then decline and remove owner's body 1, two work station passing hole pins are rigidly connected; The hanging basket 14 with autonomous lifting is installed in lower end; Remove suspension cable subsequently, staff carries essential tool and articles for use enter in climbing device by lower end, is connected by each pipeline in inside, checks errorless, completes the installation of whole dismounting machine.Namely the effect of hanging basket 14 meets the transport up and down of necessary personnel and various goods and materials instrument in work progress, ensures that ground contacts with the various of dismounting owner body 1 being positioned at high-altitude.
Enter ramp-up period, due in climb portion 7 and under portion 12 of climbing fix, along with the built-in oil cylinder effect in two, top, the ascending part 3 that swashes rises after certain altitude, and upper telescopic arm 4 stretches out, and most advanced and sophisticated water drilling starts hole and insert on building inwall to fix; Middle telescopic arm 9 is regained, phase co-altitude under four built-in oil cylinder actings in conjunction, and middle telescopic arm 9 stretches out, and just in time inserts the fixing hole of this position; Lower telescopic arm 11 is regained, and rise phase co-altitude under the built-in oil cylinder effect in two, bottom, and lower telescopic arm 11 stretches out and just in time inserts fixing hole.So move in circles, the drill bit 5 of upper telescopic arm 4 punches fixing, and middle telescopic arm 9 and lower telescopic arm 11 are fixed with Kong Shangsheng, whole body is risen to step by step the desirable peak that building needs to remove.It should be noted that the distance that namely vertical interval in hole often walks lifting is fixing, built-in oil cylinder range of lift can not be greater than, otherwise rise and fall needs cannot be completed.
Enter and remove the decline stage, when arriving ideal height, an operator is entered by climbing device and removes owner's body 1, carries out rotation demolition reduction to tubular building.Often remove level altitude, just stop removing operation, notice is positioned at the operator of climbing device according to flow process reverse operating when rising, and decline body level altitude, then start to remove operation.So move in circles, progressively complete the dismounting work to building.
When the setting height(from bottom) of the beginning that body drops to, then use general dismounting equipment just can complete remaining dismounting work, the work that the large rise buildings of interior climbing type removes machine completes.Utilize the mounting method reverse operating started, disconnect each pipeline, tear hanging basket 14 open; Suspension cable connects climbing device and removes owner's body 1, and pulled-out holes pin disconnects; Climbing device packs up telescopic arm, and climbing device and dismounting owner body 1 do not install self-propelling device; Remove suspension cable, climbing device and dismounting owner body 1 successively exit construction plant voluntarily.Residue work is given general dismounting equipment and complete whole dismounting operation.
The large rise buildings of interior climbing type provided by the invention removes machine, by the arranged outside telescopic arm in the portion of climbing, in one end of upper telescopic arm 4, drill bit 5 is set, each telescopic arm can be fixed in hole that drill bit 5 gets out, connected by stretching device 15 between upper, middle and lower-ranking telescopic arm, realize the function can alternately risen and decline in three portions of climbing.Structure of the present invention is simple, it is simple and easy to load and unload, convenient transportation, economical and practical, and not limit by depth of building, at safe construction in radius of constructing, can not affect by building slump thing, freely to creep lifting with dismounting progress.The present invention be a kind of can along with the novel dismounting equipment of domestic industry builing industry common development, be highly suitable in city, dismounting work is carried out in place that the building such as on-site is intensive, is urban development optimization and upgrading contribution technical force.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1. in, the large rise buildings of climbing type removes a machine, it is characterized in that, comprises and removes owner's body, working platform and climbing device;
Described dismounting owner body is arranged on described working platform;
Described working platform is arranged on above described climbing device;
Described climbing device comprise the ascending part that swashes, in climb portion and under to climb portion;
The described ascending part that swashes, described in climb portion and described under the portion of climbing connect together successively;
The described ascending part internal fixtion that swashes is provided with telescopic arm on a pair;
Described upper telescopic arm can stretch out in the described ascending part that swashes;
The portion's internal fixtion that climbs in described is provided with a centering telescopic arm;
Described middle telescopic arm can climb in described in portion and stretch out;
The portion's internal fixtion that climbs under described is provided with a pair time telescopic arm;
Described lower telescopic arm can climb under described in portion and stretch out;
Described swash ascending part with described in climb between portion and be connected by stretching device;
Climb in described portion with described under climb between portion and be connected by stretching device;
Described upper telescopic arm is provided with drill bit away from one end of the described ascending part that swashes.
2. the large rise buildings of interior climbing type according to claim 1 removes machine, it is characterized in that, described middle telescopic arm is provided with locating shaft away from the one end in portion of climbing in described;
Described lower telescopic arm is provided with locating shaft away from the one end in portion of climbing under described.
3. the large rise buildings of interior climbing type according to claim 1 removes machine, and it is characterized in that, described upper telescopic arm, described middle telescopic arm and described lower telescopic arm are on same vertical plane.
4. the large rise buildings of interior climbing type according to claim 3 removes machine, it is characterized in that, described in the swash arranged outside of ascending part have protected apron;
Described protected apron is arranged on the below of described upper telescopic arm, described protected apron is angled in the horizontal direction, architecture sediment for being got out by described drill bit is derived from the side of described protected apron, prevents from pounding the described middle telescopic arm of below and described lower telescopic arm.
5. the large rise buildings of interior climbing type according to claim 3 removes machine, and it is characterized in that, the arranged outside in portion of climbing in described has baffle plate;
Described baffle plate is arranged on the top of described middle telescopic arm, and the dregs for preventing described drill bit from getting out pounds described middle telescopic arm.
6. the large rise buildings of interior climbing type according to claim 1 removes machine, it is characterized in that, is provided with through cat ladder in described climbing device.
7. the large rise buildings of interior climbing type according to claim 1 removes machine, it is characterized in that, is provided with hanging basket below portion of climbing under described.
8. according to any one of claim 1-7, the large rise buildings of climbing type removes machine, and it is characterized in that, described drill bit is rhinestone head.
CN201410494142.8A 2014-09-24 2014-09-24 The large rise buildings of interior climbing type removes machine Active CN104196262B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410494142.8A CN104196262B (en) 2014-09-24 2014-09-24 The large rise buildings of interior climbing type removes machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410494142.8A CN104196262B (en) 2014-09-24 2014-09-24 The large rise buildings of interior climbing type removes machine

Publications (2)

Publication Number Publication Date
CN104196262A CN104196262A (en) 2014-12-10
CN104196262B true CN104196262B (en) 2016-04-13

Family

ID=52081611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410494142.8A Active CN104196262B (en) 2014-09-24 2014-09-24 The large rise buildings of interior climbing type removes machine

Country Status (1)

Country Link
CN (1) CN104196262B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025365B (en) * 2018-07-30 2021-02-23 李树平 Dismantling method for high-rise building
CN110422772A (en) * 2019-09-07 2019-11-08 莫崇规 Climbing machine device device and method
CN112854814B (en) * 2021-01-11 2022-06-07 周金红 House construction is with fixing a point demolish wall body device
CN114397124B (en) * 2022-01-11 2023-07-11 厦门安科科技有限公司 Interactive detection method and detection device for all mechanisms in building dismantling machine

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000240300A (en) * 1999-02-19 2000-09-05 Hitachi Constr Mach Co Ltd Construction machinery and arm used therefor
DE10254771A1 (en) * 2002-11-26 2004-06-03 Esther Jonitz Temporary building frame for demolition of high-rise structures has array of pillars and horizontal jacks hanging from a top-mounted platform
CN2688815Y (en) * 2004-04-06 2005-03-30 夏海峰 Hydraulic breaking hammer for engineering vehicle
CN101922243B (en) * 2009-06-12 2013-04-03 班云 Inner jacking method and equipment for demolishing buildings
DE202012100580U1 (en) * 2012-02-22 2012-03-22 Genesis Gmbh Hydraulic attachment for shearing or crushing structures
CN103924796B (en) * 2014-04-28 2016-04-06 樊硕 Tower large rise buildings removes machine
CN204081547U (en) * 2014-09-24 2015-01-07 樊硕 The large rise buildings of interior climbing type removes machine

Also Published As

Publication number Publication date
CN104196262A (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN104196262B (en) The large rise buildings of interior climbing type removes machine
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN104652298B (en) A kind of whole dismounting system and construction method thereof transferred across box beam supported based on bridge floor
CN105780646B (en) A kind of bridge maintenance equipment of automatically walk
CN106522581A (en) Method for demolish chimney manually
CN108411803B (en) Integral bridge pier pushing method
CN204081547U (en) The large rise buildings of interior climbing type removes machine
CN103821356A (en) Construction equipment and system of elevator shaft shear wall
CN204418013U (en) Bridge flange plate is constructed self-propelled cantilever hanging basket
CN103924796B (en) Tower large rise buildings removes machine
JP4789876B2 (en) Method and apparatus for disassembling double structure chimney
CN210859054U (en) Hoisting operation platform for prefabricated concrete tower barrel section of wind driven generator
CN203795885U (en) Tower-type large-height-building demolition machine
CN205145443U (en) Transformer upper portion construction safety belt hanging device
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN204060023U (en) A kind of bootstrap type of chimney class structure removes equipment
CN105311771A (en) Safety belt suspending device for upper construction of transformer
CN107288640A (en) A kind of steady rope self-supporting modularization vertical shaft driving and masonry construction device of nothing
CN206070370U (en) A kind of bridge maintenance equipment of automatically walk
CN214498489U (en) Complete set cutting and dismantling equipment
CN203924659U (en) Hanging frame type construction platform device
CN205293909U (en) Mobilizable assembled transport auxiliary device
CN203911362U (en) Lifting mechanism for power transmission and transformation installation and maintenance
CN104032944A (en) Suspension frame construction platform device
CN114278113A (en) Construction method for dismantling reinforced concrete chimney in complex environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant