CN104196071B - Hydro-cushion chute forming machine - Google Patents

Hydro-cushion chute forming machine Download PDF

Info

Publication number
CN104196071B
CN104196071B CN201410440963.3A CN201410440963A CN104196071B CN 104196071 B CN104196071 B CN 104196071B CN 201410440963 A CN201410440963 A CN 201410440963A CN 104196071 B CN104196071 B CN 104196071B
Authority
CN
China
Prior art keywords
fixed
transverse slat
square
tube
square bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410440963.3A
Other languages
Chinese (zh)
Other versions
CN104196071A (en
Inventor
张永忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HAIXUN INDUSTRY GROUP SHARE Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410440963.3A priority Critical patent/CN104196071B/en
Publication of CN104196071A publication Critical patent/CN104196071A/en
Application granted granted Critical
Publication of CN104196071B publication Critical patent/CN104196071B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chutes (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A kind of hydro-cushion chute forming machine, its middle and upper part is provided with center pillar, center pillar back is fixed with the first square bar, first square bar left end is fixed on the first steel pipe, the first square bar left side is cased with the first square set, first square set is fixed with first stop post below, the first transverse slat is fixed in first stop post lower end, first transverse slat is fixed on the left end of the first U-tube, the 4th square set it is cased with on the right of first square bar, 4th square set is fixed with the 4th station post below, and the 4th transverse slat is fixed in the 4th post lower end, station, and the 4th transverse slat is fixed on the right-hand member of the first U-tube;Center pillar front is fixed with the second square bar, second square bar right-hand member is fixed on the second steel pipe, the second square set it is cased with on the right of second square bar, second square set is fixed with second station post below, and the second transverse slat is fixed in second station post lower end, and the second transverse slat is fixed on the right-hand member of the second U-tube, the second square bar left side is cased with third party's set, third party overlaps and is fixed with the 3rd station post below, and the 3rd transverse slat is fixed in the 3rd post lower end, station, and the 3rd transverse slat is fixed on the left end of the second U-tube.

Description

Hydro-cushion chute forming machine
Technical field
The present invention relates to a kind of chute forming machine, particularly a kind of reservoir, river dam or the working hydro-cushion chute forming machine of Foundation Anti-seepage.
Background technology
The shortcomings such as traditional chute forming machine is constantly present inefficiency, can not be continuous during work, and the expense of building equipment is high.
Summary of the invention
The shortcoming that instant invention overcomes above chute forming machine, it is provided that a kind of efficient hydro-cushion chute forming machine.
The present invention is achieved through the following technical solutions:
A kind of hydro-cushion chute forming machine, the chute forming machine left side is provided with the first steel pipe, and the first steel pipe lower end is connected with the first sebific duct, first sebific duct lower end is connected in the first U-tube left end, the right is provided with the second steel pipe, and the second steel pipe lower end is connected with the second sebific duct, and the second sebific duct lower end is connected in the second U-tube right-hand member;Chute forming machine middle and upper part is provided with center pillar, center pillar back is fixed with the first square bar, first square bar left end is fixed on the first steel pipe, and the first square bar left side is cased with the first square set, and the first square set is fixed with first stop post below, the first transverse slat is fixed in first stop post lower end, first transverse slat is fixed on the left end of the first U-tube, is cased with the 4th square set on the right of the first square bar, and the 4th square set is fixed with the 4th station post below, the 4th transverse slat is fixed at 4th post lower end, station, and the 4th transverse slat is fixed on the right-hand member of the first U-tube;Center pillar front is fixed with the second square bar, second square bar right-hand member is fixed on the second steel pipe, the second square set it is cased with on the right of second square bar, second square set is fixed with second station post below, and the second transverse slat is fixed in second station post lower end, and the second transverse slat is fixed on the right-hand member of the second U-tube, the second square bar left side is cased with third party's set, third party overlaps and is fixed with the 3rd station post below, and the 3rd transverse slat is fixed in the 3rd post lower end, station, and the 3rd transverse slat is fixed on the left end of the second U-tube;First U-tube, the second U-tube are the bend pipe being shaped as U-shaped, and its underpart is evenly equipped with several sharpener, are provided with a water nozzle between the sharpener that each two is adjacent.
The present invention has following feature:
The present invention forms relative motion grooving by the first U-tube with the second U-tube, and grooving body refuse is carried outside the outer grooving of groove by current, and grooving efficiency is high.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further illustrated:
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the A A sectional view of Fig. 1;
Fig. 3 is the B B sectional view of Fig. 1;
Fig. 4 is the C C sectional view of Fig. 1.
In figure: 1, first steel pipe, 2, second steel pipe, 3, first sebific duct, 4, second sebific duct, 5, first square set, 6, second square set, 7, third party overlaps, 8, 4th square set, 9, first hydraulic stem, 10, second hydraulic stem, 11, first hydraulic top, 12, second hydraulic top, 13, center pillar, 14, first stop post, 15, second station post, 16, 3rd station post, 17, 4th station post, 18, first transverse slat, 19, second transverse slat, 20, 3rd transverse slat, 21, 4th transverse slat, 22, first U-tube, 23, second U-tube, 24, sharpener, 25, water nozzle, 26, first square bar, 27, second square bar.
Detailed description of the invention
Accompanying drawing is a kind of specific embodiment of the present invention, this embodiment chute forming machine left side is provided with the first steel pipe 1, first steel pipe lower end is connected with the first sebific duct 3, first sebific duct lower end is connected in the first U-tube 22 left end, the right is provided with the second steel pipe 2, second steel pipe lower end is connected with the second sebific duct 4, and the second sebific duct lower end is connected in the second U-tube 23 right-hand member;Chute forming machine middle and upper part is provided with center pillar 13, center pillar back is fixed with the first square bar 26, first square bar left end is fixed on the first steel pipe, the first square bar left side is cased with the first square set 5, first square set is fixed with first stop post 14 below, the first transverse slat 18 is fixed in first stop post lower end, first transverse slat is fixed on the left end of the first U-tube, the 4th square set 8 it is cased with on the right of first square bar, 4th square set is fixed with the 4th station post 17 below, the 4th transverse slat 21 is fixed at 4th post lower end, station, and the 4th transverse slat is fixed on the right-hand member of the first U-tube;Center pillar front is fixed with the second square bar 27, second square bar right-hand member is fixed on the second steel pipe, the second square set 6 it is cased with on the right of second square bar, second square set is fixed with second station post 15 below, and the second transverse slat 19 is fixed in second station post lower end, and the second transverse slat is fixed on the right-hand member of the second U-tube, the second square bar left side is cased with third party and overlaps 7, third party overlaps and is fixed with the 3rd station post 16 below, and the 3rd transverse slat 20 is fixed in the 3rd post lower end, station, and the 3rd transverse slat is fixed on the left end of the second U-tube;First U-tube, the second U-tube are the bend pipe being shaped as U-shaped, and its underpart is evenly equipped with several sharpener 24, are provided with a water nozzle between the sharpener that each two is adjacent.
First hydraulic top is articulated with the posterior end of center pillar, and the second hydraulic top is articulated with the front lower end of center pillar.
When the present invention works, first hydraulic top, the second hydraulic top are controlled its hydraulic stem synchronization telescope by controller, thus, first hydraulic top drives the first U-tube to be enclosed within the first square bar slip up by the first square set and four directions and moves, second hydraulic top drives the second U-tube to be enclosed within the second square bar slip up by the second square set and third party and moves, so, the first U-tube forms relative motion with the second U-tube, and sharpener is grooving at the volley;Meanwhile, one stream of water enters the first sebific duct through the first steel pipe and enters the first U-tube, another one stream of water enters the second sebific duct through the second steel pipe and enters the second U-tube, spray from water nozzle, take body refuse and overflow outside groove, after mud pit is replaced, slush pump it is pressed into the first steel pipe and the second steel pipe, so circulates.

Claims (1)

1. a hydro-cushion chute forming machine, the chute forming machine left side is provided with the first steel pipe (1), first steel pipe lower end is connected with the first sebific duct (3), first sebific duct lower end is connected in the first U-tube (22) left end, the right is provided with the second steel pipe (2), second steel pipe lower end is connected with the second sebific duct (4), and the second sebific duct lower end is connected in the second U-tube (23) right-hand member;It is characterized in that: chute forming machine middle and upper part is provided with center pillar (13), center pillar back is fixed with the first square bar (26), first square bar left end is fixed on the first steel pipe, the first square bar left side is cased with the first square set (5), first square set is fixed with first stop post (14) below, the first transverse slat (18) is fixed in first stop post lower end, first transverse slat is fixed on the left end of the first U-tube, the 4th square set (8) it is cased with on the right of first square bar, 4th square set is fixed with the 4th station post (17) below, the 4th transverse slat (21) is fixed at 4th post lower end, station, 4th transverse slat is fixed on the right-hand member of the first U-tube;Center pillar front is fixed with the second square bar (27), second square bar right-hand member is fixed on the second steel pipe, the second square set (6) it is cased with on the right of second square bar, second square set is fixed with second station post (15) below, the second transverse slat (19) is fixed in second station post lower end, second transverse slat is fixed on the right-hand member of the second U-tube, the second square bar left side is cased with third party's set (7), third party overlaps and is fixed with the 3rd station post (16) below, the 3rd transverse slat (20) is fixed at 3rd post lower end, station, and the 3rd transverse slat is fixed on the left end of the second U-tube.
CN201410440963.3A 2014-09-02 2014-09-02 Hydro-cushion chute forming machine Active CN104196071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410440963.3A CN104196071B (en) 2014-09-02 2014-09-02 Hydro-cushion chute forming machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410440963.3A CN104196071B (en) 2014-09-02 2014-09-02 Hydro-cushion chute forming machine

Publications (2)

Publication Number Publication Date
CN104196071A CN104196071A (en) 2014-12-10
CN104196071B true CN104196071B (en) 2016-06-29

Family

ID=52081422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410440963.3A Active CN104196071B (en) 2014-09-02 2014-09-02 Hydro-cushion chute forming machine

Country Status (1)

Country Link
CN (1) CN104196071B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2261325A1 (en) * 1971-12-21 1974-02-21 Bos & Kalis Baggermaatsch EQUIPMENT AND PROCEDURES FOR LOOSENING SOLID SOIL OR OTHER MATERIAL
CN102677716A (en) * 2012-05-30 2012-09-19 张永忠 Movable arm trenching machine
CN203022041U (en) * 2012-12-28 2013-06-26 张璐 Double-helical trenching machine
CN203247631U (en) * 2013-05-27 2013-10-23 张璐 Hydraulic drive trenching machine
CN204023659U (en) * 2014-09-02 2014-12-17 张永忠 Hydro-cushion groover

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2261325A1 (en) * 1971-12-21 1974-02-21 Bos & Kalis Baggermaatsch EQUIPMENT AND PROCEDURES FOR LOOSENING SOLID SOIL OR OTHER MATERIAL
CN102677716A (en) * 2012-05-30 2012-09-19 张永忠 Movable arm trenching machine
CN203022041U (en) * 2012-12-28 2013-06-26 张璐 Double-helical trenching machine
CN203247631U (en) * 2013-05-27 2013-10-23 张璐 Hydraulic drive trenching machine
CN204023659U (en) * 2014-09-02 2014-12-17 张永忠 Hydro-cushion groover

Also Published As

Publication number Publication date
CN104196071A (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN204385800U (en) A kind of dredging device for water conservancy projects
CN105442825B (en) A kind of ball for metope arc bottom of slope of constructing grinds formula roller moving device
CN106438263B (en) A kind of pumped well
CN204023659U (en) Hydro-cushion groover
CN104196071B (en) Hydro-cushion chute forming machine
CN203049652U (en) Chain type trenching machine
CN202945343U (en) High-pressure spray washing device of electrolytic lead anode plate
CN102925932B (en) A kind of electrolytic lead anode plate high-pressure spray washing device
CN203247631U (en) Hydraulic drive trenching machine
CN103243759A (en) Hydraulic drive trenching machine
CN204004984U (en) Bend pipe tools
CN204113124U (en) Anti-blocking grouting drill bit
CN208816046U (en) A kind of novel hydropower hole penetrating device
CN202672152U (en) Propeller in full-automatic water-saving anti-seepage canal cast-in-situ forming machine
CN202672098U (en) Special tool for blocking tower-eye of tailing pond backwater tower
CN104088313B (en) Dijection water groover
CN204700682U (en) One is inner wall grinding device under water
CN205060305U (en) Plastic barrel
CN204023591U (en) Dewatering well extends protective device
CN104226775A (en) Hydraulic bulging machine
CN204362798U (en) Gardens sprayer unit
CN103015475B (en) Double-arm groover
CN204525391U (en) The dust arrester of the hand-held cutting machine of electrodynamic type
CN204160604U (en) The mold tilt device of the high-pressure slip-casting equipment that a kind of longitudinal direction is extruded
CN204429796U (en) Concentrator tipping tube flusher

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160530

Address after: 266427 Qingdao District, Shandong City, Huangdao province Lingshan Wei Street Office

Applicant after: Zong Qi

Address before: 276800 Shandong province Rizhao City No. 277 Ji'nan Road, Belvedere Garden

Applicant before: Zhang Yongzhong

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170810

Address after: 226000, Donghai Avenue (East) No. 18, Chengdong Town, Haian economic and Technological Development Zone, Nantong, Jiangsu

Patentee after: JIANGSU TIANHENG NANO SCIENCE AND TECHNOLOGY CO., LTD.

Address before: 266427 Qingdao District, Shandong City, Huangdao province Lingshan Wei Street Office

Patentee before: Zong Qi

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190912

Address after: 226600 Nantong, Haian, east of the town of East China Sea Road (East), No. 18, No.

Patentee after: Jiangsu Haixun Industry Group Share Co., Ltd.

Address before: 226000 Donghai Road (East) 18, Chengdong Town, Haian economic and Technological Development Zone, Nantong, Jiangsu

Patentee before: JIANGSU TIANHENG NANO SCIENCE AND TECHNOLOGY CO., LTD.

TR01 Transfer of patent right