CN104195957A - Assembled stairway and construction technology - Google Patents

Assembled stairway and construction technology Download PDF

Info

Publication number
CN104195957A
CN104195957A CN201410462705.5A CN201410462705A CN104195957A CN 104195957 A CN104195957 A CN 104195957A CN 201410462705 A CN201410462705 A CN 201410462705A CN 104195957 A CN104195957 A CN 104195957A
Authority
CN
China
Prior art keywords
tower
ladder access
stairway
standard section
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410462705.5A
Other languages
Chinese (zh)
Inventor
卓朝旦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FENGHUA YUCHUANG PRODUCT DESIGN Co Ltd
Original Assignee
FENGHUA YUCHUANG PRODUCT DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FENGHUA YUCHUANG PRODUCT DESIGN Co Ltd filed Critical FENGHUA YUCHUANG PRODUCT DESIGN Co Ltd
Priority to CN201410462705.5A priority Critical patent/CN104195957A/en
Publication of CN104195957A publication Critical patent/CN104195957A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an assembled stairway and the construction technology and relates to the technical field of bridge pier construction. The stairway comprises single stairway units and a concrete foundation. The concrete foundation is provided with a plurality of stairway units. One stairway unit comprises four posts, transverse rods, oblique rods, a stairway body and inserting pins. The transverse rods are welded among the four posts, the oblique rods are arranged among the transverse rod in a crossed manner and among the posts, the stairway body is arranged on the bidiagonal transverse rods inside the posts, safety nets are arranged outside the posts, and the stairway units are connected through pin holes and the inserting pins; when the assembled stairway units is longer than 4m, a horizontal reinforcing frame is fixed to the outside of the posts. The upper and lower walking stairway units are assembled in a segmented manner, so that periodical usage is implemented, and cost is reduced; the assembling technology is simple, assembly can be implemented through a tower crane manually, manual operation is reduced, and safety risks are reduced.

Description

A kind of pin-connected panel ladder access and construction technology
Technical field
The present invention relates to Bridge High-pier technical field of construction, be specifically related to a kind of pin-connected panel ladder access and construction technology.
Background technology
Before Bridge High-pier construction, tower crane all to be installed, all generally to adopt to set up by support, be greater than 30 meters of pier studs and set up outrigger, set up internal frame as reinforcing bar binding support, when template installation and removal, rely on Hanging Basket as operation platform, personnel adopt up and down gate-type falling bodies or humanoid ladder access upper and lower, template assembly adopts 50t assembling hoist, requires Land leveling, and ground is firm, and add sleeper, can adopt if desired hardening of concrete.
Above-mentioned traditional Bridge High-pier construction ladder access is set up more difficult, wastes time and energy, and has increased manual operation, also have certain potential safety hazard, and cost of production is higher.
Summary of the invention
Because the above-mentioned defect of prior art the invention provides a kind of deck-molding pier personnel's upper and lower merogenesis pin-connected panel ladder access of bridge and construction method.
For achieving the above object, the invention provides a kind of pin-connected panel ladder access and construction technology, comprise ladder access single-unit monomer, concrete foundation, in concrete foundation, be provided with multiple monomers, described ladder access single-unit monomer comprises column, cross bar, brace, ladder access and latch, between four root posts, be welded with cross bar, arranged in a crossed manner between cross bar have a brace, and between column, be also provided with brace, on the diagonal angle cross bar of column inside, be provided with ladder access, four root post outer setting have safety net, and each ladder access single-unit monomer connects by pin-and-hole and latch; When the ladder access single-unit monomer of described splicing exceedes 4 meters, column external stability has horizontal reinforcing frame.
As preferably, described ladder access width must not be less than 0.9m, and the gradient must not be greater than 1: 1, and sections is not higher than 2.5m.
The present invention first installs tower crane before high pier construction, first does ladder access basis on pier side, can make of coagulation.Then with tower crane merogenesis lifting ladder access sections, artificial cooperation.
Beneficial effect of the present invention: upper and lower People's Bank of China ladder access is made to merogenesis pin-connected panel, can have enough to meet the need like this use and reduce costs.Assembling process is simple, only needs tower crane and artificial cooperation assembled.Reduce manual operation, reduce potential safety hazard.
Below with reference to accompanying drawing, the technique effect of design of the present invention, concrete structure and generation is described further, to understand fully object of the present invention, feature and effect.
Brief description of the drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structure for amplifying schematic diagram of ladder access single-unit monomer of the present invention.
Detailed description of the invention
With reference to Fig. 1-2, this detailed description of the invention is by the following technical solutions: a kind of pin-connected panel ladder access and construction technology, comprise ladder access single-unit monomer 1, concrete foundation 2, in concrete foundation 2, be provided with multiple monomers 1, described ladder access single-unit monomer 1 comprises column 11, cross bar 12, brace 13, ladder access 14 and latch 15, between four root posts 11, be welded with cross bar 12, arranged in a crossed manner between cross bar 12 have a brace 13, and between column 11, be also provided with brace 13, on the diagonal angle cross bar of column 11 inside, be provided with ladder access 14, four root post 11 outer setting have safety net, each ladder access single-unit monomer 1 connects by pin-and-hole and latch 15, when the ladder access single-unit monomer 1 of described splicing exceedes 4 meters, column 11 external stabilities have horizontal reinforcing frame 3.
It should be noted that described ladder access 14 width must not be less than 0.9m, the gradient must not be greater than 1: 1, and sections is not higher than 2.5m.
A kind of pin-connected panel ladder access and construction technology described in this detailed description of the invention:
1, first do ladder access basis on pier side, can make of coagulation, the tower-body standard section of then slinging (ladder access single-unit monomer or lower tower body), starts slew gear, boom is rotated to the direction of introducing tower-body standard section.
2, in the guiding of tower-body standard section lower end to be introduced connects trepanning, insert four and introduce pulley, put on guide frame, and by the trailer wagon tower-body standard section of slinging, reach left and right, 10.5m amplitude place, substantially drop on oil cylinder center line with the center of gravity that keeps jacking part, adjust the gap (~2.5mm) of climbing support roller and standard knot, with entering to make slew gear in on-position.
3, whether the each mechanical position of detailed inspection connects correctly, checks electric part and hydraulic part, checks whether the bearing pin of oil cylinder crossbeam has inserted marking time in pin-and-hole of standard knot, be sure of on inspection errorless after, remake preparation jacking.
4, take the connecting bolt pair between undersetting and lower tower body apart, then drive oil pump, control crank, makes oil cylinder by superstructure jack-up, and the pawl of climbing of climbing support is bearing on the jacking support plate of tower body.
5, control crank, regains piston rod, and at this moment crossbeam rises in a jacking support plate, again climbs, and again stretches out after total length until piston, can introduce tower-body standard section.
6, tower-body standard section is aligned to lower tower body, control crank, puts down tower-body standard section slowly, after docking, extract out and introduce roller, the tower-body standard section of introduction and lower tower body are coupled together with bolt pair, and tighten, complete like this high workload that adds of a tower-body standard section.
7, the height that tower-body standard section increases often exceedes 4m should arrange the horizontal reinforcement (horizontal reinforcing frame 3) being connected with column together.
Upper and lower People's Bank of China ladder access is made merogenesis pin-connected panel by this detailed description of the invention, can have enough to meet the need like this to use to reduce costs.Assembling process is simple, only needs tower crane and artificial cooperation assembled.Reduce manual operation, reduce potential safety hazard.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art just can design according to the present invention make many modifications and variations without creative work.Therefore, all technician in the art, all should be in by the determined protection domain of claims under this invention's idea on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (2)

1. a pin-connected panel ladder access, it is characterized in that, comprise ladder access single-unit monomer (1), concrete foundation (2), in concrete foundation (2), be provided with multiple monomers (1), described ladder access single-unit monomer (1) comprises column (11), cross bar (12), brace (13), ladder access (14) and latch (15), between four root posts (11), be welded with cross bar (12), arranged in a crossed manner between cross bar (12) have a brace (13), and between column (11), be also provided with brace (13), on the diagonal angle cross bar of column (11) inside, be provided with ladder access (14), four root posts (11) outer setting has safety net, each ladder access single-unit monomer (1) connects by pin-and-hole and latch (15), when the ladder access single-unit monomer (1) of described splicing exceedes 4 meters, column (11) external stability has horizontal reinforcing frame (3).
2. a kind of pin-connected panel ladder access according to claim 1, is characterized in that the construction technology of described ladder access:
1, first do ladder access basis on pier side, can make of coagulation, the tower-body standard section of then slinging, starts slew gear, boom is rotated to the direction of introducing tower-body standard section;
2, in the guiding of tower-body standard section lower end to be introduced connects trepanning, insert four and introduce pulley, put on guide frame, and by the trailer wagon tower-body standard section of slinging, reach left and right, 10.5m amplitude place, substantially drop on oil cylinder center line with the center of gravity that keeps jacking part, adjust the gap of climbing support roller and standard knot, with entering to make slew gear in on-position;
3, whether the each mechanical position of detailed inspection connects correctly, checks electric part and hydraulic part, checks whether the bearing pin of oil cylinder crossbeam has inserted marking time in pin-and-hole of standard knot, be sure of on inspection errorless after, remake preparation jacking;
4, take the connecting bolt pair between undersetting and lower tower body apart, then drive oil pump, control crank, makes oil cylinder by superstructure jack-up, and the pawl of climbing of climbing support is bearing on the jacking support plate of tower body;
5, control crank, regains piston rod, and at this moment crossbeam rises in a jacking support plate, again climbs, and again stretches out after total length until piston, can introduce tower-body standard section;
6, tower-body standard section is aligned to lower tower body, control crank, puts down tower-body standard section slowly, after docking, extract out and introduce roller, the tower-body standard section of introduction and lower tower body are coupled together with bolt pair, and tighten, complete like this high workload that adds of a tower-body standard section;
7, the height that tower-body standard section increases often exceedes 4m should arrange the horizontal reinforcing frame being connected with column together.
8, a kind of pin-connected panel ladder access according to claim 1, is characterized in that, described ladder access (14) width must not be less than 0.9m, and the gradient must not be greater than 1: 1, and sections is not higher than 2.5m.
CN201410462705.5A 2014-09-03 2014-09-03 Assembled stairway and construction technology Pending CN104195957A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410462705.5A CN104195957A (en) 2014-09-03 2014-09-03 Assembled stairway and construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410462705.5A CN104195957A (en) 2014-09-03 2014-09-03 Assembled stairway and construction technology

Publications (1)

Publication Number Publication Date
CN104195957A true CN104195957A (en) 2014-12-10

Family

ID=52081310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410462705.5A Pending CN104195957A (en) 2014-09-03 2014-09-03 Assembled stairway and construction technology

Country Status (1)

Country Link
CN (1) CN104195957A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419668A (en) * 2017-09-04 2017-12-01 广西路桥工程集团有限公司 Knotted rope platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11412A (en) * 1997-06-11 1999-01-06 Kawaju Koji Kk Structure for simplified safety net
CN2529945Y (en) * 2002-04-02 2003-01-08 史丹福(上海)工程机械有限公司 Mobile scaffold
CN202175917U (en) * 2011-07-25 2012-03-28 中建七局第三建筑有限公司 Safety ladder
CN103306471A (en) * 2013-05-22 2013-09-18 江阴市东升建筑机械有限公司 Climbing frame
CN203531421U (en) * 2013-09-03 2014-04-09 中国建筑第二工程局有限公司 Movable tower type ladder stand
CN103924519A (en) * 2014-04-11 2014-07-16 邹仁才 Banana-type bridge construction safety ladder

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11412A (en) * 1997-06-11 1999-01-06 Kawaju Koji Kk Structure for simplified safety net
CN2529945Y (en) * 2002-04-02 2003-01-08 史丹福(上海)工程机械有限公司 Mobile scaffold
CN202175917U (en) * 2011-07-25 2012-03-28 中建七局第三建筑有限公司 Safety ladder
CN103306471A (en) * 2013-05-22 2013-09-18 江阴市东升建筑机械有限公司 Climbing frame
CN203531421U (en) * 2013-09-03 2014-04-09 中国建筑第二工程局有限公司 Movable tower type ladder stand
CN103924519A (en) * 2014-04-11 2014-07-16 邹仁才 Banana-type bridge construction safety ladder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419668A (en) * 2017-09-04 2017-12-01 广西路桥工程集团有限公司 Knotted rope platform

Similar Documents

Publication Publication Date Title
CN206143757U (en) It expands bored concrete pile stake pipe and pile driver to add elongated immersed tube rammer
CN108252504A (en) Tube shear wall concrete structure large form hoisting type construction method and constructing device
CN204000932U (en) Lower channel in safety in a kind of deep foundation pit construction operation
CN203768788U (en) Tool type foundation pit soil conveying trestle bridge
CN210529495U (en) Lifting operation equipment for bridge engineering
CN205604080U (en) Building construction platform
CN110820950A (en) Integral synchronous jacking construction method for large-span combined type overweight eccentric slope angle steel structure
CN207484935U (en) Shear wall elevator adjustable operating platform
CN206680994U (en) Assembled steel reinforced cage descending frame
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN204875821U (en) Steel cofferdam structure is used in construction of high pile platform of bridge
CN104195957A (en) Assembled stairway and construction technology
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN204474202U (en) Large-tonnage steel member integrated hoisting fixture
CN204401995U (en) Encorbelment support system in a kind of center of installing for dome structure
CN108545629B (en) Utilize the construction method of tower crane lifting girder truss
CN202899608U (en) Climbing device of building construction hydraulic pressure template
CN103726449B (en) Automatically fall Liangping table apparatus and the construction method for changing railway beam thereof
CN103147401A (en) Construction method and structure of self-climbing portal frame
CN206298823U (en) Pass horse
CN211666622U (en) Test device capable of climbing up and down and turning plate to stand in counter-force well
CN211200095U (en) Matching structure of support leg and main beam of bridge girder erection machine
CN104045014A (en) Pole arraying frame for pole welding
RU122397U1 (en) TOWER BRIDGE
CN206033069U (en) Tower crane overlength anchorage device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141210