CN104167687B - Tool for live-line replacement of suspension insulator and using working method thereof - Google Patents

Tool for live-line replacement of suspension insulator and using working method thereof Download PDF

Info

Publication number
CN104167687B
CN104167687B CN201410343363.5A CN201410343363A CN104167687B CN 104167687 B CN104167687 B CN 104167687B CN 201410343363 A CN201410343363 A CN 201410343363A CN 104167687 B CN104167687 B CN 104167687B
Authority
CN
China
Prior art keywords
supporting plate
suspension insulator
insulator
stull
charged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410343363.5A
Other languages
Chinese (zh)
Other versions
CN104167687A (en
Inventor
陈红卫
王群营
赵永浩
狄京元
杨留柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LUOHE POWER SUPPLY COMPANY STATE GRID HENAN ELECTRIC POWER Co Ltd
Original Assignee
LUOHE POWER SUPPLY COMPANY STATE GRID HENAN ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LUOHE POWER SUPPLY COMPANY STATE GRID HENAN ELECTRIC POWER Co Ltd filed Critical LUOHE POWER SUPPLY COMPANY STATE GRID HENAN ELECTRIC POWER Co Ltd
Priority to CN201410343363.5A priority Critical patent/CN104167687B/en
Publication of CN104167687A publication Critical patent/CN104167687A/en
Application granted granted Critical
Publication of CN104167687B publication Critical patent/CN104167687B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Insulators (AREA)

Abstract

The invention discloses a tool for live-line replacement of a suspension insulator and a using working method thereof. The tool comprises a frame type bracket and a telescopic suspension mechanism arranged at the top of the frame type bracket. The telescopic suspension mechanism includes an adjusting lead screw and a self-locking hook arranged at the top of the adjusting lead screw. The frame type bracket includes a supporting plate at the bottom and a cross-brace unit at the top; the middle portion of the cross-brace unit is connected with the bottom of the adjusting lead screw; and the supporting plate and the cross-brace unit are connected by two insulating connecting elements with adjustable lengths. According to the invention, the frame type bracket with the telescopic suspension mechanism at the top is used for ground potential live-line suspension insulator replacement of the power transmission line; and the transmission line or weight is supported by the supporting plate, so that the tensile forces of the transmission line and the weight are transferred to the tool from the suspension insulator. Therefore, the cross arm worker can complete the replacement process of the suspension insulator by himself, thereby bringing the great convenience for suspension insulator replacement. Moreover, the tool has advantages of simple structure, high security, stability, and reliability, and high efficiency.

Description

The instrument of a kind of charged for replacement suspension insulator and use operational method thereof
Technical field
The present invention relates to electric transmission line isolator and change technical field, particularly to a kind of charged for replacement suspension insulator Instrument and use operational method thereof.
Background technology
During current power transmission circuit earth potential live replacing suspension insulator, traditional work method is that on cross-arm, operating personnel is first First on cross-arm, it is fixedly installed assembly pulley, the abseiling of assembly pulley arranges hook and hook is placed on power transmission line, by ground dough figurine Member coordinates stay cord, power transmission line and suspension insulator is promoted, makes insulator not by the pulling force effect of power transmission line, then is made by shaft tower Industry personnel with insulating bar carry out pulling pin, insulator displacement, latch, thus realize the replacing of suspension insulator.In this operation process Requiring that ground staff carries out stay cord accurately and coordinates, whole operation process is loaded down with trivial details, repeatedly, operating personnel and Ground Operation people on bar Member constantly to be carried out propagandaing directed to communicate, adjusting insulator position, and operating time length, efficiency are low, difficulty is big;And owing to hook acts on defeated On electric wire, application point is single, during changing insulator, and the as easy as rolling off a log situation occurring that hook slides on power transmission line, deposit In potential safety hazard.
Summary of the invention
It is an object of the invention to deficiency and the defect existed for current power transmission track replacement suspension insulator operation process, Provide the instrument of a kind of charged for replacement suspension insulator, pulling pin, replacing and during latch, need not Ground Operation personnel Bracing wire coordinates, and shaft tower personnel can complete alone the pulling pin of suspension insulator, replace and latch operation, easy and simple to handle, stably may be used Lean on, efficiency high.
It is a further object of the present invention to provide a kind of side utilizing above-mentioned instrument to carry out charged for replacement suspension insulator operation Method.
To achieve these goals, the technical solution used in the present invention is: the instrument of a kind of charged for replacement suspension insulator, Including frame bracket and the telescopic hitch arranging described frame pallet top, described telescopic hitch includes regulation Leading screw and the Self-locking hanging hook being arranged on described adjusting screw top;Described frame bracket includes supporting plate and the horizontal stroke at top of bottom Support, is connected with described adjusting screw bottom in the middle part of described stull, and described supporting plate and described stull are length-adjustable absolutely by two pairs Edge connector connects.
Described two secondary length-adjustable insulated connecting piece, wherein the two ends up and down of a secondary insulated connecting piece respectively with described horizontal stroke Support and the fixing connection of described supporting plate, another secondary insulated connecting piece upper end is fixing with described stull to be connected, and lives with described supporting plate in lower end It is dynamically connected.
Described adjusting screw includes the threaded portion on top and the unthreaded portion of bottom, and described top threaded portion is arranged There is a threaded collar, and described adjusting screw is provided with ratchet spanner, the described collar and institute through the top of the described collar Stating Self-locking hanging hook to connect, described bottom unthreaded portion is connected by bearing with described stull, and described adjusting screw is through institute The bottom stating bearing is provided with locating part.
Described adjusting screw includes two sections of upper leading screws being connected respectively and lower leading screw with described Self-locking hanging hook, described stull, Described upper and lower leading screw is positive and negative silk structure, and described leading screw has the sleeve connection of positive and negative silk screw thread by inwall, on described sleeve It is provided with regulation spanner.
The flight pitch of described adjusting screw is 3-5mm, and screw thread oblique angle is 2-5 degree.
Described supporting plate includes that the reinforced steel bar ring of circle and decussation are placed in the steel plate in described reinforced steel bar ring, outside described reinforced steel bar ring Being welded with the edge part being perpendicular to face, described reinforced steel bar ring place, described edge part is provided with corresponding two open slot.
Being provided with connection through hole on described edge part, described insulated connecting piece and described supporting plate are by described edge part Through hole is flexibly connected.
Described insulated connecting piece includes at least 2 insulation pulling plates, and described insulation pulling plate is laid some through holes.
Described stull is the metallic rod that two ends are provided with connecting bolt.
Described stull is the steel plate that two ends have 90 degree of flangings.
A kind of method utilizing above-mentioned instrument to carry out charged for replacement suspension insulator operation, comprises the steps:
1) prepare: the tool group of above-mentioned charged for replacement suspension insulator is installed by operating personnel in place, and reserved side Insulated connecting piece does not fills or half dress: i.e. one end of insulated connecting piece is rotationally connected with stull or supporting plate;
2) lifting: pole tower operation personnel climb up at the cross-arm above shaft tower extremely insulator to be replaced, and will band with transmission rope The instrument of charged renewal suspension insulator reaches at the cross-arm at insulator place to be replaced, and cross-arm operating personnel passes through Self-locking hanging hook will The charged for replacement suspension insulator instrument assembled is hung on the cross-arm above insulator to be replaced, has installed by hand propelled The insulated connecting piece of side, supporting plate is pushed into the lower section of insulator to be replaced;If insulator to be replaced is hanging bottle string, then will torr Plate is placed in below the heavy punch piece of hanging bottle string insulator, is put in supporting plate by heavy punch piece;If insulator to be replaced is that generic linear is exhausted Edge, then be placed in transmission pressure in the open slot of brace edge part;The most again by the insulated connecting piece of uninstalled side with Stull and supporting plate connect, or are connected with supporting plate or stull by the insulated connecting piece other end of half dress;
3) promote: cross-arm operating personnel is by operating adjusting screw by the frame of described charged for replacement suspension insulator instrument Bracket together promotes together with heavy punch piece and/or transmission pressure, the relay to insulator to be replaced by heavy punch piece and/or transmission pressure Removal;
4) change: cross-arm operating personnel by pulling pin, replace and latch can complete the replacing of insulator;In this step newly The insulator changed and the old insulator changed still use conventional transmission method to carry out ground and the transmission on shaft tower;
5) dismounting: after replacing insulator latch fixation, cross-arm operating personnel, by operation regulation spanner, makes tune Joint leading screw elongation, supporting plate departs from heavy punch piece or transmission pressure, removes or open the insulated connecting piece of frame bracket side, can make The instrument of charged for replacement suspension insulator departs from the insulator after changing, open Self-locking hanging hook by transmission rope be transferred to ground or It is transferred at the cross-arm above next insulator to be replaced carry out the replacing of next insulator.
The frame bracket that the present invention uses top to have telescopic hitch carries out transmission line of electricity earth potential live replacing Suspension insulator, is held up power transmission line or weight by supporting plate, makes the pulling force of power transmission line and weight transfer to from suspension insulator On instrument, being very easy to the replacing of suspension insulator, simple in construction, safe and stable, reliable, efficiency is high.Telescopic suspension Mechanism, by using top to have the adjusting screw structure of Self-locking hanging hook, hangs conveniently, easy and simple to handle, by operation leading screw Conveniently by supporting plate, power transmission line and weight are promoted certain altitude;Supporting plate and stull use two secondary length-adjustable insulation to connect Part connects, can effective guarantee hold up, lifting process reliable and stable, it is to avoid power transmission line or weight slip situation and occur, and, absolutely Edge connector adjustable length, is very easy to the length of length adjustment insulated connecting piece according to suspension insulator, and it is right to facilitate The lifting of suspension insulator and stablize spacing, improves and changes the safety of insulator during suspension insulator.In the application The flight pitch of adjusting screw is 3-5mm, and screw thread oblique angle is 2-5 degree, reaches the effective coordination promoting speed with rotation efficiency, both Improve lifting speed, the rotation process being unlikely to again to make regulation spanner is excessively laborious, operates light efficiency high, effectively carries from face High power transmission line and the raising efficiency of weight, effectively can foreshorten to original 1/3rd by the lifting time.Use the band of the application Charged renewal suspension insulator instrument and its use operational method, the pulling pin of insulator, replace and during latch, cross-arm operation Personnel can complete alone, it is to avoid employing traditional approach, and ground staff needs constantly to propaganda directed to communicate, regulate by stay cord coordinating operation The trouble that stay cord dynamics coordinates back and forth, makes that operation is easier, reliable and stable, efficiency is high.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings the present invention is further described:
Fig. 1 is the structural representation of the embodiment of the present invention one;
Fig. 2 is the structural representation of telescopic hitch in the embodiment of the present invention one;
Fig. 3 is the main TV structure schematic diagram of the embodiment of the present invention two;
Fig. 4 is the perspective view of the embodiment of the present invention two.
Detailed description of the invention
Embodiment one
As shown in Figure 1 and Figure 2: the instrument of a kind of charged for replacement suspension insulator, including frame bracket and arrange described frame The telescopic hitch of pallet top;Described frame bracket includes supporting plate and the stull 4 at top, described supporting plate and the institute of bottom State stull to be connected by two secondary length-adjustable insulated connecting piece 6.
Each secondary insulated connecting piece 6 includes 2 insulation pulling plates 61, and described insulation pulling plate 61 is for being laid with some connection through holes Strip panel structure, be placed through in through hole by bolt between insulation pulling plate 61 and with the spacing realization connection of nut spinning, And select the through hole of diverse location to connect as required, it is achieved the length adjustment of insulated connecting piece;If length is still inadequate, also Existing 2 insulation pulling plates can be connected by increasing insulation pulling plate 61, regulate the length of insulated connecting piece 6;
Stull 4 uses two ends to be provided with the metallic rod structure of connecting bolt 5, by being worn by the connecting bolt 5 at stull 4 two ends It is placed in the through hole of insulated connecting piece 6 upper end, and screws with nut;The wherein lower end of a secondary insulated connecting piece 6 and described supporting plate Fixing connecting, the lower end of another secondary insulated connecting piece 6 passes through hinge with the side of described supporting plate or rotating shaft 12 is hinged, it is achieved it is Hypomere insulation pulling plate 61 rotates around the side of supporting plate, exhausted by be flipped up with top after supporting plate support power transmission line or weight Edge arm-tie 61 connects, thus realizes imposing the both sides of supporting plate the pulling force of equilibrium, improves stability and the load reliability of supporting plate.
Described telescopic hitch includes adjusting screw 3 and is arranged on the Self-locking hanging hook 1 on described adjusting screw 3 top, Described adjusting screw 3 includes that the threaded portion on top and the unthreaded portion of bottom, described top threaded portion are provided with screw thread The collar 10 connected, the collar 10 can use the nut of coupling or have female steel pipe cylinder, and described adjusting screw 3 is through institute The top end stating the collar 10 is provided with locating part 9 and ratchet spanner 2, and ratchet spanner market purchasing, on the top of adjusting screw 3 End welding one positive six prisms, ratchet spanner 2 is placed on six prisms, and the described collar 10 is connected with described Self-locking hanging hook 1, institute State bottom unthreaded portion to be connected by bearing 11 with described stull 4, and described adjusting screw 3 is through the bottom of described bearing 11 Place is provided with locating part 9, and described locating part 9 can use spacer pin or place the spacing ring of pin.To be adjusted by the collar 10 Joint leading screw 3 is connected with self-marketing hook 1, and is the most back and forth pulled by the ratchet spanner 2 on adjusting screw 3 top, it is achieved regulation silk The thick stick 3 rotation in the collar 10, it is achieved the ascending motion of adjusting screw 3, adjusting screw 3 lower end is with stull 4 by bearing 10 even Connecing, the when of effective guarantee screw turns, stull 4 and whole frame bracket do not rotate, and adjusting screw 3 is at the collar 10 During interior rising, stull 4 and whole frame bracket is driven to make lifter motion.Described supporting plate includes that the reinforced steel bar ring 8 of circle and cross are handed over Fork is placed in the steel plate 11 in described reinforced steel bar ring 8, and the outside weld of described reinforced steel bar ring 8 is connected to be perpendicular to the edge in face, described reinforced steel bar ring 8 place Part 7, described edge part 7 is provided with corresponding two open slot 14.By welding edge along part 7, it is achieved under suspension insulator Weight the most spacing, it is to avoid the unnecessary trouble that weight sliding causes in lifting process, meanwhile, open slot 14 can be effectively Power transmission line is accommodated therein, it is to avoid sliding.It is provided with connection through hole, it is achieved insulated connecting piece is with described on described edge part 7 Supporting plate is attached by the through hole on described edge part, convenient dismounting, connects simplicity.
Embodiment two
As shown in Figure 1 and Figure 2: the present embodiment is in place of the difference of embodiment one:
Described adjusting screw 3 includes that two sections are fixed, with described Self-locking hanging hook 1, described stull 4, the upper leading screw 31 being connected respectively With lower leading screw 32, described upper leading screw 31 and lower leading screw 32 are positive and negative silk structure, and described upper leading screw 31 and described lower leading screw 32 pass through Inwall has the sleeve 33 of positive and negative silk screw thread and connects, and described sleeve 33 is provided with regulation handle 34, described upper leading screw 31 top Welding with described Self-locking hanging hook 1, described lower leading screw 32 lower end is welded with described stull 4 middle part.By control and regulation handle 34 turnbarrels 33, it is achieved the upper and lower leading screw rotary motion in sleeve 33 simultaneously, can be effectively improved raising efficiency, meanwhile, institute The flight pitch stating adjusting screw 3 is 3-5mm, and screw thread oblique angle is 2-5 degree, drastically increases the lifting effect in operation process Rate.
Described stull 4 uses the steel plate that two ends have 90 degree of flangings 41, and offers through hole at flanging 41, by through hole Inside place bolt 5, it is achieved stull 4 and the connection of insulation pulling plate 61.The lower end insulation pulling plate of described insulated connecting piece 6 wherein side 61 lower ends are provided with U-shaped hanging part 13, and the side length of side of described U-shaped hanging part 13 is drawn with insulation in opposite side and offering The through hole that plate 61 lower end connects.By arranging U-shaped hanging part 13 in insulated connecting piece 6 lower end, facilitate insulated connecting piece side Quickly open and be connected Guan Bi, features simple structure, it is simple to operation.
Embodiment three
A kind of method utilizing above-mentioned instrument to carry out charged for replacement hanging bottle string suspension insulator operation, comprises the steps:
1) prepare: the tool group of above-mentioned charged for replacement suspension insulator is installed by operating personnel in place, and reserved side Insulated connecting piece 6 does not fills;
2) lifting: pole tower operation personnel climb up at the cross-arm above shaft tower extremely insulator to be replaced, and will band with transmission rope The instrument of charged renewal suspension insulator reaches at the cross-arm at insulator place to be replaced, and cross-arm operating personnel passes through Self-locking hanging hook will The charged for replacement suspension insulator instrument assembled is hung on the cross-arm above insulator to be replaced, has installed by hand propelled The insulated connecting piece 6 of side, supporting plate is placed in below the heavy punch piece of hanging bottle string insulator, is put into by heavy punch piece in supporting plate, then Again the insulated connecting piece 6 of uninstalled side is connected with stull 4 and supporting plate;
3) promote: cross-arm operating personnel is by operating adjusting screw 3 by the frame of described charged for replacement suspension insulator instrument Formula bracket together promotes together with heavy punch piece and transmission pressure, heavy punch piece and transmission pressure is unloaded the relay of insulator to be replaced Remove;
4) change: cross-arm operating personnel by pulling pin, replace and latch can complete the replacing of insulator;In this step newly The insulator changed and the old insulator changed still use conventional transmission method to carry out ground and the transmission on shaft tower;
5) dismounting: after replacing insulator latch fixation, cross-arm operating personnel, by operation regulation spanner, makes tune Joint leading screw elongation, supporting plate departs from heavy punch piece and transmission pressure, removes the insulated connecting piece of frame bracket side, can make charged more The instrument changing suspension insulator departs from the insulator after changing, and opens Self-locking hanging hook 3 and is transferred to ground or transmission by transmission rope The replacing of next insulator is carried out at cross-arm above next insulator to be replaced.
Embodiment four
A kind of method utilizing above-mentioned instrument to carry out charged for replacement generic linear suspension insulator operation, including walking as follows Rapid:
1) prepare: the tool group of above-mentioned charged for replacement suspension insulator is installed by operating personnel in place, and reserved side Insulated connecting piece 6 half fills, i.e. one end of insulated connecting piece 6 is hinged with stull or supporting plate, and the other end is not connected to;
2) lifting: pole tower operation personnel climb up at the cross-arm above shaft tower extremely insulator to be replaced, and will band with transmission rope The instrument of charged renewal suspension insulator reaches at the cross-arm at insulator place to be replaced, and cross-arm operating personnel passes through Self-locking hanging hook will The charged for replacement suspension insulator instrument assembled is hung on the cross-arm above insulator to be replaced, has installed by hand propelled The insulated connecting piece 6 of side, supporting plate is pushed into the lower section of insulator to be replaced;By the transmission pressure below insulator to be replaced It is placed in the open slot 14 of brace edge part 7, and the other end of the insulated connecting piece 6 of half dress is connected with supporting plate or stull 4;
3) promote: cross-arm operating personnel is by operating adjusting screw 3 by the frame of described charged for replacement suspension insulator instrument Formula bracket together promotes together with heavy punch piece and transmission pressure, heavy punch piece and transmission pressure is unloaded the relay of insulator to be replaced Remove;
4) change: cross-arm operating personnel by pulling pin, replace and latch can complete the replacing of insulator;In this step newly The insulator changed and the old insulator changed still use conventional transmission method to carry out ground and the transmission on shaft tower;
5) dismounting: after replacing insulator latch fixation, cross-arm operating personnel, by operation regulation spanner, makes tune Joint leading screw elongation, supporting plate departs from transmission pressure, opens the insulated connecting piece 6 of frame bracket side, charged for replacement can be made to dangle The instrument of insulator departs from the insulator after changing, and opens Self-locking hanging hook 3 and is transferred to ground by transmission rope or is transferred to next The replacing of next insulator is carried out at cross-arm above individual insulator to be replaced.

Claims (6)

1. the instrument of a charged for replacement suspension insulator, it is characterised in that: it includes frame bracket and arranges described frame torr The telescopic hitch of top of the trellis, described telescopic hitch includes adjusting screw and is arranged on described adjusting screw top Self-locking hanging hook;Described frame bracket includes supporting plate and the stull at top of bottom, with described adjusting screw in the middle part of described stull Bottom connects, and described supporting plate and described stull are connected by two secondary length-adjustable insulated connecting piece;Described supporting plate includes circle Reinforced steel bar ring and decussation be placed in the steel plate in described reinforced steel bar ring, described reinforced steel bar ring outside weld is connected to be perpendicular to described reinforced steel bar ring institute At the edge part in face, described edge part is provided with corresponding two open slot, and described edge part is provided with connection through hole, institute State insulated connecting piece to be flexibly connected by the through hole on described edge part with described supporting plate;Described stull is that two ends are provided with connection The metallic rod of bolt.
2. the instrument of charged for replacement suspension insulator as claimed in claim 1, it is characterised in that: described two is secondary length-adjustable Insulated connecting piece, wherein the two ends up and down of a secondary insulated connecting piece are fixing with described stull and described supporting plate respectively is connected, another Secondary insulated connecting piece upper end is fixing with described stull to be connected, and lower end is flexibly connected with described supporting plate.
3. the instrument of charged for replacement suspension insulator as claimed in claim 1, it is characterised in that: described adjusting screw includes The threaded portion in portion and the unthreaded portion of bottom, described top threaded portion is provided with the threaded collar, and described tune Joint leading screw is provided with locating part and ratchet spanner through the top of the described collar, and the described collar is connected with described Self-locking hanging hook, institute State bottom unthreaded portion to be connected by bearing with described stull, and described adjusting screw is provided with through the bottom of described bearing Locating part.
4. the instrument of charged for replacement suspension insulator as claimed in claim 1, it is characterised in that: described adjusting screw includes two The upper leading screw that is connected with described Self-locking hanging hook, described stull respectively of section and lower leading screw, described upper and lower leading screw is positive and negative silk structure, Described upper and lower leading screw has the sleeve connection of positive and negative silk screw thread by inwall, and described sleeve is provided with regulation spanner.
5. the instrument of the charged for replacement suspension insulator as described in claim 3 or 4, it is characterised in that: described adjusting screw Flight pitch is 3-5mm, and screw thread oblique angle is 2-5 degree.
The instrument of charged for replacement suspension insulator the most as claimed in claim 1 or 2 or 3 or 4, it is characterised in that: described insulation Connector includes at least 2 insulation pulling plates, and described insulation pulling plate is laid some through holes.
CN201410343363.5A 2014-07-18 2014-07-18 Tool for live-line replacement of suspension insulator and using working method thereof Active CN104167687B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410343363.5A CN104167687B (en) 2014-07-18 2014-07-18 Tool for live-line replacement of suspension insulator and using working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410343363.5A CN104167687B (en) 2014-07-18 2014-07-18 Tool for live-line replacement of suspension insulator and using working method thereof

Publications (2)

Publication Number Publication Date
CN104167687A CN104167687A (en) 2014-11-26
CN104167687B true CN104167687B (en) 2017-01-11

Family

ID=51911397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410343363.5A Active CN104167687B (en) 2014-07-18 2014-07-18 Tool for live-line replacement of suspension insulator and using working method thereof

Country Status (1)

Country Link
CN (1) CN104167687B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105337217B (en) * 2015-11-26 2018-04-13 国网河南省电力公司检修公司 A kind of instrument and its method of charged for replacement extra-high voltage ground electrode circuit linear insulator
CN105375390A (en) * 2015-12-04 2016-03-02 国网浙江省电力公司绍兴供电公司 Power transmission line weight pallet
CN107123948B (en) * 2017-06-29 2018-12-21 国网河南省电力公司济源供电公司 A kind of replacement route weight sheet devices
CN107171249A (en) * 2017-06-30 2017-09-15 国网福建省电力有限公司 The mounting structure and replacement operation method of a kind of duplex strain insulator string
CN107293997B (en) * 2017-08-04 2019-01-25 江西电力职业技术学院 Suspension insulator replacement hook and replacing device for insulator
CN108512120A (en) * 2018-05-30 2018-09-07 广东电网有限责任公司 Insulator replacement tool
CN109038363B (en) * 2018-08-02 2020-07-21 嘉兴敏德汽车零部件有限公司 Suspension type strain insulator string connecting device for adjusting high-voltage wire string interval by magnet
CN110011217B (en) * 2019-03-21 2023-12-12 中国南方电网有限责任公司超高压输电公司百色局 Device for replacing jumper insulator string of 500 kilovolt power transmission line and application method thereof
CN110416912A (en) * 2019-07-05 2019-11-05 国家电网有限公司 Link connects combined type UHV Long Insulator String cross-arm side live-line replacing tool
CN113948998B (en) * 2021-09-26 2023-03-28 国网辽宁省电力有限公司抚顺供电公司 Tool for replacing porcelain insulator on cross arm side and wire side
CN114123027B (en) * 2021-11-24 2024-03-01 国网江苏省电力有限公司检修分公司 Steel pipe tower straight line double-I-string clamp and operation method thereof
CN115173297B (en) * 2022-05-25 2023-07-25 国网河南省电力公司信阳供电公司 Movable high-altitude suspension insulator replacement device and use method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200994046Y (en) * 2006-12-15 2007-12-19 湖北省电力公司咸宁供电公司 Double split lead live-line indirect lifting device
CN101299519A (en) * 2008-03-06 2008-11-05 福建省厦门电业局 Hanging type insulator string electrification altering apparatus interlocked with a two-connection plate
CN101692548A (en) * 2009-09-11 2010-04-07 河南省电力公司漯河供电公司 Tool for live replacing of hanging bottle string of drainage wire
CN101814707A (en) * 2009-12-15 2010-08-25 云南电网公司大理供电局 Tool for live replacement of 220kV line 'V' string insulator and method
CN102623927A (en) * 2012-03-31 2012-08-01 湖南省电力公司株洲电业局 Tool and method for charged replacement of multi-circuit double-split conductor insulators of 200kV line
CN202586171U (en) * 2012-05-21 2012-12-05 黄石供电公司输电中心 Supporting plate device of special hook card for live line replacement linear horizontal double-division insulator
CN202856246U (en) * 2012-11-16 2013-04-03 安徽电力濉溪供电有限责任公司 Insulator replacement device
CN202906354U (en) * 2012-11-13 2013-04-24 张守伟 Cable uncoiling pulley
CN103401181A (en) * 2013-07-23 2013-11-20 国家电网公司 Universal fixture
CN103606845A (en) * 2013-11-21 2014-02-26 国家电网公司 Uncoiling pulley
CN204012454U (en) * 2014-07-18 2014-12-10 国家电网公司 A kind of instrument of charged for replacement suspension insulator

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8051544B2 (en) * 2007-12-24 2011-11-08 Haverfield International Incorporated Method of replacing insulators on a tower and insulator support and transport assembly therefor

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200994046Y (en) * 2006-12-15 2007-12-19 湖北省电力公司咸宁供电公司 Double split lead live-line indirect lifting device
CN101299519A (en) * 2008-03-06 2008-11-05 福建省厦门电业局 Hanging type insulator string electrification altering apparatus interlocked with a two-connection plate
CN101692548A (en) * 2009-09-11 2010-04-07 河南省电力公司漯河供电公司 Tool for live replacing of hanging bottle string of drainage wire
CN101814707A (en) * 2009-12-15 2010-08-25 云南电网公司大理供电局 Tool for live replacement of 220kV line 'V' string insulator and method
CN102623927A (en) * 2012-03-31 2012-08-01 湖南省电力公司株洲电业局 Tool and method for charged replacement of multi-circuit double-split conductor insulators of 200kV line
CN202586171U (en) * 2012-05-21 2012-12-05 黄石供电公司输电中心 Supporting plate device of special hook card for live line replacement linear horizontal double-division insulator
CN202906354U (en) * 2012-11-13 2013-04-24 张守伟 Cable uncoiling pulley
CN202856246U (en) * 2012-11-16 2013-04-03 安徽电力濉溪供电有限责任公司 Insulator replacement device
CN103401181A (en) * 2013-07-23 2013-11-20 国家电网公司 Universal fixture
CN103606845A (en) * 2013-11-21 2014-02-26 国家电网公司 Uncoiling pulley
CN204012454U (en) * 2014-07-18 2014-12-10 国家电网公司 A kind of instrument of charged for replacement suspension insulator

Also Published As

Publication number Publication date
CN104167687A (en) 2014-11-26

Similar Documents

Publication Publication Date Title
CN104167687B (en) Tool for live-line replacement of suspension insulator and using working method thereof
CN106948646B (en) Power grid electric pole sets up Self-loading-unloading tool car construction method
CN204760890U (en) Wire hoisting device in distribution lines construction
CN104953507A (en) Device and method for lifting wire during distribution line construction
CN106142049A (en) Hot line robot
CN103532051B (en) A kind of 180 degree of rotation and lifting insulated platforms
CN106517015A (en) Simple lifting device used for maintaining electrical equipment
CN207353753U (en) Phase transfer current potential power tool in dry font anchor support
CN108847616A (en) A kind of livewire work wire lifting device
CN203895908U (en) Balance cross-arm
CN205204680U (en) High -voltage line tower is with supplementary hoisting device
CN209071955U (en) A kind of livewire work lifting bracket
CN105350901A (en) Multistage climbing ladder used for electric power overhaul
CN105366565B (en) High voltage transmission line tower auxiliary lifting apparatus
CN106786134B (en) Electrodynamic type jacks the construction method of do not have a power failure resistance to opening and closing and cross-arm equipment
CN204103349U (en) The auxiliary fixing elevation and subsidence regulating device of electric power live line working action bars
CN204012454U (en) A kind of instrument of charged for replacement suspension insulator
CN107910809B (en) A kind of hot line maintenance insulated ladder
CN104172664B (en) The adjustable tube rack of a kind of novel baking oven
CN207228778U (en) A kind of New Rigid fence
CN105406402B (en) A kind of folding lightweight goes out single string strain insulator string devices
CN209625510U (en) A kind of electrical employee training device that safety is good
CN104201611B (en) UHVDC Transmission Lines change tangent tower wire clamp tool
CN107327204A (en) Portable laborsaving leading screw electric pole erection device
CN103606846B (en) A kind of hot-line insulator string replacement operation high-strength insulating rope supporting component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant