CN104162462B - Hydraulic breaking hammer - Google Patents
Hydraulic breaking hammer Download PDFInfo
- Publication number
- CN104162462B CN104162462B CN201410233571.XA CN201410233571A CN104162462B CN 104162462 B CN104162462 B CN 104162462B CN 201410233571 A CN201410233571 A CN 201410233571A CN 104162462 B CN104162462 B CN 104162462B
- Authority
- CN
- China
- Prior art keywords
- hammer
- roller
- shell
- hammer body
- grooved tracks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
一种液压破碎锤,用于配装挖掘机、装载机、巷道清理机。锤体与锤壳之间通过顶压装置和移动装置连接。移动装置的前夹板与后夹板通过螺栓将锤体夹紧,与锤体成为一体,前夹板与后夹板外侧分别对称设置带有滚轮的滚轮轴,锤壳内侧设置凹槽轨道一,滚轮置于凹槽轨道一中;顶压装置的前夹板带有耳座一,锤壳后部法兰上带有耳座二,顶压油缸活塞杆端和缸筒座端通过销轴分别与耳座一、耳座二铰接。本发明结构简单、紧凑,加工制造容易,可确保破碎锤对于任何打击方向和角度,始终可正常起振,并可实现打击点距离自动跟进,减少机械臂的对准和破碎深度调整操作,提高工作效率。适用于矿业开采、路面破碎、隧道施工、建筑破拆施工和隧道施工清理排险作业。
The utility model relates to a hydraulic breaking hammer, which is used for matching excavators, loaders, and roadway cleaning machines. The hammer body and the hammer shell are connected through a pressing device and a moving device. The front splint and the rear splint of the mobile device clamp the hammer body through bolts, and are integrated with the hammer body. Roller shafts with rollers are symmetrically arranged on the outside of the front splint and rear splint. Groove track one; the front splint of the top pressure device has ear seat one, and the rear flange of the hammer shell has ear seat two. 1. The two ear seats are hinged. The invention has a simple and compact structure, is easy to process and manufacture, can ensure that the breaker can always vibrate normally for any strike direction and angle, and can realize automatic follow-up of the strike point distance, reducing the alignment of the mechanical arm and the adjustment of the crushing depth. Improve work efficiency. It is suitable for mining, pavement crushing, tunnel construction, building demolition construction and tunnel construction cleaning and risk removal operations.
Description
技术领域 technical field
本发明涉及破碎设备工具技术领域,具体是一种用于挖掘机、巷道清理机、破拆机器设备等可自动顶压跟进的液压破碎锤。 The invention relates to the technical field of crushing equipment and tools, in particular to a hydraulic breaker that can be used for excavators, roadway cleaning machines, demolition machinery and equipment, etc., and can be automatically pressed and followed.
背景技术 Background technique
液压破碎锤以其冲击能量大、频次快、施工效率高的优势,在矿业开采、路面破碎、隧道掘进、建筑破拆等方面的应用越来越多。液压破碎锤按其结构原理可分为活塞与钢钎杆分离的普通撞击式破碎锤和活塞与钢钎杆连接一体的动能式破碎锤。其工作原理都是由高频、高速冲击活塞撞击或带动钢钎对目标进行冲击击打使其破碎。对于结合密实、强度高、体积大的目标物,只有当击打次数和打击能量积累到一定程度才能破碎。随着打击过程的进行,打击点渐进前移,就需要调节破碎锤位置跟进打击点,并对其施加顶压力。否则就会发生不起震或空打现象。而空打现象在破碎锤的使用中是不允许的,否则将会加速破碎锤活塞、缸体及钎杆的损坏,严重降低破碎锤的使用寿命。 With its advantages of large impact energy, fast frequency and high construction efficiency, hydraulic breakers are more and more used in mining, road breaking, tunneling, building demolition, etc. According to its structural principle, the hydraulic breaker can be divided into an ordinary impact breaker in which the piston and the steel drill rod are separated, and a kinetic energy breaker in which the piston and the steel drill rod are connected together. Its working principle is that the high-frequency, high-speed impact piston hits or drives the steel braze to impact and hit the target to make it break. For the target with dense combination, high strength and large volume, it can only be broken when the number of hits and the hit energy accumulate to a certain extent. As the striking process progresses, the striking point moves forward gradually, and it is necessary to adjust the position of the breaker to follow the striking point and apply top pressure to it. Otherwise, there will be no shock or empty play. The air strike phenomenon is not allowed in the use of the breaker, otherwise it will accelerate the damage of the breaker piston, cylinder and drill rod, and seriously reduce the service life of the breaker.
但是由于现行普通挖掘机上配装普通破碎锤时,破碎锤的预顶压力和位置调整都是通过斗杆油缸进行。在向下打击时,在破碎锤和钎杆及斗杆、动杆等的自重作用下,预顶压力和位置调整要求基本一致,打击效果较好;而在水平和向上打击时,由于失去自重作用,预顶压力和位置调整要求不相一致,主要是预顶压力不足,使用中会发生破碎锤朝下打击时工作效果良好,但当钎杆水平和朝上方打击时,破碎锤不起振、不能正常冲击的现象,严重降低了工作效率,影响了破碎锤的应用拓展,特别是在巷道破松层清理排险和建筑破拆上的应用。 However, when an ordinary breaker is equipped on an existing common excavator, the pre-jacking pressure and position adjustment of the breaker are all carried out through the stick oil cylinder. When striking downwards, under the action of the self-weight of the breaker, drill rod, bucket rod, moving rod, etc., the pre-jacking pressure and position adjustment requirements are basically the same, and the striking effect is better; while striking horizontally and upwards, due to the loss of self-weight Function, pre-jacking pressure and position adjustment requirements are not consistent, mainly because the pre-jacking pressure is insufficient. During use, the breaking hammer will work well when it hits downwards, but when the drill rod is horizontal and hits upwards, the breaking hammer will not vibrate. , The phenomenon of not being able to impact normally seriously reduces the work efficiency and affects the application expansion of the breaker, especially in the application of roadway breaking loose layer cleaning and building demolition.
发明内容 Contents of the invention
为克服现有技术的不足,本发明的发明目的在于提供一种液压破碎锤,以实现破碎锤在所有方向打击破碎过程中始终保持正常起振与优良的冲击效果。 In order to overcome the deficiencies of the prior art, the purpose of the present invention is to provide a hydraulic breaker, so that the breaker can always maintain normal vibration and excellent impact effect during the crushing process in all directions.
为实现上述目的,本发明包括锤壳与带有钢钎的锤体,其特征在于:锤体与锤壳之间通过顶压装置和移动装置连接。 In order to achieve the above object, the present invention includes a hammer shell and a hammer body with a steel drill, and is characterized in that: the hammer body and the hammer shell are connected through a pressing device and a moving device.
所述移动装置的前夹板与后夹板通过螺栓将锤体夹紧,前夹板和后夹板与锤体成为一体;前夹板与后夹板的外侧分别对称设置有两个滚轮轴,滚轮轴上安装滚轮;锤壳的内侧设置有用于滚轮移动的凹槽轨道一,滚轮置于凹槽轨道一中。 The front splint and the rear splint of the mobile device clamp the hammer body through bolts, and the front splint and the rear splint are integrated with the hammer body; two roller shafts are symmetrically arranged on the outside of the front splint and the rear splint respectively, and rollers are installed on the roller shafts. ; The inside of the hammer shell is provided with a groove track 1 for the movement of the roller, and the roller is placed in the groove track 1.
所述移动装置也可以是锤壳的上部安装滚轮,前夹板与后夹板上设置凹槽轨道一的结构。 The moving device can also be a structure in which rollers are installed on the upper part of the hammer shell, and groove track 1 is arranged on the front splint and the rear splint.
所述移动装置也可以是前夹板与后夹板通过螺栓将锤体夹紧,前夹板和后夹板与锤体成为一体;锤体上设置有滚轮轴,滚轮轴上安装滚轮,锤壳上设置有凹槽轨道一,滚轮置于凹槽轨道一中;锤壳上设置有滚轮轴,滚轮轴上安装滚轮,锤体上设置有凹槽轨道二,滚轮置于凹槽轨道二中。 The moving device can also be that the front splint and the rear splint clamp the hammer body through bolts, and the front splint and the rear splint are integrated with the hammer body; the hammer body is provided with a roller shaft, and rollers are installed on the roller shaft. The groove track one, the roller is placed in the groove track one; the hammer shell is provided with the roller shaft, the roller shaft is installed with the roller, the hammer body is provided with the groove track two, and the roller is placed in the groove track two.
所述顶压装置采用油缸顶压机构,顶压装置的前夹板带有耳座一,锤壳后部的法兰上带有耳座二,顶压油缸的活塞杆端和缸筒座端通过销轴分别与耳座一、耳座二铰接。 The top pressure device adopts an oil cylinder top pressure mechanism. The front splint of the top pressure device has ear seat 1, and the flange at the rear of the hammer shell has ear seat 2. The piston rod end and cylinder seat end of the top pressure oil cylinder pass through The pin shaft is respectively hinged with the ear seat one and the ear seat two.
所述顶压装置也可以采用弹簧顶压机构,弹簧顶压机构由轴、弹簧和套筒组成,轴与前夹板的耳座一铰接或固定连接,套筒与法兰焊接固定,弹簧套在轴外,套筒套在弹簧外。 The pressing device can also adopt a spring pressing mechanism. The spring pressing mechanism is composed of a shaft, a spring and a sleeve. The shaft is hinged or fixedly connected to the ear seat of the front splint. Outside the shaft, the sleeve fits over the spring.
所述锤壳可以为整体铸造成型结构;也可以为焊接结构;也可以为分体式结构,分体式锤壳的前部通过螺栓杆将锤壳的两侧拉紧,中间用轴套支撑。 The hammer shell can be an integral casting structure; it can also be a welded structure; it can also be a split structure. The front part of the split hammer shell tightens both sides of the hammer shell through a bolt rod, and the middle is supported by a bushing.
所述滚轮可以带有挡边,可以为滑动轴承式滚轮;也可以为滚动轴承式滚轮;或为摩擦板,摩擦板与凹槽轨道为滑动配合结构,所述摩擦板和凹槽轨道的滑动式结构,可以为在锤壳上设置摩擦板,锤体上设置凹槽轨道二的结构;也可以为在锤壳上设置凹槽轨道一,锤体上设置摩擦板的结构。 The roller can have ribs, it can be a sliding bearing roller; it can also be a rolling bearing roller; or it can be a friction plate, the friction plate and the groove track are a sliding fit structure, and the sliding type of the friction plate and the groove track The structure can be a structure in which a friction plate is set on the hammer shell, and groove track 2 is set on the hammer body; it can also be a structure in which groove track 1 is set on the hammer shell, and a friction plate is set on the hammer body.
本发明在普通破碎锤的基础上加装顶压装置,形成带顶压装置的液压破碎锤,在顶压装置的作用下,实现破碎锤自动顶压跟进,以解决当钎杆水平和朝上方打击时,破碎锤不起振、不能正常冲击的问题。 The present invention adds a top pressure device on the basis of the ordinary breaker to form a hydraulic breaker with a top pressure device. When hitting from above, the breaking hammer does not vibrate and cannot impact normally.
本发明与现有技术相比,结构简单、紧凑,加工制造容易,可以确保破碎锤对于任何打击方向和角度,始终可以正常起振,并可实现打击点距离的自动跟进,减少机械臂的对准和破碎深度调整操作,提高工作效率,拓展破碎锤在巷道破松层清理排险和建筑破拆上的应用。适用于配装挖掘式装载机、巷道清理机和破拆机器等设备,用于矿业开采、路面破碎、隧道施工、建筑破拆施工和隧道施工清理排险作业。 Compared with the prior art, the present invention has a simple and compact structure, and is easy to process and manufacture. It can ensure that the breaking hammer can always vibrate normally for any striking direction and angle, and can realize automatic follow-up of the striking point distance, reducing the mechanical arm Alignment and crushing depth adjustment operations improve work efficiency and expand the application of breaking hammers in roadway loose layer cleaning and building demolition. It is suitable for equipment such as backhoe loaders, roadway cleaning machines and demolition machines, and is used for mining, road crushing, tunnel construction, building demolition construction and tunnel construction cleaning and risk removal operations.
附图说明 Description of drawings
图1为本发明的优先方案结构立体简图。 Fig. 1 is a three-dimensional schematic diagram of a preferred scheme of the present invention.
图2为图1的主视图。 Fig. 2 is a front view of Fig. 1 .
图3为图1的侧视图。 FIG. 3 is a side view of FIG. 1 .
图4为本发明双轨道方案结构立体简图。 Fig. 4 is a schematic perspective view of the structure of the double track solution of the present invention.
图5为图4的主视图。 Fig. 5 is a front view of Fig. 4 .
图6为图4的侧视图。 FIG. 6 is a side view of FIG. 4 .
图7为图1移动装置的另一方案结构简图。 FIG. 7 is a schematic structural diagram of another solution of the mobile device in FIG. 1 .
图8为图1弹簧顶压装置的方案结构简图。 Fig. 8 is a schematic structural diagram of the spring pressing device in Fig. 1 .
图9为图1移动装置为摩擦板滑动式结构的结构简图。 Fig. 9 is a schematic diagram of the structure of the moving device in Fig. 1 as a friction plate sliding structure.
图10为图9的另一方案结构简图。 FIG. 10 is a schematic structural diagram of another solution in FIG. 9 .
具体实施方式 detailed description
如图1、图2、图3所示,图1去掉了锤壳8的一侧板。本发明带有钢钎2的锤体1与锤壳8之间通过顶压装置和移动装置连接。在顶压装置的作用下,执行冲击破碎功能的锤体1受压通过移动装置向前移动,钢钎2始终顶紧打击点并随动跟进。 As shown in Fig. 1, Fig. 2 and Fig. 3, Fig. 1 removes one side plate of the hammer shell 8. In the present invention, the hammer body 1 with the steel drill 2 is connected with the hammer shell 8 through a pressing device and a moving device. Under the action of the pressing device, the hammer body 1, which performs the impact crushing function, is pressed and moves forward through the moving device, and the steel drill 2 always presses against the striking point and follows up.
本发明优选方案的移动装置的前夹板3与后夹板4通过螺栓将锤体1夹紧,前夹板3和后夹板4与锤体1成为一体;前夹板3与后夹板4的外侧分别对称设置有两个滚轮轴5,滚轮轴5上安装滚轮6;锤壳8的内侧设置有用于滚轮6移动的凹槽轨道一11,滚轮6置于凹槽轨道一11中。锤壳8可以为整体铸造成型结构;也可以为焊接结构;也可以为分体式结构,分体式锤壳8的前部通过螺栓杆12将锤壳8的两侧拉紧,中间用轴套13支撑。锤壳8的后部设置法兰9用于与挖掘机斗杆头部法兰连接;当斗杆端部为轴孔结构时,锤壳法兰上设置连接耳板14与之用销轴铰接。如图7所示,移动装置也可以是锤壳8的上部安装滚轮6,前夹板3与后夹板4上设置凹槽轨道一11的结构。所述滚轮6可以带有挡边,可以为滑动轴承式滚轮;也可以为滚动轴承式滚轮;或为摩擦板17,如图9所示,所述摩擦板17和凹槽轨道二15的滑动式结构,可以为在锤壳8上设置摩擦板17,锤体1上设置凹槽轨道二15的结构;如图10所示,所述摩擦板17和凹槽轨道一11的滑动式结构,也可以为在锤壳8上设置凹槽轨道一11,锤体1上设置摩擦板17的结构。 The front splint 3 and the rear splint 4 of the mobile device of the preferred solution of the present invention clamp the hammer body 1 by bolts, and the front splint 3 and the rear splint 4 are integrated with the hammer body 1; the outsides of the front splint 3 and the rear splint 4 are symmetrically arranged respectively There are two roller shafts 5, and roller 6 is installed on the roller shaft 5; the inner side of hammer housing 8 is provided with groove track one 11 for roller 6 to move, and roller 6 is placed in groove track one 11. The hammer shell 8 can be an integral casting structure; it can also be a welded structure; it can also be a split structure. The front part of the split hammer shell 8 tightens the two sides of the hammer shell 8 through a bolt rod 12, and a shaft sleeve 13 is used in the middle. support. The rear part of the hammer shell 8 is provided with a flange 9 for connecting with the head flange of the bucket arm of the excavator; when the end of the arm is a shaft hole structure, the flange of the hammer shell is provided with a connecting ear plate 14 and hinged with a pin . As shown in FIG. 7 , the moving device can also be a structure in which rollers 6 are installed on the upper part of the hammer housing 8 , and groove track 11 is arranged on the front splint 3 and the rear splint 4 . Described roller 6 can have rib, can be sliding bearing type roller; Also can be rolling bearing type roller; Or be friction plate 17, as shown in Figure 9, the sliding type of described friction plate 17 and groove track 2 15 The structure can be a structure in which a friction plate 17 is set on the hammer shell 8, and a groove track two 15 is set on the hammer body 1; as shown in Figure 10, the sliding structure of the friction plate 17 and the groove track one 11 is also It can be a structure in which groove track 1 11 is set on hammer shell 8 and friction plate 17 is set on hammer body 1 .
顶压装置的前夹板3带有耳座一16,锤壳8后部的法兰9上带有耳座二10,顶压油缸7的活塞杆端和缸筒座端通过销轴分别与耳座一16、耳座二10铰接。顶压装置采用顶压油缸7最为合适。打击破碎时,通过液控操纵系统驱动顶压油缸7动作,活塞杆伸出,带动锤体1和钢钎2前移,对锤体1和钢钎2施加顶压。对于每处目标打击点,只需一次对准操作,随着打击破碎过程的进行,在顶压油缸7的作用下,破碎锤自动顶压跟进,直至顶压油缸7的行程结束,破碎锤前移最远位置为止。打击目标破碎后,操纵顶压油缸7的活塞杆缩回,拉动破碎锤后退到原始位置。如图8所示,顶压装置也可以为弹簧顶压机构。弹簧顶压机构由轴19、弹簧20和套筒21组成。轴19与前夹板耳座一16铰接或固定连接,套筒21与法兰9焊接固定,弹簧20套在轴19外,套筒21套在弹簧20外。在锤体1和钢钎2打击前移时,依靠弹簧张力予以顶紧。 The front splint 3 of the top pressure device has an ear seat 16, and the flange 9 at the rear of the hammer shell 8 has an ear seat 2 10. The piston rod end and the cylinder seat end of the top pressure oil cylinder 7 are respectively connected to the ear by the pin shaft. Seat one 16, ear seat two 10 are hinged. The top pressure device adopts the top pressure oil cylinder 7 to be the most suitable. When hitting and crushing, the hydraulic control system drives the top pressure oil cylinder 7 to move, and the piston rod stretches out, driving the hammer body 1 and the steel drill 2 to move forward, and applying top pressure to the hammer body 1 and the steel drill 2. For each target strike point, only one alignment operation is required. As the crushing process progresses, under the action of the top pressure cylinder 7, the breaker automatically presses and follows up until the stroke of the top pressure cylinder 7 ends. Move forward to the farthest position. After the target is crushed, the piston rod of the top pressure cylinder 7 is manipulated to retract, and the hammer is pulled back to the original position. As shown in Figure 8, the pressing device can also be a spring pressing mechanism. The spring pressing mechanism is made up of axle 19, spring 20 and sleeve 21. Axle 19 is hinged or fixedly connected with front splint ear seat one 16, sleeve 21 is welded and fixed with flange 9, spring 20 is enclosed within axle 19, and sleeve 21 is enclosed within outside spring 20. When the hammer body 1 and the steel drill 2 hit and move forward, rely on the spring tension to be tightened.
本发明利用顶压装置的推力和行程,对锤体1施加顶压并随打击点前移自动跟进。 The present invention utilizes the thrust and stroke of the pressing device to apply pressing to the hammer body 1 and automatically follow up with the forward movement of the striking point.
如图4、图5、图6所示,为本发明另一方案的双轨道方案滚动结构,图4去掉了锤壳8的一侧板。前夹板3与后夹板4通过螺栓将带有钢钎2的锤体1夹紧,前夹板3和后夹板4与锤体1成为一体;锤体1上设置有滚轮轴5,滚轮轴5上安装滚轮6,锤壳8上设置有凹槽轨道一11,滚轮6置于凹槽轨道一11中;锤壳8上设置有滚轮轴5,滚轮轴5上安装滚轮6,锤体1上设置有凹槽轨道二15,滚轮6置于凹槽轨道二15中,锤壳8的前部通过螺栓杆12将锤壳8的两侧拉紧,中间用轴套13支撑。锤壳8的后部设置法兰9用于与挖掘机斗杆头部法兰连接;当斗杆端部为轴孔结构时,锤壳法兰上设置连接耳板14与之用销轴铰接。本发明通过分别在锤体1和锤壳8上设置相向的凹槽轨道一11和凹槽轨道二15,并分别安装滚轮6,锤体1和锤壳8上的两个相向凹槽轨道一11和凹槽轨道二15相扣组装形成上下相错的双轨道,锤体1和锤壳8上的滚轮6分别以对方的凹槽轨道一11和凹槽轨道二15为轨道移动,同时锤体1和锤壳8上的两个相向凹槽轨道一11和凹槽轨道二15也组成为滑动轨道。这样,锤体1和锤壳8之间就形成了轮与槽滚动和槽与槽滑动的多重混合移动方式。顶压装置的前夹板3带有耳座一16,锤壳8后部的法兰9上带有耳座二10,顶压油缸7的活塞杆端和缸筒座端通过销轴分别与耳座一16、耳座二10铰接。 As shown in Fig. 4, Fig. 5 and Fig. 6, it is a rolling structure of a double-track solution according to another solution of the present invention, and Fig. 4 removes one side plate of the hammer shell 8. The front splint 3 and the rear splint 4 clamp the hammer body 1 with the steel drill 2 through bolts, and the front splint 3 and the rear splint 4 are integrated with the hammer body 1; the hammer body 1 is provided with a roller shaft 5, and the roller shaft 5 Install the roller 6, the hammer shell 8 is provided with a groove track 11, the roller 6 is placed in the groove track 11; the hammer shell 8 is provided with a roller shaft 5, the roller shaft 5 is equipped with a roller 6, and the hammer body 1 Groove track two 15 is arranged, and roller 6 is placed in groove track two 15, and the front portion of hammer shell 8 is tightened by bolt rod 12 both sides of hammer shell 8, and middle is supported with axle sleeve 13. The rear part of the hammer shell 8 is provided with a flange 9 for connecting with the head flange of the bucket arm of the excavator; when the end of the arm is a shaft hole structure, the flange of the hammer shell is provided with a connecting ear plate 14 and hinged with a pin . The present invention arranges opposite groove track one 11 and groove track two 15 on hammer body 1 and hammer shell 8 respectively, and respectively installs roller 6, two opposite groove track one on hammer body 1 and hammer shell 8 11 and groove track two 15 are interlocked and assembled to form a double track that is staggered up and down. The rollers 6 on the hammer body 1 and the hammer shell 8 move on the other side's groove track one 11 and groove track two 15 respectively. Two opposite groove track one 11 and groove track two 15 on body 1 and hammer shell 8 also form slide track. In this way, between the hammer body 1 and the hammer shell 8, multiple mixed moving modes of wheel-to-groove rolling and groove-to-groove sliding are formed. The front splint 3 of the top pressure device has an ear seat 16, and the flange 9 at the rear of the hammer shell 8 has an ear seat 2 10. The piston rod end and the cylinder seat end of the top pressure oil cylinder 7 are respectively connected to the ear by the pin shaft. Seat one 16, ear seat two 10 are hinged.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410233571.XA CN104162462B (en) | 2014-05-29 | 2014-05-29 | Hydraulic breaking hammer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410233571.XA CN104162462B (en) | 2014-05-29 | 2014-05-29 | Hydraulic breaking hammer |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104162462A CN104162462A (en) | 2014-11-26 |
| CN104162462B true CN104162462B (en) | 2016-10-05 |
Family
ID=51906561
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410233571.XA Expired - Fee Related CN104162462B (en) | 2014-05-29 | 2014-05-29 | Hydraulic breaking hammer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104162462B (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104929176B (en) * | 2015-06-16 | 2018-11-20 | 新沂市芭缇雅商贸有限公司 | A kind of pavement breaking dedicated hydraulic crushing device |
| CN108487032B (en) * | 2016-05-31 | 2020-04-28 | 海门黄海创业园服务有限公司 | Drill rod displacement trigger mechanism |
| CN108487033A (en) * | 2016-08-16 | 2018-09-04 | 长泰县石艺建材有限公司 | A kind of quartering hammer |
| CN106194000A (en) * | 2016-08-28 | 2016-12-07 | 神翼航空器科技(天津)有限公司 | Quartering hammer pore-forming drill steel |
| CN107764533B (en) * | 2017-10-10 | 2023-11-17 | 桂林航天工业学院 | Clamping and vertical lifting device for hydraulic breaker testing |
| CN108222109B (en) * | 2018-03-19 | 2023-08-29 | 张家港保税区永大机械有限公司 | Large-angle universal breaking hammer |
| CN112983925B (en) * | 2021-02-05 | 2023-03-10 | 山东锐凯工程机械有限公司 | Quartering hammer and quartering hammer cylinder assembly equipment |
| CN120079463B (en) * | 2025-04-15 | 2026-07-17 | 湖北天腾重型机械股份有限公司 | Crushing mechanism of mining crushing trolley |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2326726Y (en) * | 1998-03-28 | 1999-06-30 | 孙灵慧 | Outhole driven impact drilling machine |
| CN201874570U (en) * | 2010-12-06 | 2011-06-22 | 上海工程技术大学 | Hydraulic breaking hammer |
| CN202658644U (en) * | 2012-05-21 | 2013-01-09 | 安徽惊天液压智控股份有限公司 | Integral type hydraulic breaking hammer |
| CN202989967U (en) * | 2012-11-01 | 2013-06-12 | 李小祥 | Roadway repair machine |
| CN203899651U (en) * | 2014-05-29 | 2014-10-29 | 襄阳忠良工程机械有限责任公司 | Hydraulic breaking hammer |
-
2014
- 2014-05-29 CN CN201410233571.XA patent/CN104162462B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN104162462A (en) | 2014-11-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104162462A (en) | Hydraulic breaking hammer | |
| CN105822225B (en) | A kind of two Drilling rock jib structure of an arm | |
| CN104018541B (en) | A kind of gravity-type hydraulic quartering hammer | |
| CN102400682A (en) | High-efficiency blocking coal shovel | |
| CN108487224A (en) | A kind of construction site battering ram | |
| CN204001018U (en) | A kind of hydraulic breaking hammer of new structure | |
| CN203899651U (en) | Hydraulic breaking hammer | |
| CN205833232U (en) | A kind of reliable disintegrating apparatus | |
| CN113389239A (en) | Breaking hammer with auxiliary stone breaking device | |
| CN102327788A (en) | Hydraulic crushing device for heaving floor in roadway | |
| CN202170530U (en) | Crushing device for mine backhoe loader | |
| CN114542064B (en) | Splitting machine for mine excavation | |
| CN111119269A (en) | Automatic top pressure follow-up hydraulic breaking hammer | |
| CN205636714U (en) | Ramming machine for building | |
| CN105239494B (en) | A drop hammer compaction machine | |
| CN111042248A (en) | A hydraulic breaker with hydraulic support | |
| CN110439474B (en) | Hinge type double-propelling-beam propelling mechanism | |
| CN203756165U (en) | High-frequency vibrating rake device | |
| CN108554601A (en) | A kind of heavy-duty crusher of good damping effect | |
| CN202519655U (en) | Roadbed powerful rammer compactor | |
| CN204645042U (en) | A kind of construction equipment of carrier pile | |
| CN202248007U (en) | Connecting structure of rear cylinder body of breaking hammer | |
| CN205445469U (en) | Portable small -size hydraulic rock drill | |
| CN109898494A (en) | A kind of construction ramming machine | |
| CN204402497U (en) | Be suitable for the driving chassis forward beam of different length drill steel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161005 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |