CN104153724A - Workover treatment string removing device - Google Patents

Workover treatment string removing device Download PDF

Info

Publication number
CN104153724A
CN104153724A CN201410332885.5A CN201410332885A CN104153724A CN 104153724 A CN104153724 A CN 104153724A CN 201410332885 A CN201410332885 A CN 201410332885A CN 104153724 A CN104153724 A CN 104153724A
Authority
CN
China
Prior art keywords
base
pipe
cantilever arm
tubing string
shift fork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410332885.5A
Other languages
Chinese (zh)
Inventor
张淑芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Qiyuan Technology Development Co Ltd
Original Assignee
Shaanxi Qiyuan Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Qiyuan Technology Development Co Ltd filed Critical Shaanxi Qiyuan Technology Development Co Ltd
Priority to CN201410332885.5A priority Critical patent/CN104153724A/en
Publication of CN104153724A publication Critical patent/CN104153724A/en
Pending legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to the field of oil machinery equipment, in particular to a workover treatment string removing device. The workover treatment string removing device comprises a base, four string loading and unloading devices, a slide and a dynamic extension arm, and is characterized in that the base is made of ordinary profiles by welding, two ends of the base are respectively connected with the string loading and unloading devices, the upper portion of the base is connected with the slide and the dynamic extension arm, the middle of the base is used for placing a hydraulic pressure station and an electric control cabinet, the base and the string loading and unloading devices are fixed through a steady-frame diagonal draw bar, diagonal draw bar lugs are arranged on the base, a hydraulic cylinder pin is welded on the base, and three deflecting lifting hydraulic cylinders are connected. The workover treatment string removing device is simple in structure, feasible in technology and capable of being fittingly used with existing workover equipment and safe and reliable, and automatic operation of string removing and loading and unloading is realized.

Description

Workover treatment tubing string board migration device
Technical field
The present invention relates to Petroleum Machinery Industry field, be specifically related to workover treatment tubing string board migration device.
Technical background
In all kinds of workover treatments that carry out every year in China oil field, it more than 85% is light maintenance operation.Wherein, rountrip operating frequency in light maintenance operation process is the highest, and the spent time generally will occupy the more than 70% of total used time of well workover.At present, most domestic oil well repairing operation adopt always elevator and inertia jigger work in coordination to tubing string lift by crane with under get rid of, 4 people are collaborative, the operating type of exchange in turn, its specific works process is as follows: first upper tubing string utilizes crowbar that tubing string is lifted to inertia jigger from pipe framed bent by 2 workmans, tubing string one end is fixed by jigger, the other end rides on ramp, hoist engine drives jigger motion, tubing string slides and rises on workover platform along ramp, block tubing string with elevator again, lay down jigger, utilize elevator by tubing string pull-up, make the tubing string other end to tubing string in well head place and well carry out make-up.First lower tubular column utilizes elevator that 1 endowel is pulled out and shackle in well, by workman, tubing string end is pushed into ramp, elevator is descending with tourist bus, and tubing string slides on inertia jigger under ramp, tubing string moves to horizontal level with jigger, then by 2 workmans, tubing string is pushed on pipe framed bent.
Obviously aforesaid operations mode needs many people jointly to complete, and its inefficiency, and labour intensity is large, and operation danger is high.Liaohe Oil Field main product viscous crude, viscous crude easily solidifies, and is more unfavorable for the conveying of tubing string, has increased tubing string and has drawn the difficulty of sending and discharging.
Summary of the invention
In order to address the above problem, the invention provides one novel, simple in structure, technical feasibility, and can be used in conjunction with existing workover rig, realize the workover treatment tubing string board migration device of the automation mechanized operation of tubing string movement and discharge.
Workover treatment tubing string board migration device of the present invention, comprise this base, pipe device, deflecting slideway, power cantilever arm up and down, base is welded by common section bar, the two ends of base are managed up and down mechanism and are connected with four respectively, and top connects slideway and power cantilever arm, middle Hydraulic Station and the electrical control cubicles of placing, base and being fixed by steady rest diagonal member between pipe device up and down, on base, have diagonal member hangers, soldering fluid cylinder pressure key seat on base, connects three deflecting lifting hydraulic cylinders.
Preferably, slideway comprises main skid and auxiliary slide channel, adopts Hydraulic Cylinder power cantilever arm in the middle of slideway, stretches out stroke and can reach 2 m.All there is guide wheel main skid front end and power cantilever arm rear end, auxiliary slide channel forming V-shape.
Preferably, the lower end of power cantilever arm is provided with hydraulic cylinder piston rod, matches with the hydraulic cylinder of slideway upper end, and the V-shaped groove two ends of power cantilever arm upper end are provided with backing pin, and chain is housed in the middle of the V-shaped groove of power cantilever arm upper end.
Preferably, pipe device comprises upper and lower tube body, upper pipe shift fork, lower pipe shift fork up and down, and one end of described upper, lower tube shift fork is fixed on up and down on pipe apparatus main body by bearing pin, and upper, lower tube shift fork is connected with respectively a hydraulic cylinder.
The present invention is novel, simple in structure, technical feasibility, and can be used in conjunction with existing workover rig, realize the automation mechanized operation of tubing string movement and discharge, safe and reliable.
Brief description of the drawings
Fig. 1 is workover treatment board migration device structural representation.
Reference numeral: 1-is pipe device up and down, 2-tubing string, 3-power cantilever arm, 4-base, 5-Hydraulic Station, 6-slideway, 7-switch board, 8-diagonal member hangers, 9-steady rest diagonal member, the secondary hydraulic cylinder of 10-, 11-main hydraulic cylinder, 12-backing pin, 13-V shape groove, 14-chain.
Detailed description of the invention
Workover treatment tubing string board migration device of the present invention, comprise this base 4, pipe device 1 up and down, slideway 6, power cantilever arm 3, base 4 is welded by common section bar, the two ends of base 4 respectively with four up and down pipe device 1 be connected, top connects slideway 6 and power cantilever arm 3, middle Hydraulic Station 5 and the electrical control cubicles 7 of placing, base 4 and fixing by steady rest diagonal member 9 between pipe device 1 up and down, on base 4, there is diagonal member hangers 8, soldering fluid cylinder pressure key seat on base 4, connect three deflecting lifting hydraulic cylinders, slideway comprises main skid and auxiliary slide channel, in the middle of slideway, adopt Hydraulic Cylinder power cantilever arm 3, stretch out stroke and can reach 2 m.Slideway take-off and landing device mainly adopts the bracing or strutting arrangement of a main hydraulic cylinder 11, two auxiliary hydraulic cylinders 10, and all there is guide wheel main skid front end and power cantilever arm 3 rear ends, auxiliary slide channel forming V-shape.The lower end of power cantilever arm 3 is provided with hydraulic cylinder piston rod, matches with the hydraulic cylinder of slideway upper end, and the V-shaped groove two ends of power cantilever arm 3 upper ends are provided with backing pin 12, and chain 14 is housed in the middle of the V-shaped groove of power cantilever arm 3 upper ends.Pipe device 1 comprises upper and lower tube body, upper pipe shift fork, lower pipe shift fork up and down, and one end of described upper, lower tube shift fork is fixed on up and down on pipe apparatus main body by bearing pin, and upper, lower tube shift fork is connected with respectively a hydraulic cylinder.
Operation process is divided into following three steps: the first step, lift tubing string 2 and first debug this device, make it in running order, then starting tube feeding device hydraulic cylinder 1 works, upper pipe shift fork in this device lifts a tubing string 2 on pipe framed bent automatically, under the restriction of backing pin 12, tubing string 2 is parked on the chain 14 of power cantilever arm V-shaped groove top safely.Second step, after tiltedly lift pipe string pipe is pushed on power cantilever arm 3, under the control of deflecting major-minor hydraulic cylinder, bracing device is started working, and makes tubing string inclination certain angle so that before send tubing string, realize and send pipe operation.The 3rd step, pushes tubing string power cantilever arm and advances along slideway, makes tubing string 2 and work top have an identical positioning datum, ensures that tubing string centering is transplanted on the position of appointment, completes the tubing string task of picking.Then reverse movement, returns to initial position, endowel under beamhouse operation.

Claims (4)

1. workover treatment tubing string board migration device, comprise this base (4), pipe device (1) up and down, slideway (6), power cantilever arm (3), it is characterized in that described base (4) is welded by common section bar, the two ends of base (4) respectively with four up and down pipe device (1) be connected, top connects slideway (6) and power cantilever arm (3), middle Hydraulic Station (5) and the electrical control cubicles (7) of placing, base (4) and fixing by steady rest diagonal member (9) between pipe device (1) up and down, on base (4), there is diagonal member hangers (8), the upper soldering fluid cylinder pressure key seat of base (4), connect three deflecting lifting hydraulic cylinders.
2. workover treatment tubing string board migration device as claimed in claim 1, it is characterized in that described slideway comprises main skid and auxiliary slide channel, in the middle of slideway, adopt Hydraulic Cylinder power cantilever arm (3), stretch out stroke and can reach 2m, all there is guide wheel main skid front end and power cantilever arm (3) rear end, auxiliary slide channel forming V-shape.
3. workover treatment tubing string board migration device as claimed in claim 1, the lower end that it is characterized in that described power cantilever arm (3) is provided with hydraulic cylinder piston rod, match with the hydraulic cylinder of slideway upper end, the V-shaped groove two ends of power cantilever arm (3) upper end are provided with backing pin (12), and chain (14) is housed in the middle of the V-shaped groove of power cantilever arm (3) upper end.
4. workover treatment tubing string board migration device as claimed in claim 1, it is characterized in that the described device of pipe up and down comprises upper and lower tube body, upper pipe shift fork, lower pipe shift fork, one end of described upper, lower tube shift fork is fixed on up and down on pipe apparatus main body by bearing pin, and upper, lower tube shift fork is connected with respectively pipe shift fork hydraulic cylinder, lower pipe shift fork hydraulic cylinder.
CN201410332885.5A 2014-07-14 2014-07-14 Workover treatment string removing device Pending CN104153724A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410332885.5A CN104153724A (en) 2014-07-14 2014-07-14 Workover treatment string removing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410332885.5A CN104153724A (en) 2014-07-14 2014-07-14 Workover treatment string removing device

Publications (1)

Publication Number Publication Date
CN104153724A true CN104153724A (en) 2014-11-19

Family

ID=51879335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410332885.5A Pending CN104153724A (en) 2014-07-14 2014-07-14 Workover treatment string removing device

Country Status (1)

Country Link
CN (1) CN104153724A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780855A (en) * 2016-08-24 2018-03-09 中国石油天然气股份有限公司 Oil pipe remote control transfer machine
CN109519132A (en) * 2018-11-26 2019-03-26 山东泽元石油机械有限公司 A kind of Drill-pipe conveyed machine and board migration device
CN112012680A (en) * 2020-10-14 2020-12-01 中油国家油气钻井装备工程技术研究中心有限公司 Three pipe column transverse-arrangement drill column feeding device and method for power catwalk
CN113338824A (en) * 2021-07-12 2021-09-03 新疆克拉玛依市荣昌有限责任公司 Active three drilling tool conveyors
CN115126429A (en) * 2022-08-25 2022-09-30 山东爱特机电技术有限责任公司 Pure electric power catwalk device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780855A (en) * 2016-08-24 2018-03-09 中国石油天然气股份有限公司 Oil pipe remote control transfer machine
CN107780855B (en) * 2016-08-24 2019-07-05 中国石油天然气股份有限公司 Oil pipe remote control transfer machine
CN109519132A (en) * 2018-11-26 2019-03-26 山东泽元石油机械有限公司 A kind of Drill-pipe conveyed machine and board migration device
CN112012680A (en) * 2020-10-14 2020-12-01 中油国家油气钻井装备工程技术研究中心有限公司 Three pipe column transverse-arrangement drill column feeding device and method for power catwalk
CN113338824A (en) * 2021-07-12 2021-09-03 新疆克拉玛依市荣昌有限责任公司 Active three drilling tool conveyors
CN113338824B (en) * 2021-07-12 2022-06-07 新疆克拉玛依市荣昌有限责任公司 Active three drilling tool conveyors
CN115126429A (en) * 2022-08-25 2022-09-30 山东爱特机电技术有限责任公司 Pure electric power catwalk device
CN115126429B (en) * 2022-08-25 2022-11-29 山东爱特机电技术有限责任公司 Pure electric power catwalk device

Similar Documents

Publication Publication Date Title
CN104153724A (en) Workover treatment string removing device
CN102828697B (en) Telescopic overall hoisting derrick device and hoisting method thereof
CN104594829A (en) Automatic derrick device suitable for double-wellhead pipe arrangement operation and method
CN103233687B (en) Automatic drill pipe assembly and disassembly mechanism of trenchless horizontal directional drilling machine
CN102787813A (en) Intelligent full-hydraulic power catwalk
CN107869315B (en) Automatic change workover rig
CN203097737U (en) Telescopic integral hoisting type headframe device
CN202767911U (en) Fully hydraulic intelligent type power catwalk
CN102777136A (en) Power catwalk for lifting workover rig
CN209704511U (en) Tube rod conveyer for well site automated job
CN203603787U (en) Well mouth automation system for well workover
CN105507827A (en) Lifting oil cylinder type well drilling device
CN104712270A (en) Oil field well workover operation robot
CN204060560U (en) A kind of dynamic rathole device
CN103741689A (en) Pulling device for hydraulic bushing
CN204024530U (en) Drilling well drilling rod automation conveyer
CN204419077U (en) A kind of incline shaft petroleum rig is from moving lever apparatus
CN105129031A (en) Lifting system for boarding bridge
CN103510887B (en) Power fortune pipe device
CN215804392U (en) Land continuous tripping drilling machine
CN105041237A (en) Oil tube ascending and descending aid for petroleum underground operation
CN204754824U (en) Pipe pole lifting devices
CN204492700U (en) Oil well repairing operation robot
CN203486845U (en) Hydraulic jacking device of storage tank
CN115807631A (en) Multifunctional power catwalk for workover operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141119