CN104152977B - Full automatic electroplating production line - Google Patents

Full automatic electroplating production line Download PDF

Info

Publication number
CN104152977B
CN104152977B CN201410372487.6A CN201410372487A CN104152977B CN 104152977 B CN104152977 B CN 104152977B CN 201410372487 A CN201410372487 A CN 201410372487A CN 104152977 B CN104152977 B CN 104152977B
Authority
CN
China
Prior art keywords
cell body
pipe
water
cun
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410372487.6A
Other languages
Chinese (zh)
Other versions
CN104152977A (en
Inventor
叶本栋
迟振华
张军昊
刘宝磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI HAOYU ELECTROMECHANICAL EQUIPMENT RESEARCH INSTITUTE Co Ltd
Original Assignee
HEBEI HAOYU ELECTROMECHANICAL EQUIPMENT RESEARCH INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI HAOYU ELECTROMECHANICAL EQUIPMENT RESEARCH INSTITUTE Co Ltd filed Critical HEBEI HAOYU ELECTROMECHANICAL EQUIPMENT RESEARCH INSTITUTE Co Ltd
Priority to CN201410372487.6A priority Critical patent/CN104152977B/en
Publication of CN104152977A publication Critical patent/CN104152977A/en
Application granted granted Critical
Publication of CN104152977B publication Critical patent/CN104152977B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a full automatic electroplating production line and relates to the technical field of electroplating devices or systems. The production line comprises a plurality of tanks sequentially arranged from left to right, a PLC control cabinet, a stirring system, a waste gas recovery system, a water supply system, a wastewater recovery system and a gantry crane. The production line has the advantages that the automatic control function is realized through the devices; and the production line comprises the wastewater and waste gas recycling devices, so that the produced waste gas and wastewater can be recycled and the characteristics of energy conservation and environmental protection are provided.

Description

Full automatic plating production line
Technical field
The present invention relates to electro plating device or systems technology field, more particularly to a kind of full automatic plating production line.
Background technology
Electroplating assembly line can be divided into by the mode of production:Manual electroplating assembly line, semiautomatic electroplating production line, full automatic plating Production line.Electroplating assembly line according to plating mode again to be divided into hang plating production line, barrel plating production line, continuously plate production line, Brush plating production line, annularly plating production line, straight line gantry electroplating assembly line, plastic electroplating automatic assembly line etc..
Full automatic plating production line is suitable for the product that product is relatively simple and yield is very big, such as aluminium alloy automobile wheel Shell or bicycle rim, the automatic assembly line electroplated with this kind of product are the sizes and yield design according to product, therefore are had The load mode and relatively-stationary action beat of product are especially suitable for, it is strict and after operation program is finished in plating solution management, Just continuously can carry out electroplating production automatically.The control system of full automatic plating production line adopts PLC control machines, will be true Computer is input into after fixed technological process programming, you can to carry out full automatic control.But existing automatic production line does not have Consider the recovery problem of waste water and waste gas, easily cause environmental pollution.
The content of the invention
The technical problem to be solved is to provide a kind of full automatic plating production line, and the production line can be to producing Raw waste gas and waste water are for recycling and reuse, with the characteristics of energy-conserving and environment-protective.
To solve above-mentioned technical problem, the technical solution used in the present invention is:A kind of full automatic plating production line, which is special Levy is to include:Cell body, PLC control cabinet, stirring system, gas recovery system and dragon that several are from left to right arranged in order Door driving, before and after the cell body, both sides are provided with track, and the gantry crane is located on the track, and the bottom of gantry crane sets The crossbeam for having horizontal movement drive mechanism, the gantry crane is provided with workpiece hook, one end of nylon sling and workpiece Hook connects, and the other end of nylon sling is provided with hook lift drive mechanism, the horizontal movement drive mechanism and Hook lift drive mechanism is controlled by the PLC control cabinet, and the track is provided with several position switch, the position Switch is electrically connected with PLC control cabinet;Outlet pipe on cistern is connected with the water inlet pipe on the cell body top respectively, under cell body Portion is connected with wastewater discharge pipe, and every wastewater discharge pipe is connected with purification tank for liquid waste, on every water inlet pipe and wastewater discharge pipe Electromagnetic valve is provided with, wastewater treatment equipment in the purification tank for liquid waste, is provided with, cistern is sent to by water pump after wastewater treatment and is entered Row is recycled, and the electromagnetic valve and water pump are controlled by the PLC control cabinet;Agitating device is provided with the cell body, it is described to stir Mix device and be controlled by the PLC control cabinet;The waste gas recovering device is located at by cell body, the gas transmission that will be reclaimed by pipeline Processed to exhaust gas treating tower, the waste gas recovering device includes several air draught arms, the air draught arm is provided with wind Quantity regulating device;Ventilation installation is installed on wire body side, and ventilation duct has drainage grade when installing, is provided with discharge opeing in minimum point Mouthful, the liquid that leakage fluid dram is discharged is pooled to purification tank for liquid waste by pipeline and is processed.
Further technical scheme is:The cell body includes akaline liquid groove, acidic liquid groove and rinsing bowl, above-mentioned groove Heater is provided with vivo.
Further technical scheme is:The both sides of the cell body are additionally provided with refrigeration machine, for cooling down cleanout fluid.
Further technical scheme is:The power that the stirring system is used is air.
Using the beneficial effect produced by above-mentioned technical proposal it is:The production line includes that waste water and waste gas recovery are sharp again With device, the waste gas of generation and waste water can be for recycling and reuse, with the characteristics of energy-conserving and environment-protective.
Description of the drawings
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
Fig. 1 is the overlooking the structure diagram of the present invention;
Fig. 2 is the main structure diagram of gantry crane in Fig. 1;
Wherein:1st, cell body 2, PLC control cabinet 3, gantry crane 4, track 5, horizontal movement drive mechanism 6, workpiece hook Hang device 7, hook lift drive mechanism 8, position switch 9, cistern 10, outlet pipe 11, water inlet pipe 12, waste water Discharge pipe 13, purification tank for liquid waste 14, electromagnetic valve 15, exhaust gas treating tower 16, refrigeration machine.
Specific embodiment
With reference to the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Ground description, it is clear that described embodiment a part of embodiment only of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Many details are elaborated in the following description in order to fully understand the present invention, but the present invention can be with It is different from alternate manner described here to implement using other, those skilled in the art can be without prejudice to intension of the present invention In the case of do similar popularization, therefore the present invention is not limited by following public specific embodiment.
As shown in Figure 1-2, the invention discloses a kind of full automatic plating production line, including:Several are from left to right successively The cell body 1 of arrangement, PLC control cabinet 2, stirring system, gas recovery system and gantry crane 3.Both sides before and after the cell body 1 Track 4 is provided with, the gantry crane 3 is located on the track 4, and the bottom of gantry crane 3 is provided with horizontal movement drive mechanism 5, The crossbeam of the gantry crane 3 is provided with workpiece hook 6, and one end of nylon sling is connected with workpiece hook 6, nylon The other end of suspender belt is provided with hook lift drive mechanism 7, and the horizontal movement drive mechanism 5 and hook lifting drive Mechanism 7 is controlled by the PLC control cabinet 2, and the track 4 is provided with several position switch 8, and the position switch 8 is controlled with PLC Cabinet processed 2 is electrically connected.
Outlet pipe 10 on cistern 9 is connected with the water inlet pipe 11 on 1 top of the cell body respectively, the bottom connection of cell body 1 There is wastewater discharge pipe 12, every wastewater discharge pipe 12 is connected with purification tank for liquid waste 13, every water inlet pipe 11 and wastewater discharge pipe 12 are provided with electromagnetic valve 14, be provided with wastewater treatment equipment, sent to by water pump after wastewater treatment in the purification tank for liquid waste 13 Cistern 9 is circulated use, and the electromagnetic valve 14 and water pump are controlled by the PLC control cabinet 2;It is provided with the cell body 1 and stirs Device is mixed, the agitating device is controlled by the PLC control cabinet 2;The waste gas recovering device is located at by cell body 1, by pipeline The gas transmission of recovery is processed to exhaust gas treating tower 15, refrigeration machine 16 is located at the side of production line, provides for production line Refrigerating environment.
The essential information of the production line is as follows:
First, production line production capacity:
Most short productive temp:10 minutes/time(It is adjustable).
2nd, production line use condition
Power supply:380V 50Hz Three-phase five-wire 425.5KW
Production line takes up an area about:It is long 32.5 meters, wide by 8.8, high 4.5 meters;
City's water:About 3.4T/H;Hydraulic pressure 2.0-3.0kgf/cm3
Pure water:About 2.1T/H hydraulic pressure 2.0-3.0kgf/cm3
Steam:Consumption 1281M3/ h, pressure 2.0-2.5kgf/cm3
3rd, technological process
Gantry crane → electrochemical deoiling on product(1-10 minutes)→ warm water is washed(The 5-60 seconds)→ cold water is washed(The 5-60 seconds)→ Electrolytic degreasing(1-10 minutes)→ warm water is washed(The 5-60 seconds)→ cold water is washed(The 5-60 seconds)→ activation(0.5-3 minutes)→ cold pure water is washed (The 5-60 seconds)→ impact nickel(1-10 minutes)→ cold pure water is washed(The 5-60 seconds)→ bright nickel plating(20-50 minutes)→ nickel is reclaimed(5- 60 seconds)→ cold pure water is washed(The 5-60 seconds)→ plating Bright Tin(20-50 minutes)→ stannum is reclaimed(The 5-60 seconds)→ cold water is washed(The 5-60 seconds) → neutralization(0.5-3 minutes)→ cold pure water is washed(The 5-60 seconds)→ closing(1-5 minutes)→ warm pure water is washed(0.5-2 minutes)→ product Lower gantry crane(5-10 minutes), above time and station(Cell body)Freely can adjust.
4th, production line general introduction
1)The mode of production of this technique is flame automatic production line, and Full-automatic gantry electroplating assembly line is according to electricity Nickel plating process of tin and the plating special equipment that designs.
2)According to the workflow and work efficiency of production line, production line is equipped with 2 gantry cranes, the gantry crane altogether Possess vertical-lift, decline and left and right high speed walking function;
3)The high degree of automation of the production line:Except feeding, discharge needs manually to complete in one end of track in production process Outward, remaining work is automatically performed by gantry crane entirely;It is simple to operate:After the upper complete material of operator, start button need to be clicked on only, PLC control cabinet can just automatically control the technological process of the product, control the work that gantry crane completes each operation;Operation safety can Lean on:The situation of driving error bit can be prevented.To prevent driving from thrusting into and plunging off the tracks, the two ends of Crane Rail are provided with prevents falling rubber Glue block and offside power outage security, sliver be furnished with safety arrestment switch, can emergency brake, with ensure driving running In journey on production line operator's personal safety purpose;
4)Behavioral illustrations:Equipment good looking appearance, compact conformation, dependable performance.
5th, equipment basic specification
1st, electrogalvanizing main line
1)Frame:Population structure is middle rail assembly open frame, and upper berth PP drip trays have drip tray work(on all cell bodies Can, prevent product from dripping in other grooves.
2)Track:Using 100x80 x4 square steel, 316 rustless steel band steels of upper berth 80x3mm, surface spray again three layers it is acidproof Alkali epoxy resin coating, can effectively prevent driving from skidding and positioning inaccurate.Track glacing flatness and the depth of parallelism within ± 3MM, per meter In the range of permit poor ± 2MM, the centre-to-centre spacing per column permits poor ± 2MM, the poor ± 3MM of two guide rail diagonal of frame allowance.
3)Column:Track column, framework pillar adopt 120H shaped steel, spray resistance to three layers of soda acid epoxy resin paint, can be effective Protection base material;Foundation bolt is installed on above concrete floor again.
4)PLC control cabinet:Using MITSUBISHI transducer rate controlling, the position of gantry crane is sensed by position switch, control journey Sequence directly can be operated on control panel at the scene, and screen display adopts the refreshed screen display in Beijing the Kunlun(10.4 cun).
5)Longitudinal and transverse, oblique pull part and other adnexaes:Longitudinal and transverse draw piece is adopted using flat logical, the oblique pull parts of 100x50x3mm A3 80x80x3mm A3 sides are logical, wire casing, exhaust tube bracing frame are logical using 50x50x2.5mm A3 sides, spray three layers of acid and alkali-resistance Epoxy oil Paint;Driving lenticular wire chute, position switch locating slot:
2nd, gantry crane:
1)Technical parameter:
Lifting travel:2550mm
Rising or falling speed:0—20m/min(Frequency converter timing)
Maximum lift weight:500kg(Trapeze is not included)
Lifting motor:Two 3KW Taiwan east unit brake motor
Point-to-point speed:0—22m/min(Frequency converter timing)
Translation motor:2 1.5KW Taiwan east unit brake motor
Driving positioning precision:≤±5 mm
Driving diagonal error:≤±2mm
Walking in a horizontal state roller plane degree:≤1 mm
2)Driving is furnished with PP drip trays, water container.
3)Making material and function:
Driving frame:Using 4mm thickness A3 plates(Q235A)Make, three layers of acid and alkali-resistance epoxy resin baking vanish are sprayed on surface, prevent Corrosion and protection base material.Driving lifting, three sections of speed per hours of translation point are exercised(It is low, high and low), start driving, stopping will not be because used Property and shake, the speed of service and the registration just driven a vehicle can be protected again;Driving is provided with proximity switch, limit switch and protection Hurdle, carries out software, hardware dual security protection, prevents driving faults from overstepping the limit and knock against each other;Driving is positioned up and down, it is ensured that do not flumped folded Bar;
Driving castor:Using polyurethane glue bag iron wheel, operate steadily and have enough intensity and noise is low;Directive wheel: Taken turns using macromolecule PE, can durable wear;
Driving horizontal movement drive mechanism adopts Dual Drive;Lifted:Using nylon sling;Crossbeam:Using 80x60x4mmA3 Fang Tong;
3rd, electrical control part
1)PLC control system
Temperature control can be shown in PLC control cabinet, be set by temperature controller and controlled;All of electroplating power supply is both needed to certainly Dynamic constant pressure, signal must not have interference, power supply and control line to have to comply with GB 6995.1-1986.Electric control system passes through one group Standard switch board centralized Control.To driving, rectifying installation, stirring, blower fan, solution temperature control etc., system can be indoor long-range Control.
PLC control cabinet:Made using 2.0mm thickness A3 plates, surface is dusted;Weak current part add shielding and with forceful electric power cable every From;PLC adopts independent current source, has interference protection measure;PLC passwords are opened and can be backuped, and maintenance mains lighting supply is set in switch board, are grasped Make the label that all elements on panel have clear and definite.
2)Major electrical equipment:
Man machine interface:It is using the refreshed 10.4 cun of colored man machine interfaces in Beijing the Kunlun, easy to operate, directly perceived;
PLC:Using Mitsubishi E series of products, systemic-function is strong, speed is fast, it is ensured that production line automation degree is high, fortune Row is reliable and stable.5 sets of client's designated programs are temporarily stored in PLC, later according to job demand, arbitrarily can be added.
Converter:It is using Mitsubishi product, stable and reliable for performance;
Temperature controller:Air switch is adopted for ABB digital display temperature controllers, using outsourcing Teflon, the excellent reliable control of matter product is smart for probe Really, control accuracy ± 1 DEG C
Position switch:Using Japanese Omron brand product, sensitive, accurate positioning is sensed
A.C. contactor:Applied using France and bear product, it is durable in use.
5th, operating platform:
Frame is logical using 50x50x3mm A3 sides, upper berth glass-fiber reinforced plastic grille platform pedal, three layers of acid and alkali-resistance of whole frame brush Epoxy resin coating anti-corrosion.
6th, cell body:
Plastic channel adopts 15mm(Baoding power reaches)PP plate A levels make;Welding procedure:Little welding rod is first welded in groove, is then used again Big welding gun is welded with once(Seamless welding), to ensure coating bath absolutely not seepage, it is ensured that can not occur deformation when 80 DEG C.
Plastic groove strengthens flat logical in cross reinforcement using 80x40x3mm A3, strengthens longitudinal and transverse spacing 500mm, at notch Interior receipts 5mm, to ensure that coating bath has enough intensity, will not deform.After three layers of acid and alkali-resistance epoxy resin paint baking of flat logical work again Envelope 4mmPP plate A levels, double layer anticorrosive protection;Size distortion amount is less than or equal to 3 mm, and the diagonal error of cell body is less than or equal to 5 Mm, height error are less than or equal to 2 mm, and parallelism error error is less than or equal to 2 mm.
All washings need to be filtered cell body and be made flat-bottom slot, are easy to turn over the clear bottom of cylinder, can increase substantially work efficiency;Cell body Between be provided with screening liquid baffle plate, to prevent tank liquor from instilling between cell body gap.All heating grooves have heat-insulation layer, using 60MM thickness polyurethane Plate, outsourcing 4MM thickness PP plates, oil removing high temperature groove are made using SUS316 corrosion resistant plates, can effective anti-corrosion.
7th, production line pipe-line system:
1) pipeline enters draining, air stirring pipeline and is arranged at operating surface side without exception according to pipeline construction specification arrangement, In order to operation and maintenance.All similar pipelines, the unification of valve setting height(from bottom) level;It is pipeline marshalling, attractive in appearance, without running, Emit, drip, leaking phenomenon, valve operation is flexible.Different pipelines are equipped with different marks, and operator can be made very clear, reduce The chance of error in operation;
2)Supply water:City's water is responsible for 2 cun of pvc pipes, 1 cun of pvc pipe of arm and ball valve(The water supply point of rinsing bowl is located at top, and With the overfall or adverse current mouth of top diagonally, form optimal flow state);Pure water is responsible for 1.5 cun of UPVC pipes, 1 cun of arm UPVC is managed and ball valve.Per bar, normally opened arm installs effusion meter, and operator can be made to control current in optimum state;It is normally opened per bar Arm is provided with anti-siphon hole, and the aqueous reflux when supervisor cuts off the water in anti-water stopping trough returns supervisor, and water causes cross-contamination again;Often The individual tank that often changes is provided with single inlet pipe, drain pipe.
3)Draining:3 cun of UPVC pipe two-way are responsible for containing acidic and alkaline waste water, nickel-containing waste water is responsible for 2 cun of UPVC and is managed all the way, and rinsing bowl overflows Flow tube is 1 cun of pvc pipe, and blowdown bottom valve is 1.5 cun of PVC ball valves.
4)The air stirring of stirring system:2 cun of pvc pipes of supervisor, 1 cun of pvc pipe of arm and ball valve, air stirring pipe are installed on Bottom land, function trough aerofluxuss aperture be φ 2mm, pitch-row 30mm;Rinsing bowl aerofluxuss aperture be φ 1.5mm, pitch-row 40mm.Hole trachea two Steam vent is arranged towards bottom land with 45 °, and bubble can be made uniform and sufficient stirring action can be played.All air stirring arms are all provided with There is anti-siphon hole, automatically controlled by electromagnetic valve.
8th, heating and cooling system:
1)Alkalies cell body and washing cell body:Using φ 32x1.2SUS304 steam pipe coils, it is fabricated to and snakelike is installed on groove Interior side.
2)Acid cell body:Using φ 32x1.2 titanium steam pipe coils, it is fabricated to and snakelike is installed on side in groove.
3)Within electroplating workshop, beyond cell body, enter back vapor line:Steam 2 cun of nothings of main inlet pipe are met steel pipe, return steel pipe, arm 3/4 cun of seamless steel pipe, outsourcing polyurethane sheet and iron sheet protection;The connection of all fronts flanges, can effectively solving threaded connection steam easily let out The problem of leakage.
9th, gas recovery system:
1)Using trough rim air suction mode, waste gas is responsible for 2 groups, 1 set of Tower for purifying waste gas, it is ensured that need air exhaust slot one's intention as revealed in what one says flow velocity 0.7 Meter per second.
2)To ensure air draught uniformity, volume adjusting apparatus are provided with each air draught arm, can arbitrarily adjust and take out air force, To guarantee the convulsion effect of whole production line;Air trunk is designed to ascending version according to actual needs, so as to Ensure air main end blast.Ventilation installation is installed on wire body side. and airduct has drainage grade when installing, and is provided with minimum point Leakage fluid dram, facilitates the discharge (entering waste water house steward) of condensed fluid;
3)Soda acid exhaust gas treating tower:Making material is fiberglass, PP fillers, waterproof membrane, vertical chemical-engineering pump, spray equipment, Fiberglass centrifugal blower etc..
4)Exhaust gas treating tower is placed on outside room according to demand, 20 meters of convulsion main pipeline height outside the room of workshop.
10th, oil water separator:
Electrochemical deoiling, cathode electrolytic cell are furnished with oil water separator, i.e., a little cylinder is separately set outside groove and is filled by oil-water separation Put and oil and water are separated and carries out classified emission, be connected with major trough by pipeline between them, be circulated by pumping.Its work It is can to extend the replacement cycle of degreasing fluid, reduce using degreasing powder, reduces cost with one;Two is the deoiling effect for improving product.
The production line includes waste water and exhaust gas recycle apparatus, and the waste gas of generation and waste water can be reclaimed And recycling, with the characteristics of energy-conserving and environment-protective.

Claims (4)

1. a kind of full automatic plating production line, it is characterised in that include:Several cell bodies being from left to right arranged in order(1)、PLC Switch board(2), stirring system, gas recovery system and gantry crane(3), the cell body(1)Before and after both sides be provided with track (4), the gantry crane(3)Positioned at the track(4)On, gantry crane(3)Bottom be provided with horizontal movement drive mechanism (5), the gantry crane(3)Crossbeam be provided with workpiece hook(6), one end and the workpiece hook of nylon sling (6)Connection, the other end of nylon sling are provided with hook lift drive mechanism(7), the horizontal movement drive mechanism(5)With Hook lift drive mechanism(7)It is controlled by the PLC control cabinet(2), the track(4)It is provided with several position switch (8), the position switch(8)With PLC control cabinet(2)Electrical connection;Cistern(9)On outlet pipe(10)Respectively with the cell body (1)The water inlet pipe on top(11)Connection, cell body(1)Bottom be connected with wastewater discharge pipe(12), every wastewater discharge pipe(12) With purification tank for liquid waste(13)It is connected, every water inlet pipe(11)And wastewater discharge pipe(12)It is provided with electromagnetic valve(14), it is described useless Water treating pond(13)Wastewater treatment equipment is inside provided with, cistern is sent to by water pump after wastewater treatment(9)It is circulated use, The electromagnetic valve(14)It is controlled by the PLC control cabinet with water pump(2);The cell body(1)Agitating device, the stirring are provided with inside Device is controlled by the PLC control cabinet(2);The gas recovery system is located at cell body(1)Side, the gas that will be reclaimed by pipeline It is transferred to exhaust gas treating tower(15)Processed, the gas recovery system includes several air draught arms, the air draught arm It is provided with volume adjusting apparatus;Ventilation installation is installed on the side of electronickelling stannum main line, and ventilation duct has drainage grade when installing, Leakage fluid dram is provided with minimum point, the liquid that leakage fluid dram is discharged is pooled to purification tank for liquid waste by pipeline(13)Processed;
Electronickelling stannum main line:1)Frame:Population structure is middle rail assembly open frame, and upper berth PP drip trays have on all cell bodies Drip tray function, prevents product from dripping in other grooves;2)Track:Using 100x80 x4 square steel, upper berth 80x3mm 316 is not Rust steel band steel, three layers of acid and alkali-resistance epoxy resin coating are sprayed on surface again;Track glacing flatness and the depth of parallelism within ± 3 mm, every meter of scope Interior to permit poor ± 2 mm, the centre-to-centre spacing per column permits poor ± 2 mm, and two guide rail diagonal of frame permits poor ± 3 mm;3)It is vertical Post:Track column, framework pillar adopt 120H shaped steel, spray resistance to three layers of soda acid epoxy resin paint, and foundation bolt is installed on water again Above mud ground;4)PLC control cabinet:Using MITSUBISHI transducer rate controlling, the position of gantry crane is sensed by position switch, control journey Sequence directly can be operated on control panel at the scene, and screen display adopts the refreshed screen display in Beijing the Kunlun;5)Longitudinal and transverse, oblique pull part and its Its adnexa:Longitudinal and transverse draw piece is led to using 80x80x3mm A3 sides using flat logical, the oblique pull parts of 100x50x3mm A3, wire casing, exhaust tube Bracing frame is logical using 50x50x2.5mm A3 sides, sprays three layers of acid and alkali-resistance resistant epoxy paint;Driving lenticular wire chute, position switch positioning Groove:
Gantry crane: 1)Technical parameter:Lifting travel:2550mm;Rising or falling speed:0—20m/min;Maximum lift weight: 500kg;Lifting motor:Two 3KW Taiwan east unit brake motor;Point-to-point speed:0—22m/min;Translation motor:2 1.5KW Taiwan east unit brake motor;Driving positioning precision:≤±5 mm;Driving diagonal error:≤±2mm;Walking in a horizontal state roller is put down Face degree:≤1 mm;2)Driving is furnished with PP drip trays, water container;3)Making material and function:Driving frame:It is thick using 4mm A3 plates make, and three layers of acid and alkali-resistance epoxy resin baking vanish are sprayed on surface;Driving lifting, three sections of speed per hours of translation point are exercised;Driving is provided with Proximity switch, limit switch and guard rail, carry out software, hardware dual security protection;Driving castor:Using polyurethane adhesive iron clad Wheel, operates steadily and has enough intensity and noise is low;Directive wheel:Taken turns using macromolecule PE;Driving horizontal movement driving machine Structure adopts Dual Drive;Lifted:Using nylon sling;Crossbeam:It is logical using 80x60x4mmA3 side;
Electrical control part:1)PLC control system:Temperature control can be shown in PLC control cabinet, be set by temperature controller and controlled System;All of electroplating power supply is both needed to automatic constant-pressure;PLC control cabinet:Made using 2.0mm thickness A3 plates, surface is dusted;Weak current part Plus shield and isolate with forceful electric power cable;PLC adopts independent current source;PLC passwords are opened and can be backuped, and maintenance illumination is set in switch board Power supply, on guidance panel, all elements have the label of clear and definite;2)Major electrical equipment:Man machine interface:It is logical using Beijing the Kunlun Safe 10.4 cun of colored man machine interfaces;PLC:It is serial using Mitsubishi E, 5 sets of client's designated programs are temporarily stored in PLC, after According to job demand, arbitrarily can add;Converter:Using Mitsubishi product;Temperature controller:Air switch is adopted for ABB digital display temperature-controls Device, probe is using outsourcing Teflon;Position switch:Using Japanese Omron product;A.C. contactor:Applied using France and bear product Product;
Operating platform:Frame is logical using 50x50x3mm A3 sides, and upper berth glass-fiber reinforced plastic grille platform pedal, three layers of whole frame brush are resistance to Soda acid epoxy resin coating anti-corrosion;
Cell body:Plastic channel is made using 15mmPP plate A levels;Welding procedure:Little welding rod is first welded in groove, is then welded with big welding gun again Once, ensureing coating bath absolutely not seepage, it is ensured that can not occur deformation when 80 DEG C;Plastic groove is strengthened using 80x40x3mm A3 Flat logical in cross reinforcement, reinforcement longitudinal and transverse spacing 500mm is interior at notch to receive 5mm;Three layers of acid and alkali-resistance epoxy resin baking vanish of flat logical work Seal 4mmPP plate A levels, double layer anticorrosive protection after process again;Size distortion amount is less than or equal to 3 mm, and the diagonal error of cell body is less than Equal to 5 mm, height error is less than or equal to 2 mm, and parallelism error error is less than or equal to 2 mm;All washings need to be filtered cell body and be done Into flat-bottom slot;Screening liquid baffle plate is provided between cell body;All heating grooves have heat-insulation layer, using 60 mm thickness polyurethane sheets, 4 mm of outsourcing Thick PP plates, oil removing high temperature groove are made using SUS316 corrosion resistant plates;
Production line pipe-line system:1) pipeline enters draining, air stirring pipeline and is arranged at operation according to pipeline construction specification arrangement Face side;All similar pipelines, the unification of valve setting height(from bottom) level;It is pipeline marshalling, attractive in appearance, it is existing without run, drip, leak As valve operation is flexible;Different pipelines are equipped with different marks;2)Supply water:City's water is responsible for 2 cun of pvc pipes, 1 cun of pvc pipe of arm And ball valve;Pure water is responsible for 1.5 cun of UPVC pipes, 1 cun of UPVC pipe of arm and ball valve;Per bar, normally opened arm installs effusion meter, can make Operator controls current in optimum state;Per bar, normally opened arm is provided with anti-siphon hole, when supervisor cuts off the water in anti-water stopping trough Aqueous reflux returns supervisor, and water causes cross-contamination again;Each often changes tank and is provided with single inlet pipe, drain pipe;3)Draining:Contain Acidic and alkaline waste water is responsible for 3 cun of UPVC pipe two-way, and nickel-containing waste water is responsible for 2 cun of UPVC and is managed all the way, and rinsing bowl overflow pipe is 1 cun of pvc pipe, is arranged Dirty bottom valve is 1.5 cun of PVC ball valves;4)The air stirring of stirring system:2 cun of pvc pipes of supervisor, 1 cun of pvc pipe of arm and ball valve, it is empty Gas agitating pipe is installed on bottom land, and function trough aerofluxuss aperture is φ 2mm, pitch-row 30mm;Rinsing bowl aerofluxuss aperture be φ 1.5mm, hole Away from 40mm;Trachea two steam vent in hole is arranged towards bottom land with 45 °;All air stirring arms are equipped with anti-siphon hole, by electricity Magnet valve is automatically controlled;
Heating and cooling system:1)Alkalies cell body and washing cell body:Using φ 32x1.2SUS304 steam pipe coils, Serpentiss are fabricated to Shape is installed on side in groove;2)Acid cell body:Using φ 32x1.2 titanium steam pipe coils, it is fabricated to and snakelike is installed on side in groove; 3)Within electroplating workshop, beyond cell body, enter back vapor line:Steam 2 cun of nothings of main inlet pipe are met steel pipe, return steel pipe, 3/4 cun of nothing of arm Seam steel pipe, outsourcing polyurethane sheet and iron sheet protection;All fronts flange connection;
Gas recovery system:1)Using trough rim air suction mode, waste gas is responsible for 2 groups, 1 set of Tower for purifying waste gas, it is ensured that need air draft notch Distinguished and admirable fast 0.7 meter per second;2)Volume adjusting apparatus are provided with each air draught arm, can arbitrarily be adjusted and be taken out air force;Air trunk root Ascending version is designed to according to being actually needed;Ventilation installation is installed on wire body side, and airduct has draining when installing The gradient, is provided with leakage fluid dram in minimum point;3)Soda acid exhaust gas treating tower:Making material is fiberglass, PP fillers, waterproof membrane, vertical Chemical pump, spray equipment, fiberglass centrifugal blower;4)Exhaust gas treating tower is placed on outside room according to demand, convulsion master outside the room of workshop 20 meters of duct height;
Oil water separator:Electrochemical deoiling, cathode electrolytic cell are furnished with oil water separator, i.e., a little cylinder is separately set outside groove by profit Segregation apparatuss separate oil and water carry out classified emission, be connected with major trough by pipeline, followed by pumping between them Ring.
2. full automatic plating production line according to claim 1, it is characterised in that:The cell body(1)Including akaline liquid Groove, acidic liquid groove and rinsing bowl, are provided with heater in above-mentioned cell body.
3. full automatic plating production line according to claim 1, it is characterised in that:The cell body(1)Both sides be additionally provided with Refrigeration machine(16), for cooling down cleanout fluid.
4. full automatic plating production line according to claim 1, it is characterised in that:The power that the stirring system is used is Air.
CN201410372487.6A 2014-07-31 2014-07-31 Full automatic electroplating production line Active CN104152977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410372487.6A CN104152977B (en) 2014-07-31 2014-07-31 Full automatic electroplating production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410372487.6A CN104152977B (en) 2014-07-31 2014-07-31 Full automatic electroplating production line

Publications (2)

Publication Number Publication Date
CN104152977A CN104152977A (en) 2014-11-19
CN104152977B true CN104152977B (en) 2017-04-12

Family

ID=51878595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410372487.6A Active CN104152977B (en) 2014-07-31 2014-07-31 Full automatic electroplating production line

Country Status (1)

Country Link
CN (1) CN104152977B (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104862769A (en) * 2015-05-16 2015-08-26 中北大学 Electroplate liquid circulating filtration system
CN106702469B (en) * 2015-08-07 2019-03-22 大全集团有限公司成套分公司 The tin plating automatic assembly line in both ends
CN105543944A (en) * 2015-12-16 2016-05-04 无锡福镁轻合金科技有限公司 Environment-friendly electroplating bath equipment
CN105442030B (en) * 2016-01-19 2018-03-13 福建钜丰汽车配件有限公司 One kind cleaning electric plating machine
CN106119941A (en) * 2016-08-30 2016-11-16 无锡瑾宸表面处理有限公司 Automatic intelligent electroplating production facility
CN107059097B (en) * 2017-06-16 2024-03-15 俊杰机械(深圳)有限公司 Electroplating device
CN108339798A (en) * 2018-02-05 2018-07-31 天津科创复兴科技咨询有限公司 A kind of pretreated energy-recuperation system of electronickelling production line heating bath
CN108950625B (en) * 2018-06-21 2020-02-21 上海交通大学 Electroplating system for electroplating chromium on revolving body workpiece
CN108950666A (en) * 2018-09-27 2018-12-07 无锡星亿智能环保装备股份有限公司 A kind of plating line air hose hydrops recyclable device
CN109848127B (en) * 2019-01-16 2020-09-11 湖南鑫斯科技有限公司 Cradle for glass coating cleaning process
CN109722703B (en) * 2019-02-20 2021-03-30 广东星耀光大智能装备有限公司 Chip component electroplating production line
CN110400511A (en) * 2019-06-12 2019-11-01 中国辐射防护研究院 It is a kind of for simulating the experimental provision of the rainfall containing radionuclide
CN110373702B (en) * 2019-08-13 2021-02-26 创隆实业(深圳)有限公司 Electroplating system with feeding and stirring functions
CN110565137B (en) * 2019-09-25 2021-05-11 苏州远略知识产权运营有限公司 Automatic production line for electroplating and nickel plating of gourd-shaped hardware
CN111607813A (en) * 2020-06-10 2020-09-01 徐州市全球通精密钢管有限公司 Full-automatic cleaning production line for electro-galvanizing of precise slender steel pipe
CN113913878A (en) * 2020-07-10 2022-01-11 湖南鎏源新材料有限公司 Totally-enclosed multifunctional ceiling type full-automatic barrel-plating galvanizing production line
CN111926370A (en) * 2020-08-18 2020-11-13 重庆华永金属表面处理有限公司 Automatic electroplating production line

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4399019A (en) * 1981-07-21 1983-08-16 Imperial Clevite Inc. Ultra-high current density electroplating cell
JPS58144500A (en) * 1982-02-22 1983-08-27 Sumitomo Metal Ind Ltd Method and apparatus for removing chlorine ion in plating liquid
CN201442987U (en) * 2009-07-27 2010-04-28 山东胜通集团股份有限公司 Steel-cord plating and waste-water utilizing automatic-control system
CN102162120A (en) * 2011-03-24 2011-08-24 东莞宝迪环保电镀设备有限公司 Waste gas flow guiding device of surface treatment groove
CN202910051U (en) * 2012-11-12 2013-05-01 天津三环乐喜新材料有限公司 Novel steam abstraction device
CN203256361U (en) * 2013-04-08 2013-10-30 广东雅洁五金有限公司 Gantry type automatic electroplating production line

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4399019A (en) * 1981-07-21 1983-08-16 Imperial Clevite Inc. Ultra-high current density electroplating cell
JPS58144500A (en) * 1982-02-22 1983-08-27 Sumitomo Metal Ind Ltd Method and apparatus for removing chlorine ion in plating liquid
CN201442987U (en) * 2009-07-27 2010-04-28 山东胜通集团股份有限公司 Steel-cord plating and waste-water utilizing automatic-control system
CN102162120A (en) * 2011-03-24 2011-08-24 东莞宝迪环保电镀设备有限公司 Waste gas flow guiding device of surface treatment groove
CN202910051U (en) * 2012-11-12 2013-05-01 天津三环乐喜新材料有限公司 Novel steam abstraction device
CN203256361U (en) * 2013-04-08 2013-10-30 广东雅洁五金有限公司 Gantry type automatic electroplating production line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
直线式电镀自动线组合生产的研究;许强令;《电镀与环保》;19830829(第4期);第23-30页 *

Also Published As

Publication number Publication date
CN104152977A (en) 2014-11-19

Similar Documents

Publication Publication Date Title
CN104152977B (en) Full automatic electroplating production line
CN103612643B (en) Train washing water process reuse method and device
CN202492540U (en) Energy saving vacuum degassing (VD)/vacuum oxygen degassing (VOD) vacuum refining furnace based on full automatic mechanical pump group
CN112877708B (en) Strip steel pickling tank system convenient to clean and cleaning method thereof
CN107352642A (en) Energy-efficient integrated MBR devices and its sewage water treatment method
CN205773988U (en) Glass toughening manure pit
CN205398706U (en) A hydrocone type stove nose zinc liquid pump for heating up galvanizing furnace
CN203637837U (en) Recycle device for train sewage
CN105220196A (en) For testing apparatus and the test method of analog band steel high-speed continuous electroplating
CN206947043U (en) Enamelled wire painting device
CN203711274U (en) Liquid adding device applicable to passivation and roller coating of hot galvanized plate
CN215947061U (en) Adopt quenching and tempering jar of steam jet stirring
CN208975615U (en) A kind of abraum salt acid treatment device of improvement
CN106938867A (en) A kind of acid waste water processing unit
CN207091163U (en) A kind of acid waste water processing unit
CN208815115U (en) A kind of split pin phosphating treatment device
CN208038417U (en) Steel silo formula fermentation tank
CN202942877U (en) Chemical combination barrel
CN207671641U (en) steel wire lifting device
CN206245399U (en) A kind of industrial water tank automatic flushing device
CN204369990U (en) Antitheft door phosphating treatment device
CN205653508U (en) Co -linear bonderizing system of steel aluminium automobile body
CN104843931B (en) A kind of sewage disposal system
CN203346181U (en) Waste water treatment device of aluminum profile production plant
CN107814333A (en) Steel wire lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant