CN104143162A - 一种绿色建筑评价系统 - Google Patents
一种绿色建筑评价系统 Download PDFInfo
- Publication number
- CN104143162A CN104143162A CN201410324824.4A CN201410324824A CN104143162A CN 104143162 A CN104143162 A CN 104143162A CN 201410324824 A CN201410324824 A CN 201410324824A CN 104143162 A CN104143162 A CN 104143162A
- Authority
- CN
- China
- Prior art keywords
- green building
- module
- assessment system
- building assessment
- index
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种绿色建筑评价系统,包括输入层,其用于输入指标参数的赋值;计算层,其用于对绿色建筑的建筑指标进行分析计算;输出层,其用于得出绿色建筑实施过程中需要提交的各类报告以及实现模块之间指标数值的传递和更新;输入层与计算层通过网络连接,计算层和输出层通过网络连接。优点是:提供公共接口,简化绿色建筑评价系统的指标参数的赋值、计算、参数的调整;绿色建筑实施过程中涉及到的各阶段、各指标、各主体、各专业的协调。
Description
技术领域
本发明涉及一种绿色建筑评价系统。
背景技术
目前,绿色建筑的评价被人为的分为很多环节,如:按主体划分涉及到业主、设计单位、咨询单位、施工单位和绿色节能产品供应商等五类实施主体;按专业划分分为建筑、结构、给排水、暖通、电气、景观、装修、弱电等八个专业;按时间尺度划分贯穿规划、设计、施工、运行、维护和拆除的项目全寿命周期。
由于绿色建筑评价涉及面广、涉及专业多、涉及周期长,在常规评价中,存在严重的割裂,详见附表一。
常规的评价方式,存在以下问题:
1、使得绿色建筑实施过程中涉及到的众多专业及实施主体,各主体之间难以分清主次、厘清责任;
2、将绿色建筑实施的有机过程人为割裂成互不隶属的几个阶段,造成阶段间协调困难;
在绿色建筑评价过程的人为分割使得协调工作量很大,而一旦协调沟通不到位,就可能造成规划设计意图在施工和运行管理中扭曲而无法体现、或造成专业间配合困难。
发明内容
本发明提供一种绿色建筑评价系统。
为达到上述目的,本发明采用的技术方案是:一种绿色建筑评价系统,包括输入层,其用于输入指标参数的赋值;
计算层,其用于对绿色建筑的建筑指标进行分析计算;
输出层,其用于得出绿色建筑实施过程中需要提交的各类报告以及实现模块之间指标数值的传递和更新;
输入层与计算层通过网络连接,计算层和输出层通过网络连接。
输入层包括指标输入模块。
计算层包括用绿色建筑评价系统,其用于接收指标输入模块中的输入指令;
指标计算模块,其用于对输入到绿色建筑评价系统中的指令进行计算;
指标分析模块,其用于对输入到绿色建筑评价系统中的指令进行分析;
指标排序模块,其用于对输入到绿色建筑评价系统中的指令进行排序;
绿色建筑评价系统分别连接指标计算模块、指标分析模块和指标排序模块。
输出层包括技术策略模块、绿色专篇模块、投资分析模块、进度计划模块、再生能源模块、非传统水源模块、绿色建材模块和室内环境模块。
绿色建筑评价系统含公共参数及子系统的局部参数,公共参数统一赋值,而赋值统一变更,参数可在整个系统内调用,局部参数在锡系统内部赋值、变更及调用。
绿色建筑评价系统中各子系统通过调用公共参数及子系统内部的局部参数输入条件得出一定的输出,其输出直接作为整个系统报告的一部分,或作为其他子系统的输入条件参与进一步的计算分析。
绿色建筑评价系统中各子系统之间、子系统内部在时空的二维尺度上均应协调统一。
绿色建筑评价系统内部的逻辑关系及运算均为代数运算,或简化为代数运算。
由于上述技术方案的运用,本发明与现有技术相比,具有的优点是:实现绿色建筑评价系统各子系统之间、子系统内部在时空的二维尺度上协调统一;提供公共接口,简化绿色建筑评价系统的指标参数的赋值、计算、参数的调整;绿色建筑实施过程中涉及到的各阶段、各指标、各主体、各专业的协调。
附图说明
附图1为本发明的逻辑关系图。
以上附图中:1、输入层,11、指标输入模块,2、计算层,21、绿色建筑评价系统,22、指标计算模块,23、指标分析模块,24、指标排序模块,3、输出层,31、技术策略模块,32、绿色专篇模块,33、投资分析模块,34、进度计划模块,35、再生能源模块,36、非传统水源模块,37、绿色建材模块,38、室内环境模块。
具体实施方式
下面结合附图及具体实施例对本发明做进一步的描述。
如图1所示,本发明的一种绿色建筑评价系统,包括输入层1,其用于输入指标参数的赋值;
计算层2,其用于对绿色建筑的建筑指标进行分析计算;
输出层3,其用于得出绿色建筑实施过程中需要提交的各类报告以及实现模块之间指标数值的传递和更新;
输入层1与计算层2通过网络连接,计算层2和输出层3通过网络连接。
输入层1包括指标输入模块11。
计算层2包括用绿色建筑评价系统21,其用于接收指标输入模块中的输入指令;
指标计算模块22,其用于对输入到绿色建筑评价系统中的指令进行计算;
指标分析模块23,其用于对输入到绿色建筑评价系统中的指令进行分析;
指标排序模块24,其用于对输入到绿色建筑评价系统中的指令进行排序;
绿色建筑评价系统21分别连接指标计算模块22、指标分析模块23和指标排序模块24。
输出层3包括技术策略模块31、绿色专篇模块32、投资分析模块33、进度计划模块34、再生能源模块35、非传统水源模块36、绿色建材模块37和室内环境模块38。
首先,会通过统一的输入层1输入指标参数的赋值。
其次,输入层1中的赋值会通过网络输送至绿色建筑评价系统21,绿色建筑评价系统21会将接收到的赋值按照需求分别输送给指标计算模块22、指标分析模块23以及指标排序模块24,对其进行计算、分析和排序。
最后,对计算层2中计算、分析和排序出的数据进行汇总之后输送至输出层3中的技术策略模块31、绿色专篇模块32、投资分析模块33、进度计划模块34、再生能源模块35、非传统水源模块36、绿色建材模块37或室内环境模块38中,得出绿色建筑实施过程中需要提交的各类报告,并实现模块之间指标数值的传递和及时更新。
其中,绿色建筑评价系统21含公共参数及子系统的局部参数,公共参数统一赋值,而赋值统一变更,参数可在整个系统内调用,局部参数在系统内部赋值、变更及调用。
绿色建筑评价系统21中的各子系统通过调用公共参数及子系统内部的局部参数等输入条件可得出一定的输出,其输出可直接作为整个系统报告的一部分,或作为其他子系统的输入条件参与进一步的计算分析。
绿色建筑评价系统21各子系统之间、子系统内部在时空的二维尺度上均应协调统一。
绿色建筑评价系统21内部的逻辑关系及运算均为代数运算,或简化为代数运算以保证期计算结果的可追溯性。
实现绿色建筑评价系统21各子系统之间、子系统内部在时空的二维尺度上协调统一;提供公共接口,简化绿色建筑评价系统的指标参数的赋值、计算、参数的调整;绿色建筑实施过程中涉及到的各阶段、各指标、各主体、各专业的协调。
附表一:
上述实施例只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人士能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡根据本发明精神实质所作的等效变化或修饰,都应涵盖在本发明的保护范围之内。
Claims (8)
1.一种绿色建筑评价系统,其特征在于:包括输入层,其用于输入指标参数的赋值;
计算层,其用于对绿色建筑的建筑指标进行分析计算;
输出层,其用于得出绿色建筑实施过程中需要提交的各类报告以及实现模块之间指标数值的传递和更新;
所述输入层与计算层通过网络连接,所述计算层和输出层通过网络连接。
2.根据权利要求1所述的一种绿色建筑评价系统,其特征在于:所述输入层包括指标输入模块。
3.根据权利要求1所述的一种绿色建筑评价系统,其特征在于:所述计算层包括用绿色建筑评价系统,其用于接收指标输入模块中的输入指令;
指标计算模块,其用于对输入到绿色建筑评价系统中的指令进行计算;
指标分析模块,其用于对输入到绿色建筑评价系统中的指令进行分析;
指标排序模块,其用于对输入到绿色建筑评价系统中的指令进行排序;
所述绿色建筑评价系统分别连接指标计算模块、指标分析模块和指标排序模块。
4.根据权利要求1所述的一种绿色建筑评价系统,其特征在于:所述输出层包括技术策略模块、绿色专篇模块、投资分析模块、进度计划模块、再生能源模块、非传统水源模块、绿色建材模块和室内环境模块。
5.根据权利要求1-4中任意一项所述的一种绿色建筑评价系统,其特征在于:绿色建筑评价系统含公共参数及子系统的局部参数,公共参数统一赋值,而赋值统一变更,参数可在整个系统内调用,局部参数在系统内部赋值、变更及调用。
6.根据权利要求5所述的一种绿色建筑评价系统,其特征在于:绿色建筑评价系统中各子系统通过调用公共参数及子系统内部的局部参数输入条件得出一定的输出,其输出直接作为整个系统报告的一部分,或作为其他子系统的输入条件参与进一步的计算分析。
7.根据权利要求6所述的一种绿色建筑评价系统,其特征在于:绿色建筑评价系统中各子系统之间、子系统内部在时空的二维尺度上均应协调统一。
8.根据权利要求7所述的一种绿色建筑评价系统,其特征在于:绿色建筑评价系统内部的逻辑关系及运算均为代数运算,或简化为代数运算。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410324824.4A CN104143162A (zh) | 2014-07-09 | 2014-07-09 | 一种绿色建筑评价系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410324824.4A CN104143162A (zh) | 2014-07-09 | 2014-07-09 | 一种绿色建筑评价系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104143162A true CN104143162A (zh) | 2014-11-12 |
Family
ID=51852330
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410324824.4A Pending CN104143162A (zh) | 2014-07-09 | 2014-07-09 | 一种绿色建筑评价系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104143162A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109657934A (zh) * | 2018-11-29 | 2019-04-19 | 深圳华森建筑与工程设计顾问有限公司 | 一种基于绿色建筑评价系统的产品选型方法及装置 |
CN110264080A (zh) * | 2019-06-20 | 2019-09-20 | 天津市建筑设计院 | 一种绿色建筑运行性能评价方法、装置、设备及存储介质 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080270197A1 (en) * | 2007-04-24 | 2008-10-30 | International Business Machines Corporation | Project status calculation algorithm |
CN102324075A (zh) * | 2011-10-29 | 2012-01-18 | 大连理工大学 | 一种基于WebGIS的绿色建筑智能化节能评估管理系统 |
US20130124250A1 (en) * | 2011-11-15 | 2013-05-16 | Ekotrope Inc. | Green Building System and Method |
CN103473619A (zh) * | 2013-09-26 | 2013-12-25 | 西安电子科技大学 | 一种基于网络架构的分析方法及其应用 |
-
2014
- 2014-07-09 CN CN201410324824.4A patent/CN104143162A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080270197A1 (en) * | 2007-04-24 | 2008-10-30 | International Business Machines Corporation | Project status calculation algorithm |
CN102324075A (zh) * | 2011-10-29 | 2012-01-18 | 大连理工大学 | 一种基于WebGIS的绿色建筑智能化节能评估管理系统 |
US20130124250A1 (en) * | 2011-11-15 | 2013-05-16 | Ekotrope Inc. | Green Building System and Method |
CN103473619A (zh) * | 2013-09-26 | 2013-12-25 | 西安电子科技大学 | 一种基于网络架构的分析方法及其应用 |
Non-Patent Citations (1)
Title |
---|
申杰: "《基于Grasshopper的绿色建筑技术分析方法应用研究》", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109657934A (zh) * | 2018-11-29 | 2019-04-19 | 深圳华森建筑与工程设计顾问有限公司 | 一种基于绿色建筑评价系统的产品选型方法及装置 |
CN110264080A (zh) * | 2019-06-20 | 2019-09-20 | 天津市建筑设计院 | 一种绿色建筑运行性能评价方法、装置、设备及存储介质 |
CN110264080B (zh) * | 2019-06-20 | 2023-05-23 | 天津市建筑设计院 | 一种绿色建筑运行性能评价方法、装置、设备及存储介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106096830B (zh) | 基于广义证据理论的继电保护状态评价方法及系统 | |
CN107861478A (zh) | 一种智能车间平行控制方法及系统 | |
CN103699696B (zh) | 一种云计算环境下的数据在线聚集方法 | |
CN104102212A (zh) | 一种钢铁企业中煤气和蒸汽系统的调度方法、设备和系统 | |
CN104076770A (zh) | 生产线监控方法及系统 | |
CN111191811A (zh) | 集群负荷预测方法、装置及存储介质 | |
CN111199354A (zh) | 一种基于Hopfield神经网络的电力通信网运维工单调度方法 | |
CN105718601B (zh) | 一种业务动态集成模型及其应用方法 | |
CN101976838B (zh) | 一种适合研究目的使用的牛顿法潮流计算方法 | |
CN110751416A (zh) | 一种用水量的预测方法、装置及设备 | |
CN114139802B (zh) | 一种基于流域水情变化趋势分析模型的实时优化调度方法 | |
CN106056233A (zh) | 一种电力负荷预测的方法 | |
CN109214118A (zh) | 一种基于bim的水泥企业工业设计方法 | |
CN106408126B (zh) | 一种面向能耗数据并发采集的三阶段优化方法 | |
Hatami-Marbini et al. | A bounded data envelopment analysis model in a fuzzy environment with an application to safety in the semiconductor industry | |
CN112288149A (zh) | 一种船舶工业智能制造协同服务系统 | |
CN104143162A (zh) | 一种绿色建筑评价系统 | |
CN106779222A (zh) | 机场地面等待时间预测方法及装置 | |
CN114239325B (zh) | 机场值机托运柜台配置规划方法、装置、设备和存储介质 | |
CN103778001A (zh) | 一种基于dag图的仿真任务并行度分析方法 | |
Ali et al. | Complexity of statutory requirements: Case study of refurbishment projects in Malaysia | |
CN103218516A (zh) | 一种聚类再回归的机场噪声单步预测方法 | |
CN109493077A (zh) | 行为识别方法及装置、电子设备、存储介质 | |
KR101764758B1 (ko) | 물/에너지/식량 자원의 상호 연계 분석 시스템 및 방법 | |
CN102509155A (zh) | 不确定性条件下流域污染物总量控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141112 |
|
WD01 | Invention patent application deemed withdrawn after publication |