CN104141390A - AP1000 nuclear power dome assembling jig frame - Google Patents

AP1000 nuclear power dome assembling jig frame Download PDF

Info

Publication number
CN104141390A
CN104141390A CN201310163894.1A CN201310163894A CN104141390A CN 104141390 A CN104141390 A CN 104141390A CN 201310163894 A CN201310163894 A CN 201310163894A CN 104141390 A CN104141390 A CN 104141390A
Authority
CN
China
Prior art keywords
dome
nuclear power
upright columns
jig frame
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310163894.1A
Other languages
Chinese (zh)
Other versions
CN104141390B (en
Inventor
伍崇明
邓国平
王晓峰
张芳芳
杨磊
杜佩佩
高飞
李春兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 24 Construction Co Ltd
Original Assignee
China Nuclear Industry 24 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 24 Construction Co Ltd filed Critical China Nuclear Industry 24 Construction Co Ltd
Priority to CN201310163894.1A priority Critical patent/CN104141390B/en
Publication of CN104141390A publication Critical patent/CN104141390A/en
Application granted granted Critical
Publication of CN104141390B publication Critical patent/CN104141390B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to an AP1000 nuclear power dome assembling jig frame which comprises inner-circle upright columns, outer-circle upright columns and concrete foundations. The inner-circle upright columns are used for supporting dome ring beams and are arranged along the integral peripheral direction of the AP1000 nuclear dome assembling jig frame, each outer-circle upright column is used for supporting an end of a corresponding dome radial beam, the outer-circle upright columns are arranged along the integral peripheral direction of the AP1000 nuclear power dome assembling jig frame, each concrete foundation is used for supporting the other end of the corresponding dome radial beam, and the concrete foundations are arranged along the integral peripheral direction of the AP1000 nuclear power dome assembling jig frame. Each of the inner-circle upright columns and the outer-circle upright columns axially comprises two sections, the upper half sections of the inner-circle upright columns and the upper half sections of the outer-circle upright columns are detached after a dome body is completely assembled, and the lower half sections of the inner-circle upright columns and the lower half sections of the outer-circle upright columns are connected with one another by supporting brackets; the supporting brackets are connected with dome modules. The AP1000 nuclear power dome assembling jig frame has the advantages that the AP1000 nuclear power dome assembling jig frame is low in material consumption and easy and convenient to operate, and is easy to detach and transport owing to the fact that structural bolts are connected with joints, and large spaces of a jig frame structure and a lower opening of a dome can be used for reversely transporting and mounting materials of the internal modules; the jig assembling duration and the dome construction period can be effectively shortened, and the dome assembling precision can be improved.

Description

The assembled moulding bed of AP1000 nuclear power dome
Technical field
The present invention relates to the assembled moulding bed of a kind of AP1000 nuclear power dome, particularly relate to a kind of technical field that belongs to nuclear power building operations, a kind of simple and easy flexible especially, the assembled jig frame special of AP1000 dome of be convenient to restructuring, dismantling, reuse.
Background technology
AP1000 nuclear power technology is the safest, state-of-the-art business nuclear power technology in current global nuclear power market, is also Chinese generation Ⅲ nuclear power proprietary technology simultaneously.AP1000 steel dome-shaped becomes superposition mode, needs the special moulding bed of design to meet the requirement of whole site operation.But it is prefabricated and assembled that traditional moulding bed majority integrates, project organization is complicated, take up room large, and the engineering time is long.Therefore need badly and provide a kind of simple and easy flexible, be convenient to the assembled jig frame special of AP1000 dome of restructuring, dismounting, recycling.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of splicing accuracy, minimizing use location, space of improving dome, shortens the assembled moulding bed of AP1000 nuclear power dome of construction period simultaneously.
For solving the problems of the technologies described above, the assembled moulding bed of a kind of AP1000 nuclear power of the present invention dome, comprises the concrete foundation along whole circumferential arrangement that supports the inner ring column along whole circumferential arrangement of dome ring beam, the outer ring column along whole circumferential arrangement that supports dome radial girders one end, the support dome radial girders other end.
Between inner ring column, by inner ring crossbeam shaped steel and diagonal brace, fix.
Between the column of outer ring, by outer ring crossbeam shaped steel and diagonal brace, fix.
Inner ring column and column corresponding position, outer ring are fixed by Internal and external cycle crossbeam and Internal and external cycle diagonal brace.
Concrete foundation is along being circumferentially evenly arranged, and quantity is 32.
Inner ring column and outer ring column form by two sections vertically, after dome body is assembled, the upper semisection of inner ring column and outer ring column are removed, and inner ring column is connected by supporting bracket with the lower semisection of outer ring column; Supporting bracket is connected with dome module.
The present invention is meeting under the prerequisite of the assembled requirement of dome unit, and moulding bed material usage is few, easy and simple to handle, structural bolts connected node, and quick detachable easy transportation, jig structure and dome end opening space are larger, can be used for having bad luck, installing of internal module material; Interior construction space is large, and support is not established in centre, and the limitation in the constructing operation of having avoided causing too much because of intermediate supports can effectively shorten the assembled duration of mold and the construction period of dome, improves the assembly precision of dome.
Accompanying drawing explanation
Fig. 1 is the assembled layout plan of dome moulding bed.
Fig. 2 is that the outer coil unit of dome launches schematic diagram.
Fig. 3 is coil unit deploying portion figure in dome.
Fig. 4 is dome radial girders support figure.
Fig. 5 is dome modular platform support figure.
In figure: 1 is outer ring column, 2 is inner ring column, and 3 is that outer ring crossbeam shaped steel, 4 is inner ring crossbeam shaped steel, and 5 is Internal and external cycle crossbeam, 6 for supporting bracket, and 7 is diagonal brace, and 8 is Internal and external cycle diagonal brace, and 9 is dome module, 10 is dome radial girders, and 11 is dome ring beam, and 12 is concrete foundation.
The specific embodiment
Below in conjunction with drawings and Examples, the present invention is further detailed explanation.
Moulding bed installation procedure: measurement unwrapping wire-column unit installation-intercolumniation support and connection on leveling-basis are installed on moulding bed basis.
Outer coil unit embodiment: along being connected with outer ring crossbeam shaped steel 3, diagonal brace 7 by bolt between the outer ring column 1 of whole circumferential arrangement, form and stablize trussed construction, as shown in Figure 2.
Interior coil unit embodiment: along being connected with inner ring crossbeam shaped steel 4, diagonal brace 7 by bolt between the inner ring column 2 of whole circumferential arrangement, form and stablize trussed construction, as shown in Figure 3.
Embodiment between inside and outside circle: outer ring column 1, inner ring column 2 corresponding positions employing bolts and Internal and external cycle diagonal brace 8, Internal and external cycle crossbeam 5 connected modes, form the trussed construction between inside and outside circle column, guarantee the plane stability of hoop framework.
The embodiment of dome and moulding bed: dome radial girders 10 one end are bearing in concrete foundation 12, the other end is bearing on outer ring column 1, forms dome body construction with 11 welding of dome ring beam.Concrete foundation 12 is along being circumferentially evenly arranged, and quantity is 32.Dome ring beam 11 is supported by inner ring column 2.Between basis and steel column, do not establish support, for the accessory module of dome body provides enough assembled spaces.As shown in Figure 4.
Each forms by two sections vertically for outer ring column 1, inner ring column 2, two is intersegmental with bolts, after dome body is assembled, the upper semisection of outer ring column 1, inner ring column 2 to be removed, the lower semisection of outer ring column 1, inner ring column 2 is with bolts with support bracket 6.Support bracket and by bolt, be connected with dome module 9 again, play a supporting role, as shown in Figure 5.

Claims (6)

  1. The assembled moulding bed of 1.AP1000 nuclear power dome, is characterized in that: comprise the concrete foundation along whole circumferential arrangement that supports the inner ring column along whole circumferential arrangement of dome ring beam, the outer ring column along whole circumferential arrangement that supports dome radial girders one end, the support dome radial girders other end.
  2. 2. the assembled moulding bed of a kind of AP1000 nuclear power dome according to claim 1, is characterized in that: between described inner ring column, by inner ring crossbeam shaped steel and diagonal brace, fix.
  3. 3. the assembled moulding bed of a kind of AP1000 nuclear power dome according to claim 1, is characterized in that: between the column of described outer ring, by outer ring crossbeam shaped steel and diagonal brace, fix.
  4. 4. the assembled moulding bed of a kind of AP1000 nuclear power dome according to claim 1, is characterized in that: described inner ring column and column corresponding position, outer ring are fixed by Internal and external cycle crossbeam and Internal and external cycle diagonal brace.
  5. 5. the assembled moulding bed of a kind of AP1000 nuclear power dome according to claim 1, is characterized in that: described concrete foundation is along being circumferentially evenly arranged, and quantity is 32.
  6. 6. the assembled moulding bed of a kind of AP1000 nuclear power dome according to claim 1, it is characterized in that: described inner ring column and outer ring column form by two sections vertically, after dome body is assembled, the upper semisection of inner ring column and outer ring column is removed, and inner ring column is connected by supporting bracket with the lower semisection of outer ring column; Supporting bracket is connected with dome module.
CN201310163894.1A 2013-05-07 2013-05-07 AP1000 nuclear power dome assembly moulding bed Active CN104141390B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310163894.1A CN104141390B (en) 2013-05-07 2013-05-07 AP1000 nuclear power dome assembly moulding bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310163894.1A CN104141390B (en) 2013-05-07 2013-05-07 AP1000 nuclear power dome assembly moulding bed

Publications (2)

Publication Number Publication Date
CN104141390A true CN104141390A (en) 2014-11-12
CN104141390B CN104141390B (en) 2016-11-23

Family

ID=51850707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310163894.1A Active CN104141390B (en) 2013-05-07 2013-05-07 AP1000 nuclear power dome assembly moulding bed

Country Status (1)

Country Link
CN (1) CN104141390B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401732A (en) * 2016-02-03 2016-03-16 中国核工业华兴建设有限公司 Assembling method of large steel structure module of nuclear power plant
CN105665952A (en) * 2014-11-21 2016-06-15 中国核工业第五建设有限公司 Process for assembling module of vapor generator compartment and refueling channel of nuclear power station
CN109610848A (en) * 2018-12-06 2019-04-12 中国建筑第八工程局有限公司 Moulding bed device and its construction method for assembled cambered surface network
CN114986445A (en) * 2022-06-09 2022-09-02 浙江东南网架股份有限公司 Factory assembly method for spherical reticulated shell dome structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07292992A (en) * 1994-04-22 1995-11-07 Horiuchi Komuten:Kk Method for assembling steel structure and centering pin for use therein
JPH08291579A (en) * 1995-04-24 1996-11-05 Shinyou:Kk Pitching roof construction method of concrete house and jig to be used in its construction method
CN2568714Y (en) * 2002-08-06 2003-08-27 黄达余 Green ecological house
CN201460242U (en) * 2009-07-21 2010-05-12 上海市第一建筑有限公司 Assembly jig frame with net rack structure
CN102146732A (en) * 2011-03-09 2011-08-10 中国建筑第八工程局有限公司 Extra-large-area hyperboloid welding ball network frame sliding construction method
CN102179651A (en) * 2011-04-06 2011-09-14 中国建筑第八工程局有限公司 On-site plane trusses of extra-large welded ball net frame and method for splicing three-dimensional sections
CN103061506A (en) * 2012-12-28 2013-04-24 中国华冶科工集团有限公司 Construction method of steel structure dome
CN103061412A (en) * 2013-01-01 2013-04-24 北京工业大学 Method for constructing stiff supporting dome structure
CN203284883U (en) * 2013-05-07 2013-11-13 中国核工业二四建设有限公司 AP1000 nuclear power dome assembly jig frame

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07292992A (en) * 1994-04-22 1995-11-07 Horiuchi Komuten:Kk Method for assembling steel structure and centering pin for use therein
JPH08291579A (en) * 1995-04-24 1996-11-05 Shinyou:Kk Pitching roof construction method of concrete house and jig to be used in its construction method
CN2568714Y (en) * 2002-08-06 2003-08-27 黄达余 Green ecological house
CN201460242U (en) * 2009-07-21 2010-05-12 上海市第一建筑有限公司 Assembly jig frame with net rack structure
CN102146732A (en) * 2011-03-09 2011-08-10 中国建筑第八工程局有限公司 Extra-large-area hyperboloid welding ball network frame sliding construction method
CN102179651A (en) * 2011-04-06 2011-09-14 中国建筑第八工程局有限公司 On-site plane trusses of extra-large welded ball net frame and method for splicing three-dimensional sections
CN103061506A (en) * 2012-12-28 2013-04-24 中国华冶科工集团有限公司 Construction method of steel structure dome
CN103061412A (en) * 2013-01-01 2013-04-24 北京工业大学 Method for constructing stiff supporting dome structure
CN203284883U (en) * 2013-05-07 2013-11-13 中国核工业二四建设有限公司 AP1000 nuclear power dome assembly jig frame

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
年发扬: "AP1000核电站模块化建造浅析", 《中国核科学技术进展报告(第一卷)》, 30 November 2009 (2009-11-30), pages 249 - 253 *
李忠卫 等: "山东省博物馆新馆大跨度三维双曲面穹顶钢结构安装技术", 《施工技术》, vol. 40, no. 349, 30 September 2011 (2011-09-30) *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105665952A (en) * 2014-11-21 2016-06-15 中国核工业第五建设有限公司 Process for assembling module of vapor generator compartment and refueling channel of nuclear power station
CN105665952B (en) * 2014-11-21 2018-06-12 中国核工业第五建设有限公司 The steam generator compartment of nuclear power station and the channel module packaging technology that reloads
CN105401732A (en) * 2016-02-03 2016-03-16 中国核工业华兴建设有限公司 Assembling method of large steel structure module of nuclear power plant
CN105401732B (en) * 2016-02-03 2018-03-23 中国核工业华兴建设有限公司 A kind of assemble method of nuclear power station large-sized steel construction module
CN109610848A (en) * 2018-12-06 2019-04-12 中国建筑第八工程局有限公司 Moulding bed device and its construction method for assembled cambered surface network
CN109610848B (en) * 2018-12-06 2020-12-15 中国建筑第八工程局有限公司 Jig frame device for assembling cambered surface grid structure and construction method thereof
CN114986445A (en) * 2022-06-09 2022-09-02 浙江东南网架股份有限公司 Factory assembly method for spherical reticulated shell dome structure
CN114986445B (en) * 2022-06-09 2023-12-01 浙江东南网架股份有限公司 Factory assembling method for spherical reticulated shell dome structure

Also Published As

Publication number Publication date
CN104141390B (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN104141390A (en) AP1000 nuclear power dome assembling jig frame
CN203284883U (en) AP1000 nuclear power dome assembly jig frame
CN204327103U (en) A kind of reaction frame started for tunneling shield
CN203768942U (en) Positioning device for embedded anchor bolts
CN104746862A (en) Temporary installation operating platform on overhead equipment foundation and erecting method thereof
CN102535870A (en) Tooling support for assembling and transporting nuclear-power containment-vessel cover head
CN211548750U (en) Cylindrical wallboard formwork support
CN102146492A (en) Method for installing converter body equipment and tooling platform
CN106013784A (en) Angle iron frame template and construction method
CN201460303U (en) Rapid-loading type multi-functional platform cabin
CN102454294A (en) Construction method of reinforced concrete and steel structure storage bin combined frame structure
CN213683264U (en) Inner ring beam joint combined assembling structure for steel structure awning of stadium
CN212612598U (en) Pile and beam splicing combined type wind power foundation structure
CN104499707A (en) Slip form system of large-diameter cylindrical structure and construction method thereof
JP4779765B2 (en) Container support structure modification method
CN109235262A (en) A kind of bridge tower steel reinforced concrete segment structure and its construction technology
CN102817322A (en) Shrinkable internal model without draw bar
CN206091252U (en) A interim strutting arrangement for supporting construction of cone dysmorphism steel construction
JP2017179827A (en) Reinforcement structure for underground volume structure
CN104763159B (en) Nuclear power CB20 module integral assembling shipping platform
CN112499467A (en) Subway station expanded end assembled gantry crane track foundation and construction method thereof
CN211898915U (en) Reinforced structure of steel beam column hinged joint
CN219241487U (en) Steel structure cooling tower
CN109610332A (en) The method and its auxiliary device of a kind of installation of Steel Pipe Concrete Tied-arch Bridge and application
JP2012107514A (en) Column base used for turbine pedestal and assembling method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant