Prior art keywords
steel
module
girder
shipping platform
profile steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510108834.9A
Other languages
Chinese (zh)
Other versions
CN104763159A (en
Inventor
乐群立
朱洪喜
金欣
王杉
熊卫兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Thermal Power Co
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Original Assignee
Chinese Energy Construction Group Zhejiang Construction Of Fire And Electricity Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinese Energy Construction Group Zhejiang Construction Of Fire And Electricity Co Ltd filed Critical Chinese Energy Construction Group Zhejiang Construction Of Fire And Electricity Co Ltd
Priority to CN201510108834.9A priority Critical patent/CN104763159B/en
Publication of CN104763159A publication Critical patent/CN104763159A/en
Application granted granted Critical
Publication of CN104763159B publication Critical patent/CN104763159B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of nuclear power CB20 module integral assembling shipping platform, play the detachable upright supports of carrying effect, the assembled shipping platform body of mid portion and the block supports moulding bed of topmost including bottommost;Described assembled shipping platform body includes girder and secondary beam, the cross arrangement anyhow of described girder, is provided with described secondary beam between adjacent girder and girder, and described girder and secondary beam are welded to connect;The center of described block supports moulding bed is the hollow cylinder that steel plate rolls, and the bottom of described hollow cylinder is installed on the girder of the superiors;The periphery of described hollow cylinder is radially evenly distributed with some articles of the 3rd H profile steel, and the some articles of described intersection points of the 3rd H profile steel overlap with the center of described hollow cylinder;When CB20 module is installed on block supports moulding bed, align by dismountable U-clamp is sturdy between face, the edge of a wing and the face, the edge of a wing of the T-steel of CB20 module bottom of the 3rd described H profile steel.

Description

Nuclear power CB20 module integral assembling shipping platform
Technical field
The present invention relates to a kind of nuclear power CB20 module integral assembling shipping platform.
Background technology
The construction module CB20 submodule profile of generation Ⅲ nuclear power unit AP1000/CAP1400 is one multipart group Zoarium, typically assembled by the welding of a lot of submodule assembly submodules.Need between submodule with submodule to be grouping to weld, Require submodule position error be ± 6.4mm, and the integral module dimensional tolerance after being completed also require that into ± 6.4mm.The overall dimensions length, width and height of general large scale structure module are all at more than 20m, and the precision so assembled module location is wanted Ask the highest.
Haiyang nuclear power one phase 1#2# nuclear island CB20 submodule engineering, module is made up of 112 pieces of submodules, outer circle ring diameter About 25908mm, outside annulus height about 10292mm, inner circular ring diameter about 5846mm, bottom vertebral body lower port diameter about 25908mm, back cut diameter about 10668mm, the most about 4806mm, top annulus external diameter about 25908mm, internal diameter about 10668mm, single Group manufactures net weight 302 tons.This module size is big, structure is complicated and needs outdoor assembling, and in assembling process, there are the following problems:
1, CB20 needs outdoor assembling, and on-the-spot wind is big, there was dampness in the air, and there is sleety weather, thus welding requirement of shelter High;
2, CB20 module overall dimensions is big, tank skin structure is thin and monolithic is lightweight, and scene exists strong wind and heavy rain heavy snow etc. Weather, has considerable influence to the stability during module assembled;
3, CB20 submodule quantity is many, and during assembling, monnolithic case physical dimension control difficulty is bigger;
4, the material that CB20 module assembled relates to is numerous, and welding procedure is many, and welder's operation easier is big;
5, CB20 module tank skin structure is thin, and weld seam is long, and overall weight is big, needs to arrange in welding assembly and hoisting process Anti-deformation measure;
6, CB20 module is made up of two-phase stainless steel plate substantially, needs to take rustless steel finished product protection in whole work progress Measure;
7, CB20 chamber formed after, belong to confined space, measure wherein operation needs improve ventilation, illuminating lamp, The measures such as draining;
8, CB20 cavity block chamber interior is substantially in an inclined-plane, and how setting up measurement scaffold is difficult point.
To sum up, CB20 sub modular structure is complicated, and needs at the scene outdoor to be assembled into an entirety, be directed to measure, The links such as assembling, welding, difficulty of construction is big, and how modules being transported to appointed place is also a difficult point.
Summary of the invention
In order to overcome disadvantages mentioned above present in existing CB20 module integral assembling and transport, the present invention provides a kind of nuclear power CB20 module integral assembling shipping platform.
The technical solution used in the present invention is:
Nuclear power CB20 module integral assembling shipping platform, it is characterised in that: include that bottommost plays the detachable of carrying effect Formula upright supports, the assembled shipping platform body of mid portion and the block supports moulding bed of topmost, described assembled transport Platform body is used for supporting module support jig, when CB20 module whole Transporting, described assembled shipping platform body with CB20 module is transported together;
Described support post is by fixing steel column base plate, the I-steel of Two bors d's oeuveres and the steel column top board connected from bottom to top Composition, described steel column base plate is fixed on mattess removably, described steel column top board and described spelling Ship defeated platform body bolt to connect;
Described assembled shipping platform body includes girder and secondary beam, the cross arrangement anyhow of described girder, adjacent master It is provided with described secondary beam between beam and girder, and described girder and secondary beam are welded to connect;Described girder uses a H Shaped steel, described secondary beam uses I-steel or second H profile steel of Two bors d's oeuveres;
The center of described block supports moulding bed is the hollow cylinder that steel plate rolls, the bottom of described hollow cylinder It is installed on the girder of the superiors;The periphery of described hollow cylinder is radially evenly distributed with some articles of the 3rd H profile steel, if The intersection point of the 3rd H profile steel described in dry article overlaps with the center of described hollow cylinder;CB20 module is installed to module Time on support jig, by removable between the face, the edge of a wing of the face, the edge of a wing of the 3rd described H profile steel and the T-steel of CB20 module bottom The sturdy alignment of U-clamp unloaded;
It is the most equally distributed along the periphery of hollow cylinder that the 3rd described H profile steel parallel above is placed with two-layer 4th H profile steel, one end of the 4th described H profile steel is fixed on the outer wall of hollow cylinder, another with adjacent the 4th H profile steel of layer One end is connected with each other by connector.
The face, the edge of a wing of the 3rd described H profile steel is sturdy with the face, the edge of a wing of the T-steel of CB20 module bottom align after two ends End is respectively arranged with described U-clamp;The U-shaped opening of the U-clamp of both side ends is oppositely arranged, and described U-shaped opening Two medial surface touch with the lateral surface in the described face, the edge of a wing of the 3rd H profile steel, the face, the edge of a wing of the T-steel of CB20 module bottom respectively Connect;The both sides of described U-clamp offer bolt hole respectively, by bolt by the 3rd described H profile steel in described bolt hole Face, the edge of a wing compacting of T-steel of face, the edge of a wing and CB20 module bottom fixing.
Being provided with diagonal brace between the girder of neighbouring position, described diagonal brace is Two bors d's oeuveres angle steel.
Described steel column base plate is fixed on mattess by expansion bolt.
The 3rd described H profile steel has 32 articles, and the described angle between the 3rd H profile steel and the centrage of the 3rd H profile steel is 11.25°。
Described support post is 36.
During use, first by CB20 module assembled at block supports moulding bed, transport vehicle is moved to assembled shipping platform body Side, after detachable upright supports being removed, assembly shipping platform body is transported to appointment by transport vehicle with CB20 module Position.
Beneficial effects of the present invention is embodied in:
1, CB20 module integral assembling shipping platform only needs the hardening place of one piece of 30m*30m can complete CB20 module Assembled;
2, this integral assembling shipping platform can complete the assembled work of CB20 module;
3, CB20 module spliced installs Cheng Houke and carries out whole Transporting to specifying position by shipping platform;
4, after this assembly shipping platform uses can integral demounting, move to carry out elsewhere integral platform and assemble and continue Use.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present invention.
Fig. 2 is the view of the transport vehicle transport after detachable upright supports is removed.
Fig. 3 is partial structurtes schematic diagram of the present invention.
Fig. 4 a is the Section A-A figure in Fig. 3.
Fig. 4 b is B-B-sectional view in Fig. 3.
Fig. 4 c is the C-C-sectional view in Fig. 3.
Fig. 5 is central cylinder structural representation.
Fig. 6 a is E-E-sectional view.
Fig. 6 b is F-F-sectional view.
Fig. 7 is Section X-X enlarged drawing in Fig. 3.
Fig. 8 a is DEL 1 schematic diagram.
Fig. 8 b is DEL 2 schematic diagram.
Fig. 8 c is DEL 3 schematic diagram.
Fig. 8 d is DEL 4 schematic diagram.
Fig. 8 e is DEL 5 schematic diagram.
Fig. 8 f is DEL 6 schematic diagram.
Fig. 8 g is DEL 7 schematic diagram.
Fig. 8 h is DEL 8 schematic diagram.
Fig. 9 is partial structurtes top view of the present invention.
Detailed description of the invention
Referring to figs. 1 through Fig. 9, nuclear power CB20 module integral assembling shipping platform, play the removable of carrying effect including bottommost Unload formula upright supports 1, the assembled shipping platform body 2 of mid portion and the block supports moulding bed 3 of topmost, described assembly Shipping platform body 2 is used for supporting module support jig 3, and when CB20 module whole Transporting, described assembled shipping platform is originally Body 2 transports with CB20 module;
Described support post 1 is by fixing steel column base plate, the I-steel of Two bors d's oeuveres and the steel column top connected from bottom to top Plate forms, and described steel column base plate is fixed on mattess removably, and described steel column top board is with described Assembled shipping platform body 2 bolt connects;
Described assembled shipping platform body 2 includes girder 21 and secondary beam 22, described girder 21 cross arrangement anyhow, phase It is provided with described secondary beam 22 between adjacent girder 21 and girder 21, and described girder 21 and secondary beam 22 are welded to connect;Institute The girder 21 stated uses the first H profile steel, described secondary beam 22 to use I-steel or second H profile steel of Two bors d's oeuveres;
The center of described block supports moulding bed 3 is the hollow cylinder 31 that steel plate rolls, described hollow cylinder 31 Bottom be installed on the girder 21 of the superiors;The periphery of described hollow cylinder 31 is radially evenly distributed with some articles Three H profile steel 32, the some articles of described intersection points of the 3rd H profile steel 32 overlap with the center of described hollow cylinder;By CB20 When module is installed on block supports moulding bed 3, the face, the edge of a wing 321 of the 3rd described H profile steel 32 and the T-steel of CB20 module bottom By dismountable sturdy alignment of U-clamp 5 between the face, the edge of a wing 61 of 6;
The 3rd described H profile steel 32 parallel above is placed with two-layer and the most uniformly divides along the periphery of hollow cylinder 31 4th H profile steel 33 of cloth, one end of the 4th described H profile steel 33 is fixed on the outer wall of hollow cylinder 31, with layer adjacent The other end of four H profile steel 33 is connected with each other by connector.
The face, the edge of a wing 321 of the 3rd described H profile steel 32 is sturdy with the face, the edge of a wing 61 of the T-steel 6 of CB20 module bottom aligns After end, two ends be respectively arranged with described U-clamp 5;The U-shaped opening of the U-clamp 5 of both side ends is oppositely arranged, and described U-shaped opening two medial surface respectively with the described face, the edge of a wing 321 of the 3rd H profile steel, the edge of a wing of the T-steel of CB20 module bottom The lateral surface in face 61 touches;The both sides of described U-clamp 5 offer bolt hole respectively, will by bolt in described bolt hole The face, the edge of a wing of the 3rd described H profile steel is fixing with face, the edge of a wing compacting of the T-steel of CB20 module bottom.
Being provided with diagonal brace between the girder 21 of neighbouring position, described diagonal brace is Two bors d's oeuveres angle steel.
Described steel column base plate is fixed on mattess by expansion bolt.
The 3rd described H profile steel 32 has 32 articles, the described angle between the 3rd H profile steel and the centrage of the 3rd H profile steel It it is 11.25 °.
Described support post 1 is 36.
During use, first by CB20 module assembled at block supports moulding bed 3, transport vehicle 4 is moved to assembled shipping platform body 2 Lower section, after detachable upright supports 1 is removed, transport vehicle 4 by assembly shipping platform body 2 with CB20 module transport to Specify position.
Content described in this specification embodiment is only enumerating of the way of realization to inventive concept, the protection of the present invention Scope is not construed as being only limitted to the concrete form that embodiment is stated, protection scope of the present invention is also and in art technology Personnel according to present inventive concept it is conceivable that equivalent technologies means.

Claims (6)

1. nuclear power CB20 module integral assembling shipping platform, it is characterised in that: include that bottommost plays the detachable of carrying effect Upright supports, the assembled shipping platform body of mid portion and the block supports moulding bed of topmost, described assembled transport is flat Playscript with stage directions body is used for supporting module support jig, and when CB20 module whole Transporting, described assembled shipping platform body is with CB20 Module is transported together;
Described support post is by fixing steel column base plate, the I-steel of Two bors d's oeuveres and the steel column top board group connected from bottom to top Becoming, described steel column base plate is fixed on mattess removably, described steel column top board and described assembly Shipping platform body bolt connects;
Described assembled shipping platform body includes girder and secondary beam, the cross arrangement anyhow of described girder, adjacent girder with It is provided with described secondary beam between girder, and described girder and secondary beam are welded to connect;Described girder uses a H type Steel, described secondary beam uses I-steel or second H profile steel of Two bors d's oeuveres;
The center of described block supports moulding bed is the hollow cylinder that steel plate rolls, and the bottom of described hollow cylinder is fixed On the girder of the superiors;The periphery of described hollow cylinder is radially evenly distributed with some articles of the 3rd H profile steel, some The described intersection point of the 3rd H profile steel overlaps with the center of described hollow cylinder;CB20 module is installed to block supports Time on moulding bed, by dismountable between the face, the edge of a wing of the face, the edge of a wing of the 3rd described H profile steel and the T-steel of CB20 module bottom The sturdy alignment of U-clamp;
The parallel above two-layer that is placed with of the 3rd described H profile steel is along the periphery of hollow cylinder the most equally distributed 4th H profile steel, one end of the 4th described H profile steel is fixed on the outer wall of hollow cylinder, with the other end of adjacent the 4th H profile steel of layer It is connected with each other by connector.
2. nuclear power CB20 module integral assembling shipping platform as claimed in claim 1, it is characterised in that: the 3rd described H type The face, the edge of a wing of steel is sturdy with the face, the edge of a wing of the T-steel of CB20 module bottom align after end, two ends be respectively arranged with described U Clevis;The U-shaped opening of the U-clamp of both side ends is oppositely arranged, and two medial surface of described U-shaped opening are respectively with described The face, the edge of a wing of the 3rd H profile steel, the lateral surface in face, the edge of a wing of T-steel of CB20 module bottom touch;The both sides of described U-clamp are divided Do not offer bolt hole, by bolt by the face, the edge of a wing of the 3rd described H profile steel and CB20 module bottom in described bolt hole Face, the edge of a wing compacting of T-steel fixing.
3. nuclear power CB20 module integral assembling shipping platform as claimed in claim 1 or 2, it is characterised in that: it is positioned at phase up and down Being provided with diagonal brace between the girder that ortho position is put, described diagonal brace is Two bors d's oeuveres angle steel.
4. nuclear power CB20 module integral assembling shipping platform as claimed in claim 3, it is characterised in that: at the bottom of described steel column Plate is fixed on mattess by expansion bolt.
5. nuclear power CB20 module integral assembling shipping platform as claimed in claim 4, it is characterised in that: the 3rd described H type Steel has 32, and the described angle between the 3rd H profile steel and the centrage of the 3rd H profile steel is 11.25 °.
6. nuclear power CB20 module integral assembling shipping platform as claimed in claim 5, it is characterised in that: described support post It it is 36.
CN201510108834.9A 2015-03-12 2015-03-12 Nuclear power CB20 module integral assembling shipping platform Active CN104763159B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510108834.9A CN104763159B (en) 2015-03-12 2015-03-12 Nuclear power CB20 module integral assembling shipping platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510108834.9A CN104763159B (en) 2015-03-12 2015-03-12 Nuclear power CB20 module integral assembling shipping platform

Publications (2)

Publication Number Publication Date
CN104763159A CN104763159A (en) 2015-07-08
CN104763159B true CN104763159B (en) 2016-08-24

Family

ID=53645222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510108834.9A Active CN104763159B (en) 2015-03-12 2015-03-12 Nuclear power CB20 module integral assembling shipping platform

Country Status (1)

Country Link
CN (1) CN104763159B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110532692A (en) * 2019-08-29 2019-12-03 广船国际有限公司 A method of improving large-sized structural parts assembly efficiency

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06307087A (en) * 1993-04-21 1994-11-01 Tetsukotsu Kiyado Kiyamu Center:Kk Master assembling method and apparatus for steel column
JPH08199819A (en) * 1995-01-24 1996-08-06 Taisei Corp Method and equipment for constructing steel pipe column
CN201190422Y (en) * 2008-05-21 2009-02-04 中国建筑一局(集团)有限公司 Ultra-heavy steel column rotating positioning apparatus
CN103643801A (en) * 2013-12-09 2014-03-19 中国水利水电第六工程局有限公司 Internal-pipe construction operation vehicle for erecting inverted siphon on slant and long steep side slope
CN203977880U (en) * 2014-06-26 2014-12-03 五矿二十三冶建设集团有限公司 Vertical transport material transferring platform in major structure of construction construction
CN204676905U (en) * 2015-03-12 2015-09-30 中国能源建设集团浙江火电建设有限公司 The assembled shipping platform of nuclear power CB20 module whole

Also Published As

Publication number Publication date
CN104763159A (en) 2015-07-08

Similar Documents

Publication Publication Date Title
CN101979791B (en) Ring beam and annular corbel column reinforced connection joint construction method
CN110104548B (en) Construction method of gantry crane main beam structure
CN201432273Y (en) Truss-type module jig frame for section manufacturing of steel box girder
CN103523169B (en) A kind of Double-casing boats and ships manufacture method
CN103276895B (en) Die supporting method of reversed-cone-shaped column cap die
CA2922782C (en) Overhead conveying device having support framework modules
CN106141476A (en) A kind of super-large diameter is without the assemble method of ribbed stiffener thin-wall semi top seal closure
CN104763159B (en) Nuclear power CB20 module integral assembling shipping platform
CN204676905U (en) The assembled shipping platform of nuclear power CB20 module whole
CN104727560A (en) Reinforced concrete structure reinforced steel framework forming method and reinforced steel jig frame
CN201891174U (en) Stiff connecting node for ring girder and ring-shaped bracket column
CN103225347A (en) Multi-layer multi-way intersected large-scale super-thick plate node for super-high space and manufacturing method thereof
CN205577394U (en) Support system suitable for construction of silo bottom plate conical surface structure
CN109295858B (en) Integral assembly jig frame for steel shell sections of double-wall combined bridge tower and working method thereof
CN107109836A (en) Collapsible precast construction
CN108951864B (en) Replacement support and supporting structure of reticulated shell structure
CN104141390A (en) AP1000 nuclear power dome assembling jig frame
CN100431915C (en) Cylindrical hull structural arrangement
CN213683264U (en) Inner ring beam joint combined assembling structure for steel structure awning of stadium
CN201460306U (en) Detachable circular stage
CN108857254B (en) Jig frame for manufacturing ship flow guide pipe
CN105821770A (en) Connecting and locating method for multiple tower roots and large-size concrete bearing platform foundation of steel structure main tower
CN109811997A (en) Combined type support system and application method for the installation of big special-shaped component
CN220451416U (en) Reinforcing apparatus of cylinder and beam node department template
CN205088867U (en) Rhombus space slope steel column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231110

Address after: 310000 No. 36-9, Zhenning Road, Ningxin village, ningwei Town, Xiaoshan District, Hangzhou City, Zhejiang Province

Patentee after: ZHEJIANG THERMAL POWER CO.

Patentee after: Shanghai Nuclear Engineering Research and Design Institute Co.,Ltd.

Address before: 310016 No. 77, Qingchun East Road, Hangzhou, Zhejiang

Patentee before: ZHEJIANG THERMAL POWER CO.