CN104141388B - A kind of prestressed pore passage observation and dredging method - Google Patents

A kind of prestressed pore passage observation and dredging method Download PDF

Info

Publication number
CN104141388B
CN104141388B CN201310163891.8A CN201310163891A CN104141388B CN 104141388 B CN104141388 B CN 104141388B CN 201310163891 A CN201310163891 A CN 201310163891A CN 104141388 B CN104141388 B CN 104141388B
Authority
CN
China
Prior art keywords
duct
steel strand
dredging
picture pick
strand wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310163891.8A
Other languages
Chinese (zh)
Other versions
CN104141388A (en
Inventor
杨艺精
刘学良
赵鑫禹
马建军
刘向荣
董占卜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 24 Construction Co Ltd
Original Assignee
China Nuclear Industry 24 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 24 Construction Co Ltd filed Critical China Nuclear Industry 24 Construction Co Ltd
Priority to CN201310163891.8A priority Critical patent/CN104141388B/en
Publication of CN104141388A publication Critical patent/CN104141388A/en
Application granted granted Critical
Publication of CN104141388B publication Critical patent/CN104141388B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention belongs to nuclear power station prestressed pore passage dredging technical field, and in particular to a kind of prestressed pore passage observation and dredging method;Solved in prestressed pore passage because entering concrete it is an object of the present invention to provide one kind(Mortar)The prestressed pore passage observation and dredging method combed on the premise of existing structure are not destroyed after blocking;A kind of prestressed pore passage observation of the present invention and dredging method, comprise the following steps:Observe in duct;Prepare before the dredging of duct;Duct is dredged;The features such as dredging method of the present invention has efficiency high, do not damage existing structure, can be widely applied to concrete(Mortar)Block and linear pattern of the channel diameter more than 80mm or ring-like duct comb;Observational technique of the present invention has the advantages that easy to operate, reflection duct directly perceived situation, video data can be preserved and put on record.

Description

A kind of prestressed pore passage observation and dredging method
Technical field
The invention belongs to nuclear power station prestressed pore passage dredging technical field, and in particular to a kind of prestressed pore passage is observed and dredged Circulation method.
Background technology
Current post-tensioned prestressed law technology is widely used in all kinds of heavy constructions such as nuclear power station, bridge and gymnasium.Afterwards Open method prestressing force pore-forming material wall thickness general between 0.6~3mm, easily occur in work progress damaged(Welding embedded element mistiming Weldering), due to easily ignored when damaged face is compared with minor inspection, enter slurry blocking duct probability larger.
Domestic treatment prestressed pore passage generally there are two problems because entering concrete stopping state at present:
One is unclear to duct inside stopping state, the treatment of the region between the heart and the diaphragm mesh causes secondary destruction.
The second is because aperture is small and how length is processed greatly on the premise of not destroyed to existing structure.
The content of the invention
It is not enough that the technical problems to be solved by the invention are directed to prior art, there is provided one kind solve prestressed pore passage because Enter the prestressed pore passage observation and dredging method combed on the premise of not destroying existing structure after concrete is blocked.
The technical solution adopted in the present invention is:
A kind of prestressed pore passage observation and dredging method, comprise the following steps
(1.1)Observe in duct;
(1.2)Prepare before the dredging of duct;
(1.3)Duct is dredged.
Described duct observation is comprised the following steps
(2.1)The all valves on duct to be seen are opened, the dust and other impurities in duct is blown out using air compressor machine;
(2.2)By picture pick-up device together with the firm colligation of USB extended lines on steel strand wires, picture pick-up device should lead with steel strand wires The distance of 40-50cm is kept to head, picture pick-up device and USB extended line protruding parts is wrapped up using cotton yarn, adhesive waterproof tape;
(2.3)The another end of USB extended lines is connected with computer, starts video record software in computer, test picture pick-up device After recording of finding a view is normal, the steel strand wires with picture pick-up device are determined from the duct port for blocking or destroy close to position from early stage Send into duct to be seen;
(2.4)Picture of the floor manager personnel in computer screen assigns the move of steel strand wires to operating personnel, At a slow speed near until steel strand wires guide head arrives at tamper or destruction position;
(2.5)After determining tamper or destruction position, processing equipment is guided by picture pick-up device, reach effectively treatment position Put, exit picture pick-up device;
(2.6)Duct is cleared up using air compressor machine after the completion for the treatment of, and sends into picture pick-up device observation duct foreign metapore again Road treatment is completed.
A steel strand wires are penetrated in duct using strand pulling machine, quarter is marked on the steel strand wires for exposing duct proximal outlet Degree, is fixed on vibrator is firm on the steel strand wires of proximal end.
Described steel strand wires length is not less than orifice throat length, proximal length, stemming length sum;Described vibrator length More than proximal length, stemming length sum.
Described duct dredging step is comprised the following steps:
(3.1)Vibrator is pulled at blocking with steel strand wires, open vibrator and forward pulling vibrator make its slow before Enter;
(3.2)Vibrator is exited as vibrator advance 10cm or after having vibrated 15~20min;
(3.3)The chip in duct is blown out using air compressor machine, and reuses prestressed pore passage observational technique to combing Situation confirms;
(3.4)So return multiple until duct combs completion.
The beneficial effects of the invention are as follows:
1. the features such as combing method there is efficiency high, existing structure is not damaged, concrete can be widely applied to(Mortar) Block and linear pattern of the channel diameter more than 80mm or ring-like duct comb.
2. this observational technique be using steel strand wires guiding picture pick-up device enter duct to be seen, be processing scheme selection and Guiding handling implement reaches effective processing position and provides visual foundation.The method have easy to operate, reflection duct directly perceived situation, Video data can preserve the advantages of putting on record.In the construction projects such as nuclear power station, the bridge that can be widely applied to have pre-stress construction.
Brief description of the drawings
Fig. 1 is vibrator dredging problem duct schematic diagram;
Fig. 2 is picture pick-up device observation duct schematic diagram.
Specific embodiment
A kind of prestressed pore passage observation for providing the present invention with reference to the accompanying drawings and examples is situated between with dredging method Continue:
As shown in figure 1, a kind of prestressed pore passage observation and dredging method, comprise the following steps
(1.1)Observe in duct;
(1.2)Prepare before the dredging of duct;
(1.3)Duct is dredged.
Described duct observation is comprised the following steps
(2.1)The all valves on duct to be seen are opened, the dust and other impurities in duct is blown out using air compressor machine;
(2.2)By picture pick-up device together with the firm colligation of USB extended lines on steel strand wires, picture pick-up device should lead with steel strand wires The distance of 40-50cm is kept to head, picture pick-up device and USB extended line protruding parts is wrapped up using cotton yarn, adhesive waterproof tape;
(2.3)The another end of USB extended lines is connected with computer, starts video record software in computer, test picture pick-up device After recording of finding a view is normal, the steel strand wires with picture pick-up device are determined from the duct port for blocking or destroy close to position from early stage Send into duct to be seen;
(2.4)Picture of the floor manager personnel in computer screen assigns the move of steel strand wires to operating personnel, At a slow speed near until steel strand wires guide head arrives at tamper or destruction position;
(2.5)After determining tamper or destruction position, processing equipment is guided by picture pick-up device, reach effectively treatment position Put, exit picture pick-up device;
(2.6)Duct is cleared up using air compressor machine after the completion for the treatment of, and sends into picture pick-up device observation duct foreign metapore again Road treatment is completed.
A steel strand wires are penetrated in duct using strand pulling machine, quarter is marked on the steel strand wires for exposing duct proximal outlet Degree, is fixed on vibrator is firm on the steel strand wires of proximal end.
Described steel strand wires length is not less than orifice throat length, proximal length, stemming length sum;Described vibrator length More than proximal length, stemming length sum.
Described duct dredging step is comprised the following steps:
(3.1)Vibrator is pulled at blocking with steel strand wires, open vibrator and forward pulling vibrator make its slow before Enter;
(3.2)Vibrator is exited as vibrator advance 10cm or after having vibrated 15~20min;
(3.3)The chip in duct is blown out using air compressor machine, and reuses prestressed pore passage observational technique to combing Situation confirms;
(3.4)So return multiple until duct combs completion.
It is first to find out the following two kinds of situations in duct inside using prestressed pore passage observational technique that this duct combs technology, its One:Whether be at least can be by a steel strand wires and because of concrete(Mortar)The duct of blocking;Secondly:It is clearly nearer at blocking Duct outlet(Hereinafter referred to as proximal outlet)And stemming length.Vibrator is sent into using steel strand wires again and combed at blocking, Duct intraclast is blown out using air compressor machine finally.
This duct combs the application of method, duct can be combed on the premise of original structure is not destroyed.Operation Schematic diagram is as shown in Figure 1.
1)Situation observation in duct
Picture pick-up device is sent into duct by steel strand wires using prestressed pore passage observational technique, observes duct plugging reason And measure the distance at the blocking of duct away from duct outlet.
2)Duct comb before preparation
A steel strand wires are penetrated in duct using strand pulling machine, its length cannot be less than orifice throat length, proximal length, blocking Length sum(Such as Fig. 1).Scale is marked on the steel strand wires for exposing duct proximal outlet, a length is long slightly larger than near-end Degree, the vibrator of stemming length sum firm are fixed on the steel strand wires of proximal end.
3)Duct combs
Vibrator is pulled at blocking with steel strand wires, is opened vibrator and pulling vibrator forward is advanced slowly it.When Vibrator advance 10cm exits vibrator after having vibrated 15~20min, is blown out the chip in duct using air compressor machine, and Reuse prestressed pore passage observational technique and confirm to combing situation, so return multiple until duct combs completion.
This observational technique is mainly steel strand wires guiding picture pick-up device and enters blocking duct, arrives at observation position and is observed. Before the observation of picture pick-up device access aperture road, should tentatively be judged being blocked in duct or destroying position first with steel strand wires are scrapped, It is that later stage picture pick-up device reduces workload into observation clearly to be exported from the duct for blocking or destroying close to position.
The application of this duct observational technique, can accurately observe duct block or destroy the reason for, calculate blocking or The position of destruction, and store filing.Operation chart is as shown in Figure 1.
1) preparation before observing
Picture pick-up device for observation, the computer for having installed recorded video software, length exceed duct girth to be seen Steel strand wires, adhesive waterproof tape and the strapping that the USB extended lines of half, length exceed girth half in duct to be seen are some, and Training qualified management, operating personnel.
Blocked or destruction position for duct can be calculated, USB extended lines can made every 1-2m adhesive waterproof tape colligations Mark.
2) process control when observing
Because domestic pre-stress construction lashing machinery generally penetrates speed, may be to picture pick-up device and USB extended lines Cause to damage, therefore take and be manually fed into steel strand wires.
In operating process by confiding a technological secret in clearly commanding advance, retrogressing, rotation etc. are assigned according to camera shooting and video Operation password, operating personnel must strictly observe.
Picture pick-up device into firm must being fixed on steel strand wires before duct, picture pick-up device and USB extended line protuberances Position is properly wrapped up using things such as cotton yarn, adhesive waterproof tapes, prevents from being lost or picture pick-up device dropping in duct.

Claims (1)

1. a kind of prestressed pore passage is observed and dredging method, it is characterised in that:Comprise the following steps
(1) duct observation;
Described duct observation is comprised the following steps
(1.1) all valves on duct to be seen are opened, the dust debris in duct is blown out using air compressor machine;
(1.2) by picture pick-up device together with the firm colligation of USB extended lines on steel strand wires, picture pick-up device should be with steel strand wires guide head The distance of 40-50cm is kept, picture pick-up device and USB extended line protruding parts is wrapped up using cotton yarn, adhesive waterproof tape;
(1.3) other end of USB extended lines is connected with computer, starts video record software in computer, test picture pick-up device takes After scape is recorded normally, the steel strand wires with picture pick-up device are determined from the duct port for blocking or destroy close to position from early stage Send into duct to be seen;
(1.4) picture of the floor manager personnel in computer screen assigns the move of steel strand wires to operating personnel, at a slow speed Near until steel strand wires guide head arrives at tamper or destruction position;
(1.5) after determining tamper or destruction position, processing equipment is guided by picture pick-up device, reaches effective processing position, moved back Go out picture pick-up device;
(2) prepare before the dredging of duct;
(3) duct dredging;
The duct dredging step is comprised the following steps:
(3.1) vibrator is pulled at blocking with steel strand wires, opens vibrator and pulling vibrator forward is advanced slowly it;
(3.2) vibrator is exited as vibrator advance 10cm or after having vibrated 15~20min;
(3.3) chip in duct is blown out using air compressor machine, and reuses prestressed pore passage observational technique to dredging situation Confirm;
(3.4) so repeatedly until completion is dredged in duct.
CN201310163891.8A 2013-05-07 2013-05-07 A kind of prestressed pore passage observation and dredging method Active CN104141388B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310163891.8A CN104141388B (en) 2013-05-07 2013-05-07 A kind of prestressed pore passage observation and dredging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310163891.8A CN104141388B (en) 2013-05-07 2013-05-07 A kind of prestressed pore passage observation and dredging method

Publications (2)

Publication Number Publication Date
CN104141388A CN104141388A (en) 2014-11-12
CN104141388B true CN104141388B (en) 2017-06-06

Family

ID=51850705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310163891.8A Active CN104141388B (en) 2013-05-07 2013-05-07 A kind of prestressed pore passage observation and dredging method

Country Status (1)

Country Link
CN (1) CN104141388B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2472609A1 (en) * 2004-06-28 2005-12-28 Richard Gregoire Pipe clearing system and device
CN102645244A (en) * 2012-04-17 2012-08-22 中铁十三局集团第一工程有限公司 Prestressed duct detector
JP2012217987A (en) * 2011-04-12 2012-11-12 Shinka Sangyo Kk Ultrasonic cleaning apparatus
CN102794284A (en) * 2012-08-10 2012-11-28 中铁隧道集团有限公司 Dredge device of annular embedded corrugated pipe duct and dredge method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2472609A1 (en) * 2004-06-28 2005-12-28 Richard Gregoire Pipe clearing system and device
JP2012217987A (en) * 2011-04-12 2012-11-12 Shinka Sangyo Kk Ultrasonic cleaning apparatus
CN102645244A (en) * 2012-04-17 2012-08-22 中铁十三局集团第一工程有限公司 Prestressed duct detector
CN102794284A (en) * 2012-08-10 2012-11-28 中铁隧道集团有限公司 Dredge device of annular embedded corrugated pipe duct and dredge method thereof

Also Published As

Publication number Publication date
CN104141388A (en) 2014-11-12

Similar Documents

Publication Publication Date Title
CN104141388B (en) A kind of prestressed pore passage observation and dredging method
CN206462233U (en) The system that straddling fish stocks in fish pass are carried out with observation collection
DE102006023642A1 (en) Wind turbine and rotor blade for a wind turbine
CN110206748B (en) Method, device and system for monitoring wind power blocking experiment
CN105438894A (en) Automatic cable winding-inserting method
CN207691314U (en) A kind of aluminium armor tape quickly winds specific purpose tool
CN114775913B (en) Visual grout supplementing method for sleeve grouting defects
CN116909213A (en) Automatic cable wiring control system and method based on Internet of things
CN112963009A (en) Concrete pouring and plugging method for holes of waffle slab
JP5348560B2 (en) Laying optical fiber sensor
CN107177909A (en) A kind of combing machine lap automatic piecing arrangement
CN206057257U (en) A kind of ultrasonic nondestructive testing device
CN113793117A (en) BIM-based remote supervision method for building construction
CN209685180U (en) A kind of deck erection gantry visualized management device
CN203229617U (en) Novel stripping knife for carding machine
CN207775415U (en) It is a kind of to be suitable for solving the device that Exploration for Air Pressure Hopper of Cotton Feeder hired roughneck end twines fiber
CN106153728B (en) A kind of ultrasonic nondestructive testing device
CN218766643U (en) Foreign matter cleaning and detecting device for pipeline of tunnel drainage system
CN206209168U (en) A kind of optoelectronic device cabinet inner fiber cabling fixing device
CN205615991U (en) Stifled pull throughs of funnel card
CN101736899A (en) Post-tensioned prestressing anchor recess dabbing device and construction method thereof
JP2020169493A (en) Gate control program, and gate control device
CN104360889A (en) Driving program loading method and device
CN201206337Y (en) Prestressed concrete structure
CN217517953U (en) Wire pipe reservation device for passing through secondary wall masonry lintel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant