CN209685180U - A kind of deck erection gantry visualized management device - Google Patents
A kind of deck erection gantry visualized management device Download PDFInfo
- Publication number
- CN209685180U CN209685180U CN201821690320.4U CN201821690320U CN209685180U CN 209685180 U CN209685180 U CN 209685180U CN 201821690320 U CN201821690320 U CN 201821690320U CN 209685180 U CN209685180 U CN 209685180U
- Authority
- CN
- China
- Prior art keywords
- erection gantry
- deck erection
- definition camera
- electrically connected
- management device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Studio Devices (AREA)
Abstract
The utility model discloses a kind of deck erection gantry visualized management devices, including high-definition camera, hard disk video recorder, interchanger, monitor display, deck erection gantry, server, mobile terminal, fixing end, high-definition camera is mounted on deck erection gantry, high-definition camera passes through with hard disk video recorder to be electrically connected, hard disk video recorder passes through with interchanger to be electrically connected, interchanger is electrically connected with monitoring display, monitoring display passes through with server to be electrically connected, server is electrically connected with fixing end, server and mobile terminal pass through radio connection, the technology is a kind of deck erection gantry visualized management device, structure is simple, it is easy for installation, it can be convenient construction commander and operator's remote supervisory and control(ling) equipment operating status.
Description
Technical field
The utility model belongs to suspension bridge deck erection gantry technical field of construction, in particular to a kind of deck erection gantry visualization pipe
Manage device.
Background technique
In modern construction, such as main promotions steel strand wires jack, it is active put rope capstan winch and walk steel strand wires jack position
It sets, operator cannot observe each construction point in real time, cannot find the problem in time, occur construction problem in work progress, control
Personnel processed cannot obtain in time problem, and construction accident occurs, and cause construction loss and casualties.
The prior art is monitored in real time using installation high-definition camera, but high-definition camera is exposed to outer, long-time
The long-term erosion of exposing to the weather and rainwater to high-definition camera, will affect high-definition camera service life.
To guarantee deck erection gantry safe operation, a kind of deck erection gantry visualized management device of utility model is to be highly desirable
's.
Utility model content
The purpose of this utility model be in order to meet deck erection gantry safe operation needs, and provide a kind of deck erection gantry can
Depending on changing managing device, structure is simple, easy for installation, can be convenient construction commander and operator remotely monitors construction equipment operation
State, simultaneously, it is ensured that high-definition camera by rain erosion, does not extend the service life of high-definition camera.
The above-mentioned technical purpose of the utility model has the technical scheme that
A kind of deck erection gantry visualized management device, including high-definition camera, hard disk video recorder, interchanger, monitoring display
Device, deck erection gantry, server, mobile terminal, fixing end, high-definition camera are mounted on deck erection gantry, high-definition camera and hard disk
Video recorder is by electrical connection, and with interchanger by being electrically connected, interchanger is electrically connected hard disk video recorder with monitoring display, and monitoring is aobvious
Show that device passes through with server to be electrically connected, server is electrically connected with fixing end, and server and mobile terminal pass through radio connection, high definition
The protective device for rain-proof is provided at the top of camera.
By adopting the above technical scheme, high-definition camera is mounted on deck erection gantry, passes through hard disk video recorder real-time delivery number
Data are uploaded to server by application Internet technology according to on monitoring display, and simultaneously, finally through data at
Reason, monitoring data real-time delivery to mobile terminal and fixing end, monitoring system are installed on each key monitoring position of deck erection gantry, such as main
Promoted steel strand wires jack, it is active put rope capstan winch and walking steel strand wires jack position, pass through wireless bridge and internet and pass
It is defeated, it realizes and each position realtime graphic of deck erection gantry is transmitted, guarantee construction safety.
Rain-proof can be carried out to high-definition camera by protective device, prevent rain erosion high-definition camera, improve high definition
The service life of camera.
Further preferably are as follows: protective device includes shield and the driving device for driving shield mobile.
By adopting the above technical scheme, when rainy day, shield movement is driven by driving device, shield movement will be high
Clear camera covering, prevents rainwater from falling in and corrodes high-definition camera on high-definition camera.
Further preferably are as follows: driving device includes motor and screw rod, and motor bottom is provided with mounting base, mounting base with across cable
Loop wheel machine welding, motor fixes by bolt and mounting base, and the output shaft and screw rod of motor weld, screw rod across shield and with prevent
Shield is connected through a screw thread.
By adopting the above technical scheme, operator starts motor to electrical power, and electric motor starting drives screw rod rotation, screw rod
Rotation pushes shield to move forward.
Further preferably are as follows: shield includes side plate and top plate, and side plate and top plate weld, and is provided with threaded hole on side plate,
Screw rod passes through threaded hole and connect with side plate.
By adopting the above technical scheme, side plate is used for connection wire rod, and top plate is used for rain cover.
Further preferably are as follows: top plate is arc-shaped.
By adopting the above technical scheme, rainwater can flow away along arc and be not detained on top plate.
Further preferably are as follows: mobile terminal is set as cell phone application.
By adopting the above technical scheme, no matter facilitating when and where operator can supervise in real time deck erection gantry
Control.
Further preferably are as follows: fixing end is set as computer.
By adopting the above technical scheme, facilitate operator to monitor in real time near deck erection gantry, can be convenient construction
Commander and operator's remote supervisory and control(ling) equipment operating status.
Further preferably are as follows: multiple groups are arranged in high-definition camera.
By adopting the above technical scheme, the different location of deck erection gantry can be monitored by multiple groups high-definition camera,
Each corner on deck erection gantry can be covered.
By adopting the above technical scheme, rainwater is facilitated to flow away along top plate, rainwater will not stop on top plate again.
In conclusion the utility model has the following beneficial effects: deck erection gantry provided by the utility model visualization pipe
Reason system is a kind of novel deck erection gantry Visualized management system technology, is captured on deck erection gantry by high-definition camera
The image of critical positions, image signal source pass to hard disk video recorder, and image source is passed to interchanger again by hard disk video recorder, hand over
It changes planes and image source is passed into server again, image source is passed to mobile terminal or fixing end again by server.
The image of critical positions on deck erection gantry, image signal source are captured by high-definition camera by high-definition camera
Hard disk video recorder is passed to, image source is passed to monitoring display again by hard disk video recorder.
Operator observes each monitoring point action state in real time, to find the problem in time;It collects APP and is installed on company's pipe
Reason personnel's mobile phone terminal conveniently assigns relevant control instruction convenient for real time remote viewing operation process and loop wheel machine integrality.
The technology construction is simple will have remarkable result to the safe handling and construction safety that guarantee deck erection gantry, and can be
The construction of similar engineering provides helpful reference.
Detailed description of the invention
Fig. 1 is a kind of deck erection gantry visualized management device layout drawing of embodiment 1;
Fig. 2 is the structural schematic diagram of protective device in embodiment 3, illustrates the specific structure composition of protective device;
Fig. 3 is the schematic diagram of shield in embodiment 4, illustrates the structure composition of shield.
In figure, 1, high-definition camera;11, protective device;12, shield;13, driving device;14, motor;15, screw rod;
16, mounting base;17, side plate;18, top plate;19, threaded hole;2, hard disk video recorder;3, interchanger;4, display is monitored;5, across cable
Loop wheel machine;6, server;7, mobile terminal;8, fixing end.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1: the present embodiment provides a kind of deck erection gantry visualized management devices, as shown in Figure 1, including high-definition camera
First 1, hard disk video recorder 2, interchanger 3, monitoring display 4, deck erection gantry 5, server 6, mobile terminal 7 and fixing end 8, high definition is taken the photograph
It is electrically connected as head 1 passes through with hard disk video recorder 2, with interchanger 3 by being electrically connected, interchanger 3 and monitoring are shown hard disk video recorder 2
Device 4 is electrically connected, and with server 6 by being electrically connected, server 6 is electrically connected monitoring display 4 with fixing end 8, server 6 and movement
End 8 passes through radio connection.
Mobile terminal 7 select cell phone application, though cell phone application is mounted on mobile phone can be realized operator when what
Ground can monitor deck erection gantry in real time, convenient for real time remote viewing operation process and loop wheel machine integrality, under convenient
It is instructed up to relevant control.
Fixing end 8 selects HP computer, facilitates operator to monitor in real time near deck erection gantry, when deck erection gantry goes out
When existing failure, operator can intuitively be seen by computer, timely be handled.
Embodiment 2: a kind of deck erection gantry visualized management device difference from example 1 is that, high-definition camera 1
Multiple groups are installed on deck erection gantry, the different location of deck erection gantry 5 can be monitored by multiple groups high-definition camera 1, it can
Cover each corner on deck erection gantry 5.
Embodiment 3: as shown in Fig. 2, a kind of deck erection gantry visualized management device difference from example 1 is that,
It is provided with the protective device 11 for rain-proof at the top of high-definition camera 1, protective device 11 includes shield 12 and anti-for driving
The mobile driving device 13 of shield 12, driving device 13 include motor 14 and screw rod 15, and 14 bottom of motor is provided with mounting base 16,
Mounting base 16 and deck erection gantry 5 weld, and motor 14 is fixed by bolt and mounting base 16, and the output shaft and screw rod 15 of motor 14 weld
It connects, screw rod 15 passes through shield 12 and is connected through a screw thread with shield 12.
The course of work: operator is powered to motor 14 starts motor 14, and the starting of motor 14 drives screw rod 15 to rotate, screw rod
15 rotations push shield 12 to move forward.
Embodiment 4: as shown in figure 3, a kind of deck erection gantry visualized management device difference from example 1 is that,
Shield 12 includes side plate 17 and top plate 18, and side plate 17 and top plate 18 weld, and is provided with threaded hole 19 on side plate 17, screw rod 15 is worn
Threaded hole 19 is crossed to connect with side plate 17.
Side plate 17 is used for connection wire rod 15, and top plate 18 is used for rain cover.
Embodiment 5: as shown in figure 3, a kind of deck erection gantry visualized management device difference from example 1 is that,
Top plate 18 is arc-shaped, and rainwater can flow away along arc and be not detained on top plate 18.
High-definition camera 1, hard disk video recorder 2 and monitoring display 4 are first installed on deck erection gantry 5, a local is formed
Management system.
High-definition camera 1, hard disk video recorder 2 and the monitoring display 4 after installation is complete, is answered by interchanger 3
Data are uploaded to server 6, finally through data processing, monitoring data real-time delivery to mobile terminal 7 and fixation with Internet technology
End 8, it is ensured that site construction management personnel grasp equipment state in real time, guarantee that construction is smooth.
After the management system is installed, test is determined and met the requirements after debugging, i.e. the visualized management system of deck erection gantry
System.
In conclusion this guard technology construction is simple provided by the utility model, structure stress are clear.
The course of work: the image of critical positions on deck erection gantry, image signal source transmitting are captured by high-definition camera 1
To hard disk video recorder 2, image source is passed to interchanger 3 again by hard disk video recorder 2, and image source is passed to service again by interchanger 3
Image source is passed to mobile terminal 7 or fixing end 8 again by device 6, server 6.
The image of critical positions on deck erection gantry, video signal are captured by high-definition camera 1 by high-definition camera 1
Source passes to hard disk video recorder 2, and image source is passed to monitoring display 4 again by hard disk video recorder 2.
Operator observes each monitoring point action state in real time, to find the problem in time;It collects APP and is installed on company's pipe
Reason personnel's mobile phone terminal conveniently assigns relevant control instruction convenient for real time remote viewing operation process and loop wheel machine integrality.
Multiple groups high-definition camera 1 is installed on each key monitoring position of deck erection gantry 5, such as main promotion steel strand wires jack, master
Dynamic formula puts rope capstan winch and walking steel strand wires jack position, and visualization interface is installed in deck erection gantry control room, for operating
Personnel observe each monitoring point action state in real time, to find the problem in time.
Meanwhile when encountering rainy day in work progress, it is powered to motor 14 and starts motor 14, the starting of motor 14 drives screw rod
15 rotations, the rotation of screw rod 15 push shield 12 to move forward.Shield 12 covers high-definition camera 1, and shield 12 is effective
Rainwater is stopped, will not allow rain erosion high-definition camera 1, improve the service life of high-definition camera 1.
It when encountering fine day, is powered to motor 14 and starts motor 14, the rotation of motor 14 drives screw rod 15 to invert, and screw rod 15 passes through
Shield 12 far from high-definition camera 1, will not influence the normal work of high-definition camera 1 by screw thread.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as within the protection scope of the present utility model all by the protection of Patent Law.
Claims (7)
1. a kind of deck erection gantry visualized management device, it is characterised in that: it includes high-definition camera (1), hard disk video recorder
(2), interchanger (3), monitoring display (4), deck erection gantry (5), server (6), mobile terminal (7), fixing end (8), the height
Clear camera (1) is mounted on deck erection gantry (5), and the high-definition camera (1) passes through with hard disk video recorder (2) to be electrically connected, institute
Hard disk video recorder (2) is stated with interchanger (3) by being electrically connected, the interchanger (3) is electrically connected with monitoring display (4), described
Monitoring display (4) is with server (6) by being electrically connected, and the server (6) is electrically connected with fixing end (8), the server
(6) with mobile terminal (7) by radio connection, high-definition camera (1) top is provided with the protective device for rain-proof
(11).
2. a kind of deck erection gantry visualized management device according to claim 1, it is characterised in that: the protective device
It (11) include shield (12) and the driving device (13) for driving shield (12) mobile.
3. a kind of deck erection gantry visualized management device according to claim 2, it is characterised in that: the driving device
(13) include motor (14) and screw rod (15), motor (14) bottom is provided with mounting base (16), the mounting base (16) with
Deck erection gantry (5) welding, the motor (14) is fixed by bolt and mounting base (16), the output shaft and silk of the motor (14)
Bar (15) welding, the screw rod (15) pass through shield (12) and are connected through a screw thread with shield (12).
4. a kind of deck erection gantry visualized management device according to claim 3, it is characterised in that: the shield (12)
Including side plate (17) and top plate (18), the side plate (17) and top plate (18) are welded, and are provided with threaded hole on the side plate (17)
(19), the screw rod (15) passes through threaded hole (19) and connect with side plate (17).
5. a kind of deck erection gantry visualized management device according to claim 4, it is characterised in that: the top plate (18) is in
Arc.
6. a kind of deck erection gantry visualized management device according to claim 1, it is characterised in that: the fixing end (8)
It is set as computer.
7. a kind of deck erection gantry visualized management device according to claim 1, it is characterised in that: the high-definition camera
(1) multiple groups are set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821690320.4U CN209685180U (en) | 2018-10-18 | 2018-10-18 | A kind of deck erection gantry visualized management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821690320.4U CN209685180U (en) | 2018-10-18 | 2018-10-18 | A kind of deck erection gantry visualized management device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209685180U true CN209685180U (en) | 2019-11-26 |
Family
ID=68594158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821690320.4U Active CN209685180U (en) | 2018-10-18 | 2018-10-18 | A kind of deck erection gantry visualized management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209685180U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109081243A (en) * | 2018-10-18 | 2018-12-25 | 中交二公局第五工程有限公司 | A kind of deck erection gantry Visualized management system |
-
2018
- 2018-10-18 CN CN201821690320.4U patent/CN209685180U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109081243A (en) * | 2018-10-18 | 2018-12-25 | 中交二公局第五工程有限公司 | A kind of deck erection gantry Visualized management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108748073B (en) | Live overhaul operation robot for substation equipment | |
CN105242626B (en) | Line security intelligent auxiliary monitoring system | |
CN104753177B (en) | Outdoor falling-type lightning protection system with remote terminal measuring and controlling device | |
CN209685180U (en) | A kind of deck erection gantry visualized management device | |
CN111824963A (en) | Intelligent tower crane wireless remote control system with pose perception technology and control method | |
CN101345693A (en) | Integrated lightning protection information management system and its management method | |
CN109081243A (en) | A kind of deck erection gantry Visualized management system | |
CN112953017B (en) | Comprehensive linkage monitoring device and monitoring method for distributed power distribution equipment | |
CN212265818U (en) | Inspection robot | |
CN106099823A (en) | A kind of mobile type electric cable machine with creepage protection function | |
CN116527843A (en) | Building site safety monitoring system and monitoring method based on building site core | |
CN105245007A (en) | Power transmission line early warning system | |
CN214850104U (en) | High-altitude repairing device for repairing overhead broken strand wire | |
CN115275863A (en) | Tree obstacle removing mechanical arm for distribution network line, tree obstacle removing device and removing method | |
CN211338571U (en) | Black box | |
CN211255016U (en) | Remote safety monitoring data transmission system for hoisting machinery | |
CN208331714U (en) | A kind of automation visualisation platforms during back brake | |
CN208576964U (en) | A kind of BABBbBBvvlockage clearing device for coal bunker | |
CN204454366U (en) | A kind of monitored control system for boom type span winch repair and maintenance | |
CN112010209A (en) | Multifunctional integrated tower crane operation system | |
CN219145478U (en) | Power grid transmission line monitoring device | |
CN112299274B (en) | Control method of underground intelligent safety winch for coal mine | |
CN214756680U (en) | Video monitoring system | |
CN211935322U (en) | External fire-fighting driving mechanism with power failure early warning device | |
CN216945904U (en) | Device based on panorama VR remote monitoring tower machine intelligence jacking |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |