CN104131707A - Prestressed structure pore passage grouting device and construction method of prestressed structure pore passage grouting device - Google Patents

Prestressed structure pore passage grouting device and construction method of prestressed structure pore passage grouting device Download PDF

Info

Publication number
CN104131707A
CN104131707A CN201410387659.7A CN201410387659A CN104131707A CN 104131707 A CN104131707 A CN 104131707A CN 201410387659 A CN201410387659 A CN 201410387659A CN 104131707 A CN104131707 A CN 104131707A
Authority
CN
China
Prior art keywords
grouting
grout
pipe
bellows
prestressed structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410387659.7A
Other languages
Chinese (zh)
Inventor
吴攀
黄伟
李尊强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haichuan Construction Group Co Ltd
Original Assignee
Qingdao Haichuan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haichuan Construction Group Co Ltd filed Critical Qingdao Haichuan Construction Group Co Ltd
Priority to CN201410387659.7A priority Critical patent/CN104131707A/en
Publication of CN104131707A publication Critical patent/CN104131707A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a prestressed structure pore passage grouting device, which comprises a corrugated pipe buried in concrete, wherein the corrugated pipe is in a dipping and heaving wave shape; a grouting hole is formed in a high position of the wave-shaped corrugated pipe; and grouting pipes are connected onto the grouting hole. A prefabricated arc-shaped press plate is arranged on the grouting hole; the radian of the arc-shaped press plate is matched with the pipe diameter; a connecting pipe matched with the grouting hole is arranged on the arc-shaped press plate; the grouting pipes are arranged on the connecting pipe; and a spongy cushion is padded between the arc-shaped press plate and the corrugated pipe. When the structure is adopted, and after the concrete is cast, the grouting is carried out on the grouting pipes arranged in high points of the corrugated pipe; the grouting can be carried out on the corrugated pipe section by section; gas in the corrugated pipe can be smoothly exhausted; and the condition of insufficient grouting is avoided.

Description

A kind of prestressed structure duct grouting device and construction method
Technical field
The present invention relates to technical field of building construction.
Background technology
Along with the development of builing industry, the use functional requirement of building structure is more and more higher, not only will meet the inner structural requirement for large space, is used thereby also will make structure end face can bear larger load.For reaching this effect structure, post stretching bonded prestressed concrete structure and member more and more adopt in building construction.But in work progress because pipeline damage, steel strand are closeer, curve repeatedly changes to cause and is difficult to grouting problem, thereby prestress wire passage is often filled by slurry prestressing force life-span and the prestressed stretch-draw ability of affecting completely.After post stretching bonded prestress pipeline is installed, thereby wavy metal pipeline is threaded off and is disconnected because vibrating head shakes extremely easily in the time of concreting, cause concrete to enter and blocking pipe, and be difficult to repair because of reasons such as beam steel are closeer, pipeline is heavier, curve is more.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind ofly can be guaranteed the provisions for grouting of the smooth and easy and full irrigation of duct grouting and use the method for this device.
For solving the problems of the technologies described above, prestressed structure duct grouting device of the present invention, comprise the bellows being embedded in concrete, the waveform that is shaped as dipping and heaving of described bellows, arranges grout hole in the eminence of waveform bellows, connects grout pipe on grout hole, prefabricated arc pressuring plate is installed on described grout hole, radian and the caliber of arc pressuring plate match, and arc pressuring plate is provided with the tube connector mating with grout hole, and grout pipe is installed on tube connector.
Described grout pipe goes out concrete component sectional position rubber ring is set one.Rubber ring is set and is convenient to after grouting, grout pipe be cut off from rubber washer bottom, the groove that utilizes rubber washer to form seals, and avoids shutoff post-grouting pipe to expose.
On described grout pipe, valve is set.In the time of concreting, closed, avoid concrete or other foreign material to enter grout pipe, cause line clogging and cannot use; In the time being in the milk, opening and be in the milk, in the time having multiple grout pipe on helical corrugation pipeline, while carrying out follow-up grouting by grouting pipeline valve closing above, avoid the backflow of slurry of being in the milk, can avoid waste, can make again front end sealing, more be conducive to the grouting of follow-up pipeline.
The upper foam-rubber cushion of pad between described arc pressuring plate and bellows.
The construction method of prestressed structure duct grouting device of the present invention, comprises the following steps,
(1) bellows is set to waveform, and each certain distance is established a high point;
(2) punching on height point, as grout hole;
(3) prefabricated arc pressuring plate is installed on the position of grout hole;
(4) grout pipe is arranged on the tube connector of arc pressuring plate, uses iron wire tighten;
(5) concreting, finishes after prestressed stretch-draw, is in the milk with being arranged on the high grout pipe of putting of bellows at the two ends in duct.
Grout pipe goes out concrete component sectional position rubber ring is set one, after grouting, grout pipe is cut off from rubber washer bottom, and the groove that utilizes rubber washer to form seals, and avoids shutoff post-grouting pipe to expose.
In the time of concreting by the valve closing being arranged on grout pipe, when grouting by the complete grouting pipeline valve closing that is in the milk above.
Adopt after such structure, built after concrete, on the grout pipe that is arranged on the high point of bellows, be in the milk, can segmentation be in the milk to bellows, the gas in bellows can be discharged smoothly, has avoided the discontented situation of being in the milk.
Brief description of the drawings
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
Fig. 1 is the structural representation of prestressed structure duct grouting device of the present invention.
Fig. 2 is the sectional view along A-A line in Fig. 1.
Fig. 3 is the structural perspective of arc pressuring plate and grout pipe.
Detailed description of the invention
As shown in Figure 1 to Figure 3, prestressed structure duct grouting device of the present invention, comprise the bellows 2 being embedded in concrete 1, the waveform that is shaped as dipping and heaving of bellows 2, in the eminence of waveform bellows, grout hole 3 is set, prefabricated plastics arc pressuring plate 5 is installed on grout hole 3, radian and the caliber of arc pressuring plate 5 match, arc pressuring plate 5 is provided with the tube connector 6 mating with grout hole 3, grout pipe 4 is installed on tube connector 6, the upper foam-rubber cushion 7 of pad between arc pressuring plate 5 and bellows 2, obturages with adhesive tape in end.Grout pipe 4 exceeds concrete surface 8 and is not less than 300mm, closely knit in order to hole path pressure grouting.Tube sealing position is closely knit with foaming plugging.
Grout pipe is PPR material, goes out concrete surface 8 positions set up rubber ring 10 one at grout pipe, is convenient to after grouting, grout pipe 4 be cut off from rubber washer 10 bottoms, and the groove that utilizes rubber washer 10 to form seals, and avoids shutoff post-grouting pipe 4 to expose; Encapsulant can adopt than the grouting material of the high label of concrete and carry out shutoff.On grout pipe 4, set up 9 one of PPR Plastic valves, in the time of concreting, closed, avoid concrete or other foreign material to enter grout pipe 4, cause line clogging and cannot use; In the time being in the milk, opening and be in the milk, in the time having multiple grout pipe on helical corrugation pipeline, while carrying out follow-up grouting, grouting pipeline valve 10 is above closed, avoid the backflow of slurry of being in the milk, can avoid waste, can make again front end sealing, more be conducive to the grouting of follow-up pipeline; Valve 10 is same material material with grout pipe 4, and available hot melt connects.
Utilize the technological process of duct grouting device of the present invention: concrete beam reinforcing colligation → support of pipelines installation → bellows installation → steel strand → bellows is fixed → is in the milk duct and gives vent to anger duct installation → concreting → side form dismounting → prestressed stretch-draw → duct grouting → sealing off and covering anchorage.
When construction, bellows 2 is set to waveform, each certain distance is established a high point, punching on height point, as grout hole 3, prefabricated arc pressuring plate 5 is installed, grout pipe 4 is arranged on tube connector 6, uses iron wire tighten, concreting 1, grout pipe is PPR material, the grout pipe 300mm that is not less than above ground level, goes out concrete component sectional position at grout pipe and sets up rubber ring together, is convenient to after grouting, grout pipe be cut off from rubber washer bottom, the groove that utilizes rubber washer to form seals, and avoids shutoff post-grouting pipe to expose; Encapsulant can adopt than the grouting material of the high label of concrete and carry out shutoff.Finish after prestressed stretch-draw, carry out duct grouting, can on the grout pipe 4 that is arranged on the high point of bellows, be in the milk, can segmentation be in the milk to bellows 2, the discontented situation of having avoided being in the milk, the gas in bellows 2 can be discharged smoothly.In the time of concreting by the valve closing being arranged on grout pipe, when grouting by the complete grouting pipeline valve closing that is in the milk above.
The above, be only to preferred embodiment of the present invention, not the present invention done to other forms of restriction, and any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the equivalent embodiment of equal variation.Every the present invention program's content that do not depart from,, all drops in protection scope of the present invention any simple modification made for any of the above embodiments, equivalent variations and remodeling according to technical spirit of the present invention.

Claims (7)

1. a prestressed structure duct grouting device, it is characterized in that: comprise the bellows being embedded in concrete, the waveform that is shaped as dipping and heaving of described bellows, eminence at waveform bellows arranges grout hole, on grout hole, connect grout pipe, prefabricated arc pressuring plate is installed on described grout hole, radian and the caliber of arc pressuring plate match, arc pressuring plate is provided with the tube connector mating with grout hole, and grout pipe is installed on tube connector.
2. according to prestressed structure duct grouting device claimed in claim 1, it is characterized in that: described grout pipe goes out concrete component sectional position rubber ring is set one.
3. according to prestressed structure duct grouting device claimed in claim 2, it is characterized in that: on described grout pipe, valve is set.
4. according to prestressed structure duct grouting device claimed in claim 3, it is characterized in that: the upper foam-rubber cushion of pad between described arc pressuring plate and bellows.
5. a construction method for prestressed structure duct grouting device, is characterized in that: comprises the following steps,
Bellows is set to waveform, and each certain distance is established a high point;
Punching on height point, as grout hole;
Prefabricated arc pressuring plate is installed on the position of grout hole;
Grout pipe is arranged on the tube connector of arc pressuring plate, uses iron wire tighten;
Concreting, finishes after prestressed stretch-draw, is in the milk with being arranged on the high grout pipe of putting of bellows at the two ends in duct.
6. according to the construction method of prestressed structure duct grouting device claimed in claim 5, it is characterized in that: grout pipe goes out concrete component sectional position rubber ring is set one, after grouting, grout pipe is cut off from rubber washer bottom, the groove that utilizes rubber washer to form seals, and avoids shutoff post-grouting pipe to expose.
7. according to the construction method of prestressed structure duct grouting device claimed in claim 5, it is characterized in that: in the time of concreting by the valve closing being arranged on grout pipe, when grouting by the complete grouting pipeline valve closing that is in the milk above.
CN201410387659.7A 2014-08-08 2014-08-08 Prestressed structure pore passage grouting device and construction method of prestressed structure pore passage grouting device Pending CN104131707A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410387659.7A CN104131707A (en) 2014-08-08 2014-08-08 Prestressed structure pore passage grouting device and construction method of prestressed structure pore passage grouting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410387659.7A CN104131707A (en) 2014-08-08 2014-08-08 Prestressed structure pore passage grouting device and construction method of prestressed structure pore passage grouting device

Publications (1)

Publication Number Publication Date
CN104131707A true CN104131707A (en) 2014-11-05

Family

ID=51804545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410387659.7A Pending CN104131707A (en) 2014-08-08 2014-08-08 Prestressed structure pore passage grouting device and construction method of prestressed structure pore passage grouting device

Country Status (1)

Country Link
CN (1) CN104131707A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106258555A (en) * 2016-07-28 2017-01-04 龙信建设集团有限公司 Prefabricated assembled greening flower pond construction method for hanging
CN106677050A (en) * 2016-12-09 2017-05-17 云南省建筑科学研究院 Grout outlet device of T-type beam prestress pipeline
CN106759249A (en) * 2016-12-29 2017-05-31 衡水益通管业股份有限公司 A kind of corrugated steel pipe is strengthened and grouting device
CN108277714A (en) * 2017-01-05 2018-07-13 北京九州有道交通科技有限公司 Pre-stress type levelling prefabrication and assembly construction concrete
CN108678223A (en) * 2018-06-29 2018-10-19 北京工业大学 A kind of recoverable steel pipe concrete frame compound shear wall and the practice

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005187270A (en) * 2003-12-25 2005-07-14 Taiheiyo Material Kk Grout material, method of injecting grout material and prestressed concrete
JP2006144492A (en) * 2004-11-24 2006-06-08 Anderson Technology Kk Grouting construction method into cable sheath including vacuum exhaustion process in pc structure
CN101798875A (en) * 2010-03-16 2010-08-11 南通华荣建设集团有限公司 Construction method for stretching and drawing high-span crossbeam with bonding prestress at single side
CN103603273A (en) * 2013-11-04 2014-02-26 沈阳市政集团有限公司 Method for grouting construction of prestressed pipe
CN204001777U (en) * 2014-08-08 2014-12-10 青岛海川建设集团有限公司 A kind of prestressed structure duct grouting device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005187270A (en) * 2003-12-25 2005-07-14 Taiheiyo Material Kk Grout material, method of injecting grout material and prestressed concrete
JP2006144492A (en) * 2004-11-24 2006-06-08 Anderson Technology Kk Grouting construction method into cable sheath including vacuum exhaustion process in pc structure
CN101798875A (en) * 2010-03-16 2010-08-11 南通华荣建设集团有限公司 Construction method for stretching and drawing high-span crossbeam with bonding prestress at single side
CN103603273A (en) * 2013-11-04 2014-02-26 沈阳市政集团有限公司 Method for grouting construction of prestressed pipe
CN204001777U (en) * 2014-08-08 2014-12-10 青岛海川建设集团有限公司 A kind of prestressed structure duct grouting device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106258555A (en) * 2016-07-28 2017-01-04 龙信建设集团有限公司 Prefabricated assembled greening flower pond construction method for hanging
CN106677050A (en) * 2016-12-09 2017-05-17 云南省建筑科学研究院 Grout outlet device of T-type beam prestress pipeline
CN106759249A (en) * 2016-12-29 2017-05-31 衡水益通管业股份有限公司 A kind of corrugated steel pipe is strengthened and grouting device
CN106759249B (en) * 2016-12-29 2018-09-07 衡水益通管业股份有限公司 A kind of corrugated steel pipe reinforces and grouting device
CN108277714A (en) * 2017-01-05 2018-07-13 北京九州有道交通科技有限公司 Pre-stress type levelling prefabrication and assembly construction concrete
CN108678223A (en) * 2018-06-29 2018-10-19 北京工业大学 A kind of recoverable steel pipe concrete frame compound shear wall and the practice

Similar Documents

Publication Publication Date Title
CN104131707A (en) Prestressed structure pore passage grouting device and construction method of prestressed structure pore passage grouting device
CN204001777U (en) A kind of prestressed structure duct grouting device
CN105735364B (en) Concrete joint waterproof system, construction method and the protection component for the system
CN104389314A (en) Grouting reinforcement device and method for shallow clay
CN105714942B (en) A kind of anti-water pretreatment way of newly-built basement communication channel deformation joint water-stopping belt
US9732585B2 (en) Tip-grouting tools including distribution materials and related methods
CN106523847A (en) Low-pressure pipeline pressurized leakage removing method
JP6820726B2 (en) Manhole rehabilitation structure and manhole rehabilitation method
CN204781973U (en) Antiseep plugging device in split bolt hole
KR101284618B1 (en) Dry way injection grouting method for concrete structure in water
CN205171502U (en) Device is flowed in lap guard of underground continuous wall flexible rubber hose formula
CN104131799A (en) Artesian well sealing and blocking device
CN104964121A (en) Blockage method for leakage water in sleeve pipe
CN203755544U (en) Anchoring end sealing device in prestressed corrugated tube hole channel concrete body
CN204919483U (en) Power station seam stagnant water structure
CN104154369B (en) Lined Prestressed concrete cylinder pipe boring device and boring method
CN204004983U (en) Lined Prestressed concrete cylinder pipe boring device
KR200418566Y1 (en) Packer for repair of water pipe
CN207332901U (en) A kind of new tunnel lining trolley step plug
CN107387883B (en) A kind of structure sheaf pipeline waterproof technique
CN207176766U (en) Plane grout cover water burst mouth flow control device
CN203412006U (en) Around-flow prevention device for concrete construction
CN201202121Y (en) Foundation pit drainpipe net
MX2021011862A (en) Systems and methods for rehabilitating, repairing, and replacing manholes and connected sewer lines.
CN205530721U (en) Outspoken fast plugging device of concrete wall opening

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141105