CN204004983U - Lined Prestressed concrete cylinder pipe boring device - Google Patents

Lined Prestressed concrete cylinder pipe boring device Download PDF

Info

Publication number
CN204004983U
CN204004983U CN201420424865.6U CN201420424865U CN204004983U CN 204004983 U CN204004983 U CN 204004983U CN 201420424865 U CN201420424865 U CN 201420424865U CN 204004983 U CN204004983 U CN 204004983U
Authority
CN
China
Prior art keywords
anchor ear
pipe
prestressed concrete
concrete cylinder
lined prestressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420424865.6U
Other languages
Chinese (zh)
Inventor
袁威
陶哲峰
陶学全
吴昊
龚斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI HUAYI PIPELINE CO Ltd
Original Assignee
WUXI HUAYI PIPELINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI HUAYI PIPELINE CO Ltd filed Critical WUXI HUAYI PIPELINE CO Ltd
Priority to CN201420424865.6U priority Critical patent/CN204004983U/en
Application granted granted Critical
Publication of CN204004983U publication Critical patent/CN204004983U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the auxiliary boring device of underground pipe network, a kind of lined Prestressed concrete cylinder pipe boring device specifically, while being included in construction, be coated on the rubber mat plate of concrete pipe circumferential surface, upper anchor ear and lower anchor ear are equipped with in described rubber mat plate outside, and by anchor ear bolt and anchor ear nut by upper anchor ear, lower anchor ear is locked mutually, manifold assemblies is placed in the through hole of offering on anchor ear, and be provided with seal ring between manifold assemblies bottom surface and concrete pipe, hydro-expansive rubber bar, through hole edge joint weld at upper anchor ear is connected to pressing plate, hold-down bolt is threadedly connected on described pressing plate, and hold-down bolt lower end is fixed manifold assemblies.Adopt this boring device at needs during to lined Prestressed concrete cylinder pipe temporary punching, without changing original pipeline, can realize directly perforate on original pipeline, can guarantee the Security of pipeline, can greatly use manpower and material resources sparingly again, there is good economic benefit.

Description

Lined Prestressed concrete cylinder pipe boring device
Technical field
The utility model relates to underground pipe network auxiliary boring device, specifically a kind of lined Prestressed concrete cylinder pipe boring device.
Background technique
PCCP(Prestressed concrete cylinder pipe) from introduce domestic since existing more than the 20 year time, along with PCCP wideling popularize and being widely used at home, in, small-bore Prestressed concrete cylinder pipe, received more and more users' concern.But in Practical Project, tend to encounter pipeline designs and actual water supply coverage situation devious, as increased residential quarter or enterprise outward newly at former design water supply coverage, supply water, and for example on-the-spot building or structure cause the change of pipeline designs, need increase arm.At present, for the form that need to establish arm newly, conventionally adopt steel threeway to substitute original pipeline, but when changing, pipeline need to cut off the water, cause water supply regionality to cut off the water, based on above-mentioned actual demand, development lined Prestressed concrete cylinder pipe line is on-the-spot to be with hydraulic pressure perforate or to open the certainty that " T " device becomes PCCP development.
Summary of the invention
The utility model is for the problems referred to above, a kind of lined Prestressed concrete cylinder pipe (PCCP-L) boring device is provided, adopt this boring device at needs during to Prestressed concrete cylinder pipe temporary punching, without changing original pipeline, can realize directly perforate on original pipeline, can guarantee the Security of pipeline, can greatly use manpower and material resources sparingly again, there is good economic benefit.
According to the technical solution of the utility model: a kind of lined Prestressed concrete cylinder pipe boring device, it is characterized in that: the rubber mat plate that is coated on Prestressed concrete cylinder pipe circumferential surface while being included in construction, upper anchor ear and lower anchor ear are equipped with in described rubber mat plate outside, and by anchor ear bolt and anchor ear nut by upper anchor ear, lower anchor ear is locked mutually, manifold assemblies is placed in the through hole of offering on anchor ear, and be provided with seal ring between the steel cylinder of manifold assemblies bottom surface and lined Prestressed concrete cylinder pipe, hydro-expansive rubber bar, through hole edge joint weld at upper anchor ear is connected to pressing plate, hold-down bolt is threadedly connected on described pressing plate, rubber seal between manifold assemblies bottom and steel cylinder outer wall is compressed, thereby reach sealing effect, and hold-down bolt lower end is fixed manifold assemblies.
As further improvement of the utility model, described manifold assemblies comprises port pipe, be welded in the flange of port pipe upper end and be welded in the flange in the bottom of port pipe lower end, between port pipe and flange in the bottom, be welded with the gusset of reinforcement effect, between port pipe and upper anchor ear, be welded with fagging, seal ring, hydro-expansive rubber bar are arranged at described flange in the bottom bottom surface.
As further improvement of the utility model, described pressing plate has 6~8, and 6~8 block pressur plates are along the through hole circumference uniform distribution of upper anchor ear.
The method of lined Prestressed concrete cylinder pipe perforate, is characterized in that comprising the steps:
(a), the soil of lined Prestressed concrete cylinder pipe periphery is dug up, on lined Prestressed concrete cylinder pipe, the place of at least 1.5 meters, distance bell of pipe end and socket end marks tapping point;
(b), anchor ear is set, the through-hole alignment tapping point on anchor ear having marked on the lined Prestressed concrete cylinder pipe of tapping point;
(c), remove on lined Prestressed concrete cylinder pipe corresponding to the mortar cover at tapping point place, expose steel wire, cut off steel wire;
(d), on lined Prestressed concrete cylinder pipe, corresponding to tapping point, port pipe is set, the through hole of port pipe and anchor ear coaxially arranges;
(e), in port pipe, put into tapping equipment, open tapping equipment by the steel cylinder of lined Prestressed concrete cylinder pipe and the perforate of concrete tube core.
As further improvement of the utility model, described anchor ear comprises anchor ear, lower anchor ear, wherein goes up and on anchor ear, offers through hole, and between upper anchor ear, lower anchor ear and lined Prestressed concrete cylinder pipe, rubber mat plate is set.
As further improvement of the utility model, at the lead to the hole site welding pressing plate of upper anchor ear, the hold-down bolt that is threaded in the screw of pressing plate, hold-down bolt is torqued-up to its lower end and is pressed in port pipe flange in the bottom upper-end surface.
As further improvement of the utility model, described port pipe bottom adhesive has seal ring, and the specification of seal ring is a ring 20mm, and the diameter of seal ring is greater than 6 centimetres of port pipe diameters; In flange in the bottom bottom surface, corresponding to seal ring outer ring, hydro-expansive rubber bar is set, has blocked the inside and outside leak paths all under Water Pressure of tube having holes.
As further improvement of the utility model, between described port pipe and upper anchor ear, be welded with the fagging that plays reinforcement effect, port pipe upper end is welded with for connecting the upper flange of external valve.
As further improvement of the utility model, described hold-down bolt screw program control in the decrement of seal ring at 8~12mm; On upper anchor ear, along uniform welding 4~8 block pressur plates of port pipe circumferential surface, the decrement of all pressing plates is consistent.
Described tapping equipment is outsourcing piece, and the application utilizes this equipment to carry out perforate operation to lined Prestressed concrete cylinder pipe.
Technique effect of the present utility model is: the utility model product directly operates on the pipe of former pipeline, on pipe, output the hole of specified size, install flanged (FLGD) port pipe, without retubing, not only guaranteed the Security of pipeline but also greatly saved manpower and materials, also greatly reduce the impact on former pipeline water supply region simultaneously, make underground pipe network in urban development, have more flexibility; This device adopts the seal ring the same with pipe joint to seal, and guarantees that body is watertight; This device is without Site Welding, and pipeline can with pressurely be constructed, and has reduced the engineering time, has saved water resources; Pipe shaft has been installed anchor ear, allow anchor ear impose on the certain pressure stress of pipe shaft, offset the stress relaxation of cutting off the stress loss that High Tensile Steel Wire brings and preventing both sides, hole steel wire, for the pipeline section of the compressive pre-stress guaranteeing to be lost by tube having holes parent after anchor ear clamps partly supplements and is applied with enough compressive pre-stresses; This apparatus structure is simple and reliable, and installation and maintenance are convenient, by the pipeline of perforate, can not affected working life because of perforate.
Accompanying drawing explanation
Fig. 1 is the structural representation of lined Prestressed concrete cylinder pipe.
Fig. 2~7 are the perforate schematic flow sheet of lined Prestressed concrete cylinder pipe, and wherein Fig. 4 is that A-A in Fig. 3 is to schematic diagram.
Fig. 8 is the topology view after the spending pipe of lined Prestressed concrete cylinder pipe.
Fig. 9 is the left view of Fig. 8.
Embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is further described.
In Fig. 1~9, comprise upper flange 1, port pipe 2, fagging 3, pressing plate 4, hold-down bolt 5, upper anchor ear 6, rubber mat plate 7, seal ring 8, hydro-expansive rubber bar 9, gusset 10, anchor ear bolt 11, anchor ear nut 12, lower anchor ear 13, lined Prestressed concrete cylinder pipe 14, manifold assemblies 15, flange in the bottom 16, steel wire 17, steel cylinder 18, concrete tube core 19, mortar cover 20, tapping point 21 etc.
As shown in Fig. 1~9, the utility model is a kind of lined Prestressed concrete cylinder pipe boring device, while being included in construction, be coated on the rubber mat plate 7 of lined Prestressed concrete cylinder pipe 14 circumferential surfaces, upper anchor ear 6 is equipped with in described rubber mat plate 7 outsides with lower anchor ear 13, and by anchor ear bolt 11 with anchor ear nut 12 by upper anchor ear 6, lower anchor ear 13 is locked mutually, manifold assemblies 15 is placed in the through hole of offering on anchor ear 6, and be provided with seal ring 8 between manifold assemblies 15 bottom surfaces and the steel cylinder of lined Prestressed concrete cylinder pipe 14, hydro-expansive rubber bar 9, through hole edge joint weld at upper anchor ear 6 is connected to pressing plate 4, hold-down bolt 5 is threadedly connected on described pressing plate 4, rubber seal between manifold assemblies bottom and steel cylinder outer wall is compressed, thereby reach sealing effect, and hold-down bolt 5 lower ends are fixed manifold assemblies 15.
Described manifold assemblies 15 comprises port pipe 2, be welded in the flange 1 of port pipe 2 upper ends and be welded in the flange in the bottom 16 of port pipe 2 lower ends, between port pipe 2 and flange in the bottom 16, be welded with the gusset 10 of reinforcement effect, between port pipe 2 and upper anchor ear 6, be welded with fagging 3, seal ring 8, hydro-expansive rubber bar 9 are arranged at described flange in the bottom 16 bottom surfaces.
Described pressing plate 4 has 6 ~ 8, and 6 ~ 8 block pressur plates are along the through hole circumference uniform distribution of upper anchor ear 6.
The step that use foregoing invention product carries out perforate operation is as follows:
One. first carry out by drawing accessory and the preparatory work such as relevant, specifically
1. (generally the size of perforate should be less than by 1/2nd of perforate PCCP pipe internal diameter first will to map out the size of perforate on lined Prestressed concrete cylinder pipe, the tubing bore size of example DN600 should be less than DN300, the tubing bore size of DN800 is just less than DN400), as shown in Figure 1.
2. first carry out by drawing the required accessory of perforate, as above anchor ear 6, lower anchor ear 13 and port pipe 2 etc., and the valve that buying is good and perforate mouth upper flange 1 is supporting.
3. be ready to the required auxiliary material of perforate, as seal ring 8, hydro-expansive rubber bar 9, rubber mat plate 7 etc.
4. before perforate, should be ready at the scene equipment and the related tools such as electric welding, gas cutting, mechanical tapping machine.
Two. perforate construction.
1. first will need the soil of lined Prestressed concrete cylinder pipe 14 peripheries of perforate to hollow out, requirement all hollows out and leaves manually-operated position at the position of perforate tube circumference and (notices that pipe bottom also will hollow out, anchor ear is conveniently installed), and the earth on pipe shaft is rinsed well.
2. select tapping point, pipeline tapping point is preferably chosen in and leaves the position that PCCP tube faucet, socket position are greater than 1.5 meters.
3. as shown in Figure 2, first upper anchor ear 6, lower anchor ear 13 are arranged on pipe shaft, the position of perforate on upper anchor ear 6 is placed on to pipe and needs on the position of perforate (generally in pipe bi-side) note below upper anchor ear 6, on above anchor ear 13, served as a contrast rubber mat plate 7, and tighten the anchor ear bolt 11 of upper and lower anchor ear both sides.
4. as shown in Figure 3,4,, along holding the position in hole on upper anchor ear 6 successfully, the rubber mat plate 7 by lining in 6 times faces of upper anchor ear prescinds, and removes mortar cover 20 and the hoop High Tensile Steel Wire 17 on PCCP body.
The place that this step should be noted that is: when (1) removes mortar cover 20, care should be used to clink soft peening, does not destroy protective layer and steel cylinder 18 outside hole; (2) cut off the High Tensile Steel Wire 17 in hole, but can't damage steel cylinder 18.
5. as shown in Figure 5, port pipe is installed: (1) is first bonded at the moderate seal ring 8 use glue of a ring 20mm diameter flange in the bottom 16 bottom surfaces (ring diameter of seal ring 8 should be greater than 6 centimeters of left and right of port pipe 2 diameter) of port pipe 2.
(2) cut-and-dried irony pressing plate 4 is welded on upper anchor ear 6,2 of first welding, as shown in Figure 6.
(3) port pipe 2 is arranged on PCCP steel cylinder 18, should notice that port pipe 2 is arranged on position on PCCP steel cylinder 18 (whether range estimation port pipe flange bottom is consistent with distance surrounding one ring on steel cylinder surface), then pressing plate 4 is divided equally and welded along port pipe for 2 one weeks, press port diameter and adopt 4-8 only, and press down port pipe 2 is pressed on steel cylinder 18 with the hold-down bolt 5 on pressing plate 4.
Attention: the decrement that the pressing plate 4 of (1) port pipe 2 surroundings compresses port pipe 2 surroundings is consistent; (2) decrement that will guarantee seal ring 8 is at 8-12mm, but unsuitable tension; (3) in the space between port pipe 2 flange in the bottom 16 and steel cylinder 18, put 1-2 ring hydro-expansive rubber bar 9.(4) will in the space of port pipe 2 and PCCP steel cylinder 18, fill up slush, until flat with PCCP external protection.(5) the reinforcing fagging 3(between welding port pipe 2 and upper anchor ear 6 generally welds 4-6 place).6. valve is connected with the flange on port pipe 2.
7. perforate operation as shown in Figure 7: mechanical tapping equipment machine is put into the valve of unlatching, along in the middle of port pipe 2 by PCCP steel cylinder 18 and 19 perforates of concrete tube core.
8. tapping equipment exits valve, and throttle down, and quality inspection is carried out in the hole of holding successfully.The method of check is that the hydraulic pressure in pipeline is increased to this pipeline normal operating pressure, checks whether perforate position has the situation of seepage, as not perforate success.
At upper anchor ear 6, between lower anchor ear 13 and lined Prestressed concrete cylinder pipe 14, rubber mat plate 7 is set, on lined Prestressed concrete cylinder pipe 14, perforate has adopted clamping type anchor ear, solved because perforate makes body cannot bear interior pressure and external load after having cut off Hight strength cable 17, between anchor ear and the body of lined Prestressed concrete cylinder pipe 14, be lining into the rubber mat plate 7 that 10mm is thick, solved between anchor ear and the external protection of lined Prestressed concrete cylinder pipe 14 due to the uneven stress concentration point producing of external protection, rubber mat plate 7 can play the effect of concentrated stress point diffusion.
Boring method in the utility model only operates on existing pipeline, without retubing, has greatly saved manpower and materials, and can Operating Pressure, and method is easy, effect is remarkable.

Claims (3)

1. a lined Prestressed concrete cylinder pipe boring device, it is characterized in that: the rubber mat plate (7) that is coated on lined Prestressed concrete cylinder pipe (14) circumferential surface while being included in construction, upper anchor ear (6) is equipped with in described rubber mat plate (7) outside with lower anchor ear (13), and by anchor ear bolt (11) and anchor ear nut (12) by upper anchor ear (6), lower anchor ear (13) is locked mutually, manifold assemblies (15) is placed in the through hole of offering on anchor ear (6), and between the steel cylinder of manifold assemblies (15) bottom surface and lined Prestressed concrete cylinder pipe (14), be provided with seal ring (8), hydro-expansive rubber bar (9), through hole edge joint weld at upper anchor ear (6) is connected to pressing plate (4), hold-down bolt (5) is threadedly connected on described pressing plate (4), and hold-down bolt (5) lower end is fixed manifold assemblies (15).
2. according to lined Prestressed concrete cylinder pipe boring device claimed in claim 1, it is characterized in that: described manifold assemblies (15) comprises port pipe (2), be welded in the flange (1) of port pipe (2) upper end and be welded in the flange in the bottom (16) of port pipe (2) lower end, between port pipe (2) and flange in the bottom (16), be welded with the gusset (10) of reinforcement effect, between port pipe (2) and upper anchor ear (6), be welded with fagging (3), seal ring (8), hydro-expansive rubber bar (9) are arranged at described flange in the bottom (16) bottom surface.
3. according to lined Prestressed concrete cylinder pipe boring device claimed in claim 1, it is characterized in that: described pressing plate (4) has 6~8, and 6~8 block pressur plates are along the through hole circumference uniform distribution of upper anchor ear (6).
CN201420424865.6U 2014-07-30 2014-07-30 Lined Prestressed concrete cylinder pipe boring device Withdrawn - After Issue CN204004983U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420424865.6U CN204004983U (en) 2014-07-30 2014-07-30 Lined Prestressed concrete cylinder pipe boring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420424865.6U CN204004983U (en) 2014-07-30 2014-07-30 Lined Prestressed concrete cylinder pipe boring device

Publications (1)

Publication Number Publication Date
CN204004983U true CN204004983U (en) 2014-12-10

Family

ID=52044986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420424865.6U Withdrawn - After Issue CN204004983U (en) 2014-07-30 2014-07-30 Lined Prestressed concrete cylinder pipe boring device

Country Status (1)

Country Link
CN (1) CN204004983U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104154369A (en) * 2014-07-30 2014-11-19 无锡华毅管道有限公司 Punching device and punching method for lined PCCP (prestressed concrete cylinder pipe)
CN109854745A (en) * 2018-10-31 2019-06-07 河南中拓石油工程技术股份有限公司 Pipeline branch pipe aperture and sealing technology after laminate seal can be surveyed and repaired for liner

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104154369A (en) * 2014-07-30 2014-11-19 无锡华毅管道有限公司 Punching device and punching method for lined PCCP (prestressed concrete cylinder pipe)
CN109854745A (en) * 2018-10-31 2019-06-07 河南中拓石油工程技术股份有限公司 Pipeline branch pipe aperture and sealing technology after laminate seal can be surveyed and repaired for liner

Similar Documents

Publication Publication Date Title
AU2014407470B2 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof
CN110802257A (en) In-use pipeline under-pressure tapping device, plugging device and construction method thereof
CN201795223U (en) Internal repair expansion device for pipeline cracking
CN111005743A (en) Comprehensive treatment method for secondary lining water leakage
CN204004983U (en) Lined Prestressed concrete cylinder pipe boring device
CN104047423B (en) A kind of mould and construction method of wearing the accurate reserved opening of flooring plate
CN106523847A (en) Low-pressure pipeline pressurized leakage removing method
CN204300520U (en) A kind of cable penetration sleeve structure
CN104154369B (en) Lined Prestressed concrete cylinder pipe boring device and boring method
CN103362517A (en) Assembled jacking pipe
CN203115384U (en) Water supply and drainage pipeline leakage on-line processing device
CN204491645U (en) A kind of deep foundation pit precipitation well-sealing device
CN207469277U (en) The quick slip casting plugging device of diaphram wall leakage point in a kind of foundation pit
CN203363529U (en) Concrete pipe repairing device of water supply prestress steel cylinder
CN205689219U (en) A kind of grouting device of backfill after bored tunnel two backing
CN209162799U (en) Underground continuous wall connector leakage-resistant device
CN209688340U (en) A kind of pipeline rehabilitation apparatus and system
CN103968186A (en) Repair construction method for water supply pre-stressed concrete cylinder pipe
CN206889866U (en) A kind of pipeline for avoiding seepage wears pool wall device
CN206246921U (en) A kind of rapid pipeline repairing device
CN202992424U (en) Reinforced concrete pipe with sealing rod for jacking construction method
CN110924954A (en) Device and method for checking grouting condition of annular space of orifice pipe
CN108131506A (en) The construction method that a kind of steel pipe is connect with FRP sand tube
CN210092836U (en) Prefabricated steel cylinder concrete circular power pipe gallery with pipe seat
CN211101722U (en) Pipeline under-pressure tapping device and plugging device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141210

Effective date of abandoning: 20170405

AV01 Patent right actively abandoned