CN201202121Y - Foundation Pit Drainage Network - Google Patents

Foundation Pit Drainage Network Download PDF

Info

Publication number
CN201202121Y
CN201202121Y CNU2008200880497U CN200820088049U CN201202121Y CN 201202121 Y CN201202121 Y CN 201202121Y CN U2008200880497 U CNU2008200880497 U CN U2008200880497U CN 200820088049 U CN200820088049 U CN 200820088049U CN 201202121 Y CN201202121 Y CN 201202121Y
Authority
CN
China
Prior art keywords
drainage
pipe
foundation pit
pipes
drainage pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200880497U
Other languages
Chinese (zh)
Inventor
冯志法
王伟
张持平
张蒙清
林磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Provincial Yijian Construction Group Ltd
Original Assignee
Zhejiang Provincial Yijian Construction Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Yijian Construction Group Ltd filed Critical Zhejiang Provincial Yijian Construction Group Ltd
Priority to CNU2008200880497U priority Critical patent/CN201202121Y/en
Application granted granted Critical
Publication of CN201202121Y publication Critical patent/CN201202121Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Sewage (AREA)

Abstract

基坑排水管网,属于基坑排水的技术领域。在地面上布设排水管,排水管之间用三通进行连接,经三通连接后的整条排水管端头连接90°弯头,末端连接45°弯头。本实用新型采用U-PVC管替代传统排水系统中使用的波纹管,使整个排水系统具有较高的强度,U-PVC管不直接与沉淀池连接,避免了传统排水系统中沉淀池与排水管接口处渗水的问题,本实用新型结构简单,施工方便,便于操作,且排水管布设在地面上,维护方便,能多次重复利用,极大的节省了资源。

A foundation pit drainage pipe network belongs to the technical field of foundation pit drainage. Drainage pipes are arranged on the ground, and the drainage pipes are connected with a tee. After the tee connection, the end of the entire drainage pipe is connected to a 90° elbow, and the end is connected to a 45° elbow. The utility model adopts the U-PVC pipe to replace the corrugated pipe used in the traditional drainage system, so that the whole drainage system has higher strength, and the U-PVC pipe is not directly connected with the sedimentation tank, which avoids the sedimentation tank and the drainage pipe in the traditional drainage system. For the problem of water seepage at the interface, the utility model has the advantages of simple structure, convenient construction and easy operation, and the drainage pipe is arranged on the ground, which is convenient for maintenance and can be reused many times, which greatly saves resources.

Description

基坑排水管网 Foundation Pit Drainage Network

技术领域 technical field

本实用新型属于基坑排水的技术领域,具体涉及一种在地面上布设U-PVC管来进行排水的基坑排水管网。The utility model belongs to the technical field of foundation pit drainage, in particular to a foundation pit drainage pipe network in which U-PVC pipes are arranged on the ground for drainage.

背景技术 Background technique

地下工程施工能否顺利进行最关键是降水效果,好的降水效果为工程施工的顺利开展创造了良好的条件。好的降水效果必须有良好的排水系统作保证,若排水系统不畅或渗水,降水效果就大大降低。The key to the smooth progress of underground engineering construction is the precipitation effect. A good precipitation effect creates good conditions for the smooth development of engineering construction. A good precipitation effect must be guaranteed by a good drainage system. If the drainage system is not smooth or seeps, the precipitation effect will be greatly reduced.

现在的施工中大多选用以下两种排水系统:(一)基坑周围地下埋设波纹管。此种做法与一般的暗沟排水相类似,对漏水部位不易检查出来,主要有两点原因造成漏水:①波纹管与波纹管接口处渗水;②地面重物压在波纹管上造成其破裂漏水。对于波纹管与波纹管接口处渗水,即使采用橡皮条或麻丝嵌缝后粉刷堵漏,效果还是不理想;对于波纹管破裂漏水,则只能更换断裂的波纹管,造成整片降水带停止,时间上有限制性,且返工比较麻烦。还有一个不利因素就是深井降水会通过软管带上大量泥沙,沉淀在管底不能清理且缩小了水流通过的截面面积,这些泥沙还会直接带到室外雨水管道。(二)在基坑周围地面上布设波纹管。在基坑周围间隔12m(波纹管长度为6m)设置一只沉淀池(沉淀池平面尺寸为1m×1m,坡度向室外雨水管道以2%的倾斜度逐渐降低,高度为1m)。此种做法比埋设在地下效果好,但也存在不足之处。①沉淀池四壁极易漏水,池底需要铺设钢筋网片,防止底板开裂渗水;②、沉淀池与波纹管接口处渗水难以处理;③波纹管易断,高空坠落物及其他人为因素都容易造成波纹管破裂,影响正常降水工作。④深井降水皮管能够放置到排水沟上必须有多个沉淀池,这就加大了排水系统渗水的可能。Most of the following two drainage systems are used in the current construction: (1) bellows are buried underground around the foundation pit. This method is similar to the general underground ditch drainage, and it is not easy to detect the leaking part. There are two main reasons for the leakage: ①Water seepage at the interface between the bellows and the bellows; For the water seepage at the interface between the bellows and the bellows, even if rubber strips or hemp silk caulks are used to seal the leakage, the effect is not ideal; for the water leakage of the bellows, the broken bellows can only be replaced, causing the entire precipitation belt to stop , time is limited, and rework is troublesome. Another unfavorable factor is that the deep well precipitation will bring a large amount of sediment through the hose, which cannot be cleaned when it settles at the bottom of the pipe, and the cross-sectional area through which the water flows will be reduced. The sediment will also be directly brought to the outdoor rainwater pipe. (2) Arrange bellows on the ground around the foundation pit. Set up a sedimentation tank around the foundation pit at an interval of 12m (the length of the bellows is 6m) (the plane size of the sedimentation tank is 1m×1m, the slope gradually decreases to the outdoor rainwater pipeline at a gradient of 2%, and the height is 1m). This approach is better than burying it in the ground, but it also has shortcomings. ①The four walls of the sedimentation tank are prone to water leakage, and the bottom of the pool needs to be laid with reinforced mesh to prevent the bottom plate from cracking and seepage; ②The water seepage at the interface between the sedimentation tank and the bellows is difficult to deal with; Cause the bellows to rupture and affect the normal precipitation work. ④ There must be multiple sedimentation tanks for the deep well rainfall leather pipe to be placed on the drainage ditch, which increases the possibility of water seepage in the drainage system.

实用新型内容Utility model content

针对现有技术中存在的问题,本实用新型的目的在于提供一种基坑排水管网的技术方案,维护方便,且能多次重复利用。Aiming at the problems existing in the prior art, the purpose of the utility model is to provide a technical scheme of the foundation pit drainage pipe network, which is easy to maintain and can be reused many times.

所述的基坑排水管网,其特征在于在地面上布设排水管,排水管之间用三通进行连接,经三通连接后的整条排水管端头连接90°弯头,末端连接45°弯头。The foundation pit drainage pipe network is characterized in that drainage pipes are arranged on the ground, and the drainage pipes are connected by a tee. After the tee connection, the end of the whole drainage pipe is connected to a 90° elbow, and the end is connected to a 45° elbow. ° Elbow.

所述的基坑排水管网,其特征在于整条排水管与地面的倾斜度为2%。The foundation pit drainage pipe network is characterized in that the inclination between the entire drainage pipe and the ground is 2%.

所述的基坑排水管网,其特征在于整条排水管的管底固定设置砌砖墩。The foundation pit drainage pipe network is characterized in that the bottom of the entire drainage pipe is fixedly provided with brick piers.

本实用新型采用U-PVC管替代传统排水系统中使用的波纹管,使整个排水系统具有较高的强度,U-PVC管不直接与沉淀池连接,避免了传统排水系统中沉淀池与排水管接口处渗水的问题,本实用新型结构简单,施工方便,便于操作,且排水管布设在地面上,维护方便,能多次重复利用,极大的节省了资源。The utility model adopts the U-PVC pipe to replace the corrugated pipe used in the traditional drainage system, so that the whole drainage system has higher strength, and the U-PVC pipe is not directly connected with the sedimentation tank, which avoids the sedimentation tank and the drainage pipe in the traditional drainage system For the problem of water seepage at the interface, the utility model has the advantages of simple structure, convenient construction and easy operation, and the drainage pipes are arranged on the ground, which is convenient for maintenance and can be reused many times, which greatly saves resources.

附图说明 Description of drawings

图1本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

具体实施方式 Detailed ways

在地面上布设排水管3,排水管3采用直径为300mm的U-PVC管,排水管3之间用三通2进行连接,三通2采用U-PVC三通。U-PVC管连接使用PVC管专用胶。三通2的一端向上,用来放置深井降水软管,深井降水软管将从基坑中抽上来的水排到排水管3中。经三通2连接后的整条排水管端头连接90°弯头4,用以阻止水外溢,末端连接45°弯头1,整条排水管与地面的倾斜度为2%,使排水管中的水经45°弯头1流向预先设置的沉淀池。沉淀池与室外雨水管道间用砖墙隔开,防止泥沙直接流入室外市政管道。整条排水管的管底固定设置砌砖墩5,用以保证其稳定性。Drainage pipes 3 are arranged on the ground. U-PVC pipes with a diameter of 300 mm are used for the drainage pipes 3. Tee links 2 are used to connect the drain pipes 3, and U-PVC tees are used for the tee links 2. U-PVC pipe connections use special glue for PVC pipes. One end of the tee 2 is upward, and is used for placing the deep well dewatering hose, and the deep well dewatering hose discharges the water pumped up from the foundation pit into the drain pipe 3 . The end of the entire drainage pipe connected by the tee 2 is connected to a 90° elbow 4 to prevent water from overflowing, and the end is connected to a 45° elbow 1. The inclination between the entire drainage pipe and the ground is 2%, so that the drainage pipe The water in the tank flows through the 45° elbow 1 to the pre-set sedimentation tank. The sedimentation tank and the outdoor rainwater pipeline are separated by a brick wall to prevent the sediment from directly flowing into the outdoor municipal pipeline. The pipe bottom of the whole drainpipe is fixedly provided with bricklaying pier 5, in order to guarantee its stability.

在具体的施工过程中,周围市政管网排水出口应该尽量利用,使深井降水排水系统有更多的出水口,保证排水正常不耽误施工。排水管采用U-PVC管,U-PVC管虽有一定的强度,但还是应重视因高空坠物、塔吊操作不慎或机械车辆碰撞管子,杜绝在管子上人为堆载。沉淀池四壁及池底做好防水处理,若处理不当易造成因长时间积水土体松软坍塌事故。还应在基坑周围设浅明沟排水,防止长时间降雨或暴雨时地表水流入基坑。In the specific construction process, the drainage outlets of the surrounding municipal pipe network should be used as much as possible, so that there are more outlets in the deep well precipitation drainage system, so as to ensure normal drainage without delaying construction. U-PVC pipes are used for the drainage pipes. Although the U-PVC pipes have a certain strength, attention should be paid to the pipes due to falling objects, careless tower crane operation or mechanical vehicles colliding with the pipes, so as to prevent artificial stacking on the pipes. The walls and bottom of the sedimentation tank should be waterproofed. If the treatment is not done properly, it will easily lead to collapse accidents due to long-term waterlogging and soft soil. Shallow open ditch drainage should also be set around the foundation pit to prevent surface water from flowing into the foundation pit during long-term rainfall or heavy rain.

Claims (3)

1.基坑排水管网,其特征在于在地面上布设排水管(3),排水管(3)之间用三通(2)进行连接,经三通(2)连接后的整条排水管端头连接90°弯头(4),末端连接45°弯头(1)。1. The foundation pit drainage pipe network is characterized in that drainage pipes (3) are arranged on the ground, and the drainage pipes (3) are connected by tees (2), and the entire drainage pipe connected by the tees (2) Connect the 90° elbow (4) at the end and the 45° elbow (1) at the end. 2.如权利要求1所述的基坑排水管网,其特征在于整条排水管与地面的倾斜度为2%。2. The foundation pit drainage pipe network according to claim 1, characterized in that the inclination between the entire drainage pipe and the ground is 2%. 3.如权利要求1所述的基坑排水管网,其特征在于整条排水管的管底固定设置砌砖墩(5)。3. The foundation pit drainage pipe network according to claim 1, characterized in that the bottom of the entire drainage pipe is fixedly provided with brickwork piers (5).
CNU2008200880497U 2008-05-30 2008-05-30 Foundation Pit Drainage Network Expired - Fee Related CN201202121Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200880497U CN201202121Y (en) 2008-05-30 2008-05-30 Foundation Pit Drainage Network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200880497U CN201202121Y (en) 2008-05-30 2008-05-30 Foundation Pit Drainage Network

Publications (1)

Publication Number Publication Date
CN201202121Y true CN201202121Y (en) 2009-03-04

Family

ID=40424433

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200880497U Expired - Fee Related CN201202121Y (en) 2008-05-30 2008-05-30 Foundation Pit Drainage Network

Country Status (1)

Country Link
CN (1) CN201202121Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498961A (en) * 2016-11-28 2017-03-15 中铁大桥局集团第工程有限公司 It is provided with the Yield rainfall relation system and its Yield rainfall relation method of detachable header tank
CN106638637A (en) * 2016-12-15 2017-05-10 宁波二十冶建设有限公司 Suspended type foundation pit drainage system and using method thereof
CN110700294A (en) * 2019-10-16 2020-01-17 上海建工七建集团有限公司 Drainage system for foundation pit and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498961A (en) * 2016-11-28 2017-03-15 中铁大桥局集团第工程有限公司 It is provided with the Yield rainfall relation system and its Yield rainfall relation method of detachable header tank
CN106498961B (en) * 2016-11-28 2018-11-23 中铁大桥局集团第一工程有限公司 Yield rainfall relation system and its Yield rainfall relation method equipped with detachable header tank
CN106638637A (en) * 2016-12-15 2017-05-10 宁波二十冶建设有限公司 Suspended type foundation pit drainage system and using method thereof
CN106638637B (en) * 2016-12-15 2019-07-09 浙江二十冶建设有限公司 The application method of suspension type drainage of foundation pit system
CN110700294A (en) * 2019-10-16 2020-01-17 上海建工七建集团有限公司 Drainage system for foundation pit and construction method thereof

Similar Documents

Publication Publication Date Title
CN103132488B (en) Reverse osmosis water treatment method and reverse osmosis drainage system for face rockfill dam in construction period
CN201202121Y (en) Foundation Pit Drainage Network
CN201567582U (en) A water-saving device for foundation pit dewatering
CN207268009U (en) A drainage system of underground comprehensive pipe gallery based on the existing sewage channel
CN205369377U (en) Automatic abandon class, retaining, overflow integration rainwater collection system
CN201284492Y (en) Simple and practical overhead road rainwater utilization system
CN203878651U (en) Vertical deep rainwater storage and collection system
CN202323880U (en) Reverse osmosis drainage system of concrete face rockfill dam in construction period
CN205475605U (en) Anti floating plastic sinks mud inspection shaft
CN207159744U (en) A kind of pavement drainage arrangement
CN204343255U (en) Structure of canal system hydraulic engineering through high-fall valley
CN107761903A (en) Modified sewerage system
CN204532379U (en) The pre-buried gutter structure of subway sectional tunnel waste water pump house
CN104929086B (en) Sluice stilling basin floor reinforcement structure
CN203795512U (en) Rainwater recycling device
CN202202358U (en) Establish pond structure on collapsible loess
CN115075362A (en) Sewage-removing and shunting transformation structure and method for combined underdrain
CN207392366U (en) Modified sewerage system
CN222666939U (en) Tower type rainwater collecting and recycling system
CN201206277Y (en) Integrated drainage inspection well apparatus
CN107083729A (en) One kind stores permeable module and preparation method thereof
CN201273020Y (en) Outdoor drainage system with multi-pumping room in parallel connection
CN206015833U (en) Toilet waterproofing structure
CN219386608U (en) A Concealed Sponge City Rainwater Collector
CN103437408A (en) Built-in impermeable floor drain

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090304

Termination date: 20170530