CN104131555A - 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法 - Google Patents
一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法 Download PDFInfo
- Publication number
- CN104131555A CN104131555A CN201410348059.XA CN201410348059A CN104131555A CN 104131555 A CN104131555 A CN 104131555A CN 201410348059 A CN201410348059 A CN 201410348059A CN 104131555 A CN104131555 A CN 104131555A
- Authority
- CN
- China
- Prior art keywords
- pile
- stake
- rubble
- prefabricated tubular
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 239000011150 reinforced concrete Substances 0.000 title abstract description 4
- 239000002689 soil Substances 0.000 claims abstract description 23
- 239000011083 cement mortar Substances 0.000 claims abstract description 12
- 239000007787 solid Substances 0.000 claims abstract description 11
- 239000004746 geotextile Substances 0.000 claims abstract description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 34
- 238000007569 slipcasting Methods 0.000 claims description 32
- 239000004567 concrete Substances 0.000 claims description 29
- 230000035699 permeability Effects 0.000 claims description 28
- 238000012946 outsourcing Methods 0.000 claims description 27
- 239000004744 fabric Substances 0.000 claims description 17
- 239000002002 slurry Substances 0.000 claims description 11
- 238000000034 method Methods 0.000 claims description 9
- 238000013461 design Methods 0.000 claims description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 239000002131 composite material Substances 0.000 claims description 4
- 239000011380 pervious concrete Substances 0.000 claims description 4
- 239000004576 sand Substances 0.000 claims description 4
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 230000002262 irrigation Effects 0.000 claims description 3
- 238000003973 irrigation Methods 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 2
- 230000037431 insertion Effects 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 claims description 2
- 230000000903 blocking effect Effects 0.000 abstract 1
- 238000007711 solidification Methods 0.000 abstract 1
- 230000008023 solidification Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 10
- 239000004575 stone Substances 0.000 description 10
- 238000010586 diagram Methods 0.000 description 5
- 230000008602 contraction Effects 0.000 description 3
- 238000007596 consolidation process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 235000011225 shan shi Nutrition 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005649 metathesis reaction Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 229920000728 polyester Polymers 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000010802 sludge Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410348059.XA CN104131555B (zh) | 2014-07-21 | 2014-07-21 | 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410348059.XA CN104131555B (zh) | 2014-07-21 | 2014-07-21 | 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104131555A true CN104131555A (zh) | 2014-11-05 |
CN104131555B CN104131555B (zh) | 2016-06-08 |
Family
ID=51804394
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410348059.XA Expired - Fee Related CN104131555B (zh) | 2014-07-21 | 2014-07-21 | 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104131555B (zh) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105484279A (zh) * | 2016-01-28 | 2016-04-13 | 杭州江润科技有限公司 | 一种排水式现浇混凝土薄壁管桩的施工方法 |
CN105544508A (zh) * | 2015-12-02 | 2016-05-04 | 广西大学 | 适用于具有连通性通道的岩溶地区的灌注桩 |
CN105648872A (zh) * | 2016-02-03 | 2016-06-08 | 济南轨道交通集团有限公司 | 一种预制渗漏柱装置及施工方法 |
CN106522257A (zh) * | 2016-11-04 | 2017-03-22 | 成都启立辰智科技有限公司 | 碎石填充支撑地基桩 |
CN106759274A (zh) * | 2016-12-31 | 2017-05-31 | 重庆大学 | 一种具有排水抗滑作用的半空心桩及其施工方法 |
CN108277800A (zh) * | 2018-01-12 | 2018-07-13 | 李溯 | 一种固结砂层钢筋混凝土管节碎石桩及其施工方法 |
CN108385667A (zh) * | 2018-05-11 | 2018-08-10 | 山东大学 | 一种土工布防堵塞透水桩施工装置及方法 |
CN108442365A (zh) * | 2018-05-18 | 2018-08-24 | 山东大学 | 一种防堵塞强化透水桩及施工方法 |
CN108442358A (zh) * | 2018-05-18 | 2018-08-24 | 中南航空港建设公司 | 透水混凝土后注浆地基加固法及过渡桩和复合桩成桩系统 |
CN108978630A (zh) * | 2018-09-29 | 2018-12-11 | 上海勘察设计研究院(集团)有限公司 | 一种带刚性管材的抽水注浆两用复合桩装置及施工方法 |
CN111074883A (zh) * | 2020-02-25 | 2020-04-28 | 周同和 | 一种后注浆透水混凝土管桩及其施工方法 |
CN111173014A (zh) * | 2020-01-21 | 2020-05-19 | 上海勘察设计研究院(集团)有限公司 | 一种注浆密封袋式降水井井壁止水结构 |
CN111926801A (zh) * | 2020-07-08 | 2020-11-13 | 湖南映晟交通建设工程有限公司 | 无砂大孔混凝土空心管桩复合地基处理施工工法 |
CN112227356A (zh) * | 2019-07-15 | 2021-01-15 | 河北建设勘察研究院有限公司 | 一种碎石注浆钢管桩及其制备方法 |
CN112482368A (zh) * | 2020-12-18 | 2021-03-12 | 郑州大学综合设计研究院有限公司 | 集成式管桩及其竖控器 |
WO2022095291A1 (zh) * | 2020-11-09 | 2022-05-12 | 中国海洋大学 | 一种用于加固软弱土体的双螺旋管、注浆成桩设备及其施工方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0048959A2 (de) * | 1980-09-29 | 1982-04-07 | Günter Helmdach | Lastaufnehmendes Gründungselement, insbesondere aus Stahlbeton |
JPH04339910A (ja) * | 1991-05-15 | 1992-11-26 | Takenaka Komuten Co Ltd | 場所打ちコンクリート杭の施工方法 |
CN201202116Y (zh) * | 2008-05-28 | 2009-03-04 | 徐立新 | 土工布袋散体材料后注浆桩 |
CN101532290A (zh) * | 2009-02-25 | 2009-09-16 | 河海大学 | 加固软土地基的带孔波纹塑料套管粒料注浆桩及加固方法 |
CN101591904A (zh) * | 2008-05-28 | 2009-12-02 | 徐立新 | 先排水预压后注浆排水体复合桩基的加固方法 |
CN101922146A (zh) * | 2009-09-15 | 2010-12-22 | 东南大学 | 使用透水混凝土管桩进行地基处理的方法 |
CN102433876A (zh) * | 2011-08-31 | 2012-05-02 | 浙江大学城市学院 | 多隔室套管复合桩及其施工方法 |
CN202559340U (zh) * | 2012-04-26 | 2012-11-28 | 浙江大学城市学院 | 一种先排水预压后注浆劲芯水泥搅拌桩 |
CN103074891A (zh) * | 2013-01-29 | 2013-05-01 | 浙江信博城市建设有限公司 | 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法 |
CN204000851U (zh) * | 2014-07-21 | 2014-12-10 | 冠鲁建设股份有限公司 | 一种外包透水性钢筋混凝土管碎石注浆桩 |
-
2014
- 2014-07-21 CN CN201410348059.XA patent/CN104131555B/zh not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0048959A2 (de) * | 1980-09-29 | 1982-04-07 | Günter Helmdach | Lastaufnehmendes Gründungselement, insbesondere aus Stahlbeton |
JPH04339910A (ja) * | 1991-05-15 | 1992-11-26 | Takenaka Komuten Co Ltd | 場所打ちコンクリート杭の施工方法 |
CN201202116Y (zh) * | 2008-05-28 | 2009-03-04 | 徐立新 | 土工布袋散体材料后注浆桩 |
CN101591904A (zh) * | 2008-05-28 | 2009-12-02 | 徐立新 | 先排水预压后注浆排水体复合桩基的加固方法 |
CN101532290A (zh) * | 2009-02-25 | 2009-09-16 | 河海大学 | 加固软土地基的带孔波纹塑料套管粒料注浆桩及加固方法 |
CN101922146A (zh) * | 2009-09-15 | 2010-12-22 | 东南大学 | 使用透水混凝土管桩进行地基处理的方法 |
CN102433876A (zh) * | 2011-08-31 | 2012-05-02 | 浙江大学城市学院 | 多隔室套管复合桩及其施工方法 |
CN202559340U (zh) * | 2012-04-26 | 2012-11-28 | 浙江大学城市学院 | 一种先排水预压后注浆劲芯水泥搅拌桩 |
CN103074891A (zh) * | 2013-01-29 | 2013-05-01 | 浙江信博城市建设有限公司 | 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法 |
CN204000851U (zh) * | 2014-07-21 | 2014-12-10 | 冠鲁建设股份有限公司 | 一种外包透水性钢筋混凝土管碎石注浆桩 |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544508A (zh) * | 2015-12-02 | 2016-05-04 | 广西大学 | 适用于具有连通性通道的岩溶地区的灌注桩 |
CN105484279A (zh) * | 2016-01-28 | 2016-04-13 | 杭州江润科技有限公司 | 一种排水式现浇混凝土薄壁管桩的施工方法 |
CN105648872A (zh) * | 2016-02-03 | 2016-06-08 | 济南轨道交通集团有限公司 | 一种预制渗漏柱装置及施工方法 |
CN106522257A (zh) * | 2016-11-04 | 2017-03-22 | 成都启立辰智科技有限公司 | 碎石填充支撑地基桩 |
CN106759274A (zh) * | 2016-12-31 | 2017-05-31 | 重庆大学 | 一种具有排水抗滑作用的半空心桩及其施工方法 |
CN106759274B (zh) * | 2016-12-31 | 2018-11-27 | 重庆大学 | 一种具有排水抗滑作用的半空心桩及其施工方法 |
CN108277800A (zh) * | 2018-01-12 | 2018-07-13 | 李溯 | 一种固结砂层钢筋混凝土管节碎石桩及其施工方法 |
CN108277800B (zh) * | 2018-01-12 | 2023-10-24 | 潘海涛 | 一种固结砂层钢筋混凝土管节碎石桩及其施工方法 |
CN108385667A (zh) * | 2018-05-11 | 2018-08-10 | 山东大学 | 一种土工布防堵塞透水桩施工装置及方法 |
CN108442365B (zh) * | 2018-05-18 | 2020-11-06 | 山东大学 | 一种防堵塞强化透水桩及施工方法 |
CN108442365A (zh) * | 2018-05-18 | 2018-08-24 | 山东大学 | 一种防堵塞强化透水桩及施工方法 |
CN108442358A (zh) * | 2018-05-18 | 2018-08-24 | 中南航空港建设公司 | 透水混凝土后注浆地基加固法及过渡桩和复合桩成桩系统 |
CN108978630A (zh) * | 2018-09-29 | 2018-12-11 | 上海勘察设计研究院(集团)有限公司 | 一种带刚性管材的抽水注浆两用复合桩装置及施工方法 |
CN112227356A (zh) * | 2019-07-15 | 2021-01-15 | 河北建设勘察研究院有限公司 | 一种碎石注浆钢管桩及其制备方法 |
CN111173014A (zh) * | 2020-01-21 | 2020-05-19 | 上海勘察设计研究院(集团)有限公司 | 一种注浆密封袋式降水井井壁止水结构 |
CN111074883A (zh) * | 2020-02-25 | 2020-04-28 | 周同和 | 一种后注浆透水混凝土管桩及其施工方法 |
CN111926801A (zh) * | 2020-07-08 | 2020-11-13 | 湖南映晟交通建设工程有限公司 | 无砂大孔混凝土空心管桩复合地基处理施工工法 |
WO2022095291A1 (zh) * | 2020-11-09 | 2022-05-12 | 中国海洋大学 | 一种用于加固软弱土体的双螺旋管、注浆成桩设备及其施工方法 |
US11525231B2 (en) | 2020-11-09 | 2022-12-13 | Ocean University Of China | Double-spiral-tube structure, grouting and pile forming device and construction method for strengthening soft soil |
CN112482368A (zh) * | 2020-12-18 | 2021-03-12 | 郑州大学综合设计研究院有限公司 | 集成式管桩及其竖控器 |
Also Published As
Publication number | Publication date |
---|---|
CN104131555B (zh) | 2016-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104131555B (zh) | 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法 | |
CN204059124U (zh) | 一种砂桩排水强夯后注浆地基加固结构 | |
CN204000851U (zh) | 一种外包透水性钢筋混凝土管碎石注浆桩 | |
CN103074891B (zh) | 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法 | |
CN102433876B (zh) | 多隔室套管复合桩及其施工方法 | |
CN107419630A (zh) | 一种有效控制工后沉降的软土地基高填方路堤及施工方法 | |
CN101634143A (zh) | 含软弱粘土地层中的螺旋挤土灌注桩复合地基处理方法 | |
CN103835203B (zh) | 一种深厚软基后顶升轻质路堤结构的施工方法 | |
CN103174074B (zh) | 一种已通车公路路基沉降控制结构及施工方法 | |
CN101463599A (zh) | 一种高速公路软弱土地基双向增强与排水加固方法 | |
CN111074883A (zh) | 一种后注浆透水混凝土管桩及其施工方法 | |
CN103184734A (zh) | 一种植入注浆组合桩及施工方法 | |
CN109797769B (zh) | 一种湿陷性黄土地区地下综合管廊地基结构及其施工方法 | |
CN110144783B (zh) | 一种路基施工方法 | |
CN103061328A (zh) | 一种带砂墙翼板的后注浆碎石桩及施工方法 | |
CN104234034B (zh) | 一种先排水后封堵板承式路堤的施工方法 | |
CN106676993B (zh) | 一种加筋碎石框架结构路基加固体系及其加固方法 | |
CN103741670A (zh) | 一种消除负摩阻力的地基处理方法 | |
CN106759223A (zh) | 可控刚性桩+排水体+加筋垫层组合型复合地基 | |
CN203066056U (zh) | 一种带砂墙翼板的后注浆碎石桩及其专用沉管 | |
CN101424079A (zh) | 土工格室加筋垫层与砂石桩双向增强复合地基施工方法 | |
CN102839683B (zh) | 散体桩-透水性混凝土桩二元复合地基及处理方法 | |
CN108277800A (zh) | 一种固结砂层钢筋混凝土管节碎石桩及其施工方法 | |
CN104746512B (zh) | 一种水泥土劲性复合桩及其成桩方法 | |
CN215977211U (zh) | 一种管桩联合水泥土搅拌桩复合地基处理结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Xinquan Inventor before: Zhang Zaiguo Inventor before: Ding Daibo Inventor before: Peng Benbo Inventor before: Chen Qingying Inventor before: Xie Yan Inventor before: Wang Jike Inventor before: Sun Qin Inventor before: Chen Xingtao Inventor before: Kong Fan Inventor before: Meng Lin |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160219 Address after: 310015 Hangzhou, Gongshu District Wanda Commercial Center, building 3, room 3, unit 1901, room Applicant after: Hangzhou Jiang Run Science and Technology Ltd. Address before: 273300, Shandong, Linyi Province, Pingyi County, South Ring Road, West Road Construction Applicant before: GUANLU CONSTRUCTION CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180710 Address after: 430014 Liu Song Avenue 6, Huangpi Economic Development Zone, Wuhan, Hubei Patentee after: Wuhan Panlong Mingda Building Co., Ltd. Address before: 310015 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang. Patentee before: Hangzhou Jiang Run Science and Technology Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160608 Termination date: 20200721 |