CN101424079A - 土工格室加筋垫层与砂石桩双向增强复合地基施工方法 - Google Patents
土工格室加筋垫层与砂石桩双向增强复合地基施工方法 Download PDFInfo
- Publication number
- CN101424079A CN101424079A CNA2008101439097A CN200810143909A CN101424079A CN 101424079 A CN101424079 A CN 101424079A CN A2008101439097 A CNA2008101439097 A CN A2008101439097A CN 200810143909 A CN200810143909 A CN 200810143909A CN 101424079 A CN101424079 A CN 101424079A
- Authority
- CN
- China
- Prior art keywords
- pile
- sand
- geotechnical grid
- stake
- bed course
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Revetment (AREA)
Abstract
本发明公开了一种土工格室加筋垫层与砂石桩双向增强复合地基施工方法,它包括:清理场地和定点桩位,振动沉管砂石桩施工,桩顶砂石层铺设碾压,土工格室张拉,格室内砂石填充与碾压,格室顶砂石层铺设碾压。本发明的特征在于,带横向排水功能土工格室加筋垫层施工成易于排水的八字形锥坡;土工格室应沿公路路线方向展开并逐步推进填充砂石碾压密实,使片材垂直路线方向;振动沉管砂石桩施工中同一土层由浅至深拔管速度和高度线性递减。本发明的有益效果是,能保证横向排水畅通,增加土工格室垫层密实性及抵抗变形的能力,防止桩体上大下小,提高成桩质量。
Description
技术领域
本发明涉及一种地基处理施工方法,特别是涉及一种土工格室加筋垫层与砂石桩双向增强复合地基施工方法。
背景技术
复合地基是目前最常见的高速公路软弱地基加固形式。复合地基按增强体增设方向分为水平向增强体复合地基和竖向增强复合地基。水平加筋垫层施工简单,能提高地基稳定性和承载力,但只适合浅层软弱地基加固。竖向增强体(通常为桩体)可实施深层地基加固,能显著提高地基承载力和降低沉降,但施工较复杂。水平加筋垫层和桩体双向增强复合地基,可综合利用各自优点,拓宽应用范围,较好地解决了高路堤下软弱地基的承载力低、沉降大和稳定性差等问题。土工格室加筋垫层与砂石桩组合型复合地基是双向增强复合地基中较新的一种形式,它通过土工格室砂石垫层与碎石桩双向增强与排水结构形式,可实现对软弱地基加筋、挤密、置换和排水固结等组合加固效应,同时,室内以密实砂石充填的土工格室层可形成具有一定刚度的柔性板垫层,既能提高地基承载力和稳定性,又能有效控制地基差异沉降。但是,在土工格室加筋垫层与砂石桩双向增强复合地基施工中容易存在如下问题:①振动沉管砂石桩施工易出现桩直径上大下小、缩径甚至断桩的情况;②土工格室铺设方向不对、展开不充分或者碾压方式不对而使土工格室处于松弛状态,达不到预期效果;③土工格室砂石垫层因路基沉降中间大两边小而呈凹形,影响横向排水,甚至积水,使地基土软化,地基强度降低,从而使地基承载力不能达到设计值。
发明内容
本发明所要解决的技术问题是提供一种有效地解决施工过程中易造成砂石桩直径变化大,以及土工格室加筋垫层松弛、下凹等问题的土工格室加筋垫层与砂石桩双向增强复合地基施工方法。
为了解决上述技术问题,本发明通过以下技术方案实现,具体步骤包括:
(1)、清理场地,定点桩位;
首先,清理场地,使场地垂直于路线方向形成中间高两边低的锥坡,锥坡坡比i=2~5%;然后,根据设计桩间距和布桩形式,定点放样确定桩位;
(2)采用振动沉管法施工砂石桩;
成桩工艺如下:
①移动桩基及导向架,把桩管及桩尖对准桩位;
②启动振动锤,把桩管下到预定的设计深度;
③向桩管内投入规定数量的填充料,填充料为粗砂、碎石或者砂石,颗粒的最大直径应小于5cm;
④把桩管提升一定的高度,不超过1~2m,桩尖打开,桩管内砂石料流入空内;
⑤降落桩管,先振动5~10s,再开始拔管,边振边拔,拔管速度要求:一般土层为1.2~1.5m/min,软弱土层为0.6~0.8m/min,介于前两者之间的为0.8~1.2m/min,同一土层由浅至深拔管速度线性递减;同时,要求每拔出0.5~1.0m,留振5~10s,同一土层由浅至深每次拔管高度线性递减,而留振时间线性递增,如此连续作业,桩管不断升,砂石料不断补充,直至地面,砂石桩完成;
(3)在桩顶分层铺设砂石,分层碾压密实,形成厚度为20~30cm的第一加筋垫层;
(4)铺设高度为8~20cm、室壁开孔的土工格室,并使片材垂直于路线方向;然后,将土工格室沿路线方向充分展开并用木或铁钎固定;最后,向土工格室内填充砂石料碾压密实并逐步推进;
(5)在土工格室顶面分层铺设砂石,分层碾压密实,形成厚度为20~30cm的第二加筋垫层。
土工格室加筋垫层和砂石桩所用填充料为粗砂、碎石或者砂石,颗粒的最大直径小于5cm。
本发明的有益效果为:
(1)有效地防止了振动沉管砂石桩施工中桩直径上大下小、缩径甚至断桩的情况发生,提高了成桩质量;
(2)保证了土工格室的充分展开,增加了土工格室垫层密实性及抵抗变形的能力;
(3)杜绝了土工格室砂石垫层因路基沉降而发生下凹,能保证其横向排水通畅。
综上所述,本发明是一种有效地解决施工过程中易造成砂石桩直径变化大,以及土工格室加筋垫层松弛、下凹等问题的土工格室加筋垫层与砂石桩双向增强复合地基施工方法。
附图说明
图1为振动沉管法施工砂石桩流程图;
图2为土工格室张拉施工示意图;
图3为土工格室加筋垫层与砂石桩双向增强复合地基完工后示意图。
具体实施方式
下面结合附图及实施例对本发明做进一步的说明。
湖南省临长高速公路某高路堤段下卧软弱土地基。地基土层分布依次为:①淤泥质土,软塑~流塑,天然含水量52%,承载力标准值80kPa,平均层厚4.0m;②粉质粘土,软塑~流塑,天然含水量45%,承载力标准值95kPa,平均层厚6.0m;③强风化岩层。该地基采用振动沉管碎石桩加土工格室砂石垫层进行加固处理。碎石桩设计桩长为10m,梅花形布桩,桩间距为1.8m,采用外径Φ=375mm桩管成孔,要求成桩直径达到450mm。土工格室砂石垫层设计为60cm厚。
该土工格室加筋垫层与砂石桩双向增强复合地基施工方法具体说明如下:
(1)清理场地,使场地垂直于路线方向形成中间高两边低的锥坡,锥坡坡比i=3%。按照1.8m的桩间距和梅花形布桩形式,定点放样确定桩位;
(2)采用振动沉管法施工砂石桩1,参见图1,成桩工艺如下:
①移动桩基及导向架,将底部装有混凝土桩尖、外径为Φ=375mm的桩管对准桩位;
②启动振动锤,把桩管振动下沉至10m的设计深度;
③采用碎石为填充料,颗粒的最大直径小于5cm,含泥量小于5%,每根桩碎石用量为1.25×10×3.14×0.452/4=2m3,向桩管中投入碎石料;
④把桩管提升1.5m,桩尖打开,桩管内碎石料料流入空内;
⑤降落桩管,先振动10s,再开始拔管,边振边拔,拔管速度要求桩底为0.6m/min,然后随桩管提升至桩顶线性递增为1.2m/min,同时要求每拔出0.8m停下留振10s。如此连续作业,桩管不断升,砂石料不断补充,直至地面,砂石桩完成;
(3)在桩顶分层铺设砂石,分层碾压密实,形成厚度为30cm的第一加筋垫层2;
(4)铺设高度为15cm、室壁开孔的土工格室3,并使片材垂直于路线方向;然后,将土工格室沿路线方向充分展开并用木或铁钎5固定,参见图2;最后,向土工格室内填充砂石料碾压密实并逐步推进;
(5)参见图3,在土工格室3顶面分层铺设砂石,分层碾压密实,形成厚度为20cm的第二加筋垫层4。
土工格室加筋垫层和砂石桩所用填充料为粗砂、碎石或者砂石,颗粒的最大直径小于5cm。
Claims (3)
1、一种土工格室加筋垫层与砂石桩双向增强复合地基施工方法,其特征在于:
(1)、清理场地,定点桩位,使场地垂直于路线方向形成中间高两边低的锥坡,锥坡坡比i=2~5%,然后,根据设计桩间距和布桩形式,定点放样确定桩位;
(2)、采用振动沉管法施工砂石桩;
(3)、在桩顶分层铺设砂石,分层碾压密实,形成厚度为20~30cm的第一加筋垫层;
(4)、铺设高度为8~20cm、室壁开孔的土工格室,并使片材垂直于路线方向;然后,将土工格室沿路线方向充分展开并用木或铁钎固定;最后,向土工格室内填充砂石料碾压密实并逐步推进;
(5)在土工格室顶面分层铺设砂石,分层碾压密实,形成厚度为20~30cm的第二加筋垫层。
2、根据权利要求1所述的土工格室加筋垫层与砂石桩双向增强复合地基施工方法,其特征在于:上述步骤(2)中采用振动沉管法施工砂石桩,成桩工艺如下:
①移动桩基及导向架,把桩管及桩尖对准桩位;
②启动振动锤,把桩管下到预定的设计深度;
③向桩管内投入规定数量的填充料,填充料为粗砂、碎石或者砂石,颗粒的最大直径应小于5cm;
④把桩管提升一定的高度,不超过1~2m,桩尖打开,桩管内砂石料流入空内;
⑤降落桩管,先振动5~10s,再开始拔管,边振边拔,拔管速度要求:一般土层为1.2~1.5m/min,软弱土层为0.6~0.8m/min,介于前两者之间的为0.8~1.2m/min,同一土层由浅至深拔管速度线性递减;同时,要求每拔出0.5~1.0m,留振5~10s,同一土层由浅至深每次拔管高度线性递减,而留振时间线性递增;如此连续作业,桩管不断升,砂石料不断补充,直至地面,砂石桩完成。
3、根据权利要求1所述的土工格室加筋垫层与砂石桩双向增强复合地基施工方法,其特征在于:土工格室第一、第二加筋垫层和砂石桩所用填充料为粗砂、碎石或者砂石,颗粒的最大直径小于5cm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008101439097A CN101424079A (zh) | 2008-12-12 | 2008-12-12 | 土工格室加筋垫层与砂石桩双向增强复合地基施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008101439097A CN101424079A (zh) | 2008-12-12 | 2008-12-12 | 土工格室加筋垫层与砂石桩双向增强复合地基施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101424079A true CN101424079A (zh) | 2009-05-06 |
Family
ID=40614934
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008101439097A Pending CN101424079A (zh) | 2008-12-12 | 2008-12-12 | 土工格室加筋垫层与砂石桩双向增强复合地基施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101424079A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102650128A (zh) * | 2012-04-26 | 2012-08-29 | 浙江大学城市学院 | 一种先排水预压后注浆劲芯水泥搅拌桩及其施工方法 |
CN102817353A (zh) * | 2012-08-03 | 2012-12-12 | 华侨大学 | 一种复合软粘土地基 |
CN103276716A (zh) * | 2013-05-23 | 2013-09-04 | 汇通路桥建设集团有限公司 | 一种过渡段cfg桩与褥垫层复合地基加固施工法 |
CN105544311A (zh) * | 2016-01-17 | 2016-05-04 | 中铁二院工程集团有限责任公司 | 一种富水地基抗冻胀无砟轨道路基结构 |
CN106676993A (zh) * | 2017-01-20 | 2017-05-17 | 山西省交通科学研究院 | 一种加筋碎石框架结构路基加固体系及其加固方法 |
CN108978623A (zh) * | 2018-07-31 | 2018-12-11 | 湖北工业大学 | 掺杂建筑垃圾和废旧轮胎的复合加筋砂砾垫层及施工方法 |
CN111074716A (zh) * | 2020-01-20 | 2020-04-28 | 湖南科技学院 | 一种软土地基机场跑道结构及其施工方法 |
CN111877309A (zh) * | 2020-06-16 | 2020-11-03 | 中交第三公路工程局有限公司 | 沼泽地区砂桩排水板复合地基高填方路堤施工方法 |
CN112211176A (zh) * | 2019-07-10 | 2021-01-12 | 广东工业大学 | 一种微生物注浆排水固化桩及其施工方法与应用 |
-
2008
- 2008-12-12 CN CNA2008101439097A patent/CN101424079A/zh active Pending
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102650128A (zh) * | 2012-04-26 | 2012-08-29 | 浙江大学城市学院 | 一种先排水预压后注浆劲芯水泥搅拌桩及其施工方法 |
CN102650128B (zh) * | 2012-04-26 | 2014-06-11 | 浙江大学城市学院 | 一种先排水预压后注浆劲芯水泥搅拌桩及其施工方法 |
CN102817353A (zh) * | 2012-08-03 | 2012-12-12 | 华侨大学 | 一种复合软粘土地基 |
CN103276716A (zh) * | 2013-05-23 | 2013-09-04 | 汇通路桥建设集团有限公司 | 一种过渡段cfg桩与褥垫层复合地基加固施工法 |
CN103276716B (zh) * | 2013-05-23 | 2016-02-10 | 汇通路桥建设集团有限公司 | 一种过渡段cfg桩与褥垫层复合地基加固施工法 |
CN105544311A (zh) * | 2016-01-17 | 2016-05-04 | 中铁二院工程集团有限责任公司 | 一种富水地基抗冻胀无砟轨道路基结构 |
CN106676993A (zh) * | 2017-01-20 | 2017-05-17 | 山西省交通科学研究院 | 一种加筋碎石框架结构路基加固体系及其加固方法 |
CN108978623A (zh) * | 2018-07-31 | 2018-12-11 | 湖北工业大学 | 掺杂建筑垃圾和废旧轮胎的复合加筋砂砾垫层及施工方法 |
CN108978623B (zh) * | 2018-07-31 | 2020-09-08 | 湖北工业大学 | 掺杂建筑垃圾和废旧轮胎的复合加筋砂砾垫层及施工方法 |
CN112211176A (zh) * | 2019-07-10 | 2021-01-12 | 广东工业大学 | 一种微生物注浆排水固化桩及其施工方法与应用 |
CN111074716A (zh) * | 2020-01-20 | 2020-04-28 | 湖南科技学院 | 一种软土地基机场跑道结构及其施工方法 |
CN111074716B (zh) * | 2020-01-20 | 2024-05-17 | 湖南科技学院 | 一种软土地基机场跑道结构及其施工方法 |
CN111877309A (zh) * | 2020-06-16 | 2020-11-03 | 中交第三公路工程局有限公司 | 沼泽地区砂桩排水板复合地基高填方路堤施工方法 |
CN111877309B (zh) * | 2020-06-16 | 2021-09-14 | 中交第三公路工程局有限公司 | 沼泽地区砂桩排水板复合地基高填方路堤施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101424079A (zh) | 土工格室加筋垫层与砂石桩双向增强复合地基施工方法 | |
CN104131555B (zh) | 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法 | |
CN202559376U (zh) | 一种高架桥下临河市政道路结构 | |
CN112609673B (zh) | 深层共振密实加固杂填土地基的装置及方法 | |
CN101463599A (zh) | 一种高速公路软弱土地基双向增强与排水加固方法 | |
CN203383119U (zh) | 一种新型公路路堤拓宽结构 | |
CN109736291A (zh) | 一种欠固结吹淤地基上生物水泥加固路基及其施工方法 | |
CN203393530U (zh) | 一种抗浮轻质高路堤结构 | |
CN101654899A (zh) | 高速铁路液化土地基-路基抗震加固构造 | |
CN110820716A (zh) | 碎石桩、排水板、上部填筑体强夯复合处理淤泥质土地基的方法 | |
CN103015396A (zh) | 软土地基施工方法 | |
CN101220589B (zh) | 土工袋与动力挤密综合加固软土地基的方法 | |
CN204000851U (zh) | 一种外包透水性钢筋混凝土管碎石注浆桩 | |
CN201530968U (zh) | 高速铁路液化土地基-路基抗震加固构造 | |
CN204570720U (zh) | 一种路基加宽涵洞地基 | |
CN104695419A (zh) | 一种软土土基的施工方法 | |
CN102839683B (zh) | 散体桩-透水性混凝土桩二元复合地基及处理方法 | |
CN106498923A (zh) | 自排水后固结充填砂袋复合桩体系及其施工方法 | |
CN102605758A (zh) | 一种桩承式加筋体系 | |
KR20080008494A (ko) | 등입도 투수성 콘크리트 보강 쇄석말뚝 | |
CN1584221A (zh) | 浅层软土地基快速动力固结技术 | |
CN108824412A (zh) | 基于石笼墙加筋土以及强夯联合的软基处理方法 | |
CN203270559U (zh) | 一种螺杆桩桩网结构复合地基的路基结构 | |
CN106869153A (zh) | 一种井点降水快速处理软地基的方法 | |
CN212506207U (zh) | 毛竹加筋砂石桩联合毛竹加筋砂垫层的软土地基加固结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20090506 |