CN104131532A - Leaking stoppage method and structure for karst pipeline - Google Patents
Leaking stoppage method and structure for karst pipeline Download PDFInfo
- Publication number
- CN104131532A CN104131532A CN201410361677.8A CN201410361677A CN104131532A CN 104131532 A CN104131532 A CN 104131532A CN 201410361677 A CN201410361677 A CN 201410361677A CN 104131532 A CN104131532 A CN 104131532A
- Authority
- CN
- China
- Prior art keywords
- karst
- film bag
- quick
- film
- setting mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 29
- 244000068988 Glycine max Species 0.000 claims abstract description 18
- 235000010469 Glycine max Nutrition 0.000 claims abstract description 18
- 238000010276 construction Methods 0.000 claims abstract description 7
- 239000000203 mixture Substances 0.000 claims description 8
- 230000000903 blocking effect Effects 0.000 claims description 5
- 238000007596 consolidation process Methods 0.000 claims description 4
- 230000008676 import Effects 0.000 claims description 4
- 244000043261 Hevea brasiliensis Species 0.000 claims description 3
- 238000010030 laminating Methods 0.000 claims description 3
- 229920003052 natural elastomer Polymers 0.000 claims description 3
- 229920001194 natural rubber Polymers 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 239000000463 material Substances 0.000 description 3
- 239000000126 substance Substances 0.000 description 3
- 235000019738 Limestone Nutrition 0.000 description 2
- 244000046052 Phaseolus vulgaris Species 0.000 description 2
- 235000010627 Phaseolus vulgaris Nutrition 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000008595 infiltration Effects 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 239000006028 limestone Substances 0.000 description 2
- 229920002635 polyurethane Polymers 0.000 description 2
- 239000004814 polyurethane Substances 0.000 description 2
- 206010008428 Chemical poisoning Diseases 0.000 description 1
- 150000001252 acrylic acid derivatives Chemical class 0.000 description 1
- 210000004883 areola Anatomy 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007865 diluting Methods 0.000 description 1
- 238000005429 filling process Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 229920005610 lignin Polymers 0.000 description 1
- 235000019353 potassium silicate Nutrition 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 229920003051 synthetic elastomer Polymers 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Landscapes
- Revetment (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a method and a structure for plugging a karst pipeline, wherein soybeans (4) and quick-setting mortar (3) are mixed, stirred and coated in a film bag (2) and are placed at a leakage point inlet of the karst pipeline (1), the soybeans (4) expand the volume in the film bag (2) by utilizing the self expansibility before the quick-setting mortar (3) is solidified, the quick-setting mortar (3) is quickly solidified while the volume of the film bag (2) expands, and the film bag (2) is tightly attached to the periphery of the karst pipeline (1) after the quick-setting mortar (3) is solidified to generate friction and stop flowing, so that the aim of plugging the karst pipeline (1) is fulfilled. The invention not only has small construction technical difficulty, simple construction process and low investment, but also achieves good leaking stoppage effect, and can be widely popularized and applied in the technical field of leaking stoppage of karst pipelines.
Description
Technical field
The present invention relates to a kind of blocking method for karst and film pocket type leak stopping structure, belong to Hydraulic and Hydro-Power Engineering technical field.
Background technology
In the regional hydroelectric projects such as current Guizhou, Guangxi, it is limestone when basis when water retaining structure is seated lithology, often limestone is grown more karst, for preventing karst generation Seepage, generally take karst to carry out antiseepage grouting, when karst cavity is larger, take chemical grouting.In the time taking antiseepage grouting, generally dense mortar or pea gravel concreten are injected to karst by grouting equipment, in the time that karst seepage velocity is higher, above leaking-stopping measure often ends in failure, and traces it to its cause, when after dense mortar or pea gravel concreten injection karst, the diluting effect being seeped water, dense mortar or pea gravel concreten are difficult to solidify within a short period of time, and its main component cement is taken away by infiltration, even if leave part microlith in karst, be still difficult to reach the object of leak stopping; In the time that karst cavity is large and seepage velocity is very large, generally take chemical grouting, its grouting agent has water glass, acrylates, soluble polyurethane, elastic polyurethane and lignin slurry etc., its impervious leakage-stopping is respond well, but grouting agent is expensive, and chemical grouting construction difficulty is larger, working procedure complexity, in filling process, easily produce chemical poisoning, security risk is large.Therefore, existing karst leaking-stopping measure is dissatisfactory.
Summary of the invention
The object of the present invention is to provide a kind of blocking method for karst and structure, to overcome the deficiencies in the prior art.
Technical scheme of the present invention is such: it is a kind of blocking method for karst, it adopts a kind of film pocket type leak stopping structure, this film pocket type leak stopping structure is by soya bean and quick-setting mortar mix and blend and is coated in a film bag and is positioned over the breakthrough import of karst, film bag can be subject to the induced effect of seepage flow current and get into the breakthrough of karst, and in this process, soya bean utilized the dilatancy of self that film bag inner volume is expanded before quick-setting mortar solidifies, when the long-pending generation of film bag is expanded, quick-setting mortar solidifies rapidly, quick-setting mortar solidifies caudacoria bag and karst periphery is fitted consolidation and produces frictional force and stop flowing, thereby reach the object of karst leak stopping.This leak stopping mode, is to utilize the mobility of seepage flow self to remove to block seepage flow, therefore has good guidance quality.
Therefore, the present invention has adopted such karst film pocket type leak stopping structure, it is in the breakthrough import of karst, at least one to be set can produce mobile film bag with current, and film bag is enclosed construction, is coated with the soya bean and the quick-setting mortar that mix together in film bag.Certainly, in film bag, the ratio of quick-setting mortar and soya bean is also very important in the technical program, as less in soya bean, be difficult to make film bag to obtain larger dilatancy, and soya bean is more, may causes again film bag to be damaged, or cause the rapid hardening effect of quick-setting mortar bad.Consider, preferred, in each film bag, the mass ratio of quick-setting mortar and soya bean is 3:1~10:1.In addition, film bag is preferably the closed bag shaped structure that natural rubber is made, and also can adopt artificial rubber or other material with high fluidity, pliability and water resistance to make.Film bag shape is preferably flat bag like construction, and its one end or two ends are provided with tip.
The invention has the beneficial effects as follows:
Compared with prior art, the present invention is meeting under the prerequisite of leak stopping requirement, and film bag has high fluidity, pliability and water resistance, not only can fill the different large areolas of karst, and can not punctured by stone tooth, and inner quick-setting mortar and soya bean can not be overflowed.Secondly, soya bean can cause film bag to produce large volume expansion after mixing quick-setting mortar, and quick-setting mortar possesses compared with high viscosity, can solidify rapidly in expanding film bag is long-pending, cause film bag and karst periphery laminating consolidation and produce frictional force and stop flowing, infiltration cannot be released karst, thereby reach the object of karst leak stopping.The present invention not only construction difficulty is little, and working procedure is simple, and reduced investment has also reached good plugging effect, can be in karst leakage stopping technology field wide popularization and application.
brief description of the drawings
Fig. 1 is film pocket type leak stopping structure schematic diagram of the present invention.
Description of reference numerals: 1-karst, 2-film bag, 3-quick-setting mortar, 4-soya bean.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in further detail.
The present invention implements like this: as shown in Figure 1, the present invention mainly adopts a kind of film pocket type leak stopping structure, this film pocket type leak stopping structure, outside is a film bag 2, film bag 2 has soft quality, and has good stretch-resistance and enough intensity, and also must have water proofing property, therefore the selection of material is important, conventionally adopts the film that natural rubber is processed into make.In film bag 2, pack the soya bean 4 and quick-setting mortar 3 of mix and blend into, then after film bag 2 being sealed, be placed on the seepage mouth of karst 1, like this, soya bean 4 utilized the dilatancy of self that film bag 2 inner volumes are expanded before quick-setting mortar 3 solidifies, and film bag 2 can be constantly under the drive of seepage flow be got into towards the seepage mouth in karst 1, simultaneously, when film bag 2 volumes produce expansion, quick-setting mortar 3 solidifies rapidly, quick-setting mortar 3 solidifies caudacoria bag 2 and produces frictional force and stop flowing with karst 1 periphery laminating consolidation, thereby reach the object of karst 1 leak stopping.
In order to make film bag 2 can clamp-on better the trickle seepage mouth of karst 1, film bag 2 can adopt flat structure, and its one end or two ends are provided with tip, like this along with film bag 2 flow, block more easily trickle seepage mouth.
Certainly, in the present invention, soya bean also can adopt other beans to replace, or adopts other to have the material replacement of meeting the slow expansion of water.
Certainly, be more than concrete exemplary applications of the present invention, the present invention also has other embodiment, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, within all dropping on protection domain of the presently claimed invention.
Claims (5)
1. the blocking method for karst, it is characterized in that: adopt film pocket type leak stopping structure, by soya bean (4) and quick-setting mortar (3) mix and blend and be coated on the breakthrough import that is positioned over karst (1) in film bag (2), soya bean (4) utilized the dilatancy of self that film bag (2) inner volume is expanded before quick-setting mortar (3) solidifies, when film bag (2) volume produces expansion, quick-setting mortar (3) solidifies rapidly, quick-setting mortar (3) solidifies caudacoria bag (2) and produces frictional force and stop flowing with karst (1) periphery laminating consolidation, thereby reach the object of karst (1) leak stopping.
2. the karst film pocket type leak stopping structure for method described in claim 1, comprise karst (1), it is characterized in that: in the breakthrough import of karst (1), at least one is set and can produces mobile film bag (2) with current, film bag (2) is enclosed construction, is coated with the soya bean (4) and the quick-setting mortar (3) that mix together in film bag (2).
3. karst film pocket type leak stopping structure according to claim 2, is characterized in that: in each film bag (2), the mass ratio of quick-setting mortar (3) and soya bean (4) is 3:1~10:1.
4. according to right karst film claimed in claim 2 pocket type leak stopping structure, it is characterized in that: the closed bag shaped structure that described film bag (2) is made for natural rubber.
5. according to right karst film claimed in claim 4 pocket type leak stopping structure, it is characterized in that: described film bag (2) is flat structure, and its one end or two ends are provided with tip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410361677.8A CN104131532B (en) | 2014-07-28 | 2014-07-28 | Leaking stoppage method and structure for karst pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410361677.8A CN104131532B (en) | 2014-07-28 | 2014-07-28 | Leaking stoppage method and structure for karst pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104131532A true CN104131532A (en) | 2014-11-05 |
CN104131532B CN104131532B (en) | 2016-08-17 |
Family
ID=51804371
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410361677.8A Active CN104131532B (en) | 2014-07-28 | 2014-07-28 | Leaking stoppage method and structure for karst pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104131532B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104480902A (en) * | 2014-11-21 | 2015-04-01 | 淮海工学院 | Concrete dam joint leaking stoppage method |
CN107687557A (en) * | 2017-09-28 | 2018-02-13 | 滨州学院 | A kind of automatic leakage-blocking conveyance conduit structure with pressure |
CN107687556A (en) * | 2017-09-28 | 2018-02-13 | 滨州学院 | A kind of automatic leakage-blocking negative pressure transportation pipeline configuration |
CN111424695A (en) * | 2020-04-17 | 2020-07-17 | 中国水利水电第八工程局有限公司 | Seepage-proofing and leakage-stopping method for deep-buried karst pipeline |
CN112796295A (en) * | 2021-01-07 | 2021-05-14 | 北京科技大学 | Method for extruding compact rock-soil body through soybean capsule air inflation |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004036245A (en) * | 2002-07-04 | 2004-02-05 | Shinagawa Yozai Kk | Water cut-off agent using bentonite |
CN202755349U (en) * | 2012-09-27 | 2013-02-27 | 北京金兴龙宇帐篷有限公司 | Water swellable bag |
CN103074869A (en) * | 2013-02-05 | 2013-05-01 | 张永忠 | Dam leakage stopping method |
-
2014
- 2014-07-28 CN CN201410361677.8A patent/CN104131532B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004036245A (en) * | 2002-07-04 | 2004-02-05 | Shinagawa Yozai Kk | Water cut-off agent using bentonite |
CN202755349U (en) * | 2012-09-27 | 2013-02-27 | 北京金兴龙宇帐篷有限公司 | Water swellable bag |
CN103074869A (en) * | 2013-02-05 | 2013-05-01 | 张永忠 | Dam leakage stopping method |
Non-Patent Citations (2)
Title |
---|
曾金石: "卵砾石次生覆盖层防渗灌浆施工技术研究", 《中国水利学会第9此水利水电地基与基础工程学术会议》, 16 August 2007 (2007-08-16), pages 2 - 4 * |
杨忠兴: "岩溶地区复杂地质条件下的堵漏防渗施工技术", 《四川水利发电》, vol. 32, no. 2, 30 April 2013 (2013-04-30), pages 20 - 25 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104480902A (en) * | 2014-11-21 | 2015-04-01 | 淮海工学院 | Concrete dam joint leaking stoppage method |
CN107687557A (en) * | 2017-09-28 | 2018-02-13 | 滨州学院 | A kind of automatic leakage-blocking conveyance conduit structure with pressure |
CN107687556A (en) * | 2017-09-28 | 2018-02-13 | 滨州学院 | A kind of automatic leakage-blocking negative pressure transportation pipeline configuration |
CN111424695A (en) * | 2020-04-17 | 2020-07-17 | 中国水利水电第八工程局有限公司 | Seepage-proofing and leakage-stopping method for deep-buried karst pipeline |
CN111424695B (en) * | 2020-04-17 | 2022-01-07 | 中国水利水电第八工程局有限公司 | Seepage-proofing and leakage-stopping method for deep-buried karst pipeline |
CN112796295A (en) * | 2021-01-07 | 2021-05-14 | 北京科技大学 | Method for extruding compact rock-soil body through soybean capsule air inflation |
Also Published As
Publication number | Publication date |
---|---|
CN104131532B (en) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104131532B (en) | Leaking stoppage method and structure for karst pipeline | |
CN104018526B (en) | EPR deformation joint repairs water-stopping structure and construction method thereof | |
CN105442862A (en) | Method for leakage water plugging, strengthening and repairing against concrete crack | |
CN105442622A (en) | Water-retaining construction technology for locked steel pipe piles | |
CN104234065A (en) | Leakage drainage structure of waterproof curtain | |
CN104746479A (en) | Diversion tunnel concrete water seepage leaking stoppage construction method | |
CN104847984B (en) | A kind of pipeline spigot-and-socket Joining Technology | |
MY172978A (en) | Method of limiting permeability of a matrix to limit liquid and gas inflow | |
SA520412244B1 (en) | Material Design for The Encapsulation of Additives And Release | |
CN105696522A (en) | Grouting gallery permanent expansion joint water seepage treatment method | |
CN204112350U (en) | Water stopping curtain seepage flow guiding structure | |
CN104213562A (en) | Plugging device of grouting hole and using method thereof | |
CN103244135B (en) | Construction method for manufacturing mud film in high-permeability stratum | |
CN102561720B (en) | Plugging and leakage-stopping method under flowing water condition | |
CN205260042U (en) | Annular stabilization by freezing stagnant water structure when shield ventral brush is changed | |
CN204174582U (en) | Karst pipeline membrane bag formula leaking stoppage structure | |
CN204783051U (en) | Thick liquid blender | |
CN104529339B (en) | A kind of polypropylene cross-linked copolymer fiber concrete leak stopping slurry | |
CN110966011A (en) | Method for manufacturing combined mud film for shield air pressure opening | |
CN202467865U (en) | Combined hydraulic high-pressure tunnel plug | |
CN113683369B (en) | Strong-permeability stratum double-liquid grouting new material in flowing water environment and preparation method thereof | |
CN104631478A (en) | Method and device for quick blockage of piping in deep foundation pit | |
CN205689994U (en) | The inside and outside prosthetic device simultaneously of a kind of pipeline | |
CN106007610B (en) | A kind of waterproof dam material, its application method and application based on ardealite base | |
CN212318013U (en) | Combined grouting structure suitable for rapidly plugging tunnel leakage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |