CN104131532A - Leaking stoppage method and structure for karst pipeline - Google Patents

Leaking stoppage method and structure for karst pipeline Download PDF

Info

Publication number
CN104131532A
CN104131532A CN201410361677.8A CN201410361677A CN104131532A CN 104131532 A CN104131532 A CN 104131532A CN 201410361677 A CN201410361677 A CN 201410361677A CN 104131532 A CN104131532 A CN 104131532A
Authority
CN
China
Prior art keywords
karst
film bag
quick
film
setting mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410361677.8A
Other languages
Chinese (zh)
Other versions
CN104131532B (en
Inventor
周先练
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201410361677.8A priority Critical patent/CN104131532B/en
Publication of CN104131532A publication Critical patent/CN104131532A/en
Application granted granted Critical
Publication of CN104131532B publication Critical patent/CN104131532B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a method and a structure for plugging a karst pipeline, wherein soybeans (4) and quick-setting mortar (3) are mixed, stirred and coated in a film bag (2) and are placed at a leakage point inlet of the karst pipeline (1), the soybeans (4) expand the volume in the film bag (2) by utilizing the self expansibility before the quick-setting mortar (3) is solidified, the quick-setting mortar (3) is quickly solidified while the volume of the film bag (2) expands, and the film bag (2) is tightly attached to the periphery of the karst pipeline (1) after the quick-setting mortar (3) is solidified to generate friction and stop flowing, so that the aim of plugging the karst pipeline (1) is fulfilled. The invention not only has small construction technical difficulty, simple construction process and low investment, but also achieves good leaking stoppage effect, and can be widely popularized and applied in the technical field of leaking stoppage of karst pipelines.

Description

A kind of blocking method for karst and structure
Technical field
The present invention relates to a kind of blocking method for karst and film pocket type leak stopping structure, belong to Hydraulic and Hydro-Power Engineering technical field.
Background technology
In the regional hydroelectric projects such as current Guizhou, Guangxi, it is limestone when basis when water retaining structure is seated lithology, often limestone is grown more karst, for preventing karst generation Seepage, generally take karst to carry out antiseepage grouting, when karst cavity is larger, take chemical grouting.In the time taking antiseepage grouting, generally dense mortar or pea gravel concreten are injected to karst by grouting equipment, in the time that karst seepage velocity is higher, above leaking-stopping measure often ends in failure, and traces it to its cause, when after dense mortar or pea gravel concreten injection karst, the diluting effect being seeped water, dense mortar or pea gravel concreten are difficult to solidify within a short period of time, and its main component cement is taken away by infiltration, even if leave part microlith in karst, be still difficult to reach the object of leak stopping; In the time that karst cavity is large and seepage velocity is very large, generally take chemical grouting, its grouting agent has water glass, acrylates, soluble polyurethane, elastic polyurethane and lignin slurry etc., its impervious leakage-stopping is respond well, but grouting agent is expensive, and chemical grouting construction difficulty is larger, working procedure complexity, in filling process, easily produce chemical poisoning, security risk is large.Therefore, existing karst leaking-stopping measure is dissatisfactory.
Summary of the invention
The object of the present invention is to provide a kind of blocking method for karst and structure, to overcome the deficiencies in the prior art.
Technical scheme of the present invention is such: it is a kind of blocking method for karst, it adopts a kind of film pocket type leak stopping structure, this film pocket type leak stopping structure is by soya bean and quick-setting mortar mix and blend and is coated in a film bag and is positioned over the breakthrough import of karst, film bag can be subject to the induced effect of seepage flow current and get into the breakthrough of karst, and in this process, soya bean utilized the dilatancy of self that film bag inner volume is expanded before quick-setting mortar solidifies, when the long-pending generation of film bag is expanded, quick-setting mortar solidifies rapidly, quick-setting mortar solidifies caudacoria bag and karst periphery is fitted consolidation and produces frictional force and stop flowing, thereby reach the object of karst leak stopping.This leak stopping mode, is to utilize the mobility of seepage flow self to remove to block seepage flow, therefore has good guidance quality.
Therefore, the present invention has adopted such karst film pocket type leak stopping structure, it is in the breakthrough import of karst, at least one to be set can produce mobile film bag with current, and film bag is enclosed construction, is coated with the soya bean and the quick-setting mortar that mix together in film bag.Certainly, in film bag, the ratio of quick-setting mortar and soya bean is also very important in the technical program, as less in soya bean, be difficult to make film bag to obtain larger dilatancy, and soya bean is more, may causes again film bag to be damaged, or cause the rapid hardening effect of quick-setting mortar bad.Consider, preferred, in each film bag, the mass ratio of quick-setting mortar and soya bean is 3:1~10:1.In addition, film bag is preferably the closed bag shaped structure that natural rubber is made, and also can adopt artificial rubber or other material with high fluidity, pliability and water resistance to make.Film bag shape is preferably flat bag like construction, and its one end or two ends are provided with tip.
The invention has the beneficial effects as follows:
Compared with prior art, the present invention is meeting under the prerequisite of leak stopping requirement, and film bag has high fluidity, pliability and water resistance, not only can fill the different large areolas of karst, and can not punctured by stone tooth, and inner quick-setting mortar and soya bean can not be overflowed.Secondly, soya bean can cause film bag to produce large volume expansion after mixing quick-setting mortar, and quick-setting mortar possesses compared with high viscosity, can solidify rapidly in expanding film bag is long-pending, cause film bag and karst periphery laminating consolidation and produce frictional force and stop flowing, infiltration cannot be released karst, thereby reach the object of karst leak stopping.The present invention not only construction difficulty is little, and working procedure is simple, and reduced investment has also reached good plugging effect, can be in karst leakage stopping technology field wide popularization and application.
brief description of the drawings
Fig. 1 is film pocket type leak stopping structure schematic diagram of the present invention.
Description of reference numerals: 1-karst, 2-film bag, 3-quick-setting mortar, 4-soya bean.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in further detail.
The present invention implements like this: as shown in Figure 1, the present invention mainly adopts a kind of film pocket type leak stopping structure, this film pocket type leak stopping structure, outside is a film bag 2, film bag 2 has soft quality, and has good stretch-resistance and enough intensity, and also must have water proofing property, therefore the selection of material is important, conventionally adopts the film that natural rubber is processed into make.In film bag 2, pack the soya bean 4 and quick-setting mortar 3 of mix and blend into, then after film bag 2 being sealed, be placed on the seepage mouth of karst 1, like this, soya bean 4 utilized the dilatancy of self that film bag 2 inner volumes are expanded before quick-setting mortar 3 solidifies, and film bag 2 can be constantly under the drive of seepage flow be got into towards the seepage mouth in karst 1, simultaneously, when film bag 2 volumes produce expansion, quick-setting mortar 3 solidifies rapidly, quick-setting mortar 3 solidifies caudacoria bag 2 and produces frictional force and stop flowing with karst 1 periphery laminating consolidation, thereby reach the object of karst 1 leak stopping.
In order to make film bag 2 can clamp-on better the trickle seepage mouth of karst 1, film bag 2 can adopt flat structure, and its one end or two ends are provided with tip, like this along with film bag 2 flow, block more easily trickle seepage mouth.
Certainly, in the present invention, soya bean also can adopt other beans to replace, or adopts other to have the material replacement of meeting the slow expansion of water.
Certainly, be more than concrete exemplary applications of the present invention, the present invention also has other embodiment, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, within all dropping on protection domain of the presently claimed invention.

Claims (5)

1. the blocking method for karst, it is characterized in that: adopt film pocket type leak stopping structure, by soya bean (4) and quick-setting mortar (3) mix and blend and be coated on the breakthrough import that is positioned over karst (1) in film bag (2), soya bean (4) utilized the dilatancy of self that film bag (2) inner volume is expanded before quick-setting mortar (3) solidifies, when film bag (2) volume produces expansion, quick-setting mortar (3) solidifies rapidly, quick-setting mortar (3) solidifies caudacoria bag (2) and produces frictional force and stop flowing with karst (1) periphery laminating consolidation, thereby reach the object of karst (1) leak stopping.
2. the karst film pocket type leak stopping structure for method described in claim 1, comprise karst (1), it is characterized in that: in the breakthrough import of karst (1), at least one is set and can produces mobile film bag (2) with current, film bag (2) is enclosed construction, is coated with the soya bean (4) and the quick-setting mortar (3) that mix together in film bag (2).
3. karst film pocket type leak stopping structure according to claim 2, is characterized in that: in each film bag (2), the mass ratio of quick-setting mortar (3) and soya bean (4) is 3:1~10:1.
4. according to right karst film claimed in claim 2 pocket type leak stopping structure, it is characterized in that: the closed bag shaped structure that described film bag (2) is made for natural rubber.
5. according to right karst film claimed in claim 4 pocket type leak stopping structure, it is characterized in that: described film bag (2) is flat structure, and its one end or two ends are provided with tip.
CN201410361677.8A 2014-07-28 2014-07-28 Leaking stoppage method and structure for karst pipeline Active CN104131532B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410361677.8A CN104131532B (en) 2014-07-28 2014-07-28 Leaking stoppage method and structure for karst pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410361677.8A CN104131532B (en) 2014-07-28 2014-07-28 Leaking stoppage method and structure for karst pipeline

Publications (2)

Publication Number Publication Date
CN104131532A true CN104131532A (en) 2014-11-05
CN104131532B CN104131532B (en) 2016-08-17

Family

ID=51804371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410361677.8A Active CN104131532B (en) 2014-07-28 2014-07-28 Leaking stoppage method and structure for karst pipeline

Country Status (1)

Country Link
CN (1) CN104131532B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480902A (en) * 2014-11-21 2015-04-01 淮海工学院 Concrete dam joint leaking stoppage method
CN107687557A (en) * 2017-09-28 2018-02-13 滨州学院 A kind of automatic leakage-blocking conveyance conduit structure with pressure
CN107687556A (en) * 2017-09-28 2018-02-13 滨州学院 A kind of automatic leakage-blocking negative pressure transportation pipeline configuration
CN111424695A (en) * 2020-04-17 2020-07-17 中国水利水电第八工程局有限公司 Seepage-proofing and leakage-stopping method for deep-buried karst pipeline
CN112796295A (en) * 2021-01-07 2021-05-14 北京科技大学 Method for extruding compact rock-soil body through soybean capsule air inflation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004036245A (en) * 2002-07-04 2004-02-05 Shinagawa Yozai Kk Water cut-off agent using bentonite
CN202755349U (en) * 2012-09-27 2013-02-27 北京金兴龙宇帐篷有限公司 Water swellable bag
CN103074869A (en) * 2013-02-05 2013-05-01 张永忠 Dam leakage stopping method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004036245A (en) * 2002-07-04 2004-02-05 Shinagawa Yozai Kk Water cut-off agent using bentonite
CN202755349U (en) * 2012-09-27 2013-02-27 北京金兴龙宇帐篷有限公司 Water swellable bag
CN103074869A (en) * 2013-02-05 2013-05-01 张永忠 Dam leakage stopping method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
曾金石: "卵砾石次生覆盖层防渗灌浆施工技术研究", 《中国水利学会第9此水利水电地基与基础工程学术会议》, 16 August 2007 (2007-08-16), pages 2 - 4 *
杨忠兴: "岩溶地区复杂地质条件下的堵漏防渗施工技术", 《四川水利发电》, vol. 32, no. 2, 30 April 2013 (2013-04-30), pages 20 - 25 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480902A (en) * 2014-11-21 2015-04-01 淮海工学院 Concrete dam joint leaking stoppage method
CN107687557A (en) * 2017-09-28 2018-02-13 滨州学院 A kind of automatic leakage-blocking conveyance conduit structure with pressure
CN107687556A (en) * 2017-09-28 2018-02-13 滨州学院 A kind of automatic leakage-blocking negative pressure transportation pipeline configuration
CN111424695A (en) * 2020-04-17 2020-07-17 中国水利水电第八工程局有限公司 Seepage-proofing and leakage-stopping method for deep-buried karst pipeline
CN111424695B (en) * 2020-04-17 2022-01-07 中国水利水电第八工程局有限公司 Seepage-proofing and leakage-stopping method for deep-buried karst pipeline
CN112796295A (en) * 2021-01-07 2021-05-14 北京科技大学 Method for extruding compact rock-soil body through soybean capsule air inflation

Also Published As

Publication number Publication date
CN104131532B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN104131532B (en) Leaking stoppage method and structure for karst pipeline
CN104018526B (en) EPR deformation joint repairs water-stopping structure and construction method thereof
CN105442862A (en) Method for leakage water plugging, strengthening and repairing against concrete crack
CN105442622A (en) Water-retaining construction technology for locked steel pipe piles
CN104234065A (en) Leakage drainage structure of waterproof curtain
CN104746479A (en) Diversion tunnel concrete water seepage leaking stoppage construction method
CN104847984B (en) A kind of pipeline spigot-and-socket Joining Technology
MY172978A (en) Method of limiting permeability of a matrix to limit liquid and gas inflow
SA520412244B1 (en) Material Design for The Encapsulation of Additives And Release
CN105696522A (en) Grouting gallery permanent expansion joint water seepage treatment method
CN204112350U (en) Water stopping curtain seepage flow guiding structure
CN104213562A (en) Plugging device of grouting hole and using method thereof
CN103244135B (en) Construction method for manufacturing mud film in high-permeability stratum
CN102561720B (en) Plugging and leakage-stopping method under flowing water condition
CN205260042U (en) Annular stabilization by freezing stagnant water structure when shield ventral brush is changed
CN204174582U (en) Karst pipeline membrane bag formula leaking stoppage structure
CN204783051U (en) Thick liquid blender
CN104529339B (en) A kind of polypropylene cross-linked copolymer fiber concrete leak stopping slurry
CN110966011A (en) Method for manufacturing combined mud film for shield air pressure opening
CN202467865U (en) Combined hydraulic high-pressure tunnel plug
CN113683369B (en) Strong-permeability stratum double-liquid grouting new material in flowing water environment and preparation method thereof
CN104631478A (en) Method and device for quick blockage of piping in deep foundation pit
CN205689994U (en) The inside and outside prosthetic device simultaneously of a kind of pipeline
CN106007610B (en) A kind of waterproof dam material, its application method and application based on ardealite base
CN212318013U (en) Combined grouting structure suitable for rapidly plugging tunnel leakage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant