CN104129476B CN201410307508.6A CN201410307508A CN104129476B CN 104129476 B CN104129476 B CN 104129476B CN 201410307508 A CN201410307508 A CN 201410307508A CN 104129476 B CN104129476 B CN 104129476B
Authority
CN
China
Prior art keywords
anchor
cable
winch
tension
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410307508.6A
Other languages
Chinese (zh)
Other versions
CN104129476A (en
Inventor
汪康平
高卓
李博炜
张文亮
张军福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Marine Machinery Plant Co Ltd
Original Assignee
Wuhan Marine Machinery Plant Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Marine Machinery Plant Co Ltd filed Critical Wuhan Marine Machinery Plant Co Ltd
Priority to CN201410307508.6A priority Critical patent/CN104129476B/en
Publication of CN104129476A publication Critical patent/CN104129476A/en
Application granted granted Critical
Publication of CN104129476B publication Critical patent/CN104129476B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses anchoring method and the device of a kind of boats and ships, belong to ship domain.Method includes: needs the cable length of cable laying according to the position location set, boats and ships in the preset stem direction of position location and at least three anchor, determines the position of casting anchor of at least three anchor;The polygonal central region that position location is formed with the position of casting anchor of at least three anchor, boats and ships are driven towards the position of casting anchor of first anchor, and in the position of casting anchor of first anchor, first anchor is thrown the bottom, first anchor is any one anchor at least three anchor, start clockwise or counterclockwise from the position of casting anchor of first anchor, successively the row that anchors into not cast anchor at least three anchor is cast anchor, until the bottom all thrown by all of anchor, boats and ships are sailed to position location.Device includes: first sensor, input equipment and control equipment.The present invention will avoid the anchor chain generation winding situation of anchor being thrown in water.

Description

The anchoring method of a kind of boats and ships and device
Technical field
The present invention relates to ship domain, particularly to anchoring method and the device of a kind of boats and ships.
Background technology
China is inland river more than, and the country that waters is complicated, Shipping rises emphatically in the national economic development The effect wanted.The position fixing process of boats and ships be unable to do without positioning winch.Hawser is realized by the handle of operation winch Folding and unfolding, thus realize rising and falling of anchor.Generally, the location mode of boats and ships includes multipoint positioning mode.
During realizing the present invention, inventor finds that prior art at least there is problems in that at multiple spot During location, multiple anchor need to be thrown into in water.A lot of owing to water can not be surveyed factor, such as ocean current, wave etc., These X factors can cause anchor to throw later in water impact, and anchor chain is intertwined, and directly resulting in cannot Moor a boat in location, after there is this situation, owing to its processing cost of bad environments is the highest.
Summary of the invention
In order to solve the problem that anchor chain is wound around, embodiments provide anchoring method and the dress of a kind of boats and ships Put.Described technical scheme is as follows:
First aspect, it is provided that the anchoring method of a kind of boats and ships, described method is applicable to Ship Anchoring, described Boats and ships include that at least three anchor, described method include:
According to the position location set, described boats and ships in the preset stem direction of described position location and described The respective cable length needing cable laying of at least three anchor, determines the position of casting anchor of described at least three anchor respectively, Described position location is positioned at the polygonal central region formed with the position of casting anchor of described at least three anchor;
Described boats and ships are sailed the position of casting anchor to first anchor, and described first anchor is appointing in described at least three anchor One, in the position of casting anchor of described first anchor, described first anchor is thrown the bottom;
Start clockwise or counterclockwise from the position of casting anchor of described first anchor, successively to described at least three The row that anchors into not cast anchor in individual anchor casts anchor, until the bottom all thrown by all of anchor;
Described boats and ships are sailed to described position location;
Wherein, the described position of casting anchor from described first anchor starts clockwise or counterclockwise, the most right The row that anchors into not cast anchor in described at least three anchor casts anchor, including:
Described boats and ships are sailed to the next one position of casting anchor of the anchor not cast anchor, and in the process of described ship running In, keeping the cable tension of winch being in cable laying state is the first pre-set tension, described in be in cable laying state Winch be the position of casting anchor of the anchor that cast anchor position and the described next one according to the described anchor cast anchor do not cast anchor Between distance determine from the winch belonging to the described anchor cast anchor;
Keeping the cable tension being in the winch stopping cable laying state is the second pre-set tension, at the described next one The anchor that the described next one does not casts anchor is thrown the bottom by the position of casting anchor of the anchor not cast anchor, described in be in stopping cable laying The winch of state is the winch belonging to the described anchor cast anchor.
In the embodiment that the first is possible, the described position location according to setting, described boats and ships are described The preset stem direction of position location and described at least three anchor need the cable length of cable laying, determine described in extremely The position of casting anchor of few three anchors, including:
The most affiliated according to the described boats and ships preset stem direction and described at least three anchor in described position location Winch installation site on described boats and ships, determine the direction of the position of casting anchor of described at least three anchor, institute State the direction of the position of casting anchor of at least three anchor and stem described at least three when being described preset stem direction The direction of the installation site on described boats and ships of the winch belonging to anchor difference is identical;
The pre-of the cable length of cable laying and the position of casting anchor of described at least three anchor is needed according to described at least three anchor Put the depth of water, determine the position distance respectively and between described position location of casting anchor of described at least three anchor;
The direction of the position of casting anchor according to described at least three anchor, from described position location to described at least three The direction of the position of casting anchor of anchor preset angle respectively and between described preset stem direction and described at least The position distance respectively and between described position location of casting anchor of three anchors, determines described at least three anchor Cast anchor position respectively in described preset stem direction and the side-play amount of the vertical direction in described preset stem direction;
Geographical coordinate according to described position location and the position of casting anchor of described at least three anchor are respectively described pre- Put the side-play amount of the vertical direction in stem direction and described preset stem direction, determine described at least three anchor The geographical coordinate of position of casting anchor.
In the embodiment that the second is possible, described during described ship running, keep being in putting The cable tension of the winch of cable state is the first pre-set tension, including:
It is in the cable tension of the winch of cable laying state described in detection, obtains tension signal, and according to described Force signal is in the cable tension of winch of cable laying state described in determining;
Whether the cable tension of winch of cable laying state it is in more than described first pre-set tension described in judgement;
When the cable tension of the described winch being in cable laying state is more than described first pre-set tension, increase institute State the cable releasing speed of the winch being in cable laying state;
When the cable tension of the described winch being in cable laying state is less than described first pre-set tension, reduce institute State the cable releasing speed of the winch being in cable laying state;
When the cable tension of the described winch being in cable laying state is equal to described first pre-set tension, keep institute The cable releasing speed stating the winch being in cable laying state is, the current driving speed of described boats and ships is put described being in The component of the hawser bearing of trend of the winch of cable state.
In the embodiment that the third is possible, described holding is in the hawser of the winch stopping cable laying state and opens Power is the second pre-set tension, including:
It is in the cable tension of the winch stopping cable laying state described in detection, obtains tension signal, and according to institute State tension signal determine described in be in the cable tension of winch stopping cable laying state;
Whether the cable tension being in the winch stopping cable laying state described in judgement is less than described second default Power;
When the cable tension of the described winch being in and stopping cable laying state is less than described second pre-set tension, right The described winch being in stopping cable laying state carries out take-up;
When the cable tension of the described winch being in and stopping cable laying state is more than described second pre-set tension, right The described winch being in stopping cable laying state carries out cable laying;
When the cable tension of the described winch being in and stopping cable laying state is equal to described second pre-set tension, stop Only the described winch being in stopping cable laying state is carried out take-up or cable laying.
In the 4th kind of possible embodiment, the hawser of the winch being in cable laying state described in described detection is opened Power, including:
By being in the cable tension of the winch of cable laying state described in the detection of bearing pin sensor, described bearing pin senses Device be arranged on described in be in cable laying state winch vertical chock on.
In the 5th kind of possible embodiment, described boats and ships are sailed to described position location, described side Method also includes:
Stop described at least three is anchored into row take-up or cable laying, keep the winch belonging to described at least three anchor Cable tension be respectively described second pre-set tension;
And adjust the stem direction of described boats and ships, making described boats and ships is location, described preset stem direction with stem In described position location.
Second aspect, it is provided that the anchoring method of a kind of boats and ships, described method is applicable to Ship Anchoring, described Boats and ships include that first to fourth anchor, described method include:
According to the position location set, described boats and ships in the preset stem direction of described position location and described First to fourth anchor needs the cable length of cable laying, determines the position of casting anchor of described first to fourth anchor, described fixed Position, position is positioned at the central region of the tetragon formed with the position of casting anchor of described first to fourth anchor;
Described boats and ships are driven towards the position of casting anchor of described first anchor, and in the position of casting anchor of described first anchor by institute State the first anchor and throw the bottom;
The cable tension keeping described first anchor to be cable laying state and described first anchor is the first pre-set tension, will Described boats and ships drive towards the position of casting anchor of described second anchor from the position of casting anchor of described first anchor;
The cable tension keeping described first anchor to be stopping cable laying state and described first anchor is second default Power, makes described boats and ships be parked in the position of casting anchor of described second anchor, and in the position of casting anchor of described second anchor by institute State the second anchor and throw the bottom;
Described first anchor and described second anchor is kept to be respectively described cable laying state and described first anchor and described The cable tension of two anchors is respectively described first pre-set tension, by described boats and ships from the position of casting anchor of described second anchor Put the position of casting anchor driving towards described 3rd anchor;
Described first anchor and described second anchor is kept to be respectively described stopping cable laying state and described first anchor and institute The cable tension stating the second anchor is respectively described second pre-set tension, makes described boats and ships be parked in described 3rd anchor Cast anchor position, and in the position of casting anchor of described 3rd anchor, described 3rd anchor is thrown the bottom;
Described first anchor is kept to be take-up state and keep described second anchor and described 3rd anchor the most described The cable tension of cable laying state and the second anchor and the 3rd anchor is respectively described first pre-set tension, by described boats and ships The position of casting anchor of described 4th anchor is driven towards from the position of casting anchor of described 3rd anchor;
Described first anchor, described second anchor and described 3rd anchor is kept to be respectively described stopping cable laying state and institute The cable tension stating the first anchor, described second anchor and described 3rd anchor is respectively described second pre-set tension, makes Described boats and ships are parked in the position of casting anchor of described 4th anchor, and in the position of casting anchor of described 4th anchor by the described 4th The bottom thrown by anchor;
Described first anchor, described second anchor and described 3rd anchor is kept to be respectively described take-up state and keep Described 4th anchor be the cable tension of described cable laying state and described 4th anchor be described first pre-set tension, will Described boats and ships drive towards described position location from the position of casting anchor of described 4th anchor.
The third aspect, it is provided that the ground tackle of a kind of boats and ships, described device is applicable to preceding method, described Boats and ships include at least three anchor and winch, and the quantity of described anchor is identical with the quantity of described winch and described in one The corresponding described winch of anchor, described device includes:
First sensor, for detecting the cable tension of described winch;
Input equipment, for inputting the position location of setting, the described boats and ships preset ship in described position location Bow direction and the respective cable length needing cable laying of described at least three anchor, and input instruction of casting anchor;
Control equipment, for the position location of setting according to input equipment input, described boats and ships described fixed The preset stem direction of position, position and the respective cable length needing cable laying of described at least three anchor, the most really The position of casting anchor of fixed described at least three anchor, described position location is positioned at the position of casting anchor of described at least three anchor Put the polygonal central region of formation;
According to the instruction of casting anchor of input equipment input, described boats and ships are sailed the position of casting anchor to first anchor, described First anchor is any one in described at least three anchor, and in the position of casting anchor of described first anchor by described first The bottom thrown by anchor;
Start clockwise or counterclockwise from the position of casting anchor of described first anchor, successively to described at least three The row that anchors into not cast anchor in individual anchor casts anchor, until the bottom all thrown by all of anchor;
Described boats and ships are sailed to described position location;
Wherein, the described position of casting anchor from described first anchor starts clockwise or counterclockwise, the most right The row that anchors into not cast anchor in described at least three anchor casts anchor, including:
Described boats and ships are sailed to the next one position of casting anchor of the anchor not cast anchor, and in the process of described ship running In, according to the cable tension of the winch being in cable laying state of first sensor detection, keep being in cable laying shape The cable tension of the winch of state is the first pre-set tension, described in be in the winch of cable laying state be according to described The anchor cast anchor cast anchor position and the distance casting anchor between position of anchor that the described next one does not casts anchor from described The winch belonging to anchor cast anchor is determined;
According to the cable tension being in the winch stopping cable laying state of first sensor detection, keep being in stopping Only the cable tension of the winch of cable laying state is the second pre-set tension, in the throwing of the anchor that the described next one does not casts anchor The anchor that the described next one does not casts anchor is thrown the bottom by anchor location, described in be in stop cable laying state winch be institute State the winch belonging to the anchor cast anchor.
In the embodiment that the first is possible, described device also includes the second sensor,
Described second sensor is used for, and detects the travel speed of described boats and ships;
Described control equipment is used for, when the cable tension of the described winch being in cable laying state is equal to described first During pre-set tension, the cable releasing speed of the winch being in cable laying state described in holding is, described second sensor inspection Survey described boats and ships current driving speed the described winch being in cable laying state hawser bearing of trend point Amount.
In the embodiment that the second is possible, described first sensor is bearing pin sensor, and described bearing pin passes Sensor be arranged on described in be in cable laying state winch vertical chock on.
The technical scheme that the embodiment of the present invention provides has the benefit that
During boats and ships are sailed to the next one position of casting anchor of the anchor not cast anchor, keep being in cable laying shape The cable tension of the winch of state is the first pre-set tension;Further, the position of casting anchor of the anchor not cast anchor at the next one When the bottom thrown by the anchor not cast anchor by the next one, holding is in the cable tension of the winch stopping cable laying state and is Second pre-set tension;Before not arriving position location at boats and ships, the cable tension of each anchor is controlled Preset range, therefore, the anchor chain avoiding the anchor being thrown in water, during casting anchor, is wound around by boats and ships Situation.
Accompanying drawing explanation
For the technical scheme being illustrated more clearly that in the embodiment of the present invention, institute in embodiment being described below The accompanying drawing used is needed to be briefly described, it should be apparent that, the accompanying drawing in describing below is only the present invention Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the flow chart of the anchoring method of a kind of boats and ships that the embodiment of the present invention provides;
Fig. 2 is the flow chart of the anchoring method of another boats and ships that the embodiment of the present invention provides;
Fig. 3 is the schematic diagram of the installation site of first to fourth anchor that the embodiment of the present invention provides;
Fig. 4 is showing of the geographical coordinate of the position of casting anchor of determination first to fourth anchor that the embodiment of the present invention provides It is intended to;
Fig. 5 is the detail flowchart of step 206 in Fig. 2;
Fig. 6 is the detail flowchart of step 207 in Fig. 2;
Fig. 7 is the schematic diagram of the anchoring method of a kind of boats and ships that the embodiment of the present invention provides;
Fig. 8 is the structural representation of the ground tackle of a kind of boats and ships that the embodiment of the present invention provides;
Fig. 9 is the structural representation of the ground tackle of another boats and ships that the embodiment of the present invention provides.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing to the present invention Embodiment is described in further detail.
Embodiment one
Present embodiments providing the anchoring method of a kind of boats and ships, the method is applicable to Ship Anchoring.This boats and ships bag Include at least three anchor.Seeing Fig. 1, the method comprises the following steps:
In a step 101, according to set position location, boats and ships position location preset stem direction with And at least three anchor needs the cable length of cable laying, determine the position of casting anchor of at least three anchor.
Wherein, the polygonal central region that position location is formed with the position of casting anchor of at least three anchor.
In the present embodiment, at least three anchor respectively belonging to winch installation site on boats and ships do not limit Fixed.
In a step 102, boats and ships are driven towards the position of casting anchor of first anchor, and will in the position of casting anchor of first anchor The bottom thrown by first anchor.
Wherein, any one anchor during first anchor is at least three anchor.
In step 103, start clockwise or counterclockwise from the position of casting anchor of first anchor, the most right The row that anchors into not cast anchor at least three anchor casts anchor, until the bottom all thrown by all of anchor.
This step 103 includes: boats and ships are sailed to the next one position of casting anchor of the anchor not cast anchor, and at boats and ships row During sailing, the cable tension keeping the winch being in cable laying state is the first pre-set tension, is in cable laying The winch of state is to cast anchor position and the casting anchor between position of anchor that the next one does not casts anchor according to the anchor that cast anchor Distance determine from the winch belonging to the anchor cast anchor;Holding is in the winch of stopping cable laying state Cable tension is the second pre-set tension, the anchor not cast anchor at the next one cast anchor what the next one was not cast anchor by position The bottom thrown by anchor, and the winch being in stopping cable laying state is the winch belonging to the anchor cast anchor.
At step 104, boats and ships are sailed to position location.
During the embodiment of the present invention by sailing to the next one position of casting anchor of the anchor not cast anchor by boats and ships, protect The cable tension holding the winch being in cable laying state is the first pre-set tension;Further, do not cast anchor at the next one When the bottom thrown by the anchor that the next one is not cast anchor by the position of casting anchor of anchor, keep being in the winch stopping cable laying state Cable tension be the second pre-set tension;Before not arriving position location at boats and ships, by the cable of each anchor Rope tension controls in preset range, and therefore, boats and ships are during casting anchor, by the anchor avoiding being thrown in water Anchor chain generation winding situation.
Embodiment two
Present embodiments providing the anchoring method of a kind of boats and ships, the method is applicable to Ship Anchoring.This boats and ships bag Include at least three anchor.In the present embodiment, the method will be introduced as a example by four anchors.These four anchors include One to the 4th anchor, first to fourth anchor can be separately mounted to stem and the both sides of ship stern.Such as, the first anchor May be located at the both sides of stem and the 3rd anchor with the second anchor and the 4th anchor may be located at the both sides of ship stern, or, First anchor and the second anchor may be located at the both sides of ship stern and the 3rd anchor and the 4th anchor may be located at the both sides of stem. Wherein, the first anchor and the 4th anchor are positioned at homonymy, and the second anchor and the 3rd anchor are positioned at homonymy.And for example, the first anchor and 4th anchor may be located at the both sides of stem and the 3rd anchor and the second anchor may be located at the both sides of ship stern, or, One anchor and the 4th anchor may be located at the both sides of ship stern and the 3rd anchor and the second anchor may be located at the both sides of stem.Its In, the first anchor and the second anchor are positioned at homonymy, and the 3rd anchor and the 4th anchor are positioned at homonymy.
Seeing Fig. 2, the method comprises the following steps:
In step 201, according to boats and ships at the preset stem direction of position location set and at least three anchor The winch belonging to Fen Bie installation site on boats and ships, determines the direction of the position of casting anchor of at least three anchor.
Wherein, at least three when direction of the position of casting anchor of at least three anchor and stem are preset stem direction The direction of the installation site on boats and ships of the winch belonging to anchor difference is identical.
See Fig. 3, it is assumed that the installation site on boats and ships of the winch belonging to the first anchor and the second anchor difference (includes W1 and W2) it is ship stern, the installation site (bag on boats and ships of the winch belonging to the 3rd anchor and the 4th anchor difference Include W3 and W4) it is stem.Further, the first anchor and the 4th anchor respectively belonging to winch installation site with The installation site of the winch belonging to side, the second anchor and the 3rd anchor difference is at homonymy.When stem is preset stem side To and time preset stem direction is direct north, first to fourth anchor respectively belonging to winch peace on boats and ships Holding position (including W1/W2/W3/W4) is followed successively by southwestward, southeastern direction, northeastward and northwest To.So, the direction of the position of casting anchor (including P1/P2/P3/P4) of first to fourth anchor is also followed successively by southwest Direction, southeastern direction, northeastward and direction, northwest.
In step 202., cable length and the position of casting anchor of at least three anchor of cable laying is needed according at least three anchor The preset depth of water put, determines the position distance respectively and between position location of casting anchor of at least three anchor.
Wherein, at least three anchor needs the cable length hawser total length less than at least three anchor of cable laying.
Wherein, the first anchor needs the preset depth of water of position of casting anchor and first anchor of the hawser of cable laying, the first anchor The distance form right angle triangle cast anchor between position and position location.According to right angled triangle principle, energy Enough determine the distance casting anchor between position and position location of the first anchor.Second to the 4th anchor respectively with sprocket bit The distance algorithm between distance algorithm and the first anchor and position location between putting is identical.
The distance casting anchor between position and position location assuming the first anchor determined is L1.
In step 203, according to the direction of the position of casting anchor of at least three anchor, from position location at least three The direction of the position of casting anchor of individual anchor preset angle respectively and between preset stem direction and at least three anchor Position distance respectively and between position location of casting anchor, determine that the position of casting anchor of at least three anchor exists respectively The side-play amount of the vertical direction in preset stem direction and preset stem direction.
See Fig. 4, the line L1 cast anchor between position P1 and position location O of the first anchor, the throwing of the first anchor Anchor location P1 to the straight line X1 in preset stem direction and position P1 and the position location O that casts anchor of the first anchor Between the line projection Y1 form right angle triangle in preset stem direction.Known from position location O After the preset angle theta 1 between direction and the preset stem direction of the position P1 that casts anchor of the first anchor, Ke Yiji Calculate X1 (equal to L1*sin θ 1) and Y1 (equal to L1*cos θ 1).X1 and Y1 is the first anchor the most respectively The position P1 that casts anchor in preset stem direction and the side-play amount of the vertical direction in preset stem direction.
In step 204, exist respectively according to the geographical coordinate of position location and the position of casting anchor of at least three anchor The side-play amount of the vertical direction in preset stem direction and preset stem direction, determines that at least three anchor casts anchor position The geographical coordinate put.
Achieved by step 201~step 204, according to the position location set, boats and ships in position location Preset stem direction and at least three anchor need the cable length of cable laying, determine the position of casting anchor of at least three anchor. Wherein, the polygonal central region that position location is formed with the position of casting anchor of at least three anchor.
In step 205, boats and ships are driven towards the position of casting anchor of first anchor, and will in the position of casting anchor of first anchor The bottom thrown by first anchor.
Wherein, any one anchor during first anchor is at least three anchor.Whether water can be thrown with the first anchor of artificial judgment The end.
In this example, it is assumed that first anchor is the first anchor.
In step 206, boats and ships are sailed to the next one position of casting anchor of the anchor not cast anchor, and at ship running During, the cable tension keeping the winch being in cable laying state is the first pre-set tension.
Wherein, the winch being in cable laying state is not cast anchor with the next one in the position of casting anchor according to the anchor cast anchor The distance cast anchor between position of anchor determine from the winch belonging to the anchor cast anchor.Such as, throw The distance casting anchor between position of the anchor not cast anchor with the next one in the position of casting anchor of the anchor of anchor is bigger, permissible Winch belonging to the anchor cast anchor is carried out cable laying so that it is be in cable laying state;Casting anchor of the anchor cast anchor The distance cast anchor between position of the anchor that position and the next one do not cast anchor is smaller, can be to the anchor cast anchor Affiliated winch carries out stopping cable laying or take-up.
Wherein, the first pre-set tension is the dynamic tension set, the cable of anchor during keeping ship running Rope possesses suitable tensile force (such as hawser just stretches).
Seeing Fig. 5, this step 206 includes:
The position of casting anchor of the anchor not cast anchor sailed to the next one by boats and ships by step 2061, and in the mistake of ship running Cheng Zhong, detection is in the cable tension of the winch of cable laying state, obtains tension signal, and according to tension signal Determine the cable tension of the winch being in cable laying state.
Cable releasing speed can be the current driving speed of 0.9 times of boats and ships~the current driving speed of 1.1 times of boats and ships exists It is in the component of the hawser bearing of trend of the winch of cable laying state.Wherein, the hawser of the winch of cable laying dress it is in Bearing of trend refer to from anchor in water-bed position to the direction of winch installation site on boats and ships belonging to this anchor.When When the hawser bearing of trend of the winch being in cable laying state is identical with the current driving direction of boats and ships, cable releasing speed Can be the current driving speed of boats and ships;Hawser bearing of trend and boats and ships when the winch that is in cable laying state When current driving direction forms an angle, cable releasing speed can be that the current driving speed of boats and ships is prolonged at this hawser Stretch the component in direction.For example, it is assumed that this angle is α, the current driving speed of boats and ships is V, then boats and ships work as Front travel speed V component V '=V*cos α in hawser direction.
The GPS system that the current driving speed of boats and ships can be installed from boats and ships reads.
The cable tension of the winch of cable laying state can be in by the detection of bearing pin sensor.Bearing pin sensor is pacified It is contained on the vertical chock of the winch being in cable laying state.Vertical chock is for the winding of the hawser to anchor Guide, the tension force of hawser can be transferred on the foil gauge on bearing pin sensor.Foil gauge generation shape Becoming, bearing pin sensor is according to the electric current of the corresponding size of deformation quantity output, thus obtains cable tension.
Step 2062, it is judged that whether be in the cable tension of winch of cable laying state more than the first pre-set tension.
When being in the cable tension of winch of cable laying state more than the first pre-set tension, perform step 2063; When being in the cable tension of winch of cable laying state less than the first pre-set tension, perform step 2064;Work as place When the cable tension of the winch of cable laying state is equal to the first pre-set tension, perform step 2065.
Step 2063, increases the cable releasing speed of the winch being in cable laying state.
Cable releasing speed can be in the winch of cable laying state less than the current driving speed of 1.1 times of boats and ships The component of hawser bearing of trend.
Step 2064, reduces the cable releasing speed of the winch anchor being in cable laying state.
Cable releasing speed can be in the winch of cable laying state not less than the current driving speed of 0.9 times of boats and ships The component of hawser bearing of trend.
Step 2065, the cable releasing speed of the winch that holding is in cable laying state is, the current driving speed of boats and ships Component at the hawser bearing of trend of the winch being in cable laying state.
In step 207, keeping the cable tension being in the winch stopping cable laying state is the second pre-set tension, The bottom thrown by the anchor that the next one is not cast anchor by the position of casting anchor of the anchor not cast anchor at the next one.
Wherein, the winch being in stopping cable laying state is the winch belonging to the anchor cast anchor.
Wherein, the second pre-set tension is the static tensile set, the cable of anchor when travelling for keeping boats and ships to stop Rope possesses suitable tensile force (such as hawser stretches), prevent boats and ships stop in driving process because stormy waves or Ocean current and the boats and ships that cause move.
Seeing Fig. 6, this step 207 includes:
Step 2071, detection is in the cable tension of the winch stopping cable laying state, obtains tension signal, and The cable tension being in the winch stopping cable laying state is determined according to tension signal.
Step 2072, it is judged that whether the cable tension being in the winch stopping cable laying state is less than second default Power.
When the cable tension being in the winch stopping cable laying state is less than the second pre-set tension, perform step 2073;When the cable tension being in the winch stopping cable laying state is more than the second pre-set tension, perform step 2074;When the cable tension being in the winch stopping cable laying state is equal to the second pre-set tension, perform step 2075。
Step 2073, carries out take-up to being in the winch stopping cable laying state.
Step 2074, carries out cable laying to being in the winch stopping cable laying state.
Step 2075, stops the winch to being in stopping cable laying state and carries out take-up or cable laying.
Step 2076, the bottom thrown by the anchor that the next one is not cast anchor by the position of casting anchor of the anchor not cast anchor at the next one.
Achieved by step 206 and step 207, start along clockwise or inverse from the position of casting anchor of first anchor Clockwise, casts anchor, until water all thrown by all of anchor to the row that anchors into not cast anchor at least three anchor successively The end.
In a step 208, boats and ships are sailed to position location.
Wherein, boats and ships are sailed to position location, can be according to cast anchor position and the sprocket bit of anchor The difference of the distance between putting, keeps the winch belonging to a part of anchor to be in take-up state, belonging to a part of anchor Winch be in cable laying state.Such as, positional distance position location of casting anchor is distant, can carry out cable laying, Positional distance position location of casting anchor is closer, can carry out take-up.It should be noted that and cable laying state The cable tension of winch can remain the first pre-set tension.
In step 209, stop at least three being anchored into row take-up or cable laying, keep belonging at least three anchor The cable tension of winch be respectively the second pre-set tension;And adjust the stem direction of boats and ships, make boats and ships with ship Bow is that preset stem direction is positioned at position location.
Fig. 7 shows that boats and ships (stem is Bow, and ship stern is Stern), from the position P1 that casts anchor of the first anchor, depend on Secondary cast anchor position P2, P3, P4 through the second to the 4th anchor, eventually arrive at the process of position location O.Should Process comprises the following steps:
In step 301, according to set position location, boats and ships position location preset stem direction with And first to fourth anchor need the cable length of cable laying, determine the position of casting anchor of first to fourth anchor.Wherein, fixed Position, position is positioned at the central region of the tetragon formed with the position of casting anchor of first to fourth anchor.
In step 302, boats and ships are driven towards the position of casting anchor of the first anchor, and will in the position of casting anchor of the first anchor The bottom thrown by first anchor.
In step 303, the cable tension keeping the first anchor to be cable laying state and the first anchor is first default Boats and ships are driven towards the position of casting anchor of the second anchor by power from the position of casting anchor of the first anchor.
In step 304, keeping the first anchor is that to stop the cable tension of cable laying state and the first anchor be second pre- If tension force, make boats and ships be parked in the position of casting anchor of the second anchor, and in the position of casting anchor of the second anchor, the second anchor is thrown Water-bed.
In step 305, the first anchor and the second anchor is kept to be respectively cable laying state and the first anchor and the second anchor Cable tension is respectively the first pre-set tension, and from the position of casting anchor of the second anchor, boats and ships are driven towards casting anchor of the 3rd anchor Position.
Within step 306, keep the first anchor and the second anchor to be respectively and stop cable laying state and the first anchor and second The cable tension of anchor is respectively the second pre-set tension, makes boats and ships be parked in the position of casting anchor of the 3rd anchor, and the 3rd 3rd anchor is thrown the bottom by the position of casting anchor of anchor.
In step 307, the first anchor is kept to be take-up state and keep the second anchor and the 3rd anchor respectively to put The cable tension of cable state and the second anchor and the 3rd anchor is respectively the first pre-set tension, by boats and ships from the 3rd anchor The position of casting anchor of the 4th anchor is driven towards in position of casting anchor.
Wherein, keeping the first anchor is take-up state, including: the current driving speed of detection boats and ships, and with 0.9 The current driving speed of times boats and ships is take-up speed, anchors into row take-up to first.
In step 308, keep the first anchor, the second anchor and the 3rd anchor to be respectively and stop cable laying state and first The cable tension of anchor, the second anchor and the 3rd anchor is respectively the second pre-set tension, makes boats and ships be parked in the throwing of the 4th anchor Anchor location, and in the position of casting anchor of the 4th anchor, the 4th anchor is thrown the bottom.
In a step 309, the first anchor, the second anchor and the 3rd anchor is kept to be respectively take-up state and keep Four anchors be the cable tension of cable laying state and the 4th anchor be the first pre-set tension, by boats and ships casting anchor from the 4th anchor Position location is driven towards in position.
In the step 310, keep the first anchor, the second anchor, the 3rd anchor and the 4th anchor to be respectively and stop cable laying shape The cable tension of state and the first anchor, the second anchor, the 3rd anchor and the 4th anchor is respectively the second pre-set tension, and adjusts The stem direction of whole boats and ships, making boats and ships is that preset stem direction is positioned at position location with stem.
The embodiment of the present invention by boats and ships are driven towards from the position of casting anchor of the first anchor the second anchor cast anchor position time, The cable tension keeping the first anchor to be cable laying state and the first anchor is the first cable tension;Further, at the second anchor Cast anchor position time, keeping the first anchor is that to stop the cable tension of cable laying state and the first anchor be second to preset Power, throws the second anchor to water-bed simultaneously;The like, before boats and ships do not arrive position location, by each The cable tension of anchor controls in preset range, and so, boats and ships, during casting anchor, will be avoided being thrown in water The anchor chain generation winding situation of anchor.
Meanwhile, after boats and ships arrive position location, again the cable tension of each anchor is controlled in preset range, Thus realize the correction of tension force, it is to avoid anchor chain generation winding situation after ship's fix.
Embodiment three
Embodiments providing the ground tackle of a kind of boats and ships, these boats and ships include at least three anchor and winch, The quantity of anchor is identical with the quantity of winch and a corresponding winch of anchor.This device is applicable to implement 1 or 2 The method provided, sees Fig. 8, and this device includes first sensor 401, input equipment 402 and control equipment 403。
First sensor 401 is used for, the cable tension of detection winch.
Input equipment 402 is used for, and position location that input sets, boats and ships are in the preset stem side of position location Method and the respective cable length needing cable laying of at least three anchor, and input instruction of casting anchor.
Control equipment 403 is used for, and is determining according to the position location of setting, the boats and ships of input equipment 402 input The preset stem direction of position, position and the respective cable length needing cable laying of at least three anchor, determine respectively to The position of casting anchor of few three anchors, position location is positioned at the polygonal of position formation of casting anchor with at least three anchor Central region;According to the instruction of casting anchor of input equipment 402 input, boats and ships are sailed the position of casting anchor to first anchor, First anchor is any one at least three anchor, and in the position of casting anchor of first anchor, first anchor is thrown the bottom; Start clockwise or counterclockwise from the position of casting anchor of first anchor, do not cast anchor at least three anchor successively The row that anchors into cast anchor, until all of anchor all throws the bottom;Boats and ships are sailed to position location;Wherein, from head The position of casting anchor of individual anchor starts clockwise or counterclockwise, successively to the anchor not cast anchor at least three anchor Cast anchor, including: boats and ships are sailed to the next one position of casting anchor of the anchor not cast anchor, and at ship running During, according to the cable tension of the winch being in cable laying state of first sensor 401 detection, at holding Cable tension in the winch of cable laying state is the first pre-set tension, and the winch being in cable laying state is according to The anchor cast anchor cast anchor position and the distance casting anchor between position of anchor that the next one does not casts anchor is from the anchor cast anchor Affiliated winch is determined;The winch being in stopping cable laying state according to first sensor 401 detection Cable tension, keep being in that to stop the cable tension of winch of cable laying state be the second pre-set tension, under The bottom thrown by the anchor that the next one is not cast anchor by the position of casting anchor of one anchor not cast anchor, and is in stopping cable laying state Winch be the winch belonging to the anchor cast anchor.
During the embodiment of the present invention by sailing to the next one position of casting anchor of the anchor not cast anchor by boats and ships, protect The cable tension holding the winch being in cable laying state is the first pre-set tension;Further, do not cast anchor at the next one When the bottom thrown by the anchor that the next one is not cast anchor by the position of casting anchor of anchor, keep being in the winch stopping cable laying state Cable tension be the second pre-set tension;Before not arriving position location at boats and ships, by the cable of each anchor Rope tension controls in preset range, and therefore, boats and ships are during casting anchor, by the anchor avoiding being thrown in water Anchor chain generation winding situation.
Embodiment four
Embodiments providing the ground tackle of a kind of boats and ships, this device is applicable to implement 1 or 2 offers Method, see Fig. 9, this device includes first sensor 501, input equipment 502 and control equipment 503. The structure of first sensor 501, input equipment 502 and control equipment 503 is with first sensor in embodiment three 401, input equipment 402 and the structure of control equipment 403, do not repeat them here.The dress that the present embodiment provides The difference putting the device provided with embodiment three is, this device also includes the second sensor 504.
Second sensor 504 is used for, the travel speed of detection boats and ships.
Control equipment 503 is used for, when the cable tension of the winch being in cable laying state is equal to the first pre-set tension Time, working as of the boats and ships that the cable releasing speed of the winch that holding is in cable laying state is, the second sensor 504 detects Front travel speed is at the component of the hawser bearing of trend of the winch being in cable laying state.
Wherein, first sensor 501 is bearing pin sensor, and this bearing pin sensor is arranged on and is in cable laying state Winch vertical chock on.
During the embodiment of the present invention by sailing to the next one position of casting anchor of the anchor not cast anchor by boats and ships, protect The cable tension holding the winch being in cable laying state is the first pre-set tension;Further, do not cast anchor at the next one When the bottom thrown by the anchor that the next one is not cast anchor by the position of casting anchor of anchor, keep being in the winch stopping cable laying state Cable tension be the second pre-set tension;Before not arriving position location at boats and ships, by the cable of each anchor Rope tension controls in preset range, and therefore, boats and ships are during casting anchor, by the anchor avoiding being thrown in water Anchor chain generation winding situation.
It should be understood that above-described embodiment provide boats and ships ground tackle anchoring time, only with above-mentioned respectively The division of functional module is illustrated, and in actual application, can above-mentioned functions be distributed as desired Completed by different functional modules, the internal structure of equipment will be divided into different functional modules, to complete All or part of function described above.It addition, the ground tackle of the boats and ships of above-described embodiment offer and ship The anchoring method embodiment of oceangoing ship belongs to same design, and it implements process and refers to embodiment of the method, the most not Repeat again.
The invention described above embodiment sequence number, just to describing, does not represent the quality of embodiment.
One of ordinary skill in the art will appreciate that all or part of step realizing above-described embodiment can be passed through Hardware completes, it is also possible to instructing relevant hardware by program and complete, described program can be stored in In a kind of computer-readable recording medium, storage medium mentioned above can be read only memory, disk or CD etc..
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all the present invention's Within spirit and principle, any modification, equivalent substitution and improvement etc. made, should be included in the present invention's Within protection domain.

Claims (10)

1. an anchoring method for boats and ships, described method is applicable to Ship Anchoring, and described boats and ships include at least three anchor, it is characterised in that described method includes:
According to the position location set, described boats and ships in the preset stem direction of described position location and the respective cable length needing cable laying of described at least three anchor, determining the position of casting anchor of described at least three anchor respectively, described position location is positioned at the polygonal central region formed with the position of casting anchor of described at least three anchor;
Described boats and ships are sailed the position of casting anchor to first anchor, and described first anchor is any one in described at least three anchor, in the position of casting anchor of described first anchor, described first anchor is thrown the bottom;
Start clockwise or counterclockwise from the position of casting anchor of described first anchor, successively the row that anchors into not cast anchor in described at least three anchor is cast anchor, until the bottom all thrown by all of anchor;
Described boats and ships are sailed to described position location;
Wherein, the described position of casting anchor from described first anchor starts clockwise or counterclockwise, casts anchor the row that anchors into not cast anchor in described at least three anchor successively, including:
Described boats and ships are sailed to the next one position of casting anchor of the anchor not cast anchor, and during described ship running, keeping the cable tension of winch being in cable laying state is the first pre-set tension, described in be in the winch of cable laying state be according to the described anchor cast anchor cast anchor position and the distance casting anchor between position of anchor that the described next one does not casts anchor is determined from the winch belonging to the described anchor cast anchor;
Keeping the cable tension being in the winch stopping cable laying state is the second pre-set tension, the anchor that the described next one does not casts anchor is thrown the bottom by the position of casting anchor of the anchor not cast anchor at the described next one, described in be in that to stop the winch of cable laying state be the winch belonging to the described anchor cast anchor.
Method the most according to claim 1, it is characterized in that, the described cable length needing cable laying according to the position location set, described boats and ships in the preset stem direction of described position location and described at least three anchor, determines the position of casting anchor of described at least three anchor, including:
According to described boats and ships the preset stem direction of described position location and described at least three anchor respectively belonging to winch installation site on described boats and ships, determine the direction of the position of casting anchor of described at least three anchor, the direction of the position of casting anchor of described at least three anchor when being described preset stem direction with stem described at least three anchor respectively belonging to the direction of winch installation site on described boats and ships identical;
Need the cable length of cable laying and the preset depth of water of the position of casting anchor of described at least three anchor according to described at least three anchor, determine the position distance respectively and between described position location of casting anchor of described at least three anchor;
The direction of the position of casting anchor according to described at least three anchor, from described position location to the direction of the position of casting anchor of described at least three anchor preset angle respectively and described preset stem direction and the position distance respectively and between described position location of casting anchor of described at least three anchor, determine that the position of casting anchor of described at least three anchor is respectively in described preset stem direction and the side-play amount of the vertical direction in described preset stem direction;
The geographical coordinate of the position of casting anchor of described at least three anchor, respectively in described preset stem direction and the side-play amount of the vertical direction in described preset stem direction, is determined in geographical coordinate according to described position location and the position of casting anchor of described at least three anchor.
Method the most according to claim 1, it is characterised in that described during described ship running, the cable tension keeping the winch being in cable laying state is the first pre-set tension, including:
Be in the cable tension of the winch of cable laying state described in detection, obtain tension signal, and according to described tension signal determine described in be in the cable tension of winch of cable laying state;
Whether the cable tension of winch of cable laying state it is in more than described first pre-set tension described in judgement;
When the cable tension of the described winch being in cable laying state is more than described first pre-set tension, described in increase, it is in the cable releasing speed of the winch of cable laying state;
When the cable tension of the described winch being in cable laying state is less than described first pre-set tension, described in reduction, it is in the cable releasing speed of the winch of cable laying state;
When the cable tension of the described winch being in cable laying state is equal to described first pre-set tension, it is in the current driving speed that cable releasing speed is described boats and ships of winch of cable laying state described in holding at the component of the hawser bearing of trend of the described winch being in cable laying state.
Method the most according to claim 1, it is characterised in that it is the second pre-set tension that described holding is in the cable tension of the winch stopping cable laying state, including:
Be in the cable tension of winch stopping cable laying state described in detection, obtain tension signal, and according to described tension signal determine described in be in the cable tension of the winch stopping cable laying state;
Whether the cable tension of the winch stopping cable laying state it is in less than described second pre-set tension described in judgement;
When the cable tension of the described winch being in and stopping cable laying state is less than described second pre-set tension, the described winch being in stopping cable laying state is carried out take-up;
When the cable tension of the described winch being in and stopping cable laying state is more than described second pre-set tension, the described winch being in stopping cable laying state is carried out cable laying;
When the cable tension of the described winch being in and stopping cable laying state is equal to described second pre-set tension, stop the described winch being in stopping cable laying state is carried out take-up or cable laying.
Method the most according to claim 3, it is characterised in that be in the cable tension of the winch of cable laying state described in described detection, including:
By bearing pin sensor detect described in be in the cable tension of winch of cable laying state, described bearing pin sensor be arranged on described in be in cable laying state winch vertical chock on.
6. according to the method described in any one of claim 1-5, it is characterised in that being sailed to described position location by described boats and ships, described method also includes:
Stop described at least three is anchored into row take-up or cable laying, keep the cable tension of the winch belonging to described at least three anchor to be respectively described second pre-set tension;
And adjust the stem direction of described boats and ships, making described boats and ships is that described preset stem direction is positioned at described position location with stem.
7. an anchoring method for boats and ships, described method is applicable to Ship Anchoring, and described boats and ships include first to fourth anchor, it is characterised in that described method includes:
Need the cable length of cable laying in the preset stem direction of described position location and described first to fourth anchor according to the position location set, described boats and ships, determining the position of casting anchor of described first to fourth anchor, described position location is positioned at the central region of the tetragon formed with the position of casting anchor of described first to fourth anchor;
Described boats and ships are driven towards the position of casting anchor of described first anchor, and in the position of casting anchor of described first anchor, described first anchor is thrown the bottom;
The cable tension keeping described first anchor to be cable laying state and described first anchor is the first pre-set tension, and described boats and ships drive towards the position of casting anchor of described second anchor from the position of casting anchor of described first anchor;
The cable tension keeping described first anchor to be stopping cable laying state and described first anchor is the second pre-set tension, makes described boats and ships be parked in the position of casting anchor of described second anchor, and in the position of casting anchor of described second anchor, described second anchor is thrown the bottom;
The cable tension keeping described first anchor and described second anchor to be respectively described cable laying state and described first anchor and described second anchor is respectively described first pre-set tension, and described boats and ships drive towards the position of casting anchor of described 3rd anchor from the position of casting anchor of described second anchor;
The cable tension keeping described first anchor and described second anchor to be respectively described stopping cable laying state and described first anchor and described second anchor is respectively described second pre-set tension, make described boats and ships be parked in the position of casting anchor of described 3rd anchor, and in the position of casting anchor of described 3rd anchor, described 3rd anchor is thrown the bottom;
Keep described first anchor to be take-up state and the cable tension that keeps described second anchor and described 3rd anchor to be respectively described cable laying state and the second anchor and the 3rd anchor is respectively described first pre-set tension, described boats and ships are driven towards from the position of casting anchor of described 3rd anchor the position of casting anchor of described 4th anchor;
The cable tension keeping described first anchor, described second anchor and described 3rd anchor to be respectively described stopping cable laying state and described first anchor, described second anchor and described 3rd anchor is respectively described second pre-set tension, make described boats and ships be parked in the position of casting anchor of described 4th anchor, and in the position of casting anchor of described 4th anchor, described 4th anchor is thrown the bottom;
Keep described first anchor, described second anchor and described 3rd anchor to be respectively described take-up state and the cable tension that keeps described 4th anchor to be described cable laying state and described 4th anchor is described first pre-set tension, described boats and ships are driven towards described position location from the position of casting anchor of described 4th anchor.
8. the ground tackle of boats and ships, described device is applicable to the method described in claim 1, and described boats and ships include at least three anchor and winch, and the quantity of described anchor is identical with the quantity of described winch and a corresponding described winch of described anchor, it is characterized in that, described device includes:
First sensor, for detecting the cable tension of described winch;
Input equipment, for inputting the position location of setting, described boats and ships in the preset stem direction of described position location and the respective cable length needing cable laying of described at least three anchor, and inputs instruction of casting anchor;
Control equipment, the position location of the setting for inputting according to input equipment, described boats and ships are in the preset stem direction of described position location and the respective cable length needing cable laying of described at least three anchor, determining the position of casting anchor of described at least three anchor respectively, described position location is positioned at the polygonal central region formed with the position of casting anchor of described at least three anchor;
According to the instruction of casting anchor of input equipment input, described boats and ships being sailed the position of casting anchor to first anchor, described first anchor is any one in described at least three anchor, and in the position of casting anchor of described first anchor, described first anchor is thrown the bottom;
Start clockwise or counterclockwise from the position of casting anchor of described first anchor, successively the row that anchors into not cast anchor in described at least three anchor is cast anchor, until the bottom all thrown by all of anchor;
Described boats and ships are sailed to described position location;
Wherein, the described position of casting anchor from described first anchor starts clockwise or counterclockwise, casts anchor the row that anchors into not cast anchor in described at least three anchor successively, including:
Described boats and ships are sailed to the next one position of casting anchor of the anchor not cast anchor, and during described ship running, the cable tension of the winch being in cable laying state according to first sensor detection, keeping the cable tension of winch being in cable laying state is the first pre-set tension, described in be in the winch of cable laying state be according to the described anchor cast anchor cast anchor position and the distance casting anchor between position of anchor that the described next one does not casts anchor is determined from the winch belonging to the described anchor cast anchor;
The cable tension being in the winch stopping cable laying state according to first sensor detection, keeping the cable tension being in the winch stopping cable laying state is the second pre-set tension, the anchor that the described next one does not casts anchor is thrown the bottom by the position of casting anchor of the anchor not cast anchor at the described next one, described in be in that to stop the winch of cable laying state be the winch belonging to the described anchor cast anchor.
Device the most according to claim 8, it is characterised in that described device also includes the second sensor,
Described second sensor is for detecting the travel speed of described boats and ships;
Described control equipment is for when the cable tension of the described winch being in cable laying state is equal to described first pre-set tension, and the cable releasing speed of the winch being in cable laying state described in holding is the current driving speed component at the hawser bearing of trend of the described winch being in cable laying state of the described boats and ships of described second sensor detection.
Device the most according to claim 8 or claim 9, it is characterised in that described first sensor is bearing pin sensor, described bearing pin sensor be arranged on described in be in cable laying state winch vertical chock on.
CN201410307508.6A 2014-06-30 2014-06-30 The anchoring method of a kind of boats and ships and device Active CN104129476B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410307508.6A CN104129476B (en) 2014-06-30 2014-06-30 The anchoring method of a kind of boats and ships and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410307508.6A CN104129476B (en) 2014-06-30 2014-06-30 The anchoring method of a kind of boats and ships and device

Publications (2)

Publication Number Publication Date
CN104129476A CN104129476A (en) 2014-11-05
CN104129476B true CN104129476B (en) 2016-11-23

Family

ID=51802415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410307508.6A Active CN104129476B (en) 2014-06-30 2014-06-30 The anchoring method of a kind of boats and ships and device

Country Status (1)

Country Link
CN (1) CN104129476B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106335608B (en) * 2016-09-23 2017-12-29 中交第三航务工程局有限公司宁波分公司 The installation method of seabed anchor ingot
CN107697230A (en) * 2017-09-01 2018-02-16 中交第航务工程局有限公司 A kind of anchorage regardless prestretching anchoring method
CN109613578B (en) * 2018-12-29 2020-11-06 上海大学 Ship positioning method for searching underwater target
CN111328044A (en) * 2020-03-20 2020-06-23 上海云鱼智能科技有限公司 Method, device, server, client, terminal and storage medium for calling vehicle owner
CN111417090A (en) * 2020-03-20 2020-07-14 上海云鱼智能科技有限公司 Method, device, server, client, terminal and storage medium for calling car owner
CN111441265A (en) * 2020-04-07 2020-07-24 中国水利水电第八工程局有限公司 Method for dismantling concrete bridge on water
CN113022786B (en) * 2021-04-26 2022-12-09 广西新港湾工程有限公司 Method for arranging anchor cables of engineering ship at torrent river reach
CN113715992A (en) * 2021-08-20 2021-11-30 南京中船绿洲机器有限公司 Automatic navigation and ship-moving control method of multipoint positioning winch based on GPS
CN116933480A (en) * 2022-04-01 2023-10-24 广东海洋大学 Improved ship anchor ring radius model and anchor intelligent detection method based on same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4354446A (en) * 1980-08-22 1982-10-19 Conoco Inc. Temporary mooring of tension leg platforms
CN87105223A (en) * 1987-07-25 1988-03-16 梁叔禹 Anchoring system of surface type ship for drilling
GB2347911B (en) * 1997-10-08 2001-10-31 Hitec Systems As A method and an arrangement for mooring a ship in relation to a production well located in a seabed
CN101544269A (en) * 2008-03-24 2009-09-30 南通力威机械有限公司 Mooring automatic positioning system for offshore operation platform

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59209989A (en) * 1983-05-12 1984-11-28 Nippon Steel Corp Method of replacing tension leg of tension leg mooring type ocean floating construction
AU2002256234B2 (en) * 2001-05-01 2008-03-13 Itrec, B.V. Multipurpose unit with multipurpose tower and method for tendering with a semisubmersible

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4354446A (en) * 1980-08-22 1982-10-19 Conoco Inc. Temporary mooring of tension leg platforms
CN87105223A (en) * 1987-07-25 1988-03-16 梁叔禹 Anchoring system of surface type ship for drilling
GB2347911B (en) * 1997-10-08 2001-10-31 Hitec Systems As A method and an arrangement for mooring a ship in relation to a production well located in a seabed
CN101544269A (en) * 2008-03-24 2009-09-30 南通力威机械有限公司 Mooring automatic positioning system for offshore operation platform

Also Published As

Publication number Publication date
CN104129476A (en) 2014-11-05

Similar Documents

Publication Publication Date Title
CN104129476B (en) The anchoring method of a kind of boats and ships and device
CN106114762B (en) Shallow water floating platform mooring gear and method
US20170241408A1 (en) Multi-turbine wind power platform for offshore applications
CN104229066B (en) A kind of ship mooring localization method
CN103482026B (en) A kind of hybrid mooring system for ultra-deep-water floating structure and anchoring method
JP2013519568A (en) Device for reducing flow resistance in moon pools
CN104203739A (en) Ship with a detachable hull
CN106985973A (en) A kind of marine site probing sand anchor and cast anchor and the method that weighs anchor
CN202486622U (en) Ship positioning system
CN104875851A (en) Stabilizing device of buoy
CN107084784B (en) A kind of four body ship type underwater measurement platform of movable lifting
CN109159853B (en) Self-adaptive mooring device for offshore shallow water area
CN104097748A (en) Parking craning method for vibration sinking construction of steel cylinders
JP5184275B2 (en) Vertical sway reduction structure for work boats
JP6823781B2 (en) Water work method
CN104002931A (en) U-shaped ocean engineering installation ship and method for installing module on upper portion of conduit frame
CN203601528U (en) Three-boat side-by-side mooring system
JP6884311B2 (en) How to lay
JP6949690B2 (en) Floating body mooring method and floating body
JP7370049B2 (en) Unberthing device using a mooring machine
CN209683952U (en) A kind of deployable and collapsible reduces the damping closing plate device of flow oscillation in moon pool
JP4488357B2 (en) Submarine tubular body laying system
CN102774470B (en) Semi-submergible barge fixing method for loading super-heavy ship entering into water
JP6983640B2 (en) Floating body, floating body mooring device and floating body mooring method
JPH1082042A (en) Drawing-in method of caisson

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant