CN104124752A - Intelligent lock control system of transformer substation - Google Patents
Intelligent lock control system of transformer substation Download PDFInfo
- Publication number
- CN104124752A CN104124752A CN201310142437.4A CN201310142437A CN104124752A CN 104124752 A CN104124752 A CN 104124752A CN 201310142437 A CN201310142437 A CN 201310142437A CN 104124752 A CN104124752 A CN 104124752A
- Authority
- CN
- China
- Prior art keywords
- server
- control system
- lock control
- computer key
- communication module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Testing And Monitoring For Control Systems (AREA)
Abstract
The invention relates to an intelligent lock control system which is applied to a distribution power station such as a power plant or a power station and the like and used for preventing error operations. The system includes a server, a main controller and at least one computer key. Each computer key is provided with a camera, a voice module and a 3G communication module. The server is provided with a 3G communication module. The communication modules on the computer keys are connected with the server through a 3G mobile communication network and the Internet. Through adoption of the intelligent lock control system, contact of a server command end with specific operation personnel of the computer keys can be reinforced so that operation is safer and more rapid.
Description
Technical field
The present invention relates to electric power system anti-misoperation locking technical field, particularly a kind of intelligent lock control system of the dispensing power plant stations such as power plant or power station for preventing that misoperation from being used that be applied to.
Background technology
At present, the station application of dispensing power plant is very extensive in power plant or power station etc. for intelligent error preventing block sytem, develop also rapider, although the product of each producer respectively has its characteristic, but the technological means of basic principle and employing is roughly the same, device is mainly comprised of Intelligent simulation screen, industrial computer, computer key and various number.By simulation examination operation on Intelligent simulation screen, by logic rules pre-stored in industrial computer and state, every step operation is judged, and by serial line interface communication, operating procedure is inputted in computer key, then by computer key, open the puzzle lock being loaded on on-the-spot relevant device, carry out grid switching operation.That the superiority of this kind of error proof locking system of microcomputer is is easy to operate, it is simple to safeguard, dependable performance, cost are relatively low, but due to its critical piece computer key can not with other part real-time exchange data in field apparatus and system, and its anti-error function and scope are extremely restricted, cannot meet anti-error needs during prerun of accident conditions and maintenance and have no alternative but use the emergency release without any anti-error function, to electric power safety, move and bring very big hidden danger.In course of normal operation, must depend on artificial state checks, not only to user of service, brought overcharge, and owing to being subject to the impact of subjective factor, the reliability of its locking is greatly affected, too because data can not real-time exchange, brought heavy burden to the lock operation of large-scale substation, cannot realize the parallel work-flow of the same task of many groups, for complex operations, need the overspending operating time, make operating efficiency step-down, interruption duration elongates, thereby the application of intelligent error preventing block sytem is restricted.
Summary of the invention
Object of the present invention, for overcoming above-mentioned defect, the intelligent substation lock control system that provides a kind of computer key and server end can implement swap data, high to complex operations efficiency, time-consuming short, interruption duration is short.
For achieving the above object, adopt following structure:
A kind of intelligent substation lock control system, it comprises server, main controller and at least one computer key, described computer key is provided with camera, voice module and 3G communication module, and server is provided with 3G communication module, connects by 3G mobile communications network with the 3G communication module on computer key.
Described intelligent substation lock control system, server is connected with more than one main controller.
A kind of intelligent substation lock control system, it comprises server, main controller and at least one computer key, described computer key is provided with camera, voice module and 3G communication module, and the communication module that server is provided with on 3G communication module, computer key connects with server by 3G mobile communications network, Internet.
Described intelligent substation lock control system, server is connected with more than one main controller.
Beneficial effect: 1, computer key is provided with camera, voice module and 3G communication module, the concrete operations personnel of being convenient to server commander end and grasp computer key carry out real-time contact, carrying out identity checks, task is checked, the information of task change transmits concrete operations personnel in time, convenient accurately and timely operation.2, timely swap operation desired data, high to complex operations efficiency, interruption duration is short.
Accompanying drawing explanation
Fig. 1, intelligent substation lock control system structural representation of the present invention.
embodiment
A kind of intelligent substation lock control system, it comprises server, main controller and at least one computer key, described computer key is provided with camera, voice module and 3G communication module, and server is provided with 3G communication module, connects by 3G mobile communications network with the 3G communication module on computer key.
A kind of intelligent substation lock control system, it comprises server, main controller and at least one computer key, described computer key is provided with camera, voice module and 3G communication module, and the communication module that server is provided with on 3G communication module, computer key connects with server by 3G mobile communications network, Internet.
Described intelligent substation lock control system, server is connected with more than one main controller.
Claims (4)
1. an intelligent substation lock control system, it comprises server, main controller and at least one computer key, it is characterized in that computer key is provided with camera, voice module and 3G communication module, server is provided with 3G communication module, connects by 3G mobile communications network with the 3G communication module on computer key.
2. intelligent substation lock control system according to claim 1, is characterized in that server is connected with more than one main controller.
3. an intelligent substation lock control system, it comprises server, main controller and at least one computer key, it is characterized in that computer key is provided with camera, voice module and 3G communication module, the communication module that server is provided with on 3G communication module, computer key connects with server by 3G mobile communications network, Internet.
4. intelligent substation lock control system according to claim 3, is characterized in that server is connected with more than one main controller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310142437.4A CN104124752A (en) | 2013-04-23 | 2013-04-23 | Intelligent lock control system of transformer substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310142437.4A CN104124752A (en) | 2013-04-23 | 2013-04-23 | Intelligent lock control system of transformer substation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104124752A true CN104124752A (en) | 2014-10-29 |
Family
ID=51770063
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310142437.4A Pending CN104124752A (en) | 2013-04-23 | 2013-04-23 | Intelligent lock control system of transformer substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104124752A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108988492A (en) * | 2018-07-18 | 2018-12-11 | 江苏华维电力科技有限公司 | A kind of intelligent substation lock control system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101256906A (en) * | 2007-03-01 | 2008-09-03 | 珠海市共创有限公司 | Electric operating ticket synthetic anti-mistaken closedown system and operation method |
CN201348726Y (en) * | 2008-12-16 | 2009-11-18 | 泰安慧致电子科技有限公司 | Electronic operation order system |
CN101976883A (en) * | 2010-10-14 | 2011-02-16 | 北京四方继保自动化股份有限公司 | Self-adapting integrative five-prevention system based on Ethernet communication |
CN202076678U (en) * | 2011-04-25 | 2011-12-14 | 朱轮 | Five-prevention voice prompt intelligent unlocking key box of transformer substation |
CN203312910U (en) * | 2013-04-23 | 2013-11-27 | 江苏华维电力科技有限公司 | Substation intelligent lock control system |
-
2013
- 2013-04-23 CN CN201310142437.4A patent/CN104124752A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101256906A (en) * | 2007-03-01 | 2008-09-03 | 珠海市共创有限公司 | Electric operating ticket synthetic anti-mistaken closedown system and operation method |
CN201348726Y (en) * | 2008-12-16 | 2009-11-18 | 泰安慧致电子科技有限公司 | Electronic operation order system |
CN101976883A (en) * | 2010-10-14 | 2011-02-16 | 北京四方继保自动化股份有限公司 | Self-adapting integrative five-prevention system based on Ethernet communication |
CN202076678U (en) * | 2011-04-25 | 2011-12-14 | 朱轮 | Five-prevention voice prompt intelligent unlocking key box of transformer substation |
CN203312910U (en) * | 2013-04-23 | 2013-11-27 | 江苏华维电力科技有限公司 | Substation intelligent lock control system |
Non-Patent Citations (1)
Title |
---|
方少浪: "3G通信技术在集控微机防误闭锁系统中的应用", 《科技创业》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108988492A (en) * | 2018-07-18 | 2018-12-11 | 江苏华维电力科技有限公司 | A kind of intelligent substation lock control system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102340180B (en) | Remote forced monitoring system for transformer station switching operation | |
CN105576831A (en) | Automatic verification method for security control of master station and sub station | |
CN103903184A (en) | Method for processing information between power distribution network first-aid repair command platform and mobile terminal | |
CN104133443A (en) | Method for automatically generating power grid dispatching operation order through power grid overhaul application forms | |
CN103269130A (en) | Method for remotely confirming remote-control operation of transformer station | |
CN201898375U (en) | Intelligent, integrated and comprehensive mal-operation preventing system of distribution network | |
CN104050529A (en) | Power grid dispatching intelligent maintenance order and operation order system | |
CN102025195A (en) | Distribution network simulation dispatching and management system | |
CN106532962A (en) | Centralized control method, device and system for multi-end flexible direct current converter stations | |
CN105679136A (en) | Power distribution network fault rush-repairing process simulation system and implementation method thereof | |
CN204480322U (en) | A kind of nuclear power plant emergency aided decision system | |
CN110611312B (en) | On-line simulation system and method for panoramic data of substation bay level | |
CN108649696A (en) | A kind of power distribution automation monitoring platform | |
Bucher | Smart grid functionality for the high-voltage transmission grid: On the market readiness of Digital Substation 2.0 technology | |
CN104158294A (en) | Dispatching anti-misoperation control method | |
CN203312910U (en) | Substation intelligent lock control system | |
CN104124752A (en) | Intelligent lock control system of transformer substation | |
CN203434744U (en) | Substation intelligent 3G lock device | |
CN203951261U (en) | switchyard fault simulator | |
CN103529806B (en) | Based on the implementation method of the multisystem disaster tolerance back-up system of expansion CIMXML | |
CN103105843B (en) | A kind of anti-error check module for supervisory system | |
RU101989U1 (en) | TRAIN MANAGEMENT CONTROL SYSTEM FOR TRAFFIC MANAGEMENT | |
CN104092307A (en) | Smart substation secondary device operation state monitoring method | |
CN104124753A (en) | Intelligent 3G lockset device of transformer substation | |
CN204118858U (en) | A kind of transformer station dispatching automation uniting and adjustment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141029 |
|
WD01 | Invention patent application deemed withdrawn after publication |