CN104123587B - Mto‑mts管理模式下钢铁生产合同计划和多级库存匹配优化方法 - Google Patents
Mto‑mts管理模式下钢铁生产合同计划和多级库存匹配优化方法 Download PDFInfo
- Publication number
- CN104123587B CN104123587B CN201410135585.8A CN201410135585A CN104123587B CN 104123587 B CN104123587 B CN 104123587B CN 201410135585 A CN201410135585 A CN 201410135585A CN 104123587 B CN104123587 B CN 104123587B
- Authority
- CN
- China
- Prior art keywords
- contract
- finished product
- matching
- semi
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410135585.8A CN104123587B (zh) | 2014-04-04 | 2014-04-04 | Mto‑mts管理模式下钢铁生产合同计划和多级库存匹配优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410135585.8A CN104123587B (zh) | 2014-04-04 | 2014-04-04 | Mto‑mts管理模式下钢铁生产合同计划和多级库存匹配优化方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104123587A CN104123587A (zh) | 2014-10-29 |
CN104123587B true CN104123587B (zh) | 2017-07-28 |
Family
ID=51768989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410135585.8A Active CN104123587B (zh) | 2014-04-04 | 2014-04-04 | Mto‑mts管理模式下钢铁生产合同计划和多级库存匹配优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104123587B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104881764A (zh) * | 2015-02-13 | 2015-09-02 | 四川大学 | 大型工程建设项目多材料配比动态采购与库存控制方法 |
CN104992251B (zh) * | 2015-07-17 | 2018-07-31 | 国家电网公司 | 一种协议库存匹配优化分配方法 |
CN108279647B (zh) * | 2017-12-06 | 2019-04-23 | 吉林大学 | 一种两阶段装配流水车间调度方法 |
CN109426920A (zh) * | 2018-01-19 | 2019-03-05 | 武汉十傅科技有限公司 | 一种考虑预测订单和实际订单的企业生产计划优化方法 |
CN109784543B (zh) * | 2018-12-20 | 2021-11-12 | 湖北工业大学 | 基于加权轮转调度的平衡排产方法 |
CN111292044B (zh) * | 2020-02-28 | 2023-07-21 | 雅砻江流域水电开发有限公司 | 一种工程物资多级库存控制方法及系统 |
CN113245372B (zh) * | 2021-05-26 | 2023-01-31 | 重庆钢铁股份有限公司 | 一种热轧带钢生产控制方法及系统 |
CN113723892A (zh) * | 2021-09-13 | 2021-11-30 | 北京沃东天骏信息技术有限公司 | 数据处理方法、装置、电子设备及存储介质 |
-
2014
- 2014-04-04 CN CN201410135585.8A patent/CN104123587B/zh active Active
Non-Patent Citations (5)
Title |
---|
Research on the MTO-MTS Production Management of Steel-Iron Factories;Tao Zhang et al.;《Proceedings of the 2011 Chinese Control and Decision Conference(CCDC)》;20110801;全文 * |
Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates;Altendorfer K et al.;《European Journal of Operational Research》;20110310;第213卷;全文 * |
基于MTO-MTS的钢厂合同计划方法;张涛 等;《系统工程理论与实践》;20081130(第11期);全文 * |
钢铁企业MTO-MTS混合合同计划管理模式研究;张涛 等;《管理科学学报》;20130630;第16卷(第6期);第36-37页、图1 * |
钢铁企业库存匹配与生产计划联合优化模型与算法;胡琨元 等;《信息与控制》;20040420;第33卷(第2期);第178页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104123587A (zh) | 2014-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104123587B (zh) | Mto‑mts管理模式下钢铁生产合同计划和多级库存匹配优化方法 | |
Fathi et al. | A novel bidirectional network data envelopment analysis model for evaluating sustainability of distributive supply chains of transport companies | |
Kadadevaramath et al. | Application of particle swarm intelligence algorithms in supply chain network architecture optimization | |
Jiang et al. | Information sharing and bullwhip effect in smart destination network system | |
Sadeghi et al. | A fuzzy grey goal programming approach for aggregate production planning | |
CN102651114B (zh) | 一种提高钢铁企业板坯利用率的板坯与合同转用匹配方法 | |
CN105069524B (zh) | 基于大数据分析的计划调度优化方法 | |
Zhang et al. | Multi-level inventory matching and order planning under the hybrid Make-To-Order/Make-To-Stock production environment for steel plants via Particle Swarm Optimization | |
Senouci et al. | Multiobjective optimization model for scheduling of construction projects under extreme weather | |
Hoseinpour et al. | The problem solving of bi-objective hybrid production with the possibility of production outsourcing through imperialist algorithm, NSGA-II, GAPSO hybrid algorithms | |
Singh et al. | Capacities-based supply chain network design considering demand uncertainty using two-stage stochastic programming | |
Šomplák et al. | Contribution to Global Warming Potential by waste producers: Identification by reverse logistic modelling | |
Hajiaghaei-Keshteli et al. | A collaborative stochastic closed-loop supply chain network design for tire industry | |
Hoseinpour et al. | The problem solving of bi-objective hybrid production with the possibility of production outsourcing through meta-heuristic algorithms | |
Kalantari Khalil Abad et al. | Green closed-loop supply chain network design with stochastic demand: A novel accelerated benders decomposition method | |
Jarumaneeroj et al. | A multi-objective modeling approach to harvesting resource scheduling: Decision support for a more sustainable Thai sugar industry | |
Taghaddos et al. | Simulation-based multiple heavy lift planning in industrial construction | |
Hossain et al. | Multi-period, multi-product, aggregate production planning under demand uncertainty by considering wastage cost and incentives | |
Liu et al. | Scheduling optimization for production of prefabricated components with parallel work of serial machines | |
Elkabalawy et al. | Optimized resource-constrained method for project schedule compression | |
Patil et al. | Fuzzy TOPSIS and grey relation analysis integration for supplier selection in fiber industry | |
Heidari et al. | Modeling a multi-objective location-routing problem for hazardous materials with CO2 emissions consideration | |
Toksarı | Taylor series approach for bi-level linear fractional programming problem | |
Pudasaini et al. | A multi-objective analysis of a petroleum transportation network under uncertainty | |
Reisinger et al. | Framework proposal for automated generation of production layout scenarios: A parametric design technique to connect production planning and structural industrial building design |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Tao Inventor after: Zhang Qiqi Inventor after: Zhang Bin Inventor before: Zhang Tao Inventor before: Zhang Qiqi |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180706 Address after: No. 777 Guo Ding Road, Yangpu District, Shanghai Patentee after: Shanghai University of Finance and Economics Address before: 200433 School of information management and engineering, Shanghai University of Finance and Economics, 100 Wu Dong Road, Yangpu District, Shanghai Co-patentee before: Zhang Qiqi Patentee before: Zhang Tao |
|
TR01 | Transfer of patent right |