CN104122042B - A kind of voltage-withstand test method of major diameter welding structure metallic conduit - Google Patents

A kind of voltage-withstand test method of major diameter welding structure metallic conduit Download PDF

Info

Publication number
CN104122042B
CN104122042B CN201410342202.4A CN201410342202A CN104122042B CN 104122042 B CN104122042 B CN 104122042B CN 201410342202 A CN201410342202 A CN 201410342202A CN 104122042 B CN104122042 B CN 104122042B
Authority
CN
China
Prior art keywords
welding structure
metal tube
piece
voltage
withstand test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410342202.4A
Other languages
Chinese (zh)
Other versions
CN104122042A (en
Inventor
乔宏来
邱希亮
杜金程
冯滨
周亚信
魏方锴
李滨
徐睦忠
段伟赞
闫海滨
陈明
马凤
吴海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Electric Machinery Co Ltd
Original Assignee
Harbin Electric Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Electric Machinery Co Ltd filed Critical Harbin Electric Machinery Co Ltd
Priority to CN201410342202.4A priority Critical patent/CN104122042B/en
Publication of CN104122042A publication Critical patent/CN104122042A/en
Application granted granted Critical
Publication of CN104122042B publication Critical patent/CN104122042B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Examining Or Testing Airtightness (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention is a kind of voltage-withstand test method that can be used for operations involving high pressure welding structure metallic conduit.The method of the present invention is:Suppressed by water filling in the small size annular seal space between welding structure metallic conduit to be measured and built-in concentric metal tubulose part, assess the voltage endurance capability of the operations involving high pressure welding structure metallic conduit.The method that the present invention is provided reduces the axially loaded degree of two end seal plates, and then ensure that the security of sealing plate and welding structure metallic conduit connecting portion to be measured by reducing the bearing area of pipe ends sealing plate.Sealing plate and welding structure metallic conduit connecting portion to be measured be tightly connected intensity it is identical when, compared with traditional pipeline voltage-withstand test method, the present invention provide device can realize the voltage-withstand test of higher pressure in welding structure metallic conduit, while also more energy efficient, more environmentally friendly.

Description

A kind of voltage-withstand test method of major diameter welding structure metallic conduit
Technical field
It is a kind of welding structure the present invention relates to carry out resistance test technical field to major diameter welding structure metallic conduit The structure voltage-withstand test method of metallic conduit.
Background technology
Welding structure metallic conduit is a kind of conventional Transmission system component, and each is led to can be used for oil transportation, water delivery, gas transmission etc. Domain.The voltage endurance capability and sealing of welding structure metallic conduit are the major criterions for weighing its quality of production.In order to ensure welding Security during the pipeline military service of structural metal, according to relevant criterion, is generally formally carrying out voltage-withstand test using preceding to it. Traditional pipeline voltage-withstand test method is:1), pipe ends are sealed using sealing plate, sealing means can use welding, Can be realized by the way of flange coordinates with O-ring seal;2), beaten by water filling in provided pipe road direction annular seal space or gas injection Pressure, external pressure gauge monitoring pressure in real time value;3) certain hour, is stood under the testing pressure of setting, outside observation pipe under test Whether wall has the situation of leak or cracking, obtains its voltage endurance capability.
When pipe diameter is larger, such as when pipe diameter is more than 500mm, specific voltage-withstand test mode will be as shown in figure 1, will Welding structure metal tube (1) is sealed with convex sealing plate (2), and exhaust outlet (3) and water inlet (4) are reserved on sealing plate (2) top, In water inlet (4) side placement force table (5).Assuming that pipe diameter is D, test pressure is P, pressure-resistant using this kind of conventional pipelines During method of testing, pipeline can be expressed as with the connecting portion axially loaded F of sealing plate:
F=π PD2/4
By above-mentioned formula as can be seen that when testing the voltage endurance capability of pipeline using conventional method, the company of pipeline and sealing plate Socket part axially loaded and pipe under test diameter square are directly proportional.Therefore, when pipe diameter becomes big, the connection of pipeline and seal Portion is often bigger than tube wall stress to be measured, and voltage-withstand test is carried out in this case, generally there is pipeline and seal connecting portion elder generation The risk of row failure, and then cause the voltage endurance capability test crash to tube wall, or even cause security incident.
The content of the invention
A kind of security performance of present invention offer is high, and water consumption is few, and can be used for the welding structure metal tube of hydraulic pressure test high The voltage-withstand test method in road.The technical scheme is that:
1) the smaller assistant metal tube-like piece (6) of a length is inserted in welding structure metal tube (1) inner concentric position;
2) assistant metal tube-like piece (6) one end is welded by one piece of external diameter using weld seam (10) and is more than welding structure metal tube (1) external diameter, internal diameter and the first annular metallic plate of assistant metal tube-like piece (6) internal diameter identical (7), and by first annular metal Plate (7) is tightly connected with welding structure metal tube (1);
3) assistant metal tube-like piece (6) other end is welded into internal diameter of one piece of external diameter less than welding structure metal tube (1), The metallic ring-plate (9) of opening screwed hole of the internal diameter less than assistant metal tube-like piece (6) internal diameter;
4) support reinforcing ring flat-plate (14) is installed additional inside assistant metal tube-like piece (6);
5) the second annular metal sheet (8) is sealed using the first cushion rubber (12) and opens the metallic ring-plate (9) of screwed hole, adopted afterwards Fastened with stud (11), steam vent (13) and inlet opening are reserved in the second annular metal sheet (8) surface;
6) annular metal sheet of sealing welding second (8) and welding structure metal tube (1), in welding structure metal tube (1) and The annular seal space of reserved inlet opening and steam vent (13) is formd between assistant metal tube-like piece (6);
7) by inlet opening to water filling in annular seal space, steam vent (13) discharge chamber air, air is used after draining Welded seal or rubber sealing mode are blocked to steam vent (13);
8) continue to be pressurizeed to water filling in inlet opening, using pressure gauge real-time monitoring, reach when standing one section after test pressure Between, the sealing and pressure-resistant performance of observation welding structure metal tube (1).
Technique effect:
The invention provides a kind of voltage-withstand test method of welding structure metallic conduit, and there is provided the corresponding dress of the method Put and assembling mode, with following technological merit:1st, the pressure for assuming voltage-withstand test is P, the welding structure metal of voltage-withstand test Internal diameter of the pipeline is D, and the external diameter of assistant welding structure metallic conduit is d, then during voltage-withstand test, pipeline end face connecting portion axial direction Stress F can be expressed as:F=π P (D2-d2)/4, with conventional test methodologies ratio, the present invention is reduced by built-in assistant metal pipe The axially loaded degree of pipeline end face connecting portion.Also, the method provided using the present invention, for different voltage-withstand test metals Any internal diameter D of pipe, and arbitrary test pressure P, by adjusting the outside diameter d of built-in metal pipe, welcome adjustment connection The axially loaded F in portion, makes it in tolerance zone, therefore the present invention can be used for the higher pressure of major diameter welding structure metallic conduit Power voltage-withstand test;2nd, the method provided according to the present invention, when voltage-withstand test welding structure metallic conduit wall thickness is more than assistant metal During tube-like piece wall thickness, or the requirement of voltage-withstand test metal tube test pressure is higher than 10MPa, or voltage-withstand test metal tube draw ratio During more than 3, one or more support reinforcing ring flat-plates are installed additional inside assistant metal tube-like piece, support reinforcing ring flat-plate can be great Lift the bearing capacity of built-in assistant metal tube-like piece, it is ensured that it will not deform or fail under test pressure.
Brief description of the drawings
Fig. 1 is traditional welding structural metal pipeline voltage-withstand test schematic diagram.
Fig. 2 is welding structure metal circular tube pressure resistant testing device installation diagram of the two ends without flange-interface.
Fig. 3 is the welding structure metal circular tube pressure resistant testing device installation diagram of the flanged interface in one end.
In accompanying drawing
1 welding structure metal tube;2 convex sealing plates;
3 exhaust outlets;4 water inlets;
5 pressure gauges;6 assistant metal tube-like pieces;
7 first annular metallic plates;8 second annular metal sheets;
9 metallic ring-plates for opening screwed hole;10 weld seams;
11 studs;12 first cushion rubbers;
13 steam vents;14 support reinforcing ring flat-plates;
The flanged (FLGD) welding structure metal circular tube in 15 ends;16 bolts;
17 second cushion rubbers.
Specific embodiment:
The present invention is that a kind of security performance is high, and water consumption is few, and can be used for the welding structure metallic conduit of hydraulic pressure test high Voltage-withstand test method, its targeted welding structure metallic conduit with diameter greater than equal to 500mm, specific embodiment party of the invention Formula is:
Embodiment one:As shown in Fig. 2 there is no a welding structure metal tube 1 of flange for two ends, its pressure resistant testing device and Specific implementation step is as follows:1), the smaller assistant metal pipe of a length is inserted in the inner concentric position of welding structure metal tube 1 Shape part 6;2), by the one end of assistant metal tube-like piece 6 weld one piece of external diameter more than the external diameter of welding structure metal tube 1, internal diameter with it is auxiliary The first annular metallic plate 7 of the internal diameter identical of aided metal tube-like piece 6, its weld seam is 10, and first annular metallic plate 7 is tied with welding The sealing welding of structure metal tube 1;3) other end of assistant metal tube-like piece 6, is welded into one piece of external diameter and is less than welding structure metal tube 1 Internal diameter, internal diameter less than the internal diameter of assistant metal tube-like piece 6 the metallic ring-plate 9 for opening screwed hole;4), when welding structure metal tube 1 When wall thickness is more than assistant metal 6 wall thickness of tube-like piece, or the requirement of the test pressure of welding structure metal tube 1 is higher than 5MPa, or is welded When the draw ratio of binding structure metal tube 1 is more than 3, one or more support reinforcing ring flat-plates are installed additional inside assistant metal tube-like piece 6 14;5) metallic ring-plate 9 for opening screwed hole, is sealed using the second annular metal sheet 8, sealing means are after the first cushion rubber 12 is sealed Stud 11 is fastened, and steam vent 13 and inlet opening are reserved in the surface of the second annular metal sheet 8;6), sealed using the second annular metal sheet 8 Welding structure metal tube 1, sealing means are welded seal.So far, welding structure metal tube 1 and assistant metal tube-like piece 6 it Between form the annular seal space of reserved inlet opening and steam vent 13;7), by inlet opening to water filling in annular seal space, exhaust Chamber air is discharged in hole 13, and air is blocked using welded seal or rubber sealing mode after draining to steam vent 13;8)、 Continue to be pressurizeed to water filling in inlet opening, using pressure gauge real-time monitoring, water inlet is blocked after reaching test pressure;9), in test A period of time is stood under pressure, the sealing and pressure-resistant performance of pipeline are observed according to relevant criterion.
Embodiment two:As shown in figure 3, for the flanged (FLGD) welding structure metal circular tube 15 in end, its pressure resistant testing device And specific implementation step is as follows:1), in end, the flanged (FLGD) inner concentric position of welding structure metal circular tube 15 insertion one is long The smaller assistant metal tube-like piece 6 of degree;2) it is, that the one end of assistant metal tube-like piece 6 one piece of external diameter of welding is flanged (FLGD) more than end The external diameter of welding structure metal circular tube 15, internal diameter and the first annular metallic plate 7 of the internal diameter identical of assistant metal tube-like piece 6, its weldering It is 10 to stitch, and the flanged plate of first annular metallic plate 7 and the flanged (FLGD) welding structure metal circular tube 15 in end is used into cushion rubber 17 Sealing, bolt 16 is fastened;3) other end of assistant metal tube-like piece 6, is welded into one piece of external diameter and is less than the flanged (FLGD) welding in end The internal diameter of structural metal pipe 15, the metallic ring-plate 9 of opening screwed hole of the internal diameter less than the internal diameter of assistant metal tube-like piece 6;4) end, is worked as When the flanged (FLGD) wall thickness of welding structure metal circular tube 15 in portion is more than assistant metal 6 wall thickness of tube-like piece, or the flanged (FLGD) weldering in end The test pressure of binding structure metal circular tube 15 requirement be higher than 5MPa, or the flanged (FLGD) welding structure metal circular tube 15 in end major diameter During than more than 3, one or more support reinforcing ring flat-plates 14 are installed additional inside assistant metal tube-like piece 6;5), using annular metal sheet 8 sealing metal ring flat-plates 9, sealing means are that stud 11 is fastened after middle cushion rubber 12 is sealed, the reserved exhaust in the surface of annular metal sheet 8 Hole 13 and inlet opening;6), using the flanged (FLGD) welding structure metal circular tube 15 of the sealing end of the second annular metal sheet 8, sealing side Formula is welded seal.So far, formd between the flanged (FLGD) welding structure metal circular tube 15 in end and assistant metal tube-like piece 6 Reserved inlet opening and the annular seal space of steam vent 13;7), by inlet opening to water filling in annular seal space, steam vent 13 is discharged Chamber air, air is blocked using welded seal or rubber sealing mode after draining to steam vent 13;8), continue to entering Water filling pressurization, using pressure gauge real-time monitoring, water inlet is blocked after reaching test pressure in water hole;9) it is, quiet under test pressure A period of time is put, the sealing and pressure-resistant performance of pipeline are observed according to relevant criterion.
For the flanged (FLGD) voltage-withstand test welding structure metallic conduit in both sides, its pressure resistant testing device and implementation method are joined Examining embodiment two is carried out, unique the difference is that its two end flanges side uses rubber sealing, bolt fastening.
Welding structure metallic conduit voltage-withstand test method proposed by the present invention, security is increased substantially, more energy efficient, more ring Protect;Additionally, for the welding structure metallic conduit of major diameter, or the larger welding structure metallic conduit of length, present invention side The device water consumption that method is related to is small, and testable pressure is higher.
Finally, protection scope of the present invention is not limited to the above embodiments.Obviously, those skilled in the art can be right The present invention carries out various changes and deforms without deviating from scope and spirit of the present invention.If these are changed and deformation belongs to this hair In the range of bright claim and its equivalent technologies, then the present invention is also intended to comprising these changes and deforms.

Claims (8)

1. a kind of voltage-withstand test method of major diameter welding structure metallic conduit, it is characterized in that:
Comprise the following steps:
1) the smaller assistant metal tube-like piece (6) of a length is inserted in welding structure metal tube (1) inner concentric position;
2) assistant metal tube-like piece (6) one end is welded more than welding structure metal tube (1) by one piece of external diameter using weld seam (10) External diameter, internal diameter and the first annular metallic plate of assistant metal tube-like piece (6) internal diameter identical (7), and by first annular metallic plate (7) It is tightly connected with welding structure metal tube (1);
3) assistant metal tube-like piece (6) other end is welded into internal diameter of one piece of external diameter less than welding structure metal tube (1), internal diameter Less than the metallic ring-plate (9) for opening screwed hole of assistant metal tube-like piece (6) internal diameter;
4) support reinforcing ring flat-plate (14) is installed additional inside assistant metal tube-like piece (6);
5) the second annular metal sheet (8) is sealed using the first cushion rubber (12) and opens the metallic ring-plate (9) of screwed hole, afterwards using spiral shell Post (11) is fastened, and steam vent (13) and inlet opening are reserved in the second annular metal sheet (8) surface;
6) annular metal sheet of sealing welding second (8) and welding structure metal tube (1), in welding structure metal tube (1) and auxiliary The annular seal space of reserved inlet opening and steam vent (13) is formd between metallic tubular member (6);
7) by inlet opening to water filling in annular seal space, steam vent (13) discharge chamber air, air uses welding after draining Sealing or rubber sealing mode are blocked to steam vent (13);
8) continue to be pressurizeed to water filling in inlet opening, using pressure gauge real-time monitoring, a period of time is stood after reaching test pressure, see Examine the sealing and pressure-resistant performance of welding structure metal tube (1).
2. the voltage-withstand test method of major diameter welding structure metallic conduit according to claim 1, it is characterised in that:Using Welding structure metal tube (1) internal diameter that the method carries out voltage-withstand test is more than or equal to 500mm.
3. the voltage-withstand test method of major diameter welding structure metallic conduit according to claim 1, it is characterised in that:Receive External diameter of the internal diameter of the welding structure metal tube (1) of voltage-withstand test more than assistant metal tube-like piece (6).
4. the voltage-withstand test method of major diameter welding structure metallic conduit according to claim 1, it is characterised in that:Work as weldering When binding structure metal tube (1) wall thickness is more than assistant metal tube-like piece (6) wall thickness, branch is installed additional inside assistant metal tube-like piece (6) Support enforced loop plane (14).
5. the voltage-withstand test method of major diameter welding structure metallic conduit according to claim 1, it is characterised in that:Work as weldering When the requirement of binding structure metal tube (1) test pressure is higher than 10MPa, support reinforcing ring is installed additional inside assistant metal tube-like piece (6) Plate (14).
6. the voltage-withstand test method of major diameter welding structure metallic conduit according to claim 1, it is characterised in that:Work as weldering When binding structure metal tube (1) draw ratio is more than 3, support reinforcing ring flat-plate (14) is installed additional inside assistant metal tube-like piece (6).
7. the voltage-withstand test method of major diameter welding structure metallic conduit according to claim 1, it is characterised in that:Welding When (1) end is managed without flange in structural metal, its end is used with first annular metallic plate (7) and the second annular metal sheet (8) Welded seal.
8. the voltage-withstand test method of major diameter welding structure metallic conduit according to claim 1, it is characterised in that:For The flanged (FLGD) welding structure metal circular tube (15) in end, can configure flanged (FLGD) with end in assistant metal tube-like piece (6) end Merging is used using bolt (16) by the second cushion rubber between the flange of the end flange matching of welding structure metal circular tube (15), two flanges (17) seal.
CN201410342202.4A 2014-07-18 2014-07-18 A kind of voltage-withstand test method of major diameter welding structure metallic conduit Active CN104122042B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410342202.4A CN104122042B (en) 2014-07-18 2014-07-18 A kind of voltage-withstand test method of major diameter welding structure metallic conduit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410342202.4A CN104122042B (en) 2014-07-18 2014-07-18 A kind of voltage-withstand test method of major diameter welding structure metallic conduit

Publications (2)

Publication Number Publication Date
CN104122042A CN104122042A (en) 2014-10-29
CN104122042B true CN104122042B (en) 2017-07-11

Family

ID=51767546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410342202.4A Active CN104122042B (en) 2014-07-18 2014-07-18 A kind of voltage-withstand test method of major diameter welding structure metallic conduit

Country Status (1)

Country Link
CN (1) CN104122042B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104865127A (en) * 2015-04-07 2015-08-26 昆明理工大学 Testing apparatus and detection method for welding strength of plastic sewer inspection pit
CN106442157B (en) * 2016-12-07 2018-11-27 贵州黎阳航空动力有限公司 A kind of experimental rig of Subarea detecting casing hydraulic pressure strength
CN107860661B (en) * 2017-10-25 2019-12-10 江苏禹衡工程质量检测有限公司 Water pressure testing device for high-pressure-resistant oil and gas pipeline
CN110398420B (en) * 2019-08-19 2021-11-12 艾尔希庆华(西安)汽车有限公司 Gas generator liquid explosion rechecking test method
CN112179569B (en) * 2020-09-18 2021-06-15 中国水利水电第五工程局有限公司 Water supply steel pipe hydrostatic test inner plugging head and plugging method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201327460Y (en) * 2008-12-30 2009-10-14 上海锅炉厂有限公司 Filling-up plate device for pipeline hydrotest
CN103558090A (en) * 2013-11-18 2014-02-05 中建五局工业设备安装有限公司 Water pressure testing device and method for single joint of major-diameter pressure-bearing pipeline

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130089339A (en) * 2012-02-02 2013-08-12 대우조선해양 주식회사 Watertight jig for testing water pressure of grp pipe, and method for testing water pressure of grp pipe using the same
JP5928796B2 (en) * 2012-04-27 2016-06-01 新日鐵住金株式会社 Steel pipe water pressure test apparatus and water pressure test method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201327460Y (en) * 2008-12-30 2009-10-14 上海锅炉厂有限公司 Filling-up plate device for pipeline hydrotest
CN103558090A (en) * 2013-11-18 2014-02-05 中建五局工业设备安装有限公司 Water pressure testing device and method for single joint of major-diameter pressure-bearing pipeline

Also Published As

Publication number Publication date
CN104122042A (en) 2014-10-29

Similar Documents

Publication Publication Date Title
CN104122042B (en) A kind of voltage-withstand test method of major diameter welding structure metallic conduit
CN104089824B (en) The pressure resistant testing device of major diameter Welding Structure metallic conduit
JP2017536515A (en) Dissimilar pipe joints during high temperature, high pressure transients and cyclic loading
CN101033798B (en) Sealing equipment of sealed hole
US9995250B2 (en) Exhaust gas heat exchanger
KR101146829B1 (en) Loose flange-type flared pipe joint and steel pipe joining method using the same
CN208155536U (en) A kind of conduit air tightness tester
JP4737214B2 (en) Hot water storage tank of water heater and heat pump water heater using the same
CN202521154U (en) Baffle for pipeline water/gas pressure testing
KR20090082325A (en) Separated flange for connect of pipe
CN201096679Y (en) Sealing device for small-diameter pipe pressure test
CN210088255U (en) Metal corrugated pipe and flange connecting structure
CN104132783B (en) A kind of fast assembling-disassembling hydraulic pressure test fixture
CN106402662B (en) A kind of pipeline fluid leak detecting device
CN106595996B (en) A kind of inspection tooling for the disk miller hydraulic test that more is open
CN104595612A (en) Corrugated pipe expansion joint assembly capable of testing simultaneously
CN205745852U (en) temporary pipeline plugging device
CN103196641A (en) Hot-blast stove leakproofness pressure test method
US11951521B2 (en) Method of manufacturing connection member
CN204099760U (en) A kind of high pressure flexible metallic conduit
CN207923381U (en) Heating tube tightness test device peculiar to vessel
JP2013163202A (en) Structure for mounting plug member
CN202746804U (en) Copper pipe connector
JP5384417B2 (en) Loose flange type flare pipe joint, steel pipe for loose flange type flare pipe joint, method for manufacturing steel pipe for loose flange type flare pipe joint, and method for joining steel pipes
KR101146797B1 (en) Loose flange type flared pipe joint and method of joining steel pipes together by using the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant