CN104100097A - Construction method for repairing leakage of kitchens and toilets - Google Patents

Construction method for repairing leakage of kitchens and toilets Download PDF

Info

Publication number
CN104100097A
CN104100097A CN201310112740.XA CN201310112740A CN104100097A CN 104100097 A CN104100097 A CN 104100097A CN 201310112740 A CN201310112740 A CN 201310112740A CN 104100097 A CN104100097 A CN 104100097A
Authority
CN
China
Prior art keywords
repairing
seepage
construction method
kitchen
toilet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310112740.XA
Other languages
Chinese (zh)
Inventor
陈继宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310112740.XA priority Critical patent/CN104100097A/en
Publication of CN104100097A publication Critical patent/CN104100097A/en
Pending legal-status Critical Current

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a construction method for repairing leakage of kitchens and toilets. The construction method comprises the following steps of A, cleaning the surface of a leakage part; B covering an enhancement layer on the surface of the leakage part; C, covering a waterproof layer on the enhancement layer; D, after the waterproof layer is hardened, performing water spraying maintenance on the waterproof layer every 4-6 hours, wherein the water spraying maintenance period is more than or equal to 72 hours. After the waterproof layer is hardened, water spraying maintenance is performed on the waterproof layer every 4-6 hours and the water spraying maintenance period is more than or equal to 72 hours, so that the waterproof layer is firm in structure and excellent in leakproof effect.

Description

A kind of construction method of repairing kitchen and toilet seepage
Technical field
The present invention relates to a kind of construction method of repairing kitchen and toilet seepage.
Background technology
In the process of building, finishing, due to construction technology, construction material, or build aging reason, usually have Seepage and occur.Particularly, in kitchen and washroom, be very easy to occur Seepage.While there is seepage, people just utilize sealant to come the position of shutoff seepage conventionally simply, and repairing effect is on duty mutually, easily repeatedly occurs Seepage.
Summary of the invention
The invention provides a kind of construction method of repairing kitchen and toilet seepage, it has overcome the existing deficiency of background technology.The technical solution adopted for the present invention to solve the technical problems is:
A construction method of repairing kitchen and toilet seepage, is characterized in that, it comprises step:
The surface of A, cleaning seepage place;
B, at the surface coverage enhancement Layer of seepage place;
C, on enhancement Layer, cover waterproofing course;
D, when after waterproofing course sclerosis, every 4-6 hour, this waterproofing course is carried out to wet curing, during wet curing >=72 hours.
Among one preferred embodiment: during wet curing, be laid on and carry out moisturizing on this waterproofing course with Polypropylence Sheet or leatheroid.
Among one preferred embodiment: that the material of this enhancement Layer adopts is the FSB681-A that the special engineered Co., Ltd in Hunan, capital, Xiamen produces.
Among one preferred embodiment: that the material of this waterproofing course adopts is the FSB681 that the special engineered Co., Ltd in Hunan, capital, Xiamen produces.
Among one preferred embodiment: this waterproofing course is that the mode that adopts laterally, vertically replaces spray or brush or roller covers on this enhancement Layer, per pass spray or brush or roller interval 2-3 hour.
Among one preferred embodiment: on covering before enhancement Layer, also comprise the step of repairing hole, honeycomb, crack, cutting off steel bar end.
Among one preferred embodiment: when seepage place is during at tube circumference, before cleaning the surface of seepage place, be also included in tube circumference fluting, after cleaning the surface of seepage place, in groove by the step of sealant sealing.
Among one preferred embodiment: groove width 7-15mm, dark 7-15mm.
Among one preferred embodiment: that sealant adopts is the FSB480-A that the special engineered Co., Ltd in Hunan, capital, Xiamen produces.
Among one preferred embodiment: before cleaning the surface of seepage place, in the time that pipeline is metal tube, this pipeline is eliminated rust and preservative treatment, in the time that this pipeline is plastic pipe, the sidewall of this pipeline of polishing.
The technical program is compared with background technology, and its tool has the following advantages:
1. when after waterproofing course sclerosis, every 4-6 hour, this waterproofing course is carried out to wet curing, during wet curing >=72 hours, make waterproof layer structure firm, the works very well of antiseep.
2. that the material of this enhancement Layer adopts is the FSB681-A that the special engineered Co., Ltd in Hunan, capital, Xiamen produces, FSB681-A makes with the acrylic acid ester emulsion through the special transformation of the way with silicate and the micro crystal material polymer with high resistance aging, silicate polymer forms chemical bonds interpenetrating networks pilotaxitic texture with the acrylate polymer through the special transformation of the way, thereby combine securely, form the good elastomeric polymer of water resistance.
3. that the material of this waterproofing course adopts is the FSB681 that the special engineered Co., Ltd in Hunan, capital, Xiamen produces, and FSB681 is compared with FSB681-A, and pliability is better.
4. this waterproofing course is that the mode that adopts laterally, vertically replaces spray or brush or roller covers on this enhancement Layer, effectively avoids indivedual positions drain spray, leaks brush, leaks roller.Each spray or brush or roller interval 2-3 hour, ensure that front one coating enters hardening period.
5. that sealant adopts is the FSB480-A that the special engineered Co., Ltd in Hunan, capital, Xiamen produces, its material is all made up of inorganic matter, it is a kind of rigidity water-proofing material of resistance to native chemical corrosion, there is waterproof, leak stopping, antiseepage, protection against the tide, can permeate sclerosis in capillary 7L, play several functions such as stopping up aquaporin effect.
6. in the time that pipeline is metal tube, this pipeline is eliminated rust and preservative treatment, in the time that this pipeline is plastic pipe, the sidewall of this pipeline of polishing, thereby the adhesion stress of enhancing waterproofing materials and pipeline.
Brief description of the drawings
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 has illustrated the construction method of utilizing the present invention to repair kitchen and toilet seepage and has repaired the schematic diagram at inner corner trim place.
Fig. 2 has illustrated the schematic diagram that utilizes the present invention to repair the construction method pipe-repairing periphery of kitchen and toilet seepage.
Detailed description of the invention
Please refer to Fig. 1, while utilizing method of the present invention to repair inner corner trim position place (junction of ground and wall) or common plane seepage, comprise the following steps:
Clean the surface of seepage place.Residue, greasy dirt are cleaned up, and make basic unit's face fully moistening, but should be without open fire;
Hole, honeycomb, crack are repaired, and cut off steel bar end;
At the surface coverage enhancement Layer 10 of seepage place.That the material of this enhancement Layer 10 adopts is the FSB681-A that the special engineered Co., Ltd in Hunan, capital, Xiamen produces.If at internal corner part, preferably internal corner part is repaired into circular-arc;
On enhancement Layer 10, cover waterproofing course 20.That the material of this waterproofing course 20 adopts is the FSB681 that the special engineered Co., Ltd in Hunan, capital, Xiamen produces.This waterproofing course 20 is that the mode that adopts laterally, vertically replaces spray or brush or roller covers on this enhancement Layer 10, per pass spray or brush or roller interval 2-3 hour.First operation preferably adopts the mode of spraying, can make slurries fully infiltrate basic unit's face;
When after waterproofing course sclerosis, every 4-6 hour, this waterproofing course is carried out to wet curing, during wet curing >=72 hours.During wet curing, available Polypropylence Sheet or leatheroid are laid on and on this waterproofing course, carry out moisturizing.Preferably every 5 hours, this waterproofing course is carried out to wet curing.During wet curing first 24 hours, best with sprayer wet curing, should not adopt the mode maintenance of watering.
Please refer to Fig. 2, while utilizing the present invention to repair the construction method pipe-repairing periphery of kitchen and toilet seepage, comprise step:
In the time that pipeline 30 is metal tube, pipeline 30 is eliminated rust and preservative treatment.In the time that this pipeline 30 is plastic pipe, the sidewall of this pipeline 30 of polishing;
In pipeline 30 peripheral groove 40, after cleaning the surface of seepage place, groove 40 is interior to be sealed with sealant 50.The wide 7-15mm of groove 40, dark 7-15mm, preferably wide 10mm, dark 10mm.That sealant 40 adopts is the FSB480-A that the special engineered Co., Ltd in Hunan, capital, Xiamen produces;
Hole, honeycomb, crack are repaired, and cut off steel bar end;
At the surface coverage enhancement Layer 10 of seepage place.That the material of this enhancement Layer 10 adopts is the FSB681-A that the special engineered Co., Ltd in Hunan, capital, Xiamen produces;
On enhancement Layer 10, cover waterproofing course 20.That the material of this waterproofing course 20 adopts is the FSB681 that the special engineered Co., Ltd in Hunan, capital, Xiamen produces.This waterproofing course 20 is that the mode that adopts laterally, vertically replaces spray or brush or roller covers on this enhancement Layer 10, per pass spray or brush or roller interval 2-3 hour.First operation preferably adopts the mode of spraying, can make slurries fully infiltrate basic unit's face;
When after waterproofing course sclerosis, every 4-6 hour, this waterproofing course is carried out to wet curing, during wet curing >=72 hours.During wet curing, available Polypropylence Sheet or leatheroid are laid on and on this waterproofing course, carry out moisturizing.Preferably every 5 hours, this waterproofing course is carried out to wet curing.During wet curing first 24 hours, best with sprayer wet curing, should not adopt the mode maintenance of watering.
The above, only for preferred embodiment of the present invention, therefore can not limit according to this scope of the invention process, the equivalence of doing according to the scope of the claims of the present invention and description changes and modifies, and all should still belong in the scope that the present invention contains.

Claims (10)

1. a construction method of repairing kitchen and toilet seepage, is characterized in that, it comprises step:
The surface of A, cleaning seepage place;
B, at the surface coverage enhancement Layer of seepage place;
C, on enhancement Layer, cover waterproofing course;
D, when after waterproofing course sclerosis, every 4-6 hour, this waterproofing course is carried out to wet curing, during wet curing >=72 hours.
2. a kind of construction method of repairing kitchen and toilet seepage according to claim 1, is characterized in that: during wet curing, be laid on and on this waterproofing course, carry out moisturizing with Polypropylence Sheet or leatheroid.
3. a kind of construction method of repairing kitchen and toilet seepage according to claim 1, is characterized in that: that the material of this enhancement Layer adopts is the FSB681-A that the special engineered Co., Ltd in Hunan, capital, Xiamen produces.
4. a kind of construction method of repairing kitchen and toilet seepage according to claim 1, is characterized in that: that the material of this waterproofing course adopts is the FSB681 that the special engineered Co., Ltd in Hunan, capital, Xiamen produces.
5. a kind of construction method of repairing kitchen and toilet seepage according to claim 1, is characterized in that: this waterproofing course is that the mode that adopts laterally, vertically replaces spray or brush or roller covers on this enhancement Layer, per pass spray or brush or roller interval 2-3 hour.
6. a kind of construction method of repairing kitchen and toilet seepage according to claim 1, is characterized in that: on covering before enhancement Layer, also comprise the step of repairing hole, honeycomb, crack, cutting off steel bar end.
7. a kind of construction method of repairing kitchen and toilet seepage according to claim 1, it is characterized in that: when seepage place is during at tube circumference, before cleaning the surface of seepage place, be also included in tube circumference fluting, after cleaning the surface of seepage place, the step sealing with sealant in groove.
8. a kind of construction method of repairing kitchen and toilet seepage according to claim 7, is characterized in that: groove width 7-15mm, dark 7-15mm.
9. a kind of construction method of repairing kitchen and toilet seepage according to claim 7, is characterized in that: that sealant adopts is the FSB480-A that the special engineered Co., Ltd in Hunan, capital, Xiamen produces.
10. a kind of construction method of repairing kitchen and toilet seepage according to claim 7, it is characterized in that: before cleaning the surface of seepage place, in the time that pipeline is metal tube, this pipeline is eliminated rust and preservative treatment, in the time that this pipeline is plastic pipe, the sidewall of this pipeline of polishing.
CN201310112740.XA 2013-04-02 2013-04-02 Construction method for repairing leakage of kitchens and toilets Pending CN104100097A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310112740.XA CN104100097A (en) 2013-04-02 2013-04-02 Construction method for repairing leakage of kitchens and toilets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310112740.XA CN104100097A (en) 2013-04-02 2013-04-02 Construction method for repairing leakage of kitchens and toilets

Publications (1)

Publication Number Publication Date
CN104100097A true CN104100097A (en) 2014-10-15

Family

ID=51668610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310112740.XA Pending CN104100097A (en) 2013-04-02 2013-04-02 Construction method for repairing leakage of kitchens and toilets

Country Status (1)

Country Link
CN (1) CN104100097A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442861A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for restoring water leakage air face of toilet drainage pipeline
CN111502324A (en) * 2020-04-29 2020-08-07 湖南先锋防水科技有限公司 Repairing process for leakage between elevator shaft side wall and ground
CN114059795A (en) * 2021-12-27 2022-02-18 叶亮亮 Novel hole waterproof and leaking stoppage process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1033206A (en) * 1988-12-05 1989-05-31 铁道部山海关桥梁工厂 Construction technology of preventing and controlling seepage in buildings
JPH10325252A (en) * 1997-05-27 1998-12-08 Kuule Top Baria:Kk Waterproof repairing method of bathroom and waterproofing member used therefor
CN1421586A (en) * 2001-11-22 2003-06-04 康文秀 Waterproof construction structure utilizing ventilating waterproof plates

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1033206A (en) * 1988-12-05 1989-05-31 铁道部山海关桥梁工厂 Construction technology of preventing and controlling seepage in buildings
JPH10325252A (en) * 1997-05-27 1998-12-08 Kuule Top Baria:Kk Waterproof repairing method of bathroom and waterproofing member used therefor
CN1421586A (en) * 2001-11-22 2003-06-04 康文秀 Waterproof construction structure utilizing ventilating waterproof plates

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
候海鹏: "浅谈房屋建筑工程厨卫防渗漏施工技术", 《山西建筑》 *
蔡沿革等: "JS复合防水涂料在已建房屋渗漏水治理技术中的应用", 《黑龙江科技信息》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442861A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for restoring water leakage air face of toilet drainage pipeline
CN105442861B (en) * 2015-11-19 2018-02-23 江苏鼎达建筑新技术有限公司 Drainage conduit of toilet percolating water backwater surface repair method
CN111502324A (en) * 2020-04-29 2020-08-07 湖南先锋防水科技有限公司 Repairing process for leakage between elevator shaft side wall and ground
CN114059795A (en) * 2021-12-27 2022-02-18 叶亮亮 Novel hole waterproof and leaking stoppage process

Similar Documents

Publication Publication Date Title
CN102312582A (en) Construction method for applying polyurea to old flexible waterproof roof for renovation transformation
CN105797939A (en) Pipeline rehabilitation method based on iron resin spray-coating
CN103553538A (en) Non-destructive waterproof agent for architectural indoor deep penetration curing
CN104100097A (en) Construction method for repairing leakage of kitchens and toilets
CN103806662B (en) A kind of toilet bath room Waterproof Construction Technique
CN103306383A (en) Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall
KR101804476B1 (en) Waterproof complex repairing method of concrete structures
KR100732473B1 (en) Water-proofing method for urathane flim of paint using zinc galvanizing sheets
CN103306384B (en) The construction method of waterproof sealing cream is smeared before cement final set
KR20160125654A (en) Repairing Method for Crack of Concrete Structure
JP2012202048A (en) Double drain for repair, and method for repairing roof drain using the same
CN205907910U (en) Inclined roof board rapid hardening spraying rubber impermeability structure
CN202500347U (en) Building outer wall waterproof leakage mending reinforcement structure
CN102852320A (en) Demolition-free leakage repairing construction process for kitchen and cleaning facility
KR101621757B1 (en) Construction method using panel construction and the construction site construction panel for leaks that occur on the edge of the side edges of the upper and Building
KR101338583B1 (en) Water resistant constructing method for roof and water resistant roof constructed by the same
CN205024824U (en) Bathroom mounting structure
CN203654487U (en) Waterproof layer structure on root portion of pipe and water pipe with root portion provided with waterproof layer
CN113431377A (en) Concrete slab crack seepage treatment device and seepage treatment method
KR101699615B1 (en) Waterproof construction method
CN104963418A (en) Full-sealing waterproof construction method for toilet
CN110924360A (en) Method for repairing settlement joint of concrete structure
CN204826160U (en) Balcony surface drainage mouth structure
CN204662674U (en) Shower house anti-seep water structure
CN103046763B (en) Dustproof and waterproof construction of leveling blanket method in old building remodeling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141015

WD01 Invention patent application deemed withdrawn after publication