CN104096339B - 一种登杆器 - Google Patents

一种登杆器 Download PDF

Info

Publication number
CN104096339B
CN104096339B CN201410381653.9A CN201410381653A CN104096339B CN 104096339 B CN104096339 B CN 104096339B CN 201410381653 A CN201410381653 A CN 201410381653A CN 104096339 B CN104096339 B CN 104096339B
Authority
CN
China
Prior art keywords
pair
movable hook
climbers
rear pole
front strut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410381653.9A
Other languages
English (en)
Other versions
CN104096339A (zh
Inventor
林晓兵
杨海荣
时进
张旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YIZHENG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
YIZHENG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YIZHENG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Yangzhou Power Supply Co of Jiangsu Electric Power Co filed Critical YIZHENG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority to CN201410381653.9A priority Critical patent/CN104096339B/zh
Publication of CN104096339A publication Critical patent/CN104096339A/zh
Application granted granted Critical
Publication of CN104096339B publication Critical patent/CN104096339B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

一种登杆器。提供了一种结构简单,能够提高登杆速度,保证安全性和可靠性的登杆器。包括一安全带和一对脚扣,所述脚扣包括活动钩、导管、连杆、T形板和脚踏板,还包括一对支撑组件和若干弹性拉带,所述一对支撑组件分别设在所述一对脚扣上,所述支撑组件包括前撑杆和后撑杆,所述前撑杆垂直且固定设在所述活动钩的中间,所述后撑杆垂直且固定设在所述脚踏板上;弹性拉带分别连接在所述一对前撑杆之间和所述一对后撑杆之间;安全带包括主带、一对前附带和一对后附带,主带呈圆形,一对前附带分别连接在主带和位于一对前撑杆之间的弹性拉带之间,一对后附带分别连接在所述主带和所述一对后撑杆之间。本发明节省了登杆时间,提高了工作效率。

Description

一种登杆器
技术领域
本发明涉及电力施工工具,尤其涉及用于攀登水泥电杆的登杆器。
背景技术
随着电力需求的不断增大,电网建设步伐迅猛发展,检修工作量不断攀升,提高人员工作效率以及工作安全稳定性的要求也不断提高。目前,在户外电杆发生故障时,通常使用的登杆工具包括安全带和一对脚扣,双脚放置在一对脚扣内,安全带系至腰间且连接在电杆上;然后,通过左右脚依次登杆上升,每动作一次需要将安全带向上提升一次,降低了登杆的速度,造成不能快速的恢复供电。同时,在现有登杆工具的作用下,连贯地登杆,如果操作不当,容易出现安全事故。
发明内容
本发明针对以上问题,提供了一种结构简单,能够提高登杆速度,保证安全性和可靠性的登杆器。
本发明的技术方案是:包括一安全带和一对脚扣,所述脚扣包括活动钩、导管、连杆、T形板和脚踏板,所述活动钩具有一体成型的直线段和弧形段,所述导管具有中孔,所述活动钩的直线段活动连接在所述导管的中孔内,所述活动钩的弧形段的内侧设有防滑层,所述导管连接在所述连杆上,所述连杆固定连接在所述脚踏板上;所述T形板连接在所述脚踏板上,所述T形板的内侧设有防滑块;
还包括一对支撑组件和若干弹性拉带,所述一对支撑组件分别设在所述一对脚扣上,所述支撑组件包括前撑杆和后撑杆,所述前撑杆垂直且固定设在所述活动钩的中间,所述后撑杆垂直且固定设在所述脚踏板上;
所述弹性拉带分别连接在所述一对前撑杆之间和所述一对后撑杆之间;
所述安全带包括主带、一对前附带和一对后附带,所述主带呈圆形,所述一对前附带分别连接在所述主带和位于所述一对前撑杆之间的弹性拉带之间,所述一对后附带分别连接在所述主带和所述一对后撑杆之间。
所述活动钩的弧形段的顶、底面分别设有齿形一致的锯齿。
所述锯齿的截面呈梯形、方形或三角形。
所述一对后撑杆呈圆弧形。
本发明在脚扣的活动钩和脚踏板上分别固定设有前撑杆和后撑杆,且一对前撑杆之间和一对后撑杆之间分别连接设有弹性拉带,使得一对脚扣形成一个整体,提高结构强度和支撑的可靠性;在准备工作中,一对前撑杆之间的弹性拉带绕设在电杆上,从而实现“抱住”电杆,此时,一对前撑杆贴合电杆;工作人员踩在脚踏板上,一对后撑杆和设在后撑杆之间的弹性拉带用于支撑工作人员;然后,将安全带的主带系至工作人员的腰间,一对前附带对称设在电杆的两侧,一对后附带对称设在主带的两侧;
在移动过程中,一对脚扣先后交替动作进行登杆,其工作形态表现为一脚扣和设在脚扣上前撑杆和后撑杆同步移动,由于一对前撑杆和一对后撑杆之间设有弹性拉带,能够有效地保证一对前撑杆“抱住”电杆和一对后撑杆对工作人员的支撑。本发明节省了登杆时间,提高了工作效率。
附图说明
图1是本发明的结构示意图,
图2是本发明中弹性拉带和一对支撑组件连接的结构示意图,
图3是图2中A向的结构示意图一,
图4是图2中A向的结构示意图二,
图5是图2中A向的结构示意图三,
图6是本发明中活动钩和前撑杆的连接结构示意图,
图7是本发明中脚扣的结构示意图,
图8是本发明中弹性拉带和一对前撑杆连接的结构示意图,
图9是本发明的工作展开状态图;
图中1是活动钩,111是直线段,112是弧形段,2是导管,3是连杆,4是T形板,5是脚踏板,6是扣带,7是防滑层,8是防滑块,9是支撑组件,91是前撑杆,92是后撑杆,10是弹性拉带,11是锯齿,12是安全带,121是主带,122是前附带,123是后附带,13是电杆。
具体实施方式
本发明如图1-9所示,包括一安全带12和一对脚扣,所述脚扣包括活动钩1、导管2、连杆3、T形板4和脚踏板5(脚踏板上设有扣带6),所述活动钩1具有一体成型的直线段111和弧形段112,所述导管2具有中孔,所述活动钩1的直线段111活动连接在所述导管2的中孔内,所述活动钩1的弧形段112的内侧设有防滑层7,所述导管2连接在所述连杆3上,所述连杆3固定连接在所述脚踏板5上;所述T形板4连接在所述脚踏板5上,所述T形板4的内侧设有防滑块8;
还包括一对支撑组件9和若干弹性拉带10(呈高强度),所述一对支撑组件9分别设在所述一对脚扣上,所述支撑组件9包括前撑杆91和后撑杆92,所述前撑杆91垂直且固定设在所述活动钩1的中间,所述后撑杆92垂直且固定设在所述脚踏板5上;
所述弹性拉带10分别连接在所述一对前撑杆91之间和所述一对后撑杆92之间;
所述安全带12包括主带121、一对前附带122和一对后附带123,所述主带121呈圆形,所述一对前附带122分别连接在所述主带121和位于所述一对前撑杆91之间的弹性拉带之间,所述一对后附带123分别连接在所述主带121和所述一对后撑杆92之间(即一对后附带一一连接在主带和后撑杆之间)。安全带12通过前、后附带的连接保证了工作人员的安全性。图9为展开示图,正常工作中,一对脚扣、弹性拉带和一对前撑杆抱住电杆13。
所述活动钩1的弧形段112的顶、底面分别设有齿形一致的锯齿11。由于一对活动钩在工作过程,活动钩的弧形段分别位于上、下方,其在空间上具有重合段,通过设置锯齿可以实现重合段的嵌入式连接,使得一对脚扣呈现“抱紧”的连接状态,形成一体,提高脚扣与电杆连接的可靠性。可适用于,工作人员在电杆顶部较长时间工作,实现一对脚扣的“抱紧”;同时,适用于在脚扣滑杆时,防滑层和\或防滑块意外脱落,能够在通过一对脚扣的“抱紧”,保证与电杆的可靠接触,然后,通过呼救,保证了工作人员的安全。
一对活动钩的顶、底面分别设置锯齿,适应了任一脚扣位于上方,都能实现两者的连接。
如图3-5所示,所述锯齿11的截面呈梯形、方形或三角形,便于加工选择。
所述一对后撑杆92呈圆弧形,能够适应工作人员在登杆过程中,身体的歪曲变形。
本发明在登杆或下杆过程中,若出现一只脚扣滑杆的意外时,由于一对脚扣在弹性拉带的作用下形成整体,同时,配合锯齿的可靠嵌入连接,能够有效实现脚扣的正常工作。

Claims (4)

1.一种登杆器,包括一安全带和一对脚扣,所述脚扣包括活动钩、导管、连杆、T形板和脚踏板,所述活动钩具有一体成型的直线段和弧形段,所述导管具有中孔,所述活动钩的直线段活动连接在所述导管的中孔内,所述活动钩的弧形段的内侧设有防滑层,所述导管连接在所述连杆上,所述连杆固定连接在所述脚踏板上;所述T形板连接在所述脚踏板上,所述T形板的内侧设有防滑块;
其特征在于,还包括一对支撑组件和若干弹性拉带,所述一对支撑组件分别设在所述一对脚扣上,所述支撑组件包括前撑杆和后撑杆,所述前撑杆垂直且固定设在所述活动钩的中间,所述后撑杆垂直且固定设在所述脚踏板上;
所述弹性拉带分别连接在所述一对前撑杆之间和所述一对后撑杆之间;
所述安全带包括主带、一对前附带和一对后附带,所述主带呈圆形,所述一对前附带分别连接在所述主带和位于所述一对前撑杆之间的弹性拉带之间,所述一对后附带分别连接在所述主带和所述一对后撑杆之间。
2.根据权利要求1所述的一种登杆器,其特征在于,所述活动钩的弧形段的顶、底面分别设有齿形一致的锯齿。
3.根据权利要求2所述的一种登杆器,其特征在于,所述锯齿的截面呈梯形、方形或三角形。
4.根据权利要求1-3中任一所述的一种登杆器,其特征在于,所述一对后撑杆呈圆弧形。
CN201410381653.9A 2014-08-05 2014-08-05 一种登杆器 Active CN104096339B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410381653.9A CN104096339B (zh) 2014-08-05 2014-08-05 一种登杆器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410381653.9A CN104096339B (zh) 2014-08-05 2014-08-05 一种登杆器

Publications (2)

Publication Number Publication Date
CN104096339A CN104096339A (zh) 2014-10-15
CN104096339B true CN104096339B (zh) 2016-04-13

Family

ID=51665124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410381653.9A Active CN104096339B (zh) 2014-08-05 2014-08-05 一种登杆器

Country Status (1)

Country Link
CN (1) CN104096339B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107158665B (zh) * 2017-06-06 2023-04-28 国网江苏省电力有限公司仪征市供电分公司 一种组合式登杆装置
CN107096186B (zh) * 2017-06-06 2023-05-02 国网江苏省电力有限公司仪征市供电分公司 一种登杆安全辅助装置
CN110270064B (zh) * 2019-07-22 2024-04-12 广东电网有限责任公司 一种便于携带的电力配网施工用登杆器

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1802944A1 (de) * 1968-10-14 1970-06-18 Atbutina Petat Steigeisen fuer Rundholz- und Stahlrohrmasten
FI8622U1 (sv) * 2009-10-19 2010-02-24 Palmionet Ky Stolpsko
CN102266656A (zh) * 2010-06-03 2011-12-07 上海市电力公司 一种登杆工具
CN202020863U (zh) * 2011-04-16 2011-11-02 王传武 一种新型防滑脚扣
CN203469392U (zh) * 2013-10-15 2014-03-12 国家电网公司 电线杆攀杆用脚扣组件
CN203971321U (zh) * 2014-08-05 2014-12-03 国家电网公司 登杆器

Also Published As

Publication number Publication date
CN104096339A (zh) 2014-10-15

Similar Documents

Publication Publication Date Title
CN104096339B (zh) 一种登杆器
CN207459560U (zh) 一种新型电力抢修滑车
CN103840392B (zh) 一种砼杆作业平台
CN105375372A (zh) 柱上变压器检修台架
CN203971321U (zh) 登杆器
CN203347677U (zh) 一种防滑梯
CN203161063U (zh) 一种电杆横担挂梯
CN203736798U (zh) 一种攀登输电铁塔的辅助脚蹬
CN203301060U (zh) 一种在特高压输电线路耐张绝缘子串上可调升降平台
CN204050842U (zh) 登杆组件
CN204760966U (zh) 一种拉线防爬藤罩
CN107863716A (zh) 双分裂架空输电线路下线滑车
CN203312698U (zh) 一种地线棒挂架
CN203487851U (zh) 一种电力塔的单轨攀爬结构
CN203089176U (zh) 一种放射科用射线防护装置
CN105311797A (zh) 一种登杆组件
CN204324744U (zh) 悬挂式大棚草帘装卸机
CN205070260U (zh) 柱上变压器检修台架
CN207392712U (zh) 一种建筑施工用液压爬升脚手架
CN201543185U (zh) 登塔脚蹬
CN204972745U (zh) 一种安全带挂扣支架
CN205287546U (zh) 一种新型体操运动训练辅助器
CN201527902U (zh) 一种可移动抽拉式线圈套装平台
CN204134154U (zh) 新型登杆器
CN204081427U (zh) 一种移动式建筑用脚手架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 225009 Weiyang Road, Jiangsu, China, No. 179, No.

Applicant after: Yangzhou Power Supply Company of Jiangsu Electric Power Company

Applicant after: State Grid Corporation of China

Applicant after: Jiangsu Electric Power Company

Applicant after: Yizheng Power Supply Company of Jiangsu Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: Jiangsu Electric Power Company

Applicant before: Yangzhou Power Supply Company of Jiangsu Electric Power Company

Applicant before: Yizheng Power Supply Company of Jiangsu Electric Power Company

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: STATE GRID CORPORATION OF CHINA TO: YANGZHOU POWER SUPPLY CO., JIANGSU PROV ELECTRIC POWER CO., LTD.

CB02 Change of applicant information

Address after: 211400 Yizheng City, Jiangsu Province workers and peasants North Road, No. 154, No.

Applicant after: Yizheng Power Supply Company of Jiangsu Electric Power Company

Applicant after: Yangzhou Power Supply Company of Jiangsu Electric Power Company

Applicant after: Jiangsu Electric Power Company

Applicant after: State Grid Corporation of China

Address before: 225009 Weiyang Road, Jiangsu, China, No. 179, No.

Applicant before: Yangzhou Power Supply Company of Jiangsu Electric Power Company

Applicant before: State Grid Corporation of China

Applicant before: Jiangsu Electric Power Company

Applicant before: Yizheng Power Supply Company of Jiangsu Electric Power Company

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant