CN104091534B - 一种巨幕led屏 - Google Patents

一种巨幕led屏 Download PDF

Info

Publication number
CN104091534B
CN104091534B CN201410305197.XA CN201410305197A CN104091534B CN 104091534 B CN104091534 B CN 104091534B CN 201410305197 A CN201410305197 A CN 201410305197A CN 104091534 B CN104091534 B CN 104091534B
Authority
CN
China
Prior art keywords
led screen
gag lever
lever post
mounting groove
locking slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410305197.XA
Other languages
English (en)
Other versions
CN104091534A (zh
Inventor
杨明珠
邓佳玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongyang Guangming Electric Power Construction Co ltd
Pan Hui
State Grid Corp of China SGCC
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Dongyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Bright Power Construction Co Ltd Of Dongyang City
State Grid Corp of China SGCC
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Dongyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bright Power Construction Co Ltd Of Dongyang City, State Grid Corp of China SGCC, Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Dongyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Bright Power Construction Co Ltd Of Dongyang City
Priority to CN201410305197.XA priority Critical patent/CN104091534B/zh
Publication of CN104091534A publication Critical patent/CN104091534A/zh
Application granted granted Critical
Publication of CN104091534B publication Critical patent/CN104091534B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

本发明涉及一种巨幕LED屏,属于显示屏领域,解决了LED屏拆装速度慢的问题。为解决上述问题,本发明提供了如下技术方案:一种巨幕LED屏,包括框架和设置在所述框架上的若干LED屏,所述框架上设有可放置所述LED屏的定位板,所述定位板上设有定位孔,所述LED屏上设置有安装槽、锁紧槽和盖板,所述安装槽内设有可轴向移动的限位杆,所述限位杆可通过盖板固定在所述安装槽内,所述限位杆上设有延伸至箱体外的操作杆,所述LED屏上的限位杆可轴向移动穿过定位孔插入或者拔出相邻LED屏的锁紧槽。

Description

一种巨幕LED屏
技术领域
本发明涉及一种巨幕LED屏,属于显示屏领域。
背景技术
巨幕LED屏适用大型演出表演,现有的巨幕LED屏由若干LED屏拼凑而成,LED屏通过四颗紧固件固定在框架上。此结构虽然可以将LED屏紧固在框架上,但是,LED屏不管是固定在框架上,还是从框架上取下,工作人员都需要消耗大量的时间。而且,LED屏上的螺纹孔在不断拆装紧固件的过程中,容易损坏,从而照成紧固件难以将LED屏紧固在框架上。
发明内容
本发明所要解决的问题就是提供一种巨幕LED屏,解决了LED屏拆装速度慢的问题。
为解决上述问题,本发明提供了如下技术方案:一种巨幕LED屏,包括框架和设置在所述框架上的若干LED屏,所述框架上设有放置所述LED屏的定位板,所述定位板上设有定位孔,所述LED屏上设置有安装槽、锁紧槽和盖板,所述安装槽内设有可轴向移动的限位杆,所述限位杆通过盖板固定在所述安装槽内,所述限位杆上设有延伸至安装槽外的操作杆,所述LED屏上的限位杆轴向移动穿过定位孔插入或者拔出相邻LED屏的锁紧槽。
进一步的,所述安装槽设置在所述LED屏的下端,所述锁紧槽设置在所述LED屏的上端,所述安装槽的轴心和所述锁紧槽的轴心设置在同一直线上。
进一步的,所述限位杆的端部设置有弹簧,所述限位杆通过弹簧与所述安装槽的顶壁接触。
进一步的,所述盖板上设有与所述限位杆配合的通孔,所述限位杆的侧壁上设有环形凸筋,所述环形凸筋顶触所述盖板。
进一步的,所述安装槽的侧壁上设有轴向设置的限位槽,所述操作杆插入所述限位槽延伸至所述LED屏外。
进一步的,所述操作杆与所述限位杆螺纹连接。
本发明的有益效果:
本发明巨幕LED屏包括框架和LED屏,框架上设置有定位板,定位板上设置有定位孔,LED屏上设置有安装槽和锁紧槽。设置在安装槽内的限位杆穿过定位孔可插入下方LED屏的锁紧槽内,从而实现上下两块相邻的LED屏固定在框架上。此结构有效缩短了工作人员组装和拆除巨幕LED屏所需要的时间。
操作杆方便工作人员轴向移动限位杆,弹簧为限位杆提供一个向下的锁紧力。环形凸筋避免限位杆穿过盖板从LED屏的安装槽内退出。
附图说明
图1是本发明一种巨幕LED屏的主视图;
图2是本发明一种巨幕LED屏的侧视图;
图3是本发明框架的俯视图;
图4是本发明LED屏的剖视图。
具体实施方式
参照图1、图3和图4,一种巨幕LED屏,包括框架1和设置在框架1上的若干LED屏2,框架1上设有定位板11,定位板11上设有定位孔111,LED屏2上设置有安装槽21、锁紧槽22和盖板5,安装槽21的轴心和锁紧槽22的轴心位于同一直线上,盖板5可覆盖安装槽21的开口处,且盖板5通过紧固件固定在LED屏2上,盖板5上设置有通孔。
参照图2、图3和图4,安装槽21内设置有可轴向移动的限位杆3,限位杆3上设置有操作杆31和环形凸筋32,环形凸筋32位于操作杆31的下方,操作杆31与限位杆3螺纹连接,限位杆3可穿过通孔插入定位孔111内。环形凸筋32的直径大于通孔的直径,避免限位杆3从安装槽21内拔出。安装槽21的侧壁上设置有限位槽23,操作杆31可插入限位槽23,但是,操作杆31并不延伸到限位槽23外,避免操作杆31顶触到相邻LED屏2的侧壁上,从而造成相邻LED屏2之间出现间隙,影响了消费者的观影效果。
参照图3和图4,本发明的工作原理为,LED屏2底端的左右两侧分别放置在不同的定位板11上,LED屏2上的限位杆3穿过定位孔111插入位于下方LED屏2的锁紧槽22内,从而实现固定LED屏2。在拆除LED屏2时,工作人员轴向移动操作杆31,使限位杆3退出下方LED屏的锁紧槽22,从而实现上下两个LED屏2分离。
参照图3和图4,限位杆3通过弹簧4与安装槽21的顶壁接触,弹簧4提供给限位杆3一个向下的力,使限位杆3在对准定位孔111后,能够主动穿过定位孔111并插入锁紧槽22内。
本发明中,最下方的LED屏直接放置在地面上,最上方的LED屏直接通过安装槽内的限位杆插入下方LED屏的锁紧槽内实现固定。但是,在实际安装中,为了更加牢固的固定最下方的LED屏和最上方的LED屏,可以将放置在最下方的LED屏的限位杆插入框架实现固定,将框架上的凸台插入放置在最上方的LED屏的锁紧槽,实现固定最上方的LED屏。
同时,本发明的定位杆上只设置有一个定位孔,在实际的定位杆上可以设置两个定位孔,这样,两根相邻的定位杆可以固定LED屏的端部四个角。
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,熟悉本领域的技术人员应该明白本发明包括但不限于附图和上面具体实施方式中描述的内容。任何不偏离本发明的功能和结构原理的修改都将包括在权利要求书的范围中。

Claims (2)

1.一种巨幕LED屏,包括框架和设置在所述框架上的若干LED屏,其特征在于:所述框架上设有放置所述LED屏的定位板,所述定位板上设有定位孔,所述LED屏上设置有安装槽、锁紧槽和盖板,所述安装槽内设有可轴向移动的限位杆,所述限位杆通过盖板固定在所述安装槽内,所述限位杆上设有延伸至安装槽外的操作杆,所述LED屏上的限位杆轴向移动穿过定位孔插入或者拔出相邻LED屏的锁紧槽;所述安装槽设置在所述LED屏的下端,所述锁紧槽设置在所述LED屏的上端,所述安装槽的轴心和所述锁紧槽的轴心设置在同一直线上;所述限位杆的端部设置有弹簧,所述限位杆通过弹簧与所述安装槽的顶壁接触;所述盖板上设有与所述限位杆配合的通孔,所述限位杆的侧壁上设有环形凸筋,所述环形凸筋顶触所述盖板。
2.根据权利要求1所述的一种巨幕LED屏,其特征在于:所述操作杆与所述限位杆螺纹连接。
CN201410305197.XA 2014-06-30 2014-06-30 一种巨幕led屏 Active CN104091534B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410305197.XA CN104091534B (zh) 2014-06-30 2014-06-30 一种巨幕led屏

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410305197.XA CN104091534B (zh) 2014-06-30 2014-06-30 一种巨幕led屏

Publications (2)

Publication Number Publication Date
CN104091534A CN104091534A (zh) 2014-10-08
CN104091534B true CN104091534B (zh) 2016-03-23

Family

ID=51639246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410305197.XA Active CN104091534B (zh) 2014-06-30 2014-06-30 一种巨幕led屏

Country Status (1)

Country Link
CN (1) CN104091534B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108400536B (zh) * 2018-03-29 2020-11-03 南京兆伏电力科技有限公司 电能表装置
CN109671369A (zh) * 2019-02-27 2019-04-23 安徽子午线标识标牌工程有限公司 一种智能导示牌
CN110612007A (zh) * 2019-08-12 2019-12-24 深圳市三彩显示有限公司 一种防水、防尘全密封户外节能共阴冷屏
CN111369907B (zh) * 2020-04-20 2021-11-26 浙江枫宸光电科技有限公司 一种高效的led显示屏拆装模块

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202646256U (zh) * 2012-06-11 2013-01-02 深圳市联建光电股份有限公司 箱体连接装置及箱体连接系统
CN202677745U (zh) * 2012-06-05 2013-01-16 吴建霖 集成式Led 大屏幕
CN203013172U (zh) * 2012-12-27 2013-06-19 广州市浩洋电子有限公司 一种led显示屏的快速锁紧机构
CN203335550U (zh) * 2013-07-04 2013-12-11 深圳市易事达电子股份有限公司 锁紧机构及led显示屏
CN203627444U (zh) * 2013-12-17 2014-06-04 深圳市九洲光电科技有限公司 快速吊装自锁装置、led箱体及led显示屏
CN203910202U (zh) * 2014-06-30 2014-10-29 长兴百叶龙演出有限公司 一种巨幕led屏

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5921266B2 (ja) * 2012-03-13 2016-05-24 株式会社秩父富士 照光表示器

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202677745U (zh) * 2012-06-05 2013-01-16 吴建霖 集成式Led 大屏幕
CN202646256U (zh) * 2012-06-11 2013-01-02 深圳市联建光电股份有限公司 箱体连接装置及箱体连接系统
CN203013172U (zh) * 2012-12-27 2013-06-19 广州市浩洋电子有限公司 一种led显示屏的快速锁紧机构
CN203335550U (zh) * 2013-07-04 2013-12-11 深圳市易事达电子股份有限公司 锁紧机构及led显示屏
CN203627444U (zh) * 2013-12-17 2014-06-04 深圳市九洲光电科技有限公司 快速吊装自锁装置、led箱体及led显示屏
CN203910202U (zh) * 2014-06-30 2014-10-29 长兴百叶龙演出有限公司 一种巨幕led屏

Also Published As

Publication number Publication date
CN104091534A (zh) 2014-10-08

Similar Documents

Publication Publication Date Title
CN104091534B (zh) 一种巨幕led屏
CN103337224A (zh) Led显示屏
CN203910202U (zh) 一种巨幕led屏
CN201196691Y (zh) Sfp/sfp+光电模块解锁装置及其应用的光电模块
CN104895317A (zh) 一种方盘快速安装脚手架
CN207686250U (zh) 一种炼油化工设备检修用机修工作架
CN203451016U (zh) 自动扶梯或自动人行道的插入式机房护板装置
CN104091533B (zh) 一种拆装方便的巨幕led屏
CN204163395U (zh) 一种方盘脚手架
CN203910203U (zh) 一种拆装方便的巨幕led屏
CN204359978U (zh) 配线单元箱
CN207282972U (zh) 一种配电箱面板定位锁定装置
CN204462982U (zh) 云储存服务器
CN203939818U (zh) 预端接盒快速装配机构
CN203742100U (zh) 一种预埋脚盖
CN202677758U (zh) 免拆卸拼接底座的足球场led显示屏
CN204580219U (zh) 滑板车行李箱的拉杆机构
CN209344422U (zh) 一种便于维保的路由器
CN203111507U (zh) 一种单边单点约束固定装置
CN202340060U (zh) 一种开关柜摩擦接地器
CN203789574U (zh) 一种用于钢制屏风面板的连接结构
CN204258042U (zh) 低压柜的铅封板安装结构
CN202938267U (zh) 一种静电离子球底座
CN205771174U (zh) 一种大料仓闸板用手摇手柄
CN205961640U (zh) 一种控制器模组安装结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20151230

Address after: People's road, Wu Ning 322100 Zhejiang city of Dongyang province No. 58

Applicant after: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY DONGYANG POWER SUPPLY Co.

Applicant after: DONGYANG GUANGMING ELECTRIC POWER CONSTRUCTION Co.,Ltd.

Applicant after: State Grid Corporation of China

Applicant after: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY JINHUA POWER SUPPLY Co.

Address before: 302 room 1, silkworm garden, Gongbei District, Gongshu District, Zhejiang, Hangzhou, 310000

Applicant before: Pan Hui

Effective date of registration: 20151230

Address after: 302 room 1, silkworm garden, Gongbei District, Gongshu District, Zhejiang, Hangzhou, 310000

Applicant after: Pan Hui

Address before: 313100, Jinxiu Road 2, pheasant city street, Huzhou, Zhejiang, Changxing County

Applicant before: CHANGXING BAIYELONG PERFORMANCE Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant