CN104089479B - 锆莫砖 - Google Patents

锆莫砖 Download PDF

Info

Publication number
CN104089479B
CN104089479B CN201410309230.6A CN201410309230A CN104089479B CN 104089479 B CN104089479 B CN 104089479B CN 201410309230 A CN201410309230 A CN 201410309230A CN 104089479 B CN104089479 B CN 104089479B
Authority
CN
China
Prior art keywords
projection
groove
link slot
brick body
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410309230.6A
Other languages
English (en)
Other versions
CN104089479A (zh
Inventor
范圣良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sunon Refractories Co., Ltd.
Original Assignee
ZHEJIANG RUITAI REFRACTORY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG RUITAI REFRACTORY TECHNOLOGY Co Ltd filed Critical ZHEJIANG RUITAI REFRACTORY TECHNOLOGY Co Ltd
Priority to CN201410309230.6A priority Critical patent/CN104089479B/zh
Publication of CN104089479A publication Critical patent/CN104089479A/zh
Application granted granted Critical
Publication of CN104089479B publication Critical patent/CN104089479B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明提供了一种锆莫砖,包括砖体,砖体的顶部设有贯穿砖体前后两侧的通槽,砖体前后两侧面在通槽的下方均设有凹槽,凹槽内设有引流板,砖体前后两侧面上在凹槽的上方均设置有连通凹槽和通槽的连接槽,引流板的左侧设有第一凸起、右侧设有第二凸起、上侧具有第三凸起、下侧具有第四凸起,所述引流板在第一凸起和第三凸起、第一凸起和第四凸起、第二凸起和第三凸起、第二凸起和第四凸起之间的壁面均为凹弧面,第三凸起正对对凹槽和连接槽的连通处,连接槽的侧壁具有台阶面,连接槽在台阶面上方的部分的槽宽从槽底到槽口逐渐变小。粘结料填充量均匀,不会出现粘结料过多或过少的情况,粘结料干燥后两块锆莫砖之间粘结牢固。

Description

锆莫砖
技术领域
本发明涉及一种锆莫砖。
背景技术
现有的主要由砖体、砖体顶部的贯穿砖体前后两侧的通槽和砖体前后两侧面的位于通槽下方的凹槽构成的一种硅莫材料的耐火砖在安装时是先分别在两块耐火砖的凹槽中抹上粘结料,然后将两块耐火砖凹槽与凹槽相对的对接起来以使两块耐火砖之间相互粘结在一起,这样容易出现粘结料涂抹不均匀的问题,即涂抹的粘结料过多时,两块耐火砖之间会产生较大缝隙,粘结料过少时起不到粘结作用,因此过多或过少都会影响组装成的窑炉的使用寿命。
发明内容
本发明所要解决的技术问题在于提供一种锆莫砖,通过在凹槽的上方设置连接槽,当锆莫砖对接在一起时,粘结料以填充的方式从连接槽填充进两块锆莫砖之间凹槽围成的区域,粘结料填充量均匀,不会出现粘结料过多或过少的情况,填充完成后再通过一个连接件插入二者之间连接槽形成的通道内,然后部分粘结料受压迫进入槽体内,粘结料干燥后两块锆莫砖之间粘结牢固。
为解决上述现有的技术问题,本发明采用如下方案:锆莫砖,包括砖体,所述砖体的顶部设有贯穿砖体前后两侧的通槽,所述砖体前后两侧面在通槽的下方均设有凹槽,所述凹槽内设有引流板,所述砖体前后两侧面上在凹槽的上方均设置有连通凹槽和通槽的连接槽,所述引流板的左侧设有第一凸起、右侧设有第二凸起、上侧具有第三凸起、下侧具有第四凸起,所述引流板在第一凸起和第三凸起、第一凸起和第四凸起、第二凸起和第三凸起、第二凸起和第四凸起之间的壁面均为凹弧面,所述第三凸起正对对凹槽和连接槽的连通处,所述连接槽的侧壁具有台阶面,所述连接槽在台阶面上方的部分的槽宽从槽底到槽口逐渐变小。
作为优选,所述凹槽的上侧壁具有向上凹进的槽体,所述槽体的侧壁面为环成一周的封闭面。
作为优选,所述凹槽的四个棱角处圆角过渡。
有益效果:
本发明采用上述技术方案提供的锆莫砖,通过在凹槽的上方设置连接槽,当锆莫砖对接在一起时,粘结料以填充的方式从连接槽填充进两块锆莫砖之间凹槽围成的区域,粘结料填充量均匀,不会出现粘结料过多或过少的情况,填充完成后再通过一个连接件插入二者之间连接槽形成的通道内,然后部分粘结料受压迫进入槽体内,粘结料干燥后两块锆莫砖之间粘结牢固。
附图说明
图1为本发明的左视图;
图2为本发明中两块锆莫砖对接时的剖视图;
图3为本发明的俯视图。
具体实施方式
如图1至3所示,锆莫砖,包括砖体1,所述砖体1的顶部设有贯穿砖体前后两侧的通槽2,所述砖体1前后两侧面在通槽2的下方均设有凹槽3,其特征在于:所述凹槽3内设有引流板4,所述砖体1前后两侧面上在凹槽3的上方均设置有连通凹槽3和通槽2的连接槽5,所述引流板4的左侧设有第一凸起41、右侧设有第二凸起42、上侧具有第三凸起43、下侧具有第四凸起44,所述引流板4在第一凸起41和第三凸起43、第一凸起41和第四凸起44、第二凸起42和第三凸起43、第二凸起42和第四凸起44之间的壁面均为凹弧面,所述第三凸起43正对对凹槽3和连接槽5的连通处,所述连接槽5的侧壁具有台阶面6,所述连接槽5在台阶面6上方的部分的槽宽从槽底到槽口逐渐变小。所述凹槽3的上侧壁具有向上凹进的槽体7,所述槽体7的侧壁面为环成一周的封闭面。所述凹槽3的四个棱角处圆角过渡。
安装时,先将两块锆莫砖并排对接使一块锆莫砖的前侧和另一块锆莫砖的后侧相对固定好,此时,两块锆莫砖的凹槽围成注料腔,连接槽围成引流通道,用压力注料机构从引流通道注料,粘结料经引流通道进入注料腔,然后在引流板的第三凸起的分流作用下沿着凹弧面向第一凸起和第二凸起所在方向填充、然后在向第四凸起所在方向填充,整个过程中,凹槽3的四个棱角处均可被填充到,然后用于个与引流通道结构相吻合的连接件插入引流通道内,连接件在台阶面上方的部分形成纺锤形结构使两块锆莫砖定位在一起,并将将粘结料向下压迫使粘结料进入槽体7内,这样粘结料干燥后两块锆莫砖之间连接更加牢固,而且两块锆莫砖在静置、干燥过程中,凹槽围成注料腔内的粘结料体积缩小,此时,槽体7内的粘结料会下降补充至注料腔内,使注料腔内粘结料的粘结效果更好。

Claims (3)

1.锆莫砖,包括砖体(1),所述砖体(1)的顶部设有贯穿砖体前后两侧的通槽(2),所述砖体(1)前后两侧面在通槽(2)的下方均设有凹槽(3),其特征在于:所述凹槽(3)内设有引流板(4),所述砖体(1)前后两侧面上在凹槽(3)的上方均设置有连通凹槽(3)和通槽(2)的连接槽(5),所述引流板(4)的左侧设有第一凸起(41)、右侧设有第二凸起(42)、上侧具有第三凸起(43)、下侧具有第四凸起(44),所述引流板(4)在第一凸起(41)和第三凸起(43)、第一凸起(41)和第四凸起(44)、第二凸起(42)和第三凸起(43)、第二凸起(42)和第四凸起(44)之间的壁面均为凹弧面,所述第三凸起(43)正对凹槽(3)和连接槽(5)的连通处,所述连接槽(5)的侧壁具有台阶面(6),所述连接槽(5)在台阶面(6)上方的部分的槽宽从槽底到槽口逐渐变小。
2.根据权利要求1所述的锆莫砖,其特征在于:所述凹槽(3)的上侧壁具有向上凹进的槽体(7),所述槽体(7)的侧壁面为环成一周的封闭面。
3.根据权利要求1或2所述的锆莫砖,其特征在于:所述凹槽(3)的四个棱角处圆角过渡。
CN201410309230.6A 2014-06-30 2014-06-30 锆莫砖 Expired - Fee Related CN104089479B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410309230.6A CN104089479B (zh) 2014-06-30 2014-06-30 锆莫砖

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410309230.6A CN104089479B (zh) 2014-06-30 2014-06-30 锆莫砖

Publications (2)

Publication Number Publication Date
CN104089479A CN104089479A (zh) 2014-10-08
CN104089479B true CN104089479B (zh) 2015-12-16

Family

ID=51637217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410309230.6A Expired - Fee Related CN104089479B (zh) 2014-06-30 2014-06-30 锆莫砖

Country Status (1)

Country Link
CN (1) CN104089479B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5277580A (en) * 1993-02-16 1994-01-11 Lea-Con, Inc. Wall construction system for refractory furnaces
EP0954723A1 (en) * 1996-03-19 1999-11-10 Aluminum Company Of America Flue walls using interlocking bricks
CN202329156U (zh) * 2011-11-16 2012-07-11 范圣良 组合式回转窑用低导热耐火砖
CN203964669U (zh) * 2014-06-30 2014-11-26 浙江瑞泰耐火材料科技有限公司 锆莫砖

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5993272B2 (ja) * 2012-10-18 2016-09-14 東京エレクトロン株式会社 断熱壁体の製造方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5277580A (en) * 1993-02-16 1994-01-11 Lea-Con, Inc. Wall construction system for refractory furnaces
EP0954723A1 (en) * 1996-03-19 1999-11-10 Aluminum Company Of America Flue walls using interlocking bricks
CN202329156U (zh) * 2011-11-16 2012-07-11 范圣良 组合式回转窑用低导热耐火砖
CN203964669U (zh) * 2014-06-30 2014-11-26 浙江瑞泰耐火材料科技有限公司 锆莫砖

Also Published As

Publication number Publication date
CN104089479A (zh) 2014-10-08

Similar Documents

Publication Publication Date Title
RU2014129805A (ru) Поперечные канавки, обеспечивающие наличие газоотвода в протекторах для восстановленных шин
WO2011109360A3 (en) Retaining wall block system
WO2010045144A3 (en) Mold assembly for midsole and method of manufacturing same
CN205818375U (zh) 带有锁模机构的模具
CN104089479B (zh) 锆莫砖
CN203964669U (zh) 锆莫砖
CN207030143U (zh) 一种医疗用药品自动放料取料装置
CN102554182B (zh) 连接管多斜销抽芯组合的压铸模具结构
CN105735609A (zh) 插接式地板
CN104089478B (zh) 硅莫砖
CN203486827U (zh) 一种分体式牵引板
CN104985682A (zh) 板材定型烘干机
CN203908313U (zh) 一种水泥窑镶嵌式硅莫砖
CN201106033Y (zh) 炼焦用平煤装置
CN108237616A (zh) 一种陶瓷注模装置
CN106193423A (zh) 一种装配式空心砖
CN202399476U (zh) 一种防溢胶的模具结构
CN206561619U (zh) 多色鞋底模具
CN104034164B (zh) 一种窑头罩顶挂砖
CN204755922U (zh) 传动皮带密封用真空盒
CN204844719U (zh) 一种压塑模具按钮多模穴结构
CN209723367U (zh) 一种隔音保温的轻质砖
CN205214390U (zh) 一种长筒靴鞋楦
CN203665504U (zh) 一种盒体脚垫固定结构
CN204139493U (zh) 家用内粘式木塑板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191108

Address after: 313100, Zhejiang, Huzhou province Changxing County Town, Hong Kong Industrial Park

Patentee after: Zhejiang Sunon Refractories Co., Ltd.

Address before: 313106 Zhejiang city of Huzhou province Changxing County Hongqiao science and Technology Park Zhejiang Ruitai refractory Mstar Technology Ltd

Patentee before: Zhejiang Ruitai Refractory Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20200630