CN104076399B - 一种扇贝养殖区海底电缆地震采集施工方法 - Google Patents
一种扇贝养殖区海底电缆地震采集施工方法 Download PDFInfo
- Publication number
- CN104076399B CN104076399B CN201410249922.6A CN201410249922A CN104076399B CN 104076399 B CN104076399 B CN 104076399B CN 201410249922 A CN201410249922 A CN 201410249922A CN 104076399 B CN104076399 B CN 104076399B
- Authority
- CN
- China
- Prior art keywords
- ball float
- scallop
- labelling
- long rope
- brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Geophysics And Detection Of Objects (AREA)
Abstract
一种扇贝养殖区海底电缆地震采集施工方法,属扇贝等海产品养殖区域的地震勘探采集、海洋地质调查于技术领域。含有以下步骤;用长绳系在起始浮球的锚绳上,长绳的一端系上标记浮球,标记浮球系上锚,然后将标记浮球和锚扔到海里,并记录施工坐标;依次用重物(砖头)代替浮球,并与长绳相连,震源船进行激发作业时,若干条橡皮艇进行相应的警戒或者拖拽标记浮球工作;顺着长绳将重物(砖头)捞起,用浮球依次替下重物(砖头),去掉连接的长绳即可,即恢复扇贝浮球现场;用橡皮艇或者木船进行相应的收起电缆工作,在电缆铺设后进行替换浮球操作,在震源实施后电缆收起前恢复浮球。
Description
技术领域
本发明涉及一种扇贝养殖区海底电缆地震采集施工方法,属扇贝等海产品养殖区域的地震勘探采集、海洋地质调查于技术领域。
背景技术
浅海(5m-50m)地震勘探施工环境非常复杂,固定障碍区域众多,如钻井平台、堤坝、栈桥、人工岛等;同样,影响勘探施工还有移动障碍物,如大型船舶、平台系泊、随季节变化的各类养殖区域等。这些较大障碍物的存在,会导致部分正常排列测线无法正常铺放,部分正常激发点无法正常激发,进而导致地震资料浅层部分缺失,无法取得最佳地震资料。对于固定障碍区,传统的施工方法是将激发点、检波点绕行障碍物进行施工,根据障碍区的特点,激发点采用“下线不停炮”、“纵横法加密”施工,检波点通过小船绕行或者采用类似陆地蛇形排列方式进行布设,尽最大可能减小浅层资料缺口,保证资料完整性;对于随季节变化的各类养殖形成的障碍区,传统的施工方法是进行提前踏勘,工农协调赔偿,制定特观施工方案,尽最大可能减小浅层资料缺口。
海湾扇贝养殖已发展成为北方主要的养殖品种之一,给沿海广大养殖单位和渔民带来了显著的经济效益。扇贝养殖一般是每年的4-5月开始投放扇贝幼苗,整个养殖周期持续到当年的11月,养殖范围由浅水区向深水区逐渐扩大(水深小于20m),扇贝养殖区海面上分布着密集的扇贝浮球:横向上约800m-3000m一排,间隔5m-20m一对浮球,纵向上若干排不等,排间隔约80m-150m,扇贝浮球区纵向距离一般为1500m-3000m,这 样就会形成的1km2-9km2的障碍区,扇贝浮球漂浮在海面上,浮球通过一定长度的锚绳连接着海底的锚桩,在这样的障碍区震源点、检波点都无法正常实施激发、布设。若震源船进入的话,将会被锚绳、浮球缠住,导致气枪等船属设备的损坏,所以,通常在施工时或者进行避让,不进入施工,或者进行工农协调赔偿,这样导致的结果是或不能够获取最佳地震资料或大大增加了勘探成本,而在扇贝养殖周期内,正是OBC地震采集的黄金季节,如果仅仅进行工农协调赔偿,勘探作业将付出极高的代价。
因此只有我们掌握了扇贝养殖区勘探施工方法,形成一套行之可行的扇贝养殖区施工方法,用以指导震源点、检波点的激发与布设作业,保障勘探作业的顺利进行,才能有效地提高经济效益。所以,形成及完善OBC地震采集扇贝养殖障碍区施工方法具有非常重要的意义。
发明内容
为了克服现有技术的不足,本发明提供一种扇贝养殖区海底电缆地震采集施工方法。
一种扇贝养殖区海底电缆地震采集施工方法,含有以下步骤;
摘除和恢复扇贝浮球,使扇贝浮球不阻碍气枪震源船在海面上进行实施作业,同时也最大程度减少了工农协商及赔偿问题,提高生产时效与经济效益,该方法具体实施步骤如下:
1)提前踏勘,准备好打捞工具、砖头、长绳、剪刀等工具;统筹规划,赶在渔民在扇贝养殖区投放扇贝幼苗前,即此时扇贝障碍区只有密集的浮球,还没有扇贝幼苗,用橡皮艇或者木船进行电缆检波器投放工作,若扇贝浮球影响电缆铺设,可以让另一条橡皮艇先行,挪开在测线上的浮球进行电缆铺设。电缆铺设之后用木船或者橡皮艇进行相关的定位工作。
2)在橡皮艇上用打捞工具依次捞起扇贝浮球,从锚绳上摘下浮球, 用重物(一般是砖头)替换之。
3)用长绳系在起始浮球的锚绳上,长绳的一端系上标记浮球,标记浮球系上锚,然后将标记浮球和锚扔到海里,并记录施工坐标。
4)依次用重物(砖头)代替浮球,并与长绳相连,替换掉所有浮球后,在长绳的另一端也系上标记浮球,并记下施工坐标,这样原来连接扇贝浮球的锚绳都被重物(砖头)沉到海底,并且被长绳连接起来,易于下一步的恢复浮球现场工作;标记浮球与重物(砖头)之间的长绳足够长(根据采集施工设计设定),即在震源激发过程中,如果标记浮球影响震源施工,可以将标记浮球拖拽到适当区域避免影响施工。
5)震源船进行激发作业时,若干条橡皮艇进行相应的警戒或者拖拽标记浮球工作。
6)待扇贝区的震源点全部激发后,立即对该区域进行扇贝浮球恢复工作,即根据原先记录的标记浮球的施工坐标找到标记浮球,顺着长绳将重物(砖头)捞起,用浮球依次替下重物(砖头),去掉连接的长绳即可,即恢复扇贝浮球现场。
7)用橡皮艇或者木船进行相应的收起电缆工作,完成扇贝区的地震采集作业。
扇贝浮球摘除及恢复基本原则:在电缆铺设后进行替换浮球操作,在震源实施后电缆收起前恢复浮球。
本发明的优点是OBC地震采集扇贝养殖障碍区施工方法目的是最大程度上获取障碍区的地震资料,最大程度降低勘探成本,提高生产时效,使BGP在浅海OBC扇贝养殖区域勘探拥有自己的施工、技术、质量控制能力。
该发明能够保证扇贝养殖区勘探的顺利推进,最大程度上获取了地震资料,即扇贝养殖区域炮点可以正常实施,同时也最大程度避免了相关的 工农协商赔偿,降低了勘探成本,提高了经济效益。效果方面需要具体说明怎样计算,降低了成本,提高了效益。
附图说明
当结合附图考虑时,通过参照下面的详细描述,能够更完整更好地理解本发明以及容易得知其中许多伴随的优点,但此处所说明的附图用来提供对本发明的进一步理解,构成本发明的一部分,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定,如图其中:
图1扇贝浮球的原始状态:浮球成对漂浮在海面上,下面被锚桩固定在海底,中间用锚绳相连。
图2浮球摘除和恢复的施工方法示意图;步骤1:将扇贝浮球捞起后,用砖头替下浮球,浮球收集起来以待还原。
图3浮球摘除和恢复的施工方法示意图;步骤2:用长绳连接锚绳和标记浮球,记下施工坐标,标记浮球下系上锚后一同扔到海里。
图4浮球摘除和恢复的施工方法示意图;步骤3:依次用砖头代替浮球,并与长绳相连,替换好所有浮球后,在长绳的另一端也系上标记浮球,并记下施工坐标。
图5浮球摘除和恢复施工方法示意图;步骤4:施工后对浮球进行还原:根据原先记下的施工坐标找到标记浮球,顺着长绳捞起砖头用浮球替下去掉长绳即可。
图6扇贝养殖区OBC施工现场示意图。
下面结合附图和实施例对本发明进一步说明。
具体实施方式
显然,本领域技术人员基于本发明的宗旨所做的许多修改和变化属于本发明的保护范围。
实施例1:如图1、图2、图3、图4、图5、图6所示,
本发明在QHD区带海底电缆三维地震资料采集项目中得到很好的应用。该项目最大的障碍区也是最大的难点便是扇贝养殖区,扇贝养殖区面积占工区的面积的50%,扇贝分布区域随着季节变化,4-5月份开始投放幼苗,由浅水区向深水区逐渐扩大(水深小于20m)。
1)根据渔民养殖扇贝的情况,统筹规划,提前踏勘,共计踏勘扇贝障碍区达50处,每一个区域的面积在2km2-9km2之间,共计准备如下施工工具及材料:橡皮艇8条,剪刀10把,长绳50捆,红砖6000块,打捞工具10副;扇贝障碍区逐一进行施工,用木船进行电缆检波器投放工作,在扇贝浮球影响电缆铺设的区域用橡皮艇挪开测线上的浮球进行电缆铺设,而在木船无法进入的扇贝球密集区域,用橡皮艇进行电缆铺设工作。电缆铺设完成之后用木船或者橡皮艇进行相关的定位工作。
2)在每一处扇贝浮球障碍区,一人驾驶橡皮艇靠近该区域的起始扇贝浮球,两人用打捞工具捞起扇贝浮球,另外有一人用剪刀剪断系在浮球上的锚绳,摘掉浮球,并用砖头系在锚绳上。为提高施工效率,一般4条橡皮艇同时作业。
3)用长绳系在起始浮球的锚绳上,长绳的一端系上标记浮球,标记浮球系上锚,然后将标记浮球和锚扔到海里,驾驶橡皮艇人员用手持GPS记录施工坐标。
4)依次用砖头代替浮球,并与长绳相连,替换掉一排的所有浮球后,在长绳的另一端也系上标记浮球,并记下施工坐标,这样原来连接扇贝浮球的锚绳都被相应的砖头沉到海底,并且被长绳连接起来。标记浮球与起始砖头之间的长绳为100m,即在震源激发过程中,如果标记浮球影响震源施工,可以将标记浮球拖拽到适当区域避免影响施工。
5)替换完该区域所有浮球后,震源船开始进行激发作业,同时两条橡皮艇进行相应的警戒应对突发的安全事故,而当有标记浮球影响震源施工时进行相应的拖拽工作。
6)在该扇贝区的震源点全部激发后,立即对该区域进行扇贝浮球恢复工作,即根据原先记录的标记浮球的施工坐标找到标记浮球,一人驾驶橡皮艇,两人顺着长绳将重物(砖头)捞起,另外一人用剪刀剪断系在砖头上的绳子,用浮球替下砖头,并把浮球系在原来的锚绳上。收起连接的砖头间的长绳,用作下次使用。
7)该扇贝障碍区的浮球全部恢复完毕后,根据施工设计滚动施工的要求,安排橡皮艇或者木船进行相应的收起电缆工作,从而完成该扇贝区的地震采集作业。下一处扇贝养殖障碍区使用同样的施工方法。
在4个月的时间里共计出动施工人数达600余人次,共计摘除30000对即60000个浮球。通过扇贝浮球摘除和恢复的施工方法,设计接收点和激发点全部实施,浅层资料未缺失,未产生资料缺口,赢得了甲方的高度赞赏和认可。
该施工方法不仅保证了QHD项目安全平稳、高质高效运行,最大程度避免了工农协商问题,保证了养殖区扇贝球密集施工区域最佳地震资料的取得,也为复杂养殖区OBC地震资料采集提供借鉴经验,值得进一步推广和应用。
如上所述,对本发明的实施例进行了详细地说明,但是只要实质上没有脱离本发明的发明点及效果可以有很多的变形,这对本领域的技术人员来说是显而易见的。因此,这样的变形例也全部包含在本发明的保护范围之内。
Claims (1)
1.一种扇贝养殖区海底电缆地震采集施工方法,其特征在于含有以下步骤;
1)提前踏勘,准备好打捞工具、砖头、长绳、剪刀;统筹规划,赶在渔民在扇贝养殖区投放扇贝幼苗前,即此时扇贝障碍区只有密集的浮球,还没有扇贝幼苗,用橡皮艇或者木船进行电缆检波器投放工作,若扇贝浮球影响电缆铺设,让另一条橡皮艇先行,挪开在测线上的浮球进行电缆铺设;电缆铺设之后用木船或者橡皮艇进行相关的定位工作;
2)在橡皮艇上用打捞工具依次捞起扇贝浮球,从锚绳上摘下浮球,用砖头替换之;
3)用长绳系在起始浮球的锚绳上,长绳的一端系上标记浮球,标记浮球系上锚,然后将标记浮球和锚扔到海里,并记录施工坐标;
4)依次用砖头代替浮球,并与长绳相连,替换掉所有浮球后,在长绳的另一端也系上标记浮球,并记下施工坐标,这样原来连接扇贝浮球的锚绳都被砖头沉到海底,并且被长绳连接起来,易于下一步的恢复浮球现场工作;标记浮球与起始砖头之间的长绳为100m,即在震源激发过程中,如果标记浮球影响震源施工,将标记浮球拖拽到适当区域避免影响施工;
5)震源船进行激发作业时,若干条橡皮艇进行相应的警戒或者拖拽标记浮球工作;
6)待扇贝区的震源点全部激发后,立即对该区域进行扇贝浮球恢复工作,即根据原先记录的标记浮球的施工坐标找到标记浮球,顺着长绳将砖头捞起,用浮球依次替下砖头,去掉连接的长绳即可,即恢复扇贝浮球现场;
7)用橡皮艇或者木船进行相应的收起电缆工作,完成扇贝区的地震采集作业;
扇贝浮球摘除及恢复基本原则:在电缆铺设后进行替换浮球操作,在震源实施后电缆收起前恢复浮球。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410249922.6A CN104076399B (zh) | 2014-06-06 | 2014-06-06 | 一种扇贝养殖区海底电缆地震采集施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410249922.6A CN104076399B (zh) | 2014-06-06 | 2014-06-06 | 一种扇贝养殖区海底电缆地震采集施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104076399A CN104076399A (zh) | 2014-10-01 |
CN104076399B true CN104076399B (zh) | 2017-03-01 |
Family
ID=51597781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410249922.6A Active CN104076399B (zh) | 2014-06-06 | 2014-06-06 | 一种扇贝养殖区海底电缆地震采集施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104076399B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0018053A1 (en) * | 1979-04-24 | 1980-10-29 | Shell Internationale Researchmaatschappij B.V. | Means for marine seismic exploration and method of operating such means |
EP0545986B1 (en) * | 1990-08-29 | 1995-07-05 | Försvarets Forskningsanstalt | A method to operate with a wire-guided, in air or water, movable vehicle and a device for carrying out the method |
CN102405419A (zh) * | 2009-03-09 | 2012-04-04 | 离子地球物理公司 | 结冰和有障碍水域中的海上地震勘测 |
CN102540257A (zh) * | 2011-12-19 | 2012-07-04 | 中国石油集团川庆钻探工程有限公司地球物理勘探公司 | 地震信号接收设备的定位方法 |
-
2014
- 2014-06-06 CN CN201410249922.6A patent/CN104076399B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0018053A1 (en) * | 1979-04-24 | 1980-10-29 | Shell Internationale Researchmaatschappij B.V. | Means for marine seismic exploration and method of operating such means |
EP0545986B1 (en) * | 1990-08-29 | 1995-07-05 | Försvarets Forskningsanstalt | A method to operate with a wire-guided, in air or water, movable vehicle and a device for carrying out the method |
CN102405419A (zh) * | 2009-03-09 | 2012-04-04 | 离子地球物理公司 | 结冰和有障碍水域中的海上地震勘测 |
CN102540257A (zh) * | 2011-12-19 | 2012-07-04 | 中国石油集团川庆钻探工程有限公司地球物理勘探公司 | 地震信号接收设备的定位方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104076399A (zh) | 2014-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ford et al. | Rift migration and lateral propagation: evolution of normal faults and sediment-routing systems of the western Corinth rift (Greece) | |
Blanchon et al. | Marine-planation terraces on the shelf around Grand Cayman: a result of stepped Holocene sea-level rise | |
Chan et al. | Dynamic liquefaction of Jurassic sand dunes: processes, Origins, and implications | |
CN103744117A (zh) | 河道水下根石非接触式水下探测方法 | |
CN104076399B (zh) | 一种扇贝养殖区海底电缆地震采集施工方法 | |
Koster et al. | The use of ground penetrating radar (GPR) in the investigation of historical quarry abandonment in Svalbard | |
CN102955172B (zh) | 水上走航式地震勘探方法及装置 | |
CN103091706A (zh) | 一种淤泥沉淀池地震勘探方法 | |
Lona et al. | AkvaLab–Project Summary Report-Evaluation of seaweed cultivation technology for weather exposed locations | |
Larsen et al. | The Tertiary opening of the North Atlantic: DLC investigations along the east coast of Greenland | |
Bryn et al. | Submarine slides on the Mid-Norwegian Continental Margin—A challenge to the oil industry | |
Mason et al. | The Lapithas Mountain faults and nearby archaeological damage, western Peloponnese, Greece | |
Dziak et al. | Growth, Demise, and Recent Eruption History of the Eastern Cobb‐Eickelberg Seamounts at the Intersection with the Juan De Fuca Ridge | |
Masson et al. | Seismic survey of Sinai and the Gulf of Suez | |
Otott Jr et al. | Long Beach unit 3-D survey | |
Sun et al. | Seismic investigation on the Littoral Faults Zone in the northern continental margin of South China Sea | |
Birchall | The need to integrate geophysical with geotechnical data to aid pile design and installation: a case study of the Sheringham Shoal offshore wind farm | |
Kopp | Conjoint Monitoring of the Ocean Bottom offshore Chile Humboldt Organic MattEr Remineralization, Cruise No. SO288, 15.01. 2022–15.02. 2022, Guayaquil (Ecuador)–Valparaiso (Chile) COMBO & HOMER | |
Bald et al. | Environmental impacts over the seabed and benthic communities of submarine cable installation in the Biscay Marine Energy Platform (bimep) | |
Hayward et al. | Vibroseis survey acquisition in the central Nechako Basin, south-central British Columbia (parts of NTS 093B, C, F, G) | |
Bohloli et al. | Assuring integrity of CO2 storage sites through ground surface monitoring (SENSE) | |
Steyne | Cegrass™, sand and marine habitats: A sustainable future for the William Salthouse wreck | |
Grevemeyer et al. | CAYSEIS-magma-starved oceanic crustal accretion and transform margin formation in the Cayman Trough revealed by seismic and seismological data-Cruise No. M115, April 1-April 28, 2015-Kingston (Jamaica)-Pointe-à-Pitre (Guadeloupe) | |
Lona et al. | AkvaLab–Project Summary Report-Evaluation of seaweed cultivation technology for weather exposed locations-2020: 00593 A | |
Bock | Engineering Properties of Coral Reefs. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |