CN104061920B - Parallel double mobile jib bracing or strutting arrangement - Google Patents

Parallel double mobile jib bracing or strutting arrangement Download PDF

Info

Publication number
CN104061920B
CN104061920B CN201410258702.XA CN201410258702A CN104061920B CN 104061920 B CN104061920 B CN 104061920B CN 201410258702 A CN201410258702 A CN 201410258702A CN 104061920 B CN104061920 B CN 104061920B
Authority
CN
China
Prior art keywords
king
rod
fixedly connected
adapter sleeve
mobile jib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410258702.XA
Other languages
Chinese (zh)
Other versions
CN104061920A (en
Inventor
薛文英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG AT&M NEW MATERIALS Co.,Ltd.
Original Assignee
Suzhou Hualai Photoelectric Instrument Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Hualai Photoelectric Instrument Co Ltd filed Critical Suzhou Hualai Photoelectric Instrument Co Ltd
Priority to CN201410258702.XA priority Critical patent/CN104061920B/en
Publication of CN104061920A publication Critical patent/CN104061920A/en
Application granted granted Critical
Publication of CN104061920B publication Critical patent/CN104061920B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/02Means for marking measuring points
    • G01C15/06Surveyors' staffs; Movable markers
    • G01C15/08Plumbing or registering staffs or markers over ground marks

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Jib Cranes (AREA)

Abstract

The present invention discloses a kind of parallel double mobile jib bracing or strutting arrangement, comprise to king-rod one, to king-rod two and support bar, described to king-rod one, king-rod two and support bar are included an outer tube and are inserted in outer tube scalable in pipe, described outer tube and interior pipe are fixed by drot gfasplng locking piece; Described to king-rod one with to the parallel contour vertical setting of king-rod two; Described king-rod one be fixedly connected with beam with king-rod two-way being crossed be connected, described in be fixedly connected with beam and be horizontally disposed with; By tie-in module, beam is connected described support bar with being fixedly connected with; Described it is fixedly connected with on beam to be provided with mapping instrument Connection Block; Described to king-rod one and/or to being also at least set with an adapter sleeve on the interior pipe of king-rod two, described adapter sleeve one end is provided with the bracket for supporting detection part, and the other end of described adapter sleeve is provided with counterweight assembly. Useful effect is, have that structure is simple, easy to operate, highly versatile, solid and reliable, good stability, operation efficiency height, the advantages such as mapping result is accurate.

Description

Parallel double mobile jib bracing or strutting arrangement
Technical field
The present invention relates to mapping equipment technical field, particularly relate to a kind of parallel double mobile jib bracing or strutting arrangement.
Background technology
Survey and draw with to king-rod as indispensable aligning equipment in mapping, mapping has purposes widely, it can directly point to the scalable metallic rod of ground mark point by lead direction of hanging down.
Existing that king-rod specification is a lot, generally there are the different heights specifications such as 2.15 meters, 2 meters, 3 meters, 5 meters, although existing, king-rod have been made into flexible metallic rod structure, from height, improve its universal performance.
But, mapping equipment is all mounted in the top to king-rod, and king-rod but can only be carried out a mapping operation by one. If Surveying and Mapping Project is various, then can be very long for length during the operation of same mapped point, time-consuming require great effort again; And when changing Surveying and Mapping Project, it is necessary to re-start the adjustment work of parameters, add adjustment intensity, but still there is mapping precision and have deviation; If the mapper amount of thinking highly of is very big, generally the weight capacity of king-rod is greatly affected, even if by regulating other bracing frame can not well ensure its stability, thus the accuracy of overall mapping result can be affected.
In addition, king-rod playing certain centering effect incessantly, also plays important supporting role, but its duration of service one is long, then the accuracy to king-rod can be caused limited, stability reduces.
Summary of the invention
The main purpose of the present invention is, overcomes deficiency of the prior art, it is provided that a kind of parallel double mobile jib bracing or strutting arrangement, is specially adapted to install the very big mapping instrument of weight, and same mapped point can carry out the multinomial object mapping of different heights.
Technical problem to be solved by this invention improves that structure is simple, easy to operate, the parallel double mobile jib bracing or strutting arrangement of highly versatile, be possible not only to realize same mapped point and carry out the multinomial object mapping operation of different heights simultaneously, it is to increase operation efficiency; And do not need adjustment work repeatedly, reduce the bias factor surveyed and drawn and may exist, it is to increase mapping result accuracy; Installing/dismounting is all simple and efficient, solid and reliable, and stability is guaranteed, and the utility value having in industry.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of parallel double mobile jib bracing or strutting arrangement, comprises to king-rod one, to king-rod two and support bar, described to king-rod one, king-rod two and support bar are included an outer tube and are inserted in outer tube scalable in pipe, described outer tube and interior pipe are fixed by drot gfasplng locking piece;Described to king-rod one with to the parallel contour vertical setting of king-rod two; Described king-rod one be fixedly connected with beam with king-rod two-way being crossed be connected, described in be fixedly connected with beam and be horizontally disposed with; By tie-in module, beam is connected described support bar with being fixedly connected with; Described it is fixedly connected with on beam to be provided with mapping instrument Connection Block; Described to king-rod one and/or to being also at least set with an adapter sleeve on the interior pipe of king-rod two, described adapter sleeve one end is provided with the bracket for supporting detection part, and the other end of described adapter sleeve is provided with counterweight assembly.
Adopting technique scheme, king-rod and support bar are played strong and stable support effect by two, and the mapping instrument of heavier-weight is firmly arranged on by mapping instrument Connection Block and is fixedly connected with on beam, such that it is able to start mapping operation; King-rod and support bar are just played firm support effect by two herein, and the centering surveying and drawing instrument has departed from original in king-rod, then need the adjustment work before surveying and drawing to complete.
Above-mentioned parallel double mobile jib bracing or strutting arrangement, by to the interior pipe of king-rod is at least set with an adapter sleeve, described adapter sleeve one end is provided with the bracket for supporting detection part, the other end of described adapter sleeve is provided with counterweight assembly, realizes same mapped point and can carry out the multinomial object mapping operation of different heights simultaneously; Only multiple adapter sleeve need to be arranged on the different heights to pipe in king-rod, assembling need different detections part (such as prism) of mapping, then carries out disposable whole adjustment, mapping operation can be started; Also can to taking to king-rod as the different adjoining mapped point in the certain limit in the center of circle carries out the mapping of different heights different directions; If detection part heavier-weight, then being carried out balance adjustment by counterweight assembly, certainly overall load-bearing scope will within the weight capacity to king-rod and support bar.
Although the adjustment work before mapping no longer directly relies on, king-rod is harmonized, but described to king-rod one with to the parallel contour vertical setting of king-rod two, the described beam that is fixedly connected with is horizontally disposed with, and still can fast harmonize, and does not increase unnecessary working strength and difficulty; Meanwhile, that but can significantly improve bracing frame stablizes firm performance, reduces other bias factors surveyed and drawn and may exist.
The present invention is set to further: described mapping instrument Connection Block is arranged on the centre being fixedly connected with beam.
The present invention is further set to: described detection part is achieved rotation by rotating shaft, and described rotating shaft is arranged on the side end of bracket place adapter sleeve.
Technique scheme arranges, by rotating shaft, the mapping angle that can change detection part, thus draws and more surveys and draws result, makes surveying and mapping data more comprehensively.
The present invention is further set to: described bracket is L-type support, and described support is hung on adapter sleeve one end.
The present invention is further set to: described counterweight assembly comprises counterweight and connects block, hook and counterweight part; Described counterweight connects block one end and is connected with adapter sleeve, and the other end is connected with hook; Described counterweight part hangs and is connected on hook.
Counterweight part in above-mentioned counterweight assembly can be chosen according to the weight that different size detects part, is hung by counterweight part and is connected on hook, simple and quick.
The present invention is further set to: also comprise levelling instrument, and described levelling instrument is separately positioned on and is fixedly connected with on beam and support.
The present invention is further set to: described in be fixedly connected with on beam levelling instrument be 2, be fixedly connected with on beam to survey and draw instrument Connection Block as longitudinal axes is symmetrically distributed in.
The present invention is further set to: described tie-in module is for twisting formula locking piece.
Complete in order to the adjustment work before surveying and drawing is faster, by mapping instrument Connection Block is arranged on the centre being fixedly connected with beam in technique scheme, and it is provided with 2 levelling instrument being symmetric, improves operation efficiency, can ensure the accurate degree of adjustment simultaneously; The adjustment of other detection parts is ensured by also arranging levelling instrument on support; In addition, by stubborn formula locking piece, beam is connected support bar with being fixedly connected with, and installing/dismounting is all fast and simple.
In sum, a kind of parallel double mobile jib bracing or strutting arrangement of the present invention, has that structure is simple, easy to operate, the advantage of highly versatile; Same mapped point can not only be realized and carry out the multinomial object mapping operation of different heights simultaneously, and can to taking to king-rod as the different adjoining mapped point in the certain limit in the center of circle carries out the mapping of different heights different directions; Operation efficiency height, mapping result is accurate.
Foregoing is only the general introduction of technical solution of the present invention, and in order to more clearly understand the technique means of the present invention, below in conjunction with accompanying drawing, the invention will be further described.
Accompanying drawing explanation
Fig. 1 is the structural representation of parallel double mobile jib bracing or strutting arrangement of the present invention.
Embodiment
Below in conjunction with Figure of description, the present invention is further illustrated.
As shown in Figure 1, a kind of parallel double mobile jib bracing or strutting arrangement, comprises to king-rod 1, to king-rod 22 and support bar 3; Described king-rod 1 is comprised to king-rod one outer tube 11 and be inserted in king-rod one outer tube 11 scalable to pipe 12 in king-rod one, described fixed to king-rod one outer tube 11 with to pipe 12 in king-rod one by drot gfasplng locking piece 13; Described king-rod 22 is comprised to king-rod two outer tube 21 and be inserted in king-rod two outer tube 21 scalable to pipe 22 in king-rod two, described fixed to king-rod two outer tube 21 with to pipe 22 in king-rod two by drot gfasplng locking piece 23; Same, described support bar 3 comprises support bar outer tube and is inserted in the scalable support bar in support bar outer tube Nei manages, and in described support bar outer tube and support bar, pipe is fixed by drot gfasplng locking piece; Described to king-rod 1 with to the parallel contour vertical setting of king-rod 22; Described to king-rod 1 with to king-rod 22, by being fixedly connected with, beam 4 is connected, described in be fixedly connected with beam 4 and be horizontally disposed with; By stubborn this tie-in module of formula locking piece, beam 4 is connected described support bar 3 with being fixedly connected with; The described middle upper surface being fixedly connected with beam 4 is provided with mapping instrument Connection Block 5; Also described to king-rod one in pipe 12 has been set with an adapter sleeve 6, described adapter sleeve 6 one end is provided with the bracket 61 for supporting detection part 7, and the other end of described adapter sleeve 6 is provided with counterweight assembly 8.
Aforesaid detection part 7 is achieved rotation by rotating shaft 71, and described rotating shaft 71 is arranged on the side end of bracket 61 place adapter sleeve 6; Namely the outboard end that rotating shaft is arranged in adapter sleeve 6 horizontal direction; Described bracket 61 is L-type support, and described support is hung on adapter sleeve 6 one end; Described support is also provided with levelling instrument 62; Described detection part 7 is supported by the leveling plates being arranged on support.
Aforesaid counterweight assembly 8 comprises counterweight and connects block 81, hook 82 and counterweight part 83; Described counterweight connects block 81 one end and is connected with adapter sleeve 6, and the other end is connected with hook 82; Described counterweight part 83 hangs and is connected on hook 82.
Aforesaid being fixedly connected with on beam 4 to be provided with 2 levelling instrument 41, it is symmetrically distributed in as longitudinal axes to be fixedly connected with on beam 4 to be located at the mapping instrument Connection Block 5 being fixedly connected with the middle position of beam 4.
Compared with prior art, the useful effect of the present invention is, by mapping instrument 9 is firmly arranged on to king-rod 1 with on the mapping instrument Connection Block 5 being fixedly connected with beam 4 between king-rod 22, then the adjustment work before surveying and drawing, treat that adjustment completes, then start mapping operation; The present invention has used two to king-rod and support bar, and namely to king-rod 1, to king-rod 22 and support bar 3, thus provide strong and stable supporting role, that significantly improves bracing frame stablizes firm performance; In addition, by will to king-rod 1 with to the parallel contour vertical setting of king-rod 22, be fixedly connected with beam 4 and be horizontally disposed with, it is ensured that fast and effectively harmonizing before mapping.
Also by described to king-rod in a suit adapter sleeve 6 on pipe 12, described adapter sleeve 6 one end is provided with the bracket 61 for supporting detection part 7, the other end of described adapter sleeve 6 is provided with counterweight assembly 8, realizes same mapped point and can carry out two height mapping operations of disparity items or adjoining two mapped point carry out the mapping operation of different heights simultaneously; Rotatably detect part 7 by rotating shaft 71, realize the mapping operation of same height different angles; By the balance adjustment of counterweight assembly 8, increase its stability.
The above, it it is only the better embodiment of the present invention, not the present invention is done any restriction in form, although the present invention discloses as above with better embodiment, but and be not used to limit the present invention, any those skilled in the art, do not departing within the scope of technical solution of the present invention, make a little change when the technology contents of above-mentioned announcement can be utilized or it is modified to the equivalent embodiment of equivalent variations, in every case it is the content not departing from technical solution of the present invention, the any simple modification above embodiment done according to the technical spirit of the present invention, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (6)

1. a parallel double mobile jib bracing or strutting arrangement, it is characterized in that: comprise to king-rod one, to king-rod two and support bar, described to king-rod one, king-rod two and support bar are included an outer tube and are inserted in outer tube scalable in pipe, described outer tube and interior pipe are fixed by drot gfasplng locking piece; Described to king-rod one with to the parallel contour vertical setting of king-rod two; Described king-rod one be fixedly connected with beam with king-rod two-way being crossed be connected, described in be fixedly connected with beam and be horizontally disposed with; By tie-in module, beam is connected described support bar with being fixedly connected with; Described it is fixedly connected with on beam to be provided with mapping instrument Connection Block; Described to king-rod one and/or to being also at least set with an adapter sleeve on the interior pipe of king-rod two, described adapter sleeve one end is provided with the bracket for supporting detection part, and the other end of described adapter sleeve is provided with counterweight assembly; Described detection part is achieved rotation by rotating shaft, and described rotating shaft is arranged on the side end of bracket place adapter sleeve; Described bracket is L-type support, and described support is hung on adapter sleeve one end.
2. parallel double mobile jib bracing or strutting arrangement according to claim 1, it is characterised in that: described mapping instrument Connection Block is arranged on the centre being fixedly connected with beam.
3. parallel double mobile jib bracing or strutting arrangement according to claim 1 and 2, it is characterised in that: described counterweight assembly comprises counterweight and connects block, hook and counterweight part; Described counterweight connects block one end and is connected with adapter sleeve, and the other end is connected with hook; Described counterweight part hangs and is connected on hook.
4. parallel double mobile jib bracing or strutting arrangement according to claim 1, it is characterised in that: also comprising levelling instrument, described levelling instrument is separately positioned on and is fixedly connected with on beam and support.
5. parallel double mobile jib bracing or strutting arrangement according to claim 4, it is characterised in that: described in be fixedly connected with on beam levelling instrument be 2, be fixedly connected with on beam to survey and draw instrument Connection Block as longitudinal axes is symmetrically distributed in.
6. parallel double mobile jib bracing or strutting arrangement according to claim 1 and 2, it is characterised in that: described tie-in module is for twisting formula locking piece.
CN201410258702.XA 2014-06-11 2014-06-11 Parallel double mobile jib bracing or strutting arrangement Active CN104061920B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410258702.XA CN104061920B (en) 2014-06-11 2014-06-11 Parallel double mobile jib bracing or strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410258702.XA CN104061920B (en) 2014-06-11 2014-06-11 Parallel double mobile jib bracing or strutting arrangement

Publications (2)

Publication Number Publication Date
CN104061920A CN104061920A (en) 2014-09-24
CN104061920B true CN104061920B (en) 2016-06-08

Family

ID=51549748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410258702.XA Active CN104061920B (en) 2014-06-11 2014-06-11 Parallel double mobile jib bracing or strutting arrangement

Country Status (1)

Country Link
CN (1) CN104061920B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104776876A (en) * 2015-03-31 2015-07-15 苏州华徕光电仪器有限公司 Anti-skid bracket for surveying and mapping instrument
CN111623748A (en) * 2020-05-06 2020-09-04 中铁桥隧技术有限公司 Ruler pad of automatic centering sliding staff and working method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4625428A (en) * 1985-04-26 1986-12-02 Griffin Gerald E Lighted plumb bob
US7048241B2 (en) * 2002-04-19 2006-05-23 Crain Enterprises, Inc. Geomatic support having hinged legs with hinge lock
CN102012226A (en) * 2010-07-27 2011-04-13 河南省大成建设工程有限公司 Multifunctional laser position indicator for building
CN102944228A (en) * 2012-11-07 2013-02-27 北京七彩风景科技发展有限公司 Adjustable precise lofting device
CN204007675U (en) * 2014-06-11 2014-12-10 苏州华徕光电仪器有限公司 Parallel double mobile jib bracing or strutting arrangement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4625428A (en) * 1985-04-26 1986-12-02 Griffin Gerald E Lighted plumb bob
US7048241B2 (en) * 2002-04-19 2006-05-23 Crain Enterprises, Inc. Geomatic support having hinged legs with hinge lock
CN102012226A (en) * 2010-07-27 2011-04-13 河南省大成建设工程有限公司 Multifunctional laser position indicator for building
CN102944228A (en) * 2012-11-07 2013-02-27 北京七彩风景科技发展有限公司 Adjustable precise lofting device
CN204007675U (en) * 2014-06-11 2014-12-10 苏州华徕光电仪器有限公司 Parallel double mobile jib bracing or strutting arrangement

Also Published As

Publication number Publication date
CN104061920A (en) 2014-09-24

Similar Documents

Publication Publication Date Title
CN104061920B (en) Parallel double mobile jib bracing or strutting arrangement
CN104061919A (en) Prism centering rod
CN204007630U (en) Prism centering rod
CN208059808U (en) A kind of bridge machine arch measurer
CN205691118U (en) A kind of mapping support means
CN203116729U (en) Plumb-line rod
CN204007675U (en) Parallel double mobile jib bracing or strutting arrangement
CN204612711U (en) A kind of collapsible instrument of surveying and mapping support
CN107796381A (en) Measurement of the level prism centering rod
CN104061916B (en) Instrument of surveying and mapping bracing frame
CN207848862U (en) A kind of portable mapping tripod
CN204007620U (en) Instrument of surveying and mapping bracing frame
CN104776836A (en) Foldable support for surveying and mapping instrument
CN205333054U (en) From perpendicular surveyor's level
CN203375120U (en) Fixing device for measuring apparatus
CN204405096U (en) A kind of civil engineering work portable surveying instrument bracing or strutting arrangement
CN108612915A (en) A kind of tube support arrangement based on beam support
CN208075858U (en) A kind of urban and rural planning convenient for positioning mapping support device
CN204240020U (en) A kind of support device of building surveying instrument
CN207963891U (en) A kind of vertical detection ruler for constructional engineering
CN202734830U (en) Steady elevation vertical positioning instrument
CN105937906A (en) Surveying and mapping support frame
CN207610701U (en) A kind of plumb bob device for building
CN104359469A (en) Suspension wire device
CN205745930U (en) A kind of levelling rod leveling fixing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180810

Address after: 226000 2, building 9, Chongchuan Road, Chongchuan District, Nantong, Jiangsu, China 1

Patentee after: Nantong klida Information Technology Co., Ltd.

Address before: 215153 new street of Tongan town, Suzhou high tech Zone, Jiangsu Province

Patentee before: Suzhou Hua Lai photoelectric instrument Co., Ltd

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 226000 2, building 9, Chongchuan Road, Chongchuan District, Nantong, Jiangsu, China 1

Patentee after: Collida Information Technology Co., Ltd.

Address before: 226000 2, building 9, Chongchuan Road, Chongchuan District, Nantong, Jiangsu, China 1

Patentee before: Nantong klida Information Technology Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201012

Address after: 226300 group 4, qianju, Shizong Town, Tongzhou District, Nantong City, Jiangsu Province

Patentee after: NANTONG AT&M NEW MATERIALS Co.,Ltd.

Address before: 226000 Jiangsu Province, Nantong City Chongchuan District Chongchuan Road No. 1 Building 9 floor 2

Patentee before: KELIDA INFORMATION TECHNOLOGY Co.,Ltd.