CN203116729U - Plumb-line rod - Google Patents

Plumb-line rod Download PDF

Info

Publication number
CN203116729U
CN203116729U CN 201320067218 CN201320067218U CN203116729U CN 203116729 U CN203116729 U CN 203116729U CN 201320067218 CN201320067218 CN 201320067218 CN 201320067218 U CN201320067218 U CN 201320067218U CN 203116729 U CN203116729 U CN 203116729U
Authority
CN
China
Prior art keywords
rod
horizontal
vertical
suspension
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320067218
Other languages
Chinese (zh)
Inventor
黄诗东
王旭生
唐香辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN 201320067218 priority Critical patent/CN203116729U/en
Application granted granted Critical
Publication of CN203116729U publication Critical patent/CN203116729U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

本实用新型提出了一种吊线杆,包括立杆,所述立杆的一侧设置有与其垂直的水平杆,所述水平杆为两根,分别位于立杆的上部和中部,所述水平杆上设置有刻度尺,位于立杆上部的水平杆上固定有吊绳,所述吊绳的下端设置有线锤。本实用新型采用吊线杆检查墙柱面垂直度,操作人员可直接在楼地面上作业,将立杆远离水平杆的一侧贴于墙柱表面,由于立杆中上部安装了两个水平杆,水平杆上有刻度尺,可直接读数,测量时,墙柱面上部和中部不用再次测量,可以由一个人独立完成,且只测量下部吊绳离模板面的距离,操作简单,作业效率大大提高,无安全隐患。

Figure 201320067218

The utility model proposes a suspension rod, which includes a vertical rod. One side of the vertical rod is provided with a horizontal rod perpendicular to it. A scale is arranged on the top, a suspension rope is fixed on the horizontal bar at the top of the vertical pole, and a wire hammer is provided at the lower end of the suspension rope. The utility model adopts the hanging pole to check the verticality of the wall column surface. The operator can directly work on the floor, and attach the side of the vertical pole away from the horizontal pole to the surface of the wall column. Since two horizontal poles are installed in the upper part of the vertical pole, There is a scale on the horizontal rod, which can be read directly. When measuring, the upper and middle parts of the wall column surface do not need to be measured again. It can be completed by one person independently, and only the distance between the lower hanging rope and the formwork surface is measured. The operation is simple and the working efficiency is greatly improved. , no security risks.

Figure 201320067218

Description

一种吊线杆a hanging rod

技术领域technical field

本实用新型涉及一种墙柱模板垂直度检查工具,尤其涉及一种吊线杆。The utility model relates to a tool for checking the verticality of a formwork of a wall column, in particular to a suspension rod.

背景技术Background technique

墙柱模板安装完后,通常要对墙柱面垂直度进行检查,常规做法是操作人员上至墙柱顶部,放下吊线锤,上、中、下同时测量吊线与模板面的距离,根据上、中、下测量间距的差值,来判断模板安装面的垂直度偏差是否符合规范要求。此种做法需2个以上操作人员协同作业,上部吊线人员需在高处脚手架上操作,操作很不方便,效率低,且安全隐患较大。After the wall column formwork is installed, it is usually necessary to check the verticality of the wall column surface. The conventional method is that the operator goes up to the top of the wall column, puts down the hanging wire hammer, and measures the distance between the hanging wire and the formwork surface at the same time, according to the upper, middle and lower The difference between the middle and lower measurement distances is used to judge whether the verticality deviation of the formwork installation surface meets the specification requirements. This method requires more than 2 operators to work together, and the upper hanging line personnel need to operate on the scaffolding at a high place. The operation is very inconvenient, the efficiency is low, and the safety hazard is relatively large.

实用新型内容Utility model content

本实用新型提出一种吊线杆,它能够有效地克服现有技术中的不足,提高墙柱模板垂直度检查效率和准确性。The utility model provides a suspension rod, which can effectively overcome the deficiencies in the prior art, and improve the efficiency and accuracy of the verticality inspection of the wall stud formwork.

本实用新型的技术方案是这样实现的:一种吊线杆,包括立杆,所述立杆的一侧设置有与其垂直的水平杆,所述水平杆为两根,分别位于立杆的上部和中部,所述水平杆上设置有刻度尺,位于立杆上部的水平杆上固定有吊绳,所述吊绳的下端设置有线锤。The technical solution of the utility model is realized in the following way: a suspension rod, comprising a vertical rod, one side of the vertical rod is provided with a horizontal rod perpendicular to it, and there are two horizontal rods, which are respectively located on the upper part of the vertical rod and In the middle part, the horizontal bar is provided with a scale, and the horizontal bar at the top of the vertical bar is fixed with a suspension rope, and the lower end of the suspension rope is provided with a wire hammer.

作为优选,位于立杆上部的水平杆的顶部与立杆的顶端平齐。Preferably, the top of the horizontal bar on the upper part of the vertical bar is flush with the top of the vertical bar.

作为优选,水平杆和立杆之间设置有斜撑杆。Preferably, a diagonal brace is arranged between the horizontal bar and the vertical bar.

作为优选,位于立杆中部的水平杆与立杆之间未设置斜撑杆。Preferably, no diagonal brace is provided between the horizontal bar and the vertical bar in the middle of the vertical bar.

作为优选,所述立杆、水平杆和斜撑杆由硬质木条或者硬质塑料管制成。Preferably, the vertical rods, horizontal rods and diagonal bracing rods are made of hard wood strips or hard plastic pipes.

本实用新型的有益效果在于:采用吊线杆检查墙柱面垂直度,操作人员可直接在楼地面上作业,将立杆远离水平杆的一侧贴于墙柱表面,由于立杆中上部安装了两个水平杆,水平杆上有刻度尺,可直接读数,测量时,墙柱面上部和中部不用再次测量,可以由一个人独立完成,且只测量下部吊绳离模板面的距离,操作简单,作业效率大大提高,无安全隐患。立杆上部的水平杆的顶部与立杆的顶端平齐,检测时,可将立杆顶端伸至墙柱的顶端,使检查更加准确全面。斜撑杆使水平杆和立杆之间的连接更加稳固。由于位于立杆中部的水平杆受力较小,则无需设置斜撑杆,减少材料,节约成本。所述立杆、水平杆和斜撑杆由硬质木条或者硬质塑料管制成,材料成本低,加工容易。The beneficial effect of the utility model is that: the verticality of the wall column surface is checked by the suspension rod, the operator can directly work on the floor, and the side of the vertical rod away from the horizontal rod is attached to the surface of the wall column, because the middle and upper part of the vertical rod is installed Two horizontal rods with a scale on the horizontal rod can be read directly. When measuring, the upper and middle parts of the wall column surface do not need to be measured again. It can be completed by one person independently, and only the distance between the lower hanging rope and the formwork surface is measured, which is easy to operate , The operating efficiency is greatly improved, and there is no potential safety hazard. The top of the horizontal bar on the upper part of the pole is flush with the top of the pole. When testing, the top of the pole can be extended to the top of the wall column to make the inspection more accurate and comprehensive. Diagonal bracing makes the connection between the horizontal bar and the vertical bar more stable. Since the force of the horizontal bar located in the middle of the vertical bar is relatively small, there is no need to set a diagonal bracing bar, which reduces material and saves cost. The vertical rods, horizontal rods and diagonal bracing rods are made of hard wood strips or hard plastic tubes, with low material cost and easy processing.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的其中一个实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only the present invention For one embodiment of the new model, those skilled in the art can also obtain other drawings based on these drawings without any creative effort.

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图中:1、立杆;2、水平杆;3、刻度尺;4、斜撑杆;5、吊绳;6、线锤。In the figure: 1, vertical rod; 2, horizontal rod; 3, scale; 4, diagonal brace; 5, hanging rope; 6, wire hammer.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型其中一个实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiment is only one of the embodiments of the present invention, not all of them. Example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

如图1所示,一种吊线杆,包括立杆1,所述立杆1的一侧设置有与其垂直的水平杆2,所述水平杆2为两根,分别位于立杆1的上部和中部,所述水平杆2上设置有刻度尺3,位于立杆1上部的水平杆2上固定有吊绳5,所述吊绳5的下端设置有线锤6。位于立杆1上部的水平杆2的顶部与立杆1的顶端平齐,该水平杆2和立杆1之间设置有斜撑杆4,斜撑杆4使水平杆2和立杆1之间的连接更加稳固。由于位于立杆1中部的水平杆2受力较小,则无需设置斜撑杆4,可以减少材料,节约成本。As shown in Fig. 1, a kind of hanging wire rod comprises a vertical rod 1, and one side of the vertical rod 1 is provided with a horizontal rod 2 perpendicular to it, and the horizontal rods 2 are two, respectively located on the upper part of the vertical rod 1 and In the middle, the horizontal bar 2 is provided with a scale 3, and the horizontal bar 2 at the top of the vertical bar 1 is fixed with a suspension rope 5, and the lower end of the suspension rope 5 is provided with a wire hammer 6. The top of the horizontal bar 2 on the top of the vertical bar 1 is flush with the top of the vertical bar 1, and a diagonal strut 4 is arranged between the horizontal bar 2 and the vertical bar 1, and the diagonal strut 4 makes the gap between the horizontal bar 2 and the vertical bar 1 The connection between them is more stable. Since the horizontal bar 2 located in the middle of the vertical bar 1 bears less force, there is no need to set the diagonal bracing bar 4, which can reduce materials and save costs.

作为优选,所述立杆1、水平杆2和斜撑杆4由硬质木条或者硬质塑料管制成,材料成本低,加工容易。Preferably, the vertical bar 1 , the horizontal bar 2 and the diagonal bracing bar 4 are made of hard wood strips or hard plastic tubes, the material cost is low and the processing is easy.

本实用新型采用吊线杆检查墙柱面垂直度,操作人员可直接在楼地面上作业,将立杆1远离水平杆2的一侧贴于墙柱面,吊绳5在线锤6的作用下绷直,由于水平杆2上有刻度尺3,可以直接依次读取吊绳5在两个水平杆2的刻度尺3上对应位置的读数,测量时,墙柱面上部和中部不用再次测量,可以由一个人独立完成,且只测量下部吊绳5离墙柱面的距离,操作简单,作业效率大大提高,无安全隐患。The utility model adopts the hanging rod to check the verticality of the wall cylinder, the operator can directly work on the floor, stick the side of the vertical rod 1 away from the horizontal rod 2 to the wall cylinder, and the hanging rope 5 is stretched under the action of the wire hammer 6 Straight, since there is a scale 3 on the horizontal bar 2, the readings of the corresponding positions of the hanging rope 5 on the scale 3 of the two horizontal bars 2 can be directly read in sequence. It is completed by one person independently, and only the distance between the lower suspension rope 5 and the wall cylinder is measured, the operation is simple, the operation efficiency is greatly improved, and there is no potential safety hazard.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.

Claims (5)

1.一种吊线杆,其特征在于:包括立杆,所述立杆的一侧设置有与其垂直的水平杆,所述水平杆为两根,分别位于立杆的上部和中部,所述水平杆上设置有刻度尺,位于立杆上部的水平杆上固定有吊绳,所述吊绳的下端设置有线锤。1. A suspension rod, characterized in that: it comprises a vertical rod, one side of the vertical rod is provided with a horizontal rod perpendicular to it, the horizontal rods are two, and are respectively located at the top and middle of the vertical rod, and the horizontal rod A scale is arranged on the bar, a suspension rope is fixed on the horizontal bar at the top of the vertical pole, and a wire hammer is arranged at the lower end of the suspension rope. 2.根据权利要求1所述的一种吊线杆,其特征在于:位于立杆上部的水平杆的顶部与立杆的顶端平齐。2. A suspension rod according to claim 1, characterized in that: the top of the horizontal rod located on the upper part of the vertical rod is flush with the top end of the vertical rod. 3.根据权利要求1或2所述的一种吊线杆,其特征在于:水平杆和立杆之间设置有斜撑杆。3. A suspension rod according to claim 1 or 2, characterized in that: a diagonal brace is arranged between the horizontal rod and the vertical rod. 4.根据权利要求3所述的一种吊线杆,其特征在于:位于立杆中部的水平杆与立杆之间未设置斜撑杆。4. A suspension rod according to claim 3, characterized in that no diagonal brace is provided between the horizontal rod and the vertical rod in the middle of the vertical rod. 5.根据权利要求4所述的一种吊线杆,其特征在于:所述立杆、水平杆和斜撑杆由硬质木条或者硬质塑料管制成。5. A suspension rod according to claim 4, characterized in that: said vertical rod, horizontal rod and diagonal bracing rod are made of hard wood strips or hard plastic pipes.
CN 201320067218 2013-02-05 2013-02-05 Plumb-line rod Expired - Fee Related CN203116729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320067218 CN203116729U (en) 2013-02-05 2013-02-05 Plumb-line rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320067218 CN203116729U (en) 2013-02-05 2013-02-05 Plumb-line rod

Publications (1)

Publication Number Publication Date
CN203116729U true CN203116729U (en) 2013-08-07

Family

ID=48897065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320067218 Expired - Fee Related CN203116729U (en) 2013-02-05 2013-02-05 Plumb-line rod

Country Status (1)

Country Link
CN (1) CN203116729U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103925864A (en) * 2014-03-14 2014-07-16 沪东中华造船(集团)有限公司 Auxiliary tool for installation and positioning of ship ballast pipe system and installation and positioning method through auxiliary tool
CN105547249A (en) * 2016-01-21 2016-05-04 中建八局第三建设有限公司 Tool for controlling perpendicularity and angle of oblique pillar
CN106468550A (en) * 2015-08-19 2017-03-01 五冶集团上海有限公司 A kind of wall column formwork detection rule for verticality and preparation method thereof
CN110500938A (en) * 2019-07-04 2019-11-26 大乘汽车集团有限公司 A kind of camber angle measuring method and its measuring device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103925864A (en) * 2014-03-14 2014-07-16 沪东中华造船(集团)有限公司 Auxiliary tool for installation and positioning of ship ballast pipe system and installation and positioning method through auxiliary tool
CN103925864B (en) * 2014-03-14 2016-09-14 沪东中华造船(集团)有限公司 Utilize ballast for cruising piping installs the method that positioning assisting tooling carries out installing location
CN106468550A (en) * 2015-08-19 2017-03-01 五冶集团上海有限公司 A kind of wall column formwork detection rule for verticality and preparation method thereof
CN105547249A (en) * 2016-01-21 2016-05-04 中建八局第三建设有限公司 Tool for controlling perpendicularity and angle of oblique pillar
CN105547249B (en) * 2016-01-21 2017-10-10 中建八局第三建设有限公司 A kind of instrument of the control sub- perpendicularity of batter post and angle
CN110500938A (en) * 2019-07-04 2019-11-26 大乘汽车集团有限公司 A kind of camber angle measuring method and its measuring device

Similar Documents

Publication Publication Date Title
CN203069127U (en) Verticality detector
CN205561851U (en) Detect hang down straightness's instrument of form setting
CN207214994U (en) A kind of wall column verticality measuring tool
CN204740028U (en) Novel squareness measurement chi
CN203116729U (en) Plumb-line rod
CN103470041B (en) The cast-in-place concrete beam template steel pipe support precompressed construction method that adopts loose sand to load
CN104132855A (en) Structural member torsion test method and device
CN202614236U (en) Portable template verticality detection tool
CN204001731U (en) A kind of shuttering supporting vertical rod base fixing device
CN205506057U (en) Measuring scale for building
CN204286338U (en) Convenient verticality measuring instrument
CN202393389U (en) Wall column template perpendicularity measuring tool
CN203687932U (en) Verticality measurement tool
CN202614235U (en) Ruler for measuring verticality of vertical member template
CN205373716U (en) Portable template straightness detector that hangs down
CN203657810U (en) Special perpendicularity detection device for frame column and shear wall
CN205209499U (en) Construct perpendicular detection device
CN205426173U (en) Hang down straightness's measuring tool of template
CN204313847U (en) A kind of verticality fast detector
CN208505323U (en) Easy verticality measuring tool
CN217687209U (en) Eminence template straightness measuring device that hangs down
CN204630579U (en) A kind of portable collapsible mold plate verticality measurement mechanism
CN208109087U (en) A kind of Portable vertical degree measuring device
CN205138496U (en) Building templates straightness detection device that hangs down
CN207448776U (en) A kind of high ferro box beam catenary mast built-in fitting calibrating installation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807

Termination date: 20150205

EXPY Termination of patent right or utility model