CN104060612A - 用于混凝土坝严寒冬季施工的温控方法及装置 - Google Patents

用于混凝土坝严寒冬季施工的温控方法及装置 Download PDF

Info

Publication number
CN104060612A
CN104060612A CN201310094078.XA CN201310094078A CN104060612A CN 104060612 A CN104060612 A CN 104060612A CN 201310094078 A CN201310094078 A CN 201310094078A CN 104060612 A CN104060612 A CN 104060612A
Authority
CN
China
Prior art keywords
concrete
thermometer
water pipe
temperature
reading value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310094078.XA
Other languages
English (en)
Other versions
CN104060612B (zh
Inventor
周先练
卢昆华
姚元成
王洪军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Guiyang Engineering Corp
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN201310094078.XA priority Critical patent/CN104060612B/zh
Publication of CN104060612A publication Critical patent/CN104060612A/zh
Application granted granted Critical
Publication of CN104060612B publication Critical patent/CN104060612B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种用于混凝土坝严寒冬季施工的温控方法及装置,本发明在混凝土准备施工期前,用磁铁片将防水型调温型电热毯固定于混凝土模板上;在混凝土施工时,在混凝土内部埋设冷却水管和位于混凝土两边的温度计T1、位于混凝土中部的温度计T2;当混凝土施工完成后,利用冷却水管进行通水冷却,同时采用防水型调温型电热毯对混凝土表面进行保温加热改变温度计T1的读数值与温度计T2的读数值差值以达到温控目的;当温度计T2的读数值随着冷水水管的通水时间不断降低时,通过动态调节防水型调温型电热毯的功率改变温度计T1的读数值与温度计T2的读数值差值以达到温控目的。本发明具有技术风险小,简单易行,方便实用,成本低廉等优点。

Description

用于混凝土坝严寒冬季施工的温控方法及装置
技术领域
本发明涉及一种混凝土坝的温控措施,特别涉及一种用于混凝土坝严寒冬季施工的温控方法及装置。
背景技术
目前,根据国内混凝土坝寒冬季节施工温控措施,如严寒地区的藏木水电站,大坝为常态混凝土,混凝土施工时一般采用混凝土模板内贴聚苯乙烯保温板,由于采用保温板进行内贴保温,不能将混凝土与外界完全隔离,混凝土表面不断向外界散发热能,致使表面温度与外界温度相差不大。另外,严寒季节混凝土浇筑温度就很低,常态混凝土水泥含量高,水化热能量大,混凝土绝热温升高,当混凝土龄期处于某一时间段时,其内部温度值与表面温度值差值达到最大并超过允许差值范围,最终导致坝体出现表面裂缝或贯穿性裂缝,给工程安全运行带来极大危害。因此以上技术措施难以满足混凝土寒冬季节施工温控要求。
发明内容
本发明的目的在于为克服现有温控技术的不足,提供一种用于混凝土坝严寒冬季施工的温控方法及装置,通过对混凝土表面进行给热,确保混凝土内部温度上升过程中与表面温度差值在允许范围值内,从而避免坝体出现表面裂缝或贯穿性裂缝。
为实现本发明的目的,本发明采用了这样的技术方案:本发明的用于混凝土坝严寒冬季施工的温控方法是在混凝土准备施工期前,用磁铁片将防水型调温型电热毯固定于混凝土模板上;在混凝土施工时,在混凝土内部埋设冷却水管和位于混凝土两边的温度计T1、位于混凝土中部的温度计T2;当混凝土施工完成后,利用冷却水管进行通水冷却,同时采用防水型调温型电热毯对混凝土表面进行保温加热改变温度计T1的读数值与温度计T2的读数值差值以达到温控目的;当温度计T2的读数值随着冷水水管的通水时间不断降低时,通过动态调节防水型调温型电热毯的功率改变温度计T1的读数值与温度计T2的读数值差值以达到温控目的。
基于前述的方法,本发明还采用了一种调节混凝土内外温差的装置,它包括混凝土及用于该混凝土浇筑的混凝土模板,在该混凝土模板上设有防水型调温型电热毯,在该混凝土内部埋设有冷却水管,在该混凝土内靠近两侧边缘的位置设有温度计T1,在该混凝土内中部设有温度计T2。由于混凝土浇筑时内部温度大,而冬季施工混凝土表面温度降低快,使混凝土内部温度过高而外部过低,本发明的装置通过对内冷却和对外加温,从而使混凝土内外温度差得到调节。
进一步的,前述的防水型调温型电热毯用磁铁片固定在前述的混凝土模板上。
更进一步的,前述的冷却水管在所述混凝土中分层弯曲布置。这种分层弯曲布置是一层一层的弯折循环布置,使混凝土内部各个部位都得到均匀降温。
由于采用了本发明的技术方案,当混凝土浇筑前,利用磁铁片将防水型调温型电热毯固定于混凝土模板内侧;当混凝土浇筑时,在混凝土内部埋设冷却水管和温度计;当混凝土浇筑完成后,对混凝土进行通水冷却,并通过防水型调温型电热毯动态调整混凝土表面温度,使温度计T1和温度计T2的读数差值控制在允许范围值内。由于采用了防水型调温型电热毯,不仅避免了混凝土表面散热而导致表面温度降低,同时在对混凝土表面给热后确保混凝土内、外温差在允许范围值内。本发明技术措施技术风险小,简单易行,方便实用,充分利用了防水型调温型电热毯保温给热的特点,不仅成本低廉,对避免坝体产生表面裂缝或贯穿性裂缝起到很好的效果,确保工程的安全运行,而且也不会对水工建筑物自身遗留下永久的缺陷,值得推广。
附图说明
图1是本发明的剖面布置示意图;
图2是防水型调温型电热毯布置剖面图;
图3是防水型调温型电热毯布置展示图;
图4是磁铁片结构示意图;
附图标记说明:1-混凝土模板,2-防水型调温型电热毯,3-磁铁片,4-混凝土,5-冷却水管,6-温度计T1,7-温度计T2。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明。
先看图1,图1展示了本发明的剖面布置,从图中可以看出,本发明的技术措施主要是当混凝土4浇筑完成时,利用冷却水管5进行通水冷却,同时利用防水型调温型电热毯2对混凝土4表面保温给热,并动态调整防水型调温型电热毯2功率,确保温度计T2 7与温度计T1 6的读数差值在允许范围值内。
图2图3展示了防水型调温型电热毯2的布置,防水型调温型电热毯2必须平整地内贴于混凝土模板1内侧,并由磁铁片3将其固定。
图4展示了磁铁片3的结构型式,磁铁片3的数量由防水型调温型电热毯2重量决定,同时,磁铁片3均匀布置于防水型调温型电热毯2表面,确保其表面平整。
当然,以上只是本发明的具体应用范例,本发明还有其他的实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本发明所要求的保护范围之内。

Claims (4)

1.一种用于混凝土坝严寒冬季施工的温控方法,其特征在于:在混凝土(4)准备施工期前,用磁铁片(3)将防水型调温型电热毯(2)固定于混凝土模板(1)内侧;在混凝土(4)施工时,在混凝土(4)内部埋设冷却水管(5)和位于混凝土(4)两边的温度计T1(6)、位于混凝土(4)中部的温度计T2(7);当混凝土(4)施工完成后,利用冷却水管(5)进行通水冷却,同时采用防水型调温型电热毯(2)对混凝土表面进行保温加热改变温度计T1(6)的读数值与温度计T2(7)的读数值差值以达到温控目的;当温度计T2(7)的读数值随着冷水水管(5)的通水时间不断降低时,通过动态调节防水型调温型电热毯(2)的功率改变温度计T1(6)的读数值与温度计T2(7)的读数值差值以达到温控目的。
2.一种调节混凝土内外温差的装置,包括混凝土(4)及用于所述混凝土(4)浇筑的混凝土模板(1),其特征在于:在所述混凝土模板(1)内侧设有防水型调温型电热毯(2),在所述混凝土(4)内部埋设有冷却水管(5),在所述混凝土(4)内靠近两侧边缘的位置设有温度计T1(6),在所述混凝土(4)内中部设有温度计T2(7)。
3.根据权利要求2所述的调节混凝土内外温差的装置,其特征在于:所述防水型调温型电热毯(2)用磁铁片(3)固定在所述混凝土模板(1)上。
4.根据权利要求2所述的调节混凝土内外温差的装置,其特征在于:所述冷却水管(5)在所述混凝土(4)中分层弯曲布置。
CN201310094078.XA 2013-03-22 2013-03-22 用于混凝土坝严寒冬季施工的温控方法及装置 Active CN104060612B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310094078.XA CN104060612B (zh) 2013-03-22 2013-03-22 用于混凝土坝严寒冬季施工的温控方法及装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310094078.XA CN104060612B (zh) 2013-03-22 2013-03-22 用于混凝土坝严寒冬季施工的温控方法及装置

Publications (2)

Publication Number Publication Date
CN104060612A true CN104060612A (zh) 2014-09-24
CN104060612B CN104060612B (zh) 2016-06-08

Family

ID=51548526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310094078.XA Active CN104060612B (zh) 2013-03-22 2013-03-22 用于混凝土坝严寒冬季施工的温控方法及装置

Country Status (1)

Country Link
CN (1) CN104060612B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951834A (zh) * 2016-07-02 2016-09-21 安徽水利开发股份有限公司 混凝土施工内环境温度调节设备
CN106032707A (zh) * 2015-03-18 2016-10-19 中天建设集团有限公司 一种混凝土局部加热养护方法及装置
CN110055933A (zh) * 2019-04-18 2019-07-26 中水东北勘测设计研究有限责任公司 一种严寒地区混凝土坝抗冰拔保温防渗结构及其施工方法
CN113048699A (zh) * 2021-05-13 2021-06-29 中国水利水电第九工程局有限公司 高海拔寒冷地区大坝混凝土通水冷却工艺和装置
CN114922452A (zh) * 2022-06-14 2022-08-19 中国二十二冶集团有限公司 剪力墙冬季保温施工方法

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001207430A (ja) * 2000-01-31 2001-08-03 Ohbayashi Corp 施工管理支援システム
CN101638940A (zh) * 2009-05-26 2010-02-03 中冶集团华冶资源开发有限责任公司 大板块、大体积混凝土无缝施工方法
CN101701495A (zh) * 2009-09-28 2010-05-05 中国葛洲坝集团股份有限公司 大体积混凝土温度控制的个性化通水方法
CN101781931A (zh) * 2010-01-21 2010-07-21 中铁二十局集团有限公司 大体积混凝土承台冬季一次性浇注施工方法
CN101962997A (zh) * 2010-09-30 2011-02-02 天津二十冶建设有限公司 超厚基础大体积混凝土施工方法
CN102094528A (zh) * 2010-12-09 2011-06-15 中国葛洲坝集团股份有限公司 一种大体积混凝土冷却水管布置方法
CN102344270A (zh) * 2011-07-04 2012-02-08 程华 内约束混凝土及其制备方法
CN102383365A (zh) * 2011-11-04 2012-03-21 广东冠粤路桥有限公司 混凝土保湿加温养生装置及其应用方法
KR101155285B1 (ko) * 2009-11-27 2012-06-18 현대건설주식회사 콘크리트 온도차 저감방법, 그 저감장치 및 그 저감방법에 의해 양생된 구조물
CN102778473A (zh) * 2012-07-10 2012-11-14 东华大学 一种围护结构热阻现场检测方法
CN203145016U (zh) * 2013-03-22 2013-08-21 中国水电顾问集团贵阳勘测设计研究院 一种调节混凝土内外温差的装置

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001207430A (ja) * 2000-01-31 2001-08-03 Ohbayashi Corp 施工管理支援システム
CN101638940A (zh) * 2009-05-26 2010-02-03 中冶集团华冶资源开发有限责任公司 大板块、大体积混凝土无缝施工方法
CN101701495A (zh) * 2009-09-28 2010-05-05 中国葛洲坝集团股份有限公司 大体积混凝土温度控制的个性化通水方法
KR101155285B1 (ko) * 2009-11-27 2012-06-18 현대건설주식회사 콘크리트 온도차 저감방법, 그 저감장치 및 그 저감방법에 의해 양생된 구조물
CN101781931A (zh) * 2010-01-21 2010-07-21 中铁二十局集团有限公司 大体积混凝土承台冬季一次性浇注施工方法
CN101962997A (zh) * 2010-09-30 2011-02-02 天津二十冶建设有限公司 超厚基础大体积混凝土施工方法
CN102094528A (zh) * 2010-12-09 2011-06-15 中国葛洲坝集团股份有限公司 一种大体积混凝土冷却水管布置方法
CN102344270A (zh) * 2011-07-04 2012-02-08 程华 内约束混凝土及其制备方法
CN102383365A (zh) * 2011-11-04 2012-03-21 广东冠粤路桥有限公司 混凝土保湿加温养生装置及其应用方法
CN102778473A (zh) * 2012-07-10 2012-11-14 东华大学 一种围护结构热阻现场检测方法
CN203145016U (zh) * 2013-03-22 2013-08-21 中国水电顾问集团贵阳勘测设计研究院 一种调节混凝土内外温差的装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孟文清,阎西康: "《现代建筑施工新技术》", 30 June 2010 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106032707A (zh) * 2015-03-18 2016-10-19 中天建设集团有限公司 一种混凝土局部加热养护方法及装置
CN105951834A (zh) * 2016-07-02 2016-09-21 安徽水利开发股份有限公司 混凝土施工内环境温度调节设备
CN110055933A (zh) * 2019-04-18 2019-07-26 中水东北勘测设计研究有限责任公司 一种严寒地区混凝土坝抗冰拔保温防渗结构及其施工方法
CN113048699A (zh) * 2021-05-13 2021-06-29 中国水利水电第九工程局有限公司 高海拔寒冷地区大坝混凝土通水冷却工艺和装置
CN114922452A (zh) * 2022-06-14 2022-08-19 中国二十二冶集团有限公司 剪力墙冬季保温施工方法

Also Published As

Publication number Publication date
CN104060612B (zh) 2016-06-08

Similar Documents

Publication Publication Date Title
Jin et al. Thermal performance evaluation of the wall using heat flux time lag and decrement factor
CN104060612A (zh) 用于混凝土坝严寒冬季施工的温控方法及装置
CN104963698B (zh) 用于隧道衬砌混凝土的保温保湿养生装置的施工方法
CN203145016U (zh) 一种调节混凝土内外温差的装置
CN102505777B (zh) 大型水平孔复合夹心保温墙板保温体系
KR101503522B1 (ko) 혹한기 타설 콘크리트 벽체의 복합식 보온 양생 시스템 및 보온 양생 운용 방법
CN103415096A (zh) 湿法采暖电缆安装结构
CN204901188U (zh) 管道加热保温件
Guo et al. Application self-regulating heating cable curing of concrete in winter
CN203435172U (zh) 湿法采暖电缆安装结构
CN207794520U (zh) 一种铝木地暖系统
CN104879817B (zh) 干式地暖系统
CN203307958U (zh) 一种保温墙
CN207420017U (zh) 一种通水保温的建筑模板
CN106196383A (zh) 一种预制双层相变蓄能供冷暖末端结构及楼板
CN203768876U (zh) 一种用于混凝土坝施工的温控模板
CN105444252A (zh) 一种高导热石墨膜地暖系统
CN102121293B (zh) 毛细管网调温仿生板及室内采暖、降温系统
CN104652769A (zh) 一种快速加热地暖地板
CN204386622U (zh) 一种隧道离壁式保温结构
CN205244720U (zh) 一种环卫车管路保温装置
CN203834880U (zh) 地暖地板
CN211143342U (zh) 一种通水调温模块
CN204240455U (zh) 地热采暖组装块
CN202692228U (zh) 一种采用电热膜进行加热的地暖系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant