CN104028924A - 施工现场线缆跨越安全通道过桥装置 - Google Patents
施工现场线缆跨越安全通道过桥装置 Download PDFInfo
- Publication number
- CN104028924A CN104028924A CN201410280506.2A CN201410280506A CN104028924A CN 104028924 A CN104028924 A CN 104028924A CN 201410280506 A CN201410280506 A CN 201410280506A CN 104028924 A CN104028924 A CN 104028924A
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- telescopic
- pillar stand
- crossing device
- portals
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D18/00—Bridges specially adapted for particular applications or functions not provided for elsewhere, e.g. aqueducts, bridges for supporting pipe-lines
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Details Of Indoor Wiring (AREA)
Abstract
本发明的一种施工现场线缆跨越安全通道过桥装置,包括双门形架,双门形架包括前后并排的两个单门形架,两个单门形架之间连接有纵向的连接杆,单门形架包括两个伸缩立柱和连接在两个伸缩立柱顶部之间的伸缩横梁,伸缩立柱的底部连接有底座,伸缩立杆边缘向外侧延伸有横限位杆,伸缩横梁边缘向上延伸有竖限位杆;连接杆上套有可转动的套管。本发明的有益效果是:保证了施工现场整齐有序和安全通道的畅行。将过桥装置设计成高度和宽度可伸缩调节结构,增加了该装置的适用性,同时随着施工区域的转移变动,可以反复利用。不单对施工线缆及胶管可以妥善保护,还降低了工程支出成本和消除了安全隐患。
Description
技术领域
本发明涉及一种施工现场线缆跨越安全通道过桥装置。
背景技术
在建筑安装施工领域,为保证安全文明施工和场地合理利用,施工现场施工电源箱、电焊机、氧气及乙炔瓶、热处理控制柜等施工设备会集中定置布置。因作业地点的经常变化,施工电源、电焊机二次线,火焰切割输气胶管、热处理动力线往往会跨越已设定的安全通道。一般的做法是将上述线缆、输气胶管直接从划定的安全通道地面上敷设通过。线缆、胶管走向不一,观感凌乱,影响现场整体文明施工形象和管理水平体现。特别是在安全通道要经常通过施工人员、液压搬运车,砖块水泥等物料运输推车,有时设备管道托运也会跨越安全通道。受外力挤压极易造成线缆、胶管损坏,发生漏电、触电、火灾事故,给安全生产也带来较大的安全隐患。
发明内容
为解决以上技术上的不足,本发明提供了一种使用方便安全的施工现场线缆跨越安全通道过桥装置。
本发明是通过以下措施实现的:
本发明的一种施工现场线缆跨越安全通道过桥装置,包括双门形架,所述双门形架包括前后并排的两个单门形架,两个单门形架之间连接有纵向的连接杆,所述单门形架包括两个伸缩立柱和连接在两个伸缩立柱顶部之间的伸缩横梁,伸缩立柱的底部连接有底座,所述伸缩立杆边缘向外侧延伸有横限位杆,所述伸缩横梁边缘向上延伸有竖限位杆;所述连接杆上套有可转动的套管。
上述伸缩立柱包括相套接并可上下滑动的下立柱和上立柱,所述伸缩横梁包括相套接并可左右横向滑动的左横梁和右横梁,下立柱、上立柱、左横梁和右横梁均为槽型钢,并且下立柱、上立柱、左横梁和右横梁的侧壁上均开有可穿入定位销轴的定位孔。
上述伸缩立柱和伸缩横梁的侧表面贴有夜光警示条。
本发明的有益效果是:保证了施工现场整齐有序和安全通道的畅行。将过桥装置设计成高度和宽度可伸缩调节结构,增加了该装置的适用性,同时随着施工区域的转移变动,可以反复利用。不单对施工线缆及胶管可以妥善保护,还降低了工程支出成本和消除了安全隐患。
附图说明
图1 为本发明的主视结构图。
图2为图1的侧面结构示意图。
图3为图1的俯视结构示意图。
其中:1下立柱,2上立柱,3左横梁,4右横梁,5底座,6横限位杆,7定位销轴,8竖限位杆,9连接杆。
具体实施方式
下面结合附图对本发明做进一步详细的描述:
如图1、2、3所示,本发明的一种施工现场线缆跨越安全通道过桥装置,将线缆、胶管从安全通道地面随意敷设通过,改成架空跨越。
其包括双门形架,双门形架包括前后并排的两个单门形架,两个单门形架之间连接有纵向的连接杆9,单门形架包括两个伸缩立柱和连接在两个伸缩立柱顶部之间的伸缩横梁,伸缩立柱的底部连接有底座5,伸缩立杆边缘向外侧延伸有横限位杆6,伸缩横梁边缘向上延伸有竖限位杆8;横限位杆6和竖限位杆8可以防止敷设的线缆和软管脱离过桥装置。连接杆9上套有可转动的套管。在连接杆9上铺设电缆时减小摩擦,省时省力。采用伸缩立柱和伸缩横梁可以根据安全通道的实际情况灵活调整。
伸缩立柱包括相套接并可上下滑动的下立柱1和上立柱2,伸缩横梁包括相套接并可左右横向滑动的左横梁3和右横梁4,下立柱1、上立柱2、左横梁3和右横梁4均为槽型钢,通过穿插方式相互套接。下立柱1、上立柱2、左横梁3和右横梁4的侧壁上均开有可穿入定位销轴7的定位孔。确定好设定宽度和高度后,通过间距一致的定位销孔穿入件定位孔,即可稳固定位。伸缩立柱和伸缩横梁的侧表面贴有夜光警示条,可以起到警示作用。
在现场组合完成后,施工现场集中布置的施工电源箱、电焊机、氧气及乙炔瓶、热处理控制柜与作业地点距离较远,需跨越安全通道或孔洞时,就可以通过本过桥装置将电缆、软管等进行方便、安全、整洁的敷设。
以上所述仅是本专利的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本专利技术原理的前提下,还可以做出若干改进和替换,这些改进和替换也应视为本专利的保护范围。
Claims (3)
1.一种施工现场线缆跨越安全通道过桥装置,其特征在于:包括双门形架,
所述双门形架包括前后并排的两个单门形架,两个单门形架之间连接有纵向的连接杆,所述单门形架包括两个伸缩立柱和连接在两个伸缩立柱顶部之间的伸缩横梁,伸缩立柱的底部连接有底座,所述伸缩立杆边缘向外侧延伸有横限位杆,所述伸缩横梁边缘向上延伸有竖限位杆;所述连接杆上套有可转动的套管。
2. 根据权利要求1所述施工现场线缆跨越安全通道过桥装置,其特征在于:
所述伸缩立柱包括相套接并可上下滑动的下立柱和上立柱,所述伸缩横梁包括相套接并可左右横向滑动的左横梁和右横梁,下立柱、上立柱、左横梁和右横梁均为槽型钢,并且下立柱、上立柱、左横梁和右横梁的侧壁上均开有可穿入定位销轴的定位孔。
3.根据权利要求1所述施工现场线缆跨越安全通道过桥装置,其特征在于:
所述伸缩立柱和伸缩横梁的侧表面贴有夜光警示条。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410280506.2A CN104028924A (zh) | 2014-06-23 | 2014-06-23 | 施工现场线缆跨越安全通道过桥装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410280506.2A CN104028924A (zh) | 2014-06-23 | 2014-06-23 | 施工现场线缆跨越安全通道过桥装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104028924A true CN104028924A (zh) | 2014-09-10 |
Family
ID=51460042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410280506.2A Pending CN104028924A (zh) | 2014-06-23 | 2014-06-23 | 施工现场线缆跨越安全通道过桥装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104028924A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105490233A (zh) * | 2015-11-26 | 2016-04-13 | 国网河南偃师市供电公司 | 一种导线公路跨越装置 |
CN108374325A (zh) * | 2018-01-22 | 2018-08-07 | 国核电力规划设计研究院有限公司 | 一种蒸汽管道的踏步装置 |
US11569643B2 (en) | 2020-07-10 | 2023-01-31 | Babylon Consolidated LLC | Adjustable cable support structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5548932A (en) * | 1994-11-08 | 1996-08-27 | Maxcess Technologies, Inc. | Adjustable cable tray support system |
US20090090549A1 (en) * | 2007-10-03 | 2009-04-09 | Cooper Technologies Company | Under-Floor Cable Support System |
US20110006022A1 (en) * | 2009-05-19 | 2011-01-13 | Panduit Corp. | Telescoping Wire Cable Tray System |
CN201851780U (zh) * | 2010-06-25 | 2011-06-01 | 中国二十冶集团有限公司 | 一种拱形电缆过线桥架 |
EP2518845A1 (en) * | 2011-04-27 | 2012-10-31 | MP Bolagen Industri AB | A splice plate for coupling two adjacent ends of two cable ladder units and a cable ladder arrangement |
CN203918272U (zh) * | 2014-06-23 | 2014-11-05 | 山东电力建设第一工程公司 | 施工现场线缆跨越安全通道过桥装置 |
-
2014
- 2014-06-23 CN CN201410280506.2A patent/CN104028924A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5548932A (en) * | 1994-11-08 | 1996-08-27 | Maxcess Technologies, Inc. | Adjustable cable tray support system |
US20090090549A1 (en) * | 2007-10-03 | 2009-04-09 | Cooper Technologies Company | Under-Floor Cable Support System |
US20110006022A1 (en) * | 2009-05-19 | 2011-01-13 | Panduit Corp. | Telescoping Wire Cable Tray System |
CN201851780U (zh) * | 2010-06-25 | 2011-06-01 | 中国二十冶集团有限公司 | 一种拱形电缆过线桥架 |
EP2518845A1 (en) * | 2011-04-27 | 2012-10-31 | MP Bolagen Industri AB | A splice plate for coupling two adjacent ends of two cable ladder units and a cable ladder arrangement |
CN203918272U (zh) * | 2014-06-23 | 2014-11-05 | 山东电力建设第一工程公司 | 施工现场线缆跨越安全通道过桥装置 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105490233A (zh) * | 2015-11-26 | 2016-04-13 | 国网河南偃师市供电公司 | 一种导线公路跨越装置 |
CN105490233B (zh) * | 2015-11-26 | 2018-01-26 | 国网河南偃师市供电公司 | 一种导线公路跨越装置 |
CN108374325A (zh) * | 2018-01-22 | 2018-08-07 | 国核电力规划设计研究院有限公司 | 一种蒸汽管道的踏步装置 |
US11569643B2 (en) | 2020-07-10 | 2023-01-31 | Babylon Consolidated LLC | Adjustable cable support structure |
US12034286B2 (en) | 2020-07-10 | 2024-07-09 | Babylon Consolidated LLC | Adjustable cable support structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205348818U (zh) | 一种组装式高度可调节的防护护栏 | |
PH12017500428A1 (en) | Robot and method for hot line washing of low-altitude insulators at substation | |
CN104028924A (zh) | 施工现场线缆跨越安全通道过桥装置 | |
CN203918272U (zh) | 施工现场线缆跨越安全通道过桥装置 | |
CN103056579A (zh) | 切割钢构中型弯管相贯线的弯管夹持装置 | |
CN104355267A (zh) | 一种钢材顶升输送装置 | |
CN203977883U (zh) | 一种城市地铁施工用遮阳棚 | |
CN103322298B (zh) | 一种隧道内电缆敷设用滑轮支架 | |
CN204530480U (zh) | 错台调整装置 | |
CN203018963U (zh) | 一种切割钢构中型弯管相贯线的弯管夹持装置 | |
CN203734257U (zh) | 长距离电缆敷设装置 | |
CN204623801U (zh) | 一种脚手架夹具 | |
CN204187123U (zh) | 一种石油管道支架 | |
CN203660434U (zh) | 电缆中间接头悬吊保护支架 | |
CN106760566B (zh) | 一种高度可变型进出料平台施工方法 | |
CN202073489U (zh) | 绝缘梯 | |
CN205638520U (zh) | 煤矿综采工作面机头、机尾处液压支架脚踏板装置 | |
CN104153592A (zh) | 工具化可拆卸式保护平台及其制造方法 | |
CN204265416U (zh) | 一种检修吊笼 | |
CN204941034U (zh) | 一种便携式施工防护围栏 | |
CN203701602U (zh) | 一种烟囱快速施工装置 | |
CN204197779U (zh) | 一种管材堆放架 | |
CN204002868U (zh) | 一种矿山掘进用的前探梁 | |
CN203218715U (zh) | 移动式开关箱支架 | |
CN204098616U (zh) | 一种简易承插连接式组合工具围挡 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140910 |