CN104022462A - Neutral conductor picking pulley for power line construction and neutral conductor picking method - Google Patents

Neutral conductor picking pulley for power line construction and neutral conductor picking method Download PDF

Info

Publication number
CN104022462A
CN104022462A CN201410289494.XA CN201410289494A CN104022462A CN 104022462 A CN104022462 A CN 104022462A CN 201410289494 A CN201410289494 A CN 201410289494A CN 104022462 A CN104022462 A CN 104022462A
Authority
CN
China
Prior art keywords
pulley
hinge
pole
center line
shaped clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410289494.XA
Other languages
Chinese (zh)
Other versions
CN104022462B (en
Inventor
董昊宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410289494.XA priority Critical patent/CN104022462B/en
Publication of CN104022462A publication Critical patent/CN104022462A/en
Application granted granted Critical
Publication of CN104022462B publication Critical patent/CN104022462B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Table Equipment (AREA)

Abstract

The invention relates to a neutral conductor picking pulley for power line construction and a neutral conductor picking method, and belongs to the technical field of power construction. The technical scheme is as follows: a pulley base (4) is in an inverted U-shaped structure, one ends of an upper plate and a lower plate are connected through a bent plate, a pulley frame (3) is fixed on the upper plate of the pulley base, a pulley is arranged on the pulley frame through a pulley shaft, a U-shaped clamp is fixed below a support base (14), the end parts of two vertical plates are connected through a transverse plate to form an inverted U-shape structure, and the support base is fixed on the transverse plate of the U-shaped clamp. During paying off, a neutral conductor is arranged on the pulley, and is picked up; after tensioning, the neutral conductor is lifted from the pulley, and translates to a wiring duct of an upright bottle of the neutral conductor, so that the neutral conductor picking operation is finished. The neutral conductor picking pulley and the neutral conductor picking method provided by the invention have the beneficial effects that the manual carrying of the neutral conductor is replaced by a manner of jacking the neutral conductor by using a special tool, and therefore, the labor intensity is reduced, the safety factor is improved, and the efficiency is high.

Description

A kind of power line construction center line take-up coaster and take-up method
Technical field
The present invention relates to a kind of power line construction center line take-up coaster and take-up method, belong to power construction technical field.
Background technology
To power line construction, particularly in mountain route work progress, three-phase power circuit is isosceles triangle and arranges, at the center line that is called of head of the mast extreme higher position, center line is the wire being positioned on the electric pole of landform peak, because being subject to the impact of downforce, very difficulty of the fixing colligation of wire, background technology is to use manually center line to lift with hands, to the insulator of peak, completes the fixing colligation of center line; Existing problems are that labour intensity is large, and efficiency is low, manually shoulders line at the head of the mast, very dangerous, have potential safety hazard.
Summary of the invention
The object of the invention is to provide a kind of power line construction center line take-up coaster and take-up method, makes manually to shoulder line and becomes specific purpose tool top line, has reduced labour intensity, has improved coefficient of safety, and efficiency is high, solves the problem existing in background technology.
Technical scheme of the present invention is:
Center line take-up coaster for a kind of power line construction, comprises pulley, pulley yoke, pulley spindle, pulley base, upper left pole, upper right pole, lower-left pole, bottom right pole, screw rod, screw rod wrench, supporting seat, U-shaped clamp, anchor ear, anchor ear bolt, upper hinge, left hinge, right hinge, lower-left hinge and bottom right hinge; Pulley base is the U-shaped structure of falling, and one end of upper plate and lower plate is connected by bent plate; Pulley yoke is fixed on above the upper plate of pulley base, and pulley is arranged on pulley yoke by pulley spindle.
The lower plate of pulley base is provided with hinge, and one end of upper left pole and upper right pole is by the lower plate of the hinged pulley base of upper hinge; One end of the other end of upper left pole and lower-left pole is hinged by left hinge, and one end of the other end of upper right pole and bottom right pole is hinged by right hinge; The lower-left pole other end is hinged on supporting seat by lower-left hinge, and the other end of bottom right pole is hinged on supporting seat by bottom right hinge; One end of screw rod is passed right hinge and is threaded with right hinge, and the other end of screw rod passes left hinge and is threaded with left hinge, and screw rod passes after left hinge, and end is provided with screw rod wrench.
Below supporting seat, be fixed with U-shaped clamp, the end of two risers connects and composes inverted U-shaped by a transverse slat, and the transverse slat of supporting seat and U-shaped clamp is fixed together, and the distance between two risers of U-shaped clamp is slightly larger than head of the mast diameter; Anchor ear is fixed on two risers of U-shaped clamp, is arranged vertically with two risers of U-shaped clamp; Anchor ear is provided with anchor ear bolt.
Described pulley yoke top is provided with lamina tecti, and one end of lamina tecti is hinged on pulley yoke top by plate shaft, and one end of lamina tecti is provided with snap close and mates with pulley yoke top.
A center line take-up method for power line construction, comprises following steps:
1. adopt power line construction center line take-up coaster to carry out, it comprises pulley, pulley yoke, pulley spindle, pulley base, upper left pole, upper right pole, lower-left pole, bottom right pole, screw rod, screw rod wrench, supporting seat, U-shaped clamp, anchor ear, anchor ear bolt, upper hinge, left hinge, right hinge, lower-left hinge and bottom right hinge; Pulley base is the U-shaped structure of falling, and one end of upper plate and lower plate is connected by bent plate; Pulley yoke is fixed on above the upper plate of pulley base, and pulley is arranged on pulley yoke by pulley spindle; The lower plate of pulley base is provided with hinge, and one end of upper left pole and upper right pole is by the lower plate of the hinged pulley base of upper hinge; One end of the other end of upper left pole and lower-left pole is hinged by left hinge, and one end of the other end of upper right pole and bottom right pole is hinged by right hinge; The lower-left pole other end is hinged on supporting seat by lower-left hinge, and the other end of bottom right pole is hinged on supporting seat by bottom right hinge; One end of screw rod is passed right hinge and is threaded with right hinge, and the other end of screw rod passes left hinge and is threaded with left hinge, and screw rod passes after left hinge, and end is provided with screw rod wrench; Below supporting seat, be fixed with U-shaped clamp, the end of two risers connects and composes inverted U-shaped by a transverse slat, and the transverse slat of supporting seat and U-shaped clamp is fixed together, and the distance between two risers of U-shaped clamp is slightly larger than head of the mast diameter; Anchor ear is fixed on two risers of U-shaped clamp, is arranged vertically with two risers of U-shaped clamp; Anchor ear is provided with anchor ear bolt;
2. the transverse slat of U-shaped clamp is placed in to the head of the mast, two risers of U-shaped clamp are positioned at the side of the head of the mast, anchor ear is bolted on electric pole by anchor ear, and power line construction is fixed on the head of the mast by center line take-up coaster entirety, is arranged in juxtaposition near the upright bottle of the highest center line of electric pole;
3. clamp screw rod wrench with spanner, rotating screw bolt, change the angle between upper left pole, upper right pole, lower-left pole, bottom right pole, and then the whole height of center line take-up coaster for adjustment power line construction, make the upright bottle of center line that the top of pulley and electric pole are the highest contour, or a little more than the upright bottle of center line;
4. center line is placed on pulley when unwrapping wire, center line is provoked; Complete after stringing, center line is lifted from pulley, move in the wire casing of the upright bottle of center line, complete the work of center line take-up.
The invention has the beneficial effects as follows: make manually to shoulder line and become specific purpose tool top line, reduced labour intensity, improved coefficient of safety, efficiency is high.
Brief description of the drawings
Fig. 1 is embodiment of the present invention structural representation;
Fig. 2 is embodiment of the present invention pulley, pulley base structural representation;
In figure: pulley 1, pulley spindle 2, pulley yoke 3, pulley base 4, upper hinge 5, upper right pole 6, upper left pole 7, bottom right pole 8, lower-left pole 9, left hinge 10, right hinge 11, screw rod 12, screw rod wrench 13, supporting seat 14, bottom right hinge 15, lower-left hinge 16, U-shaped clamp 17, anchor ear 18, anchor ear bolt 19, electric pole 20, center line 21, lamina tecti 22, plate shaft 23, snap close 24.
Embodiment
Below in conjunction with accompanying drawing, by example, the invention will be further described.
Center line take-up coaster for a kind of power line construction, comprises pulley 1, pulley yoke 3, pulley spindle 2, pulley base 4, upper left pole 7, upper right pole 6, lower-left pole 9, bottom right pole 8, screw rod 12, screw rod wrench 13, supporting seat 14, U-shaped clamp 17, anchor ear 18, anchor ear bolt 19, upper hinge 5, left hinge 10, right hinge 11, lower-left hinge 16 and bottom right hinge 15; Pulley base is the U-shaped structure of falling, and one end of upper plate and lower plate is connected by bent plate; Pulley yoke is fixed on above the upper plate of pulley base, and pulley is arranged on pulley yoke by pulley spindle.
The lower plate of pulley base is provided with hinge, and one end of upper left pole and upper right pole is by the lower plate of the hinged pulley base of upper hinge; One end of the other end of upper left pole and lower-left pole is hinged by left hinge, and one end of the other end of upper right pole and bottom right pole is hinged by right hinge; The lower-left pole other end is hinged on supporting seat by lower-left hinge, and the other end of bottom right pole is hinged on supporting seat by bottom right hinge; One end of screw rod is passed right hinge and is threaded with right hinge, and the other end of screw rod passes left hinge and is threaded with left hinge, and screw rod passes after left hinge, and end is provided with screw rod wrench.
Below supporting seat, be fixed with U-shaped clamp, the end of two risers connects and composes inverted U-shaped by a transverse slat, and the transverse slat of supporting seat and U-shaped clamp is fixed together, and the distance between two risers of U-shaped clamp is slightly larger than head of the mast diameter; Anchor ear is fixed on two risers of U-shaped clamp, is arranged vertically with two risers of U-shaped clamp; Anchor ear is provided with anchor ear bolt.
Described pulley yoke top is provided with lamina tecti 22, and one end of lamina tecti is hinged on pulley yoke top by plate shaft 23, and one end of lamina tecti is provided with snap close 24 and mates with pulley yoke top.
A center line take-up method for power line construction, comprises following steps:
1. adopt power line construction center line take-up coaster to carry out, it comprises pulley 1, pulley yoke 3, pulley spindle 2, pulley base 4, upper left pole 7, upper right pole 6, lower-left pole 9, bottom right pole 8, screw rod 12, screw rod wrench 13, supporting seat 14, U-shaped clamp 17, anchor ear 18, anchor ear bolt 19, upper hinge 5, left hinge 10, right hinge 11, lower-left hinge 16 and bottom right hinge 15; Pulley base is the U-shaped structure of falling, and one end of upper plate and lower plate is connected by bent plate; Pulley yoke is fixed on above the upper plate of pulley base, and pulley is arranged on pulley yoke by pulley spindle; The lower plate of pulley base is provided with hinge, and one end of upper left pole and upper right pole is by the lower plate of the hinged pulley base of upper hinge; One end of the other end of upper left pole and lower-left pole is hinged by left hinge, and one end of the other end of upper right pole and bottom right pole is hinged by right hinge; The lower-left pole other end is hinged on supporting seat by lower-left hinge, and the other end of bottom right pole is hinged on supporting seat by bottom right hinge; One end of screw rod is passed right hinge and is threaded with right hinge, and the other end of screw rod passes left hinge and is threaded with left hinge, and screw rod passes after left hinge, and end is provided with screw rod wrench; Below supporting seat, be fixed with U-shaped clamp, the end of two risers connects and composes inverted U-shaped by a transverse slat, and the transverse slat of supporting seat and U-shaped clamp is fixed together, and the distance between two risers of U-shaped clamp is slightly larger than head of the mast diameter; Anchor ear is fixed on two risers of U-shaped clamp, is arranged vertically with two risers of U-shaped clamp; Anchor ear is provided with anchor ear bolt;
2. the transverse slat of U-shaped clamp is placed in to the head of the mast, two risers of U-shaped clamp are positioned at the side of the head of the mast, anchor ear is bolted on electric pole by anchor ear, and power line construction is fixed on the head of the mast by center line take-up coaster entirety, is arranged in juxtaposition near the upright bottle of the highest center line of electric pole;
3. clamp screw rod wrench with spanner, rotating screw bolt, change the angle between upper left pole, upper right pole, lower-left pole, bottom right pole, and then the whole height of center line take-up coaster for adjustment power line construction, make the upright bottle of center line that the top of pulley and electric pole are the highest contour, or a little more than the upright bottle of center line;
4. center line is placed on pulley when unwrapping wire, center line is provoked; Complete after stringing, center line is lifted from pulley, move in the wire casing of the upright bottle of center line, complete the work of center line take-up.
Described pulley yoke top is provided with lamina tecti 22, and one end of lamina tecti is hinged on pulley yoke top by plate shaft 23, and one end of lamina tecti is provided with snap close 24 and mates with pulley yoke top; When unwrapping wire, open lamina tecti, center line is placed in the race of pulley, buckle lamina tecti, lock snap close; Need to choose line time, open snap close, open lamina tecti, the center line in pulley race is put in the wire casing of the upright bottle of center line.

Claims (3)

1. a center line take-up coaster for power line construction, is characterized in that: comprise pulley (1), pulley yoke (3), pulley spindle (2), pulley base (4), upper left pole (7), upper right pole (6), lower-left pole (9), bottom right pole (8), screw rod (12), screw rod wrench (13), supporting seat (14), U-shaped clamp (17), anchor ear (18), anchor ear bolt (19), upper hinge (5), left hinge (10), right hinge (11), lower-left hinge (16) and bottom right hinge (15); Pulley base is the U-shaped structure of falling, and one end of upper plate and lower plate is connected by bent plate; Pulley yoke is fixed on above the upper plate of pulley base, and pulley is arranged on pulley yoke by pulley spindle;
The lower plate of pulley base is provided with hinge, and one end of upper left pole and upper right pole is by the lower plate of the hinged pulley base of upper hinge; One end of the other end of upper left pole and lower-left pole is hinged by left hinge, and one end of the other end of upper right pole and bottom right pole is hinged by right hinge; The lower-left pole other end is hinged on supporting seat by lower-left hinge, and the other end of bottom right pole is hinged on supporting seat by bottom right hinge; One end of screw rod is passed right hinge and is threaded with right hinge, and the other end of screw rod passes left hinge and is threaded with left hinge, and screw rod passes after left hinge, and end is provided with screw rod wrench;
Below supporting seat, be fixed with U-shaped clamp, the end of two risers connects and composes inverted U-shaped by a transverse slat, and the transverse slat of supporting seat and U-shaped clamp is fixed together, and the distance between two risers of U-shaped clamp is slightly larger than head of the mast diameter; Anchor ear is fixed on two risers of U-shaped clamp, is arranged vertically with two risers of U-shaped clamp; Anchor ear is provided with anchor ear bolt.
2. center line take-up coaster for a kind of power line construction according to claim 1, it is characterized in that described pulley yoke top is provided with lamina tecti (22), one end of lamina tecti is hinged on pulley yoke top by plate shaft (23), and one end of lamina tecti is provided with snap close (24) and mates with pulley yoke top.
3. a center line take-up method for power line construction, comprises following steps:
1. adopt power line construction center line take-up coaster to carry out, it comprises pulley (1), pulley yoke (3), pulley spindle (2), pulley base (4), upper left pole (7), upper right pole (6), lower-left pole (9), bottom right pole (8), screw rod (12), screw rod wrench (13), supporting seat (14), U-shaped clamp (17), anchor ear (18), anchor ear bolt (19), upper hinge (5), left hinge (10), right hinge (11), lower-left hinge (16) and bottom right hinge (15); Pulley base is the U-shaped structure of falling, and one end of upper plate and lower plate is connected by bent plate; Pulley yoke is fixed on above the upper plate of pulley base, and pulley is arranged on pulley yoke by pulley spindle; The lower plate of pulley base is provided with hinge, and one end of upper left pole and upper right pole is by the lower plate of the hinged pulley base of upper hinge; One end of the other end of upper left pole and lower-left pole is hinged by left hinge, and one end of the other end of upper right pole and bottom right pole is hinged by right hinge; The lower-left pole other end is hinged on supporting seat by lower-left hinge, and the other end of bottom right pole is hinged on supporting seat by bottom right hinge; One end of screw rod is passed right hinge and is threaded with right hinge, and the other end of screw rod passes left hinge and is threaded with left hinge, and screw rod passes after left hinge, and end is provided with screw rod wrench; Below supporting seat, be fixed with U-shaped clamp, the end of two risers connects and composes inverted U-shaped by a transverse slat, and the transverse slat of supporting seat and U-shaped clamp is fixed together, and the distance between two risers of U-shaped clamp is slightly larger than head of the mast diameter; Anchor ear is fixed on two risers of U-shaped clamp, is arranged vertically with two risers of U-shaped clamp; Anchor ear is provided with anchor ear bolt;
2. the transverse slat of U-shaped clamp is placed in to the head of the mast, two risers of U-shaped clamp are positioned at the side of the head of the mast, anchor ear is bolted on electric pole by anchor ear, and power line construction is fixed on the head of the mast by center line take-up coaster entirety, is arranged in juxtaposition near the upright bottle of the highest center line of electric pole;
3. clamp screw rod wrench with spanner, rotating screw bolt, change the angle between upper left pole, upper right pole, lower-left pole, bottom right pole, and then the whole height of center line take-up coaster for adjustment power line construction, make the upright bottle of center line that the top of pulley and electric pole are the highest contour, or a little more than the upright bottle of center line;
4. center line is placed on pulley when unwrapping wire, center line is provoked; Complete after stringing, center line is lifted from pulley, move in the wire casing of the upright bottle of center line, complete the work of center line take-up.
CN201410289494.XA 2014-06-26 2014-06-26 A kind of power line construction center line take-up coaster and take-up method Active CN104022462B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410289494.XA CN104022462B (en) 2014-06-26 2014-06-26 A kind of power line construction center line take-up coaster and take-up method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410289494.XA CN104022462B (en) 2014-06-26 2014-06-26 A kind of power line construction center line take-up coaster and take-up method

Publications (2)

Publication Number Publication Date
CN104022462A true CN104022462A (en) 2014-09-03
CN104022462B CN104022462B (en) 2016-05-04

Family

ID=51439091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410289494.XA Active CN104022462B (en) 2014-06-26 2014-06-26 A kind of power line construction center line take-up coaster and take-up method

Country Status (1)

Country Link
CN (1) CN104022462B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105071297A (en) * 2015-09-08 2015-11-18 国家电网公司 Multifunctional power distribution line paying-off tackle

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006340484A (en) * 2005-06-01 2006-12-14 Kinden Corp Down-lock block and power cable replacement method using down-lock block
CN102403670A (en) * 2010-09-13 2012-04-04 哈尔滨第二电业局 Quick wire picking device applied to 10 KV and below overhead power transmission lines
CN202721425U (en) * 2012-06-05 2013-02-06 浙江省电力公司紧水滩水力发电厂 Portable fast lifting cable paying off rack
CN203932830U (en) * 2014-06-26 2014-11-05 国家电网公司 Center line take-up coaster for a kind of power line construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006340484A (en) * 2005-06-01 2006-12-14 Kinden Corp Down-lock block and power cable replacement method using down-lock block
CN102403670A (en) * 2010-09-13 2012-04-04 哈尔滨第二电业局 Quick wire picking device applied to 10 KV and below overhead power transmission lines
CN202721425U (en) * 2012-06-05 2013-02-06 浙江省电力公司紧水滩水力发电厂 Portable fast lifting cable paying off rack
CN203932830U (en) * 2014-06-26 2014-11-05 国家电网公司 Center line take-up coaster for a kind of power line construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105071297A (en) * 2015-09-08 2015-11-18 国家电网公司 Multifunctional power distribution line paying-off tackle

Also Published As

Publication number Publication date
CN104022462B (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN205377168U (en) Erect leap device of power transmission line
CN103247971A (en) Portable three-phase conductor synchronous lifting holding pole
CN103944107A (en) Tool for electrified replacement of 500kV strain insulator string
CN202423974U (en) Crossing support for overhead lines
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN202190018U (en) Overhead ground wire ratchet wrench wire-lifting tool
CN104022462B (en) A kind of power line construction center line take-up coaster and take-up method
CN203334941U (en) Overhaul ladder with function of supporting cable wires
CN202678823U (en) Jacking tool for tower ground wire clamp
CN203932830U (en) Center line take-up coaster for a kind of power line construction
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN204407787U (en) A kind of power line construction center line take-up coaster
CN204271504U (en) A kind of large-scale current transformer upkeep operation lead-in wire suspension arrangement
CN202840363U (en) Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit
CN203813330U (en) Tool for live-line replacement of 500 kV strain insulator strings
CN203301060U (en) Adjustable lift platform on strain insulator string of UHV power transmission line
CN203398638U (en) Operation ladder for painting insulator string in power transmission line
CN206117003U (en) Articulate distribution network ice -melt connecting wire's device fast
CN204780605U (en) Prestressed anchorage cable machine of reeving
CN204720888U (en) Portable power distribution less important work platform
CN104300430A (en) Supporting tool used for replacing strain tower double insulator strings
CN207572853U (en) A kind of shaft tower insulator chain electrification replacing tool
CN202937046U (en) Temporary support cross arm for hot-line work
CN202616657U (en) Paying-off crossing bracket
CN203660410U (en) Three-phase wire interphase imbalance tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant