CN104018674B - The concrete casting building technology of wide-angle pitched roof - Google Patents
The concrete casting building technology of wide-angle pitched roof Download PDFInfo
- Publication number
- CN104018674B CN104018674B CN201410254128.0A CN201410254128A CN104018674B CN 104018674 B CN104018674 B CN 104018674B CN 201410254128 A CN201410254128 A CN 201410254128A CN 104018674 B CN104018674 B CN 104018674B
- Authority
- CN
- China
- Prior art keywords
- guide rail
- channel
- steel
- steel form
- organizing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The concrete casting building technology of wide-angle pitched roof, belongs to the realm of building construction.Comprise the following steps: 1) lay pitched roof bottom wooden form; 2) guide rail that the many groups of channel-section steels relative by two openings arranged to Po Ding direction at the bottom of slope form is fixed with successively from bottom wooden form left end to right-hand member; 3) in the guide rail often organizing channel-section steel composition, steel form is installed, steel form is all provided with vibrator; 4) lifting gear is all installed in roof often organizing above guide rail; 5) concreting between two channel-section steels often organizing guide rail, simultaneously Vibration on Start-up device; 6), after concreting, start lifting gear and drive steel form upwards sliding; 7) steel form sliding after carry out secondary again and polish process; The present invention improves conventional double wooden form construction technology, make concrete discharging easily, should vibration compacting, should thickness of slab be controlled, surfacing is levelling without the need to secondary, decreases the waste of timber.
Description
Technical field
The invention belongs to the realm of building construction, be specially a kind of concrete construction process of wide-angle pitched roof.
Background technology
The many employings of existing pitched roof concrete construction technology make real process or adopt double-deck wooden form after vibrating, prior art by roofing angle limits cannot be vibrated, concrete very easily glides accumulations, time of building long, the surperficial bad control of planeness, secondary roofing mortar or phenomenon, expense of the taking a lot of work material such as fine-stone concrete is levelling.
Summary of the invention
The object of this invention is to provide a kind of concrete discharging easily, facilitate vibration compacting and control thickness of slab, surfacing without the need to the concrete casting building technology of the levelling wide-angle pitched roof of secondary.
Realize the technical scheme of above-mentioned purpose: the concrete casting building technology of wide-angle pitched roof, is characterized in that, its concrete technology step:
1) pitched roof bottom wooden form is laid, and the good reinforcing bar of colligation; .
2) guide rail that the many groups of channel-section steels relative by two openings arranged to Po Ding direction at the bottom of slope form is fixed with successively from bottom wooden form left end to right-hand member, distance between two channel-section steels is no more than 2.5m, without pitch arrangement between two adjacent groups guide rail, be connected by sealing up screw between channel-section steel with bottom wooden form, leave gap between channel-section steel and bottom wooden form, the size in gap is identical with concrete thickness to be poured;
3) in the guide rail often organizing channel-section steel composition, install steel form, steel form is all provided with form vibrator, and steel form is placed in one end at the bottom of the slope of respective carter;
4) lifting gear is all installed in roof, for driving corresponding steel form along slide often organizing above guide rail;
5) concreting between two channel-section steels often organizing guide rail, builds and carries out successively from the bottom to top, and concrete edge blowing limit small vibrating rod vibrates, and starts form vibrator simultaneously, guarantees concrete compaction;
6) after concreting 15 minutes, start lifting gear and drive steel form upwards sliding, every 15min upwards promoted once, calculates promote 30-40cm at every turn with roofing plagioclase;
7) steel form is sliding push up to slope after carry out secondary by artificial traditionally method again and polish process;
8) guide rail, steel form, vibrator and lifting gear after having built is removed, and by floating for the concrete below the guide rail of dismounting;
9) guide rail, steel form, vibrator and the lifting gear step 8) removed are by step 2)-4) install successively on the right side of the guide rail of low order end, until cover the bottom wooden form on whole roofing, after installation, repeat step 5)-8).
Above-mentioned steps 3) in install before steel form, coating lubricating oil in two channel-section steels often organizing guide rail.
Lifting gear in above-mentioned steps 4 is bottle gouard moved by hands or electric block.
The invention solves in existing normal pitched roof concrete placings process, cannot vibrate, concrete very easily glides accumulation, the bad control of planeness that the time of building is long, surperficial, secondary roofing mortar or the phenomenon such as fine-stone concrete is levelling.
The present invention improves conventional double wooden form construction technology, make concrete discharging easily, should vibration compacting, should thickness of slab be controlled, surfacing is levelling without the need to secondary, decrease the waste of timber, improve the turnover utilization rate of material, and construction quality and molding effect increase substantially.
Accompanying drawing explanation
Fig. 1 is the front view of duty of the present invention;
Fig. 2 is the lateral view of duty of the present invention.
Detailed description of the invention
Below in conjunction with Fig. 1,2, processing step of the present invention is illustrated:
1) pitched roof bottom wooden form 1 is laid, and the good reinforcing bar of colligation.
2) guide rail 3 that three groups of channel-section steels 2 relative by two openings arranged to Po Ding direction at the bottom of slope form is fixed with successively from bottom wooden form 1 left end to right-hand member, distance between two channel-section steels 2 is no more than 2.5m, without pitch arrangement between two adjacent groups guide rail 3, be connected by sealing up screw 4 between channel-section steel 2 with bottom wooden form 1, the two ends of sealing up screw 4 are respectively arranged with the catch 5 of the spacing for limiting channel-section steel 2 and bottom wooden form 1, the two ends of sealing up screw 4 are fixed by nut 6 through after channel-section steel 2 and bottom wooden form 1, distance between the two ends catch 5 of sealing up screw 4 is identical with concrete thickness to be poured.
3) equal coating lubricating oil in two channel-section steels 2 of three groups of guide rails 3, in the guide rail 3 that three groups of channel-section steels 2 form, all install steel form 7, steel form 7 is all provided with form vibrator 8, and steel form 7 is placed in one end at the bottom of the slope of respective carter 3.
4) above three groups of guide rails 3, bottle gouard moved by hands 9 all being installed on roof, sliding along guide rail 3 for driving corresponding steel form 7.
5) concreting 10 between two channel-section steels 2 often organizing guide rail 3, builds and carries out successively from the bottom to top, and blowing limit, concrete 10 limit small vibrating rod vibrates, and starts form vibrator 8 simultaneously, guarantees concrete compaction.
6) after concreting 15 minutes, start bottle gouard moved by hands 9 and drive steel form 7 upwards sliding, every 5min upwards promoted once, calculates promote 30-40cm at every turn with roofing plagioclase.
7) steel form 7 sliding after carry out secondary by artificial traditionally method again and polish process.
8) guide rail 3 that after completing, dismounting is all, steel form 7, vibrator 8 and bottle gouard moved by hands 9, and by floating for the concrete 10 below the guide rail 3 of dismounting.
Claims (3)
1. the concrete casting building technology of wide-angle pitched roof, is characterized in that comprising the following steps:
1) pitched roof bottom wooden form is laid, and the good reinforcing bar of colligation;
2) guide rail that the many groups of channel-section steels relative by two openings arranged to Po Ding direction at the bottom of slope form is fixed with successively from bottom wooden form left end to right-hand member, distance between two channel-section steels is no more than 2.5m, without pitch arrangement between two adjacent groups guide rail, be connected by sealing up screw between channel-section steel with bottom wooden form, leave gap between channel-section steel and bottom wooden form, the size in gap is identical with concrete thickness to be poured;
3) in the guide rail often organizing channel-section steel composition, install steel form, steel form is all provided with vibrator, and steel form is placed in one end at the bottom of the slope of respective carter;
4) lifting gear is all installed in roof, for driving corresponding steel form along slide often organizing above guide rail;
5) concreting between two channel-section steels often organizing guide rail, builds and carries out successively from the bottom to top, and concrete edge blowing limit small vibrating rod vibrates, simultaneously Vibration on Start-up device;
6) 10-20min after concreting, starts lifting gear and drives steel form upwards sliding, sliding 30-40cm at every turn on roof inclined length direction;
7) steel form sliding after carry out secondary again and polish process;
8) guide rail, steel form, vibrator and lifting gear after having built is removed, and by floating for the concrete below the guide rail of dismounting;
9) guide rail, steel form, vibrator and the lifting gear step 8) removed are by step 2)-4) install successively on the right side of the guide rail of low order end, until cover the bottom wooden form on whole roofing, after installation, repeat step 5)-8).
2. the concrete casting building technology of wide-angle pitched roof according to claim 1, is characterized in that: before installing steel form in step 3), coating lubricating oil in two channel-section steels often organizing guide rail.
3. the concrete casting building technology of wide-angle pitched roof according to claim 1, is characterized in that: the lifting gear in step 4) is bottle gouard moved by hands or electric block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410254128.0A CN104018674B (en) | 2014-06-10 | 2014-06-10 | The concrete casting building technology of wide-angle pitched roof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410254128.0A CN104018674B (en) | 2014-06-10 | 2014-06-10 | The concrete casting building technology of wide-angle pitched roof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104018674A CN104018674A (en) | 2014-09-03 |
CN104018674B true CN104018674B (en) | 2015-10-21 |
Family
ID=51435640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410254128.0A Expired - Fee Related CN104018674B (en) | 2014-06-10 | 2014-06-10 | The concrete casting building technology of wide-angle pitched roof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104018674B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105298115A (en) * | 2015-11-16 | 2016-02-03 | 上海建工五建集团有限公司 | Construction structure for high-inclination sloping roof |
CN106836814A (en) * | 2016-12-30 | 2017-06-13 | 上海建工七建集团有限公司 | The control method of structure slope uniform thickness flooring absolute altitude |
CN110725319B (en) * | 2019-09-11 | 2022-01-25 | 北京清河水利建设集团有限公司 | Large-angle concrete pouring method |
CN110835983A (en) * | 2019-10-23 | 2020-02-25 | 江苏兴厦建设工程集团有限公司 | Method for pouring concrete on large-angle sloping roof |
CN113006283B (en) * | 2021-03-15 | 2023-02-28 | 中玮装配式建筑科技(铜陵)有限公司 | Industrial assembled house structure made of composite materials |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6438920B1 (en) * | 2000-02-24 | 2002-08-27 | Russel J. Tobey | Hybrid truss and system of fabricating with hybrid truss |
CN202194317U (en) * | 2011-08-16 | 2012-04-18 | 江西建工第一建筑有限责任公司 | Guide rail structure for cast-in-site concrete slope surface |
CN202644976U (en) * | 2011-12-31 | 2013-01-02 | 青建集团股份公司 | Slope roof double-side formwork support structure |
CN103452221A (en) * | 2013-08-26 | 2013-12-18 | 叶长青 | Pitched roof concrete construction method |
CN103615075A (en) * | 2013-11-26 | 2014-03-05 | 中冶天工集团有限公司 | Concrete sloping roof continuous casting forming method |
-
2014
- 2014-06-10 CN CN201410254128.0A patent/CN104018674B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6438920B1 (en) * | 2000-02-24 | 2002-08-27 | Russel J. Tobey | Hybrid truss and system of fabricating with hybrid truss |
CN202194317U (en) * | 2011-08-16 | 2012-04-18 | 江西建工第一建筑有限责任公司 | Guide rail structure for cast-in-site concrete slope surface |
CN202644976U (en) * | 2011-12-31 | 2013-01-02 | 青建集团股份公司 | Slope roof double-side formwork support structure |
CN103452221A (en) * | 2013-08-26 | 2013-12-18 | 叶长青 | Pitched roof concrete construction method |
CN103615075A (en) * | 2013-11-26 | 2014-03-05 | 中冶天工集团有限公司 | Concrete sloping roof continuous casting forming method |
Also Published As
Publication number | Publication date |
---|---|
CN104018674A (en) | 2014-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018674B (en) | The concrete casting building technology of wide-angle pitched roof | |
CN209774973U (en) | Stair mould integration equipment of vibrating | |
CN104264984A (en) | Formwork for concrete structure pouring and pouring construction method | |
CN113152493B (en) | Panel pouring slip form construction system and construction method | |
CN109252662B (en) | One-step forming construction method for vertical shaft bridge frame through cast-in-place concrete floor | |
CN202148694U (en) | Prefabricated T-shaped beam steel bar colligation positioning device | |
CN205364159U (en) | Prefab production bench formwork | |
CN207812625U (en) | Special-shaped gutter template integrated apparatus | |
CN110607911A (en) | Electric rail type hammering template vibrating system and construction method thereof | |
CN116180991A (en) | Construction method for improving concrete compactness of sloping roof | |
CN202925476U (en) | Bridge floor pre-embedded sleeve positioner | |
CN205476468U (en) | Non - design, can all rotary die plate bodys be prefabricated staircase bench template | |
CN106812064A (en) | Parallel-moving type bridge bow member | |
CN105113806B (en) | Concrete floor displacement wood floor construction method and waterproof cloth fixing structure | |
CN104631675B (en) | A kind of two-sided prefabricated superimposed sheet | |
CN210947771U (en) | Electronic rail mounted hammering template system of vibrating | |
CN208034976U (en) | Precast T-Beam concreting distributing device | |
CN208347799U (en) | A kind of tunnel cable channel forming device | |
CN207700681U (en) | A kind of trench cover making mould bases | |
DE19808812C2 (en) | Process for making a solid carriageway | |
CN110805278A (en) | Method for controlling thickness and flatness of concrete floor | |
KR200458490Y1 (en) | Mold frame for constructing concrete gutter | |
CN109057824A (en) | A kind of tunnel cable channel forming device and forming method | |
CN205344277U (en) | Concrete slab base pressure flower device | |
CN204079878U (en) | Large span vault constructing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151021 Termination date: 20190610 |
|
CF01 | Termination of patent right due to non-payment of annual fee |