CN104009449A - 3 kV-10 kV bus protection and failure protection method - Google Patents

3 kV-10 kV bus protection and failure protection method Download PDF

Info

Publication number
CN104009449A
CN104009449A CN201410200673.1A CN201410200673A CN104009449A CN 104009449 A CN104009449 A CN 104009449A CN 201410200673 A CN201410200673 A CN 201410200673A CN 104009449 A CN104009449 A CN 104009449A
Authority
CN
China
Prior art keywords
mother
bus
protection
switch
action
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410200673.1A
Other languages
Chinese (zh)
Other versions
CN104009449B (en
Inventor
韦江平
周永兵
李琦永
徐鹏
余慧敏
李秋玲
梁宇路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longtan Hydropower Development Co Ltd
Original Assignee
Longtan Hydropower Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longtan Hydropower Development Co Ltd filed Critical Longtan Hydropower Development Co Ltd
Priority to CN201410200673.1A priority Critical patent/CN104009449B/en
Publication of CN104009449A publication Critical patent/CN104009449A/en
Application granted granted Critical
Publication of CN104009449B publication Critical patent/CN104009449B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a 3 kV-10 kV bus protection and failure protection method suitable for power plants and transformer substations in the power supply mode that in the primary wiring mode of a one-way work incoming power source, a three-way bus tie switch, a two-way bus tie switch and a one-way bus tie switch, the one-way power source or the one-way bus tie switch serves as a power source on the segment. According to the method, work incoming power switch currents, bus tie switch currents, bus voltages, all outgoing instant lockout overcurrent connection points and other protection basic quantities are detected to form lockout type overcurrent bus protection and failure protection action basic logic. When a bus fails, a corresponding protection action is performed for rapidly protecting the bus. The method has the advantages of being high in safety, reliability, sensitivity and flexibility and the like and has great actual application and popularization value on site.

Description

A kind of 3kV~10kV bus protection and failure protection method
Technical field
The invention belongs to electrical system bus technical field of relay protection, particularly under the primary connection mode of a kind of Yi of being applicable to road work incoming power, three tunnels and following bus connection switch single channel power supply or single channel bus connection switch as factory's (station) use 3kV~10kV bus protection and the failure protection method of the power plant under this section of Power supply mode and transformer station.
Background technology
Factory's (station) of the power plant of generation current Chang Ji transformer station and transformer station is with in 3kV~10kV bus and failure protection bus scheme; bus is without any special quick protection, but is realized by the inlet wire overcurrent protection of transformer backup protection low-pressure side and high-pressure side overcurrent protection.Because the protection of the overcurrent protection of low-pressure side inlet wire, high-pressure side overcurrent protection and outlet switch need to cooperatively interact; coordinate the differential 300ms that is at least; coordinate progression many, so cause low-pressure side and at least 1 second above action excision fault of high voltage side lead-in overcurrent protection time delay.Therefore, factory's (station) all wants time delay above action excision at least 1 second by any fault occurring on 3kV~10kV bus.During due to busbar fault, protect action delay longer, can not excise in time fault and will cause bus seriously to burn, even develop into the major accident of " baked wheaten cake is operated ".Therefore be necessary that factory's (station) is increased to special bus with 3kV~10kV bus station service section bus to be protected fast, the main protection as factory's (station) with 3kV~10kV bus station service section bus, to excise fast fault.
Factory's (station) of generation current Chang Ji transformer station protects fast with 3kV~10kV bus current enclosed type bus, can only realize bus and the failure protection function of a road work incoming power, a road bus connection switch.And less than the current locking type bus fast protection method for multichannel bus connection switch situation.Therefore the safe power supply for present power plant and transformer station is of great importance by 3kV~10kV bus protection and failure protection method, to research and develop a kind of factory's (station) that is applicable to road work incoming power, three tunnels and a following bus connection switch.
Summary of the invention
The object of the present invention is to provide single channel power supply under the primary connection mode of a kind of Yi of being applicable to road work incoming power, three tunnels and following bus connection switch or single channel bus connection switch as factory's (station) use 3kV~10kV bus protection and the failure protection method of the power plant under this section of Power supply mode and transformer station.
To achieve these goals, the present invention has adopted following technical scheme:
3kV~10kV bus protection and a failure protection method are to be applicable to 3kV~10kV bus protection and the failure protection method that single channel power supply under the primary connection mode of Yi road work incoming power, three tunnels and following bus connection switch or single channel bus connection switch are used as the power plant under this section of bus Power supply mode and transformer station; The method is mainly to protect base quantity to form enclosed type overcurrent bus protection and failure protection action basic logic by detection, when bus breaks down, makes corresponding protection action, and bus is protected fast;
Described protection base quantity comprises to be opened into analog quantity, opens into switching value and the amount of outputing, wherein: open the threephase current transformer secondary current, the secondary current of threephase current transformer separately of three road bus connection switches, the bus threephase potential transformer secondary voltage that into analog quantity, comprise a road work incoming power switch; Open into switching value and comprise that the instantaneous locking overcurrent of each outlet contact, bus protection function pressing plate drop into, bus failure protection function pressing plate drops into; The amount of outputing comprises tripping relay contact, the contact of tripping relay separately of Tiao San road bus connection switch, bus protection actuating signal contact, failure protection actuating signal contact, protective device alarm contact, the protective device block signal contact of Tiao Yi road work incoming power switch;
Described bus protection and failure protection action basic logic are: this section of bus is respectively when work incoming power, mother 1,2,3 switch power supply power supply, power supply overcurrent action during bus troubles inside the sample space and outlet be without overcurrent locking, bus protection short time delay action tripping power supply; Power supply overcurrent action during bus external area error and the locking of outlet overcurrent, bus protection is failure to actuate, if during now outlet switch, protection tripping, the malfunctioning action long delay of bus tripping power supply.
As of the present invention, further illustrate, when work incoming power is during as power supply, bus protection and failure protection action basic logic are:
In bus generating region during busbar short-circuit fault, work service entrance switch phase current high-set setting element and the action of composite voltage element, the low definite value element of Er San road bus connection switch phase current, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate, meet bus protection action logic, short time delay jumping work incoming power switch, locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp;
Mother 1 switch or mother 2 switches or mother 3 switches or while going out specific electric load short trouble outside bus generating region, the high and low definite value element action of work service entrance switch phase current, and the low definite value element action of mother 1 switch or mother 2 switches or mother 3 switches or outlet phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 1 switch or mother 2 switches or mother 3 switches go out specific electric load or protection tripping; cannot excise outlet fault for a long time; mother 1 switch or mother 2 switches or mother 3 switches or go out the action of the low definite value element of specific electric load phase current and do not return in setting-up time; meet failure protection action logic; failure protection action; long delay jumping work incoming power switch, locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
As of the present invention, further illustrate, when mother 1 switch power supply is during as power supply, bus protection and failure protection action basic logic are:
In bus generating region during busbar short-circuit fault, mother 1 switch phase current high-set setting element and the action of composite voltage element, and work inlet wire, mother 2, the low definite value element of mother 3 switch phase current, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate, meet bus protection action logic, short time delay is jumped mother 1 switch, locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp;
Outside bus generating region, work service entrance switch or mother 2 switches or mother 3 switches or while going out specific electric load short trouble, the high and low definite value element action of mother 1 switch phase current, and the low definite value element action of work service entrance switch or mother 2 switches or mother 3 switches or outlet phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to work service entrance switch or mother 2 switches or mother 3 switches go out specific electric load or protection tripping; cannot excise outlet fault for a long time; work service entrance switch or mother 2 switches or mother 3 switches or go out the action of the low definite value element of specific electric load phase current and do not return in setting-up time; meet failure protection action logic; failure protection action; long delay is jumped mother 1 switch, and locking backup auto-activating device sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
As of the present invention, further illustrate, when mother 2 switch power supplies are during as power supply, bus protection and failure protection action basic logic are:
In bus generating region during busbar short-circuit fault, mother 2 switch phase current high-set setting elements and the action of composite voltage element, and work inlet wire, mother 1, the low definite value element of mother 3 switch phase current, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate, meet bus protection action logic, short time delay is jumped mother 1 switch, locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp;
Outside bus generating region, work service entrance switch or mother 1 switch or mother 3 switches or while going out specific electric load short trouble, the high and low definite value element action of mother 2 switch phase current, and the low definite value element action of work service entrance switch or mother 1 switch or mother 3 switches or outlet phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to work service entrance switch or mother 1 switch or mother 3 switches go out specific electric load or protection tripping; cannot excise outlet fault for a long time; work service entrance switch or mother 1 switch or mother 3 switches or go out the action of the low definite value element of specific electric load phase current and do not return in setting-up time; meet failure protection action logic; failure protection action; long delay is jumped mother 2 switches, and locking backup auto-activating device sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
As of the present invention, further illustrate, when mother 3 switch power supplies are during as power supply, bus protection and failure protection action basic logic are:
In bus generating region during busbar short-circuit fault, mother 3 switch phase current high-set setting elements and the action of composite voltage element, and work inlet wire, mother 1, the low definite value element of mother 2 switch phase current, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate, meet bus protection action logic, short time delay is jumped mother 3 switches, locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp;
Outside bus generating region, work service entrance switch or mother 1 switch or mother 2 switches or while going out specific electric load short trouble, the high and low definite value element action of mother 3 switch phase current, and the low definite value element action of work service entrance switch or mother 1 switch or mother 2 switches or outlet phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to work service entrance switch or mother 1 switch or mother 2 switches go out specific electric load or protection tripping; cannot excise outlet fault for a long time; work service entrance switch or mother 1 switch or mother 2 switches or go out the action of the low definite value element of specific electric load phase current and do not return in setting-up time; meet failure protection action logic; failure protection action; long delay is jumped mother 3 switches, and locking backup auto-activating device sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
Advantage of the present invention:
The present invention realizes single channel work incoming power under the primary connection mode of Liao mono-tunnel work incoming power, three tunnels and following bus connection switch or single channel bus connection switch as factory's (station) use 3kV~10kV bus protection and the failure protection method of the power plant under this section of Power supply mode and transformer station.Bus protection energy action message during bus troubles inside the sample space, can taper to 0.15 second by former excision 1 second fault time above, gives full play to the effect of main protection; Outside district, bus protection can reliable locking during short trouble, if bus failure protection can excise fault in time during district's external switch tripping, gives full play to the effect of backup protection.This protection all can correct, reliable, quick acting when internal fault external fault.The advantage such as that the method has is safe, reliability is high, highly sensitive, flexibility is large, very large on-the-spot practical application promotional value.
Accompanying drawing explanation
Accompanying drawing 1 is bus protection and the failure protection allocation plan of related road work incoming power, three tunnels and a following bus connection switch of the present invention.
Accompanying drawing 2 for the present invention related when work incoming power during as power supply bus protection and failure protection move basic logic figure.
Accompanying drawing 3 for the present invention related when mother 1 switch power supply during as power supply bus protection and failure protection move basic logic figure.
Accompanying drawing 4 for the present invention related when mother 2 switch power supplies during as power supply bus protection and failure protection move basic logic figure.
Accompanying drawing 5 for the present invention related when mother 3 switch power supplies during as power supply bus protection and failure protection move basic logic figure.
Embodiment
Below in conjunction with drawings and Examples, the present invention is further described, but protection scope of the present invention is not only confined to the scope that following specific embodiment is recorded.
Embodiment:
3kV~10kV bus protection and a failure protection method are to be applicable to 3kV~10kV bus protection and the failure protection method that single channel power supply under the primary connection mode of Yi road work incoming power, three tunnels and following bus connection switch or single channel bus connection switch are used as the power plant under this section of bus Power supply mode and transformer station; Wherein, the method is mainly to protect base quantity to form enclosed type overcurrent bus protection and failure protection action basic logic by detection, when bus breaks down, makes corresponding protection action, and bus is protected fast;
Described protection base quantity comprises to be opened into analog quantity, opens into switching value and the amount of outputing, wherein, open threephase current transformer secondary current, the secondary current of threephase current transformer separately of three road bus connection switches, the bus threephase potential transformer secondary voltage into analog quantity Wei Yi road work incoming power switch; Open into switching value as the instantaneous locking overcurrent of each outlet contact, bus protection function pressing plate drop into, bus failure protection function pressing plate drops into; Tripping relay contact, the contact of tripping relay separately of Tiao San road bus connection switch, bus protection actuating signal contact, failure protection actuating signal contact, protective device alarm contact, the protective device block signal contact of the amount of outputing Wei Tiao mono-tunnel work incoming power switch;
Described bus protection and failure protection action basic logic are: this section of bus is respectively when work incoming power, mother 1,2,3 switch power supply power supply, power supply overcurrent action during bus troubles inside the sample space and outlet be without overcurrent locking, bus protection short time delay action tripping power supply; Power supply overcurrent action during bus external area error and the locking of outlet overcurrent, bus protection is failure to actuate, if during now outlet switch, protection tripping, the malfunctioning action long delay of bus tripping power supply.
Bus protection and failure protection action basic logic are specially:
One, when work inlet wire is Power supply mode, bus protection and failure protection action basic logic (as shown in Figure 2):
(1) bus protection drops into, work inlet wire supply power mode bus protection drops into, mother 3 switches drop into, work inlet wire supply power mode failure protection drops into, and the hard pressing plate of bus protection, the hard pressing plate of failure protection drop into.
(2) in bus generating region during busbar short-circuit fault; work inlet wire phase current or Sudden Changing Rate start; the action of work service entrance switch phase current high-set setting element; if drop into composite voltage blocking element simultaneously; the action of composite voltage element; the low definite value element of Er San road bus connection switch phase current, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate; meet bus protection action logic; time delay 1T1 jumps work incoming power switch; locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
(3) outside bus generating region during mother 1 switch short trouble, work inlet wire phase current or Sudden Changing Rate start, the high and low definite value element action of work service entrance switch phase current, and the low definite value element action of mother 1 switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 1 switch or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of mother 1 switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 1T2 jumps work incoming power switch, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(4) outside bus generating region during mother 2 switch short trouble, work inlet wire phase current or Sudden Changing Rate start, the high and low definite value element action of work service entrance switch phase current, and the low definite value element action of mother 2 switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 2 switches or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of mother 2 switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 1T3 jumps work incoming power switch, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(5) outside bus generating region during mother 3 switch short trouble, work inlet wire phase current or Sudden Changing Rate start, the high and low definite value element action of work service entrance switch phase current, and the low definite value element action of mother 3 switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 3 switches or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of mother 3 switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 1T4 jumps work incoming power switch, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(6) while having an outlet short trouble at least outside bus generating region, work inlet wire phase current or Sudden Changing Rate start, the high and low definite value element action of work service entrance switch phase current, and outlet switch protection output instantaneous overcurrent contact has an action at least, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to outlet switch or protection tripping; cannot excise outlet fault for a long time; the action of outlet switch protection output instantaneous overcurrent contact is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 1T5 jumps work incoming power switch, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
Two, when Power supply mode that mother 1 switch is this section of bus, bus protection and failure protection action basic logic (as shown in Figure 3):
(1) bus protection drops into, mother 1 switch supply power mode bus protection drops into, mother 3 switches drop into, mother 1 switch supply power mode failure protection drops into, and the hard pressing plate of bus protection, the hard pressing plate of failure protection drop into.
(2) in bus generating region during busbar short-circuit fault; mother 1 switch phase current or Sudden Changing Rate start; mother 1 switch phase current high-set setting element action; if drop into composite voltage blocking element simultaneously; the action of composite voltage element; and work service entrance switch phase current low definite value element, the low definite value element of other 2 road bus connection switch phase currents, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate; meet bus protection action logic; time delay 2T1 jumps mother 1 switch; locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
(3) while working service entrance switch short trouble outside bus generating region, mother 1 switch phase current or Sudden Changing Rate start, the high and low definite value element action of mother 1 switch phase current, and the low definite value element action of work service entrance switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to work service entrance switch switch or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of work service entrance switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 2T2 jumps mother 1 switch, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(4) outside bus generating region during mother 2 switch short trouble, mother 1 switch phase current or Sudden Changing Rate start, the high and low definite value element action of mother 1 switch phase current, and the low definite value element action of mother 2 switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 2 switches or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of mother 2 switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 2T3 jumps mother 1 switch, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(5) outside bus generating region during mother 3 switch short trouble, mother 1 switch phase current or Sudden Changing Rate start, the high and low definite value element action of mother 1 switch phase current, and the low definite value element action of mother 3 switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 3 switches or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of mother 3 switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 2T4 jumps mother 1 switch, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(6) while having an outlet short trouble at least outside bus generating region, mother 1 switch phase current or Sudden Changing Rate start, the high and low definite value element action of mother 1 switch phase current, and outlet switch protection output instantaneous overcurrent contact has an action at least, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to outlet switch or protection tripping; cannot excise outlet fault for a long time; the action of outlet switch protection output instantaneous overcurrent contact is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 2T5 jumps mother 1 switch, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
Three, when Power supply mode that mother 2 switches are this section of bus, bus protection and failure protection action basic logic (as shown in Figure 4):
(1) bus protection drops into, mother 2 switch supply power mode bus protections drop into, mother 3 switches drop into, mother 2 switch supply power mode failure protections drop into, and the hard pressing plate of bus protection, the hard pressing plate of failure protection drop into.
(2) in bus generating region during busbar short-circuit fault; mother 2 switch phase currents or Sudden Changing Rate start; mother 2 switch phase current high-set setting element actions; if drop into composite voltage blocking element simultaneously; the action of composite voltage element; and work service entrance switch phase current low definite value element, the low definite value element of other 2 road bus connection switch phase currents, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate; meet bus protection action logic; time delay 3T1 jumps mother 2 switches; locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
(3) outside bus generating region during mother 1 switch short trouble, mother 2 switch phase currents or Sudden Changing Rate start, the high and low definite value element action of mother 2 switch phase current, and the low definite value element action of mother 1 switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 1 switch or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of mother 1 switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 3T2 jumps mother 2 switches, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(4) while working service entrance switch short trouble outside bus generating region, mother 2 switch phase currents or Sudden Changing Rate start, the high and low definite value element action of mother 2 switch phase current, and the low definite value element action of work service entrance switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to work service entrance switch switch or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of work service entrance switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 3T3 jumps mother 2 switches, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(5) outside bus generating region during mother 3 switch short trouble, mother 2 switch phase currents or Sudden Changing Rate start, the high and low definite value element action of mother 2 switch phase current, and the low definite value element action of mother 3 switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 3 switches or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of mother 3 switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 3T4 jumps mother 2 switches, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(6) while having an outlet short trouble at least outside bus generating region, mother 2 switch phase currents or Sudden Changing Rate start, the high and low definite value element action of mother 2 switch phase current, and outlet switch protection output instantaneous overcurrent contact has an action at least, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to outlet switch or protection tripping; cannot excise outlet fault for a long time; the action of outlet switch protection output instantaneous overcurrent contact is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 3T5 jumps mother 2 switches, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
Four, when Power supply mode that mother 3 switches are this section of bus, bus protection and failure protection action basic logic (as shown in Figure 5):
(1) bus protection drops into, mother 3 switch supply power mode bus protections drop into, mother 3 switches drop into, mother 3 switch supply power mode failure protections drop into, and the hard pressing plate of bus protection, the hard pressing plate of failure protection drop into.
(2) in bus generating region during busbar short-circuit fault; mother 3 switch phase currents or Sudden Changing Rate start; mother 3 switch phase current high-set setting element actions; if drop into composite voltage blocking element simultaneously; the action of composite voltage element; and work service entrance switch phase current low definite value element, the low definite value element of other 2 road bus connection switch phase currents, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate; meet bus protection action logic; time delay 4T1 jumps mother 3 switches; locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
(3) outside bus generating region during mother 1 switch short trouble, mother 3 switch phase currents or Sudden Changing Rate start, the high and low definite value element action of mother 3 switch phase current, and the low definite value element action of mother 1 switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 1 switch or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of mother 1 switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 4T2 jumps mother 3 switches, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(4) outside bus generating region during mother 2 switch short trouble, mother 3 switch phase currents or Sudden Changing Rate start, the high and low definite value element action of mother 3 switch phase current, and the low definite value element action of mother 2 switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 2 switches or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of mother 2 switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 4T3 jumps mother 3 switches, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(5) while working service entrance switch short trouble outside bus generating region, mother 3 switch phase currents or Sudden Changing Rate start, the high and low definite value element action of mother 3 switch phase current, and the low definite value element action of work service entrance switch phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to work service entrance switch switch or protection tripping; cannot excise outlet fault for a long time; the low definite value element action of work service entrance switch phase current is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 4T4 jumps mother 3 switches, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.
(6) while having an outlet short trouble at least outside bus generating region, mother 3 switch phase currents or Sudden Changing Rate start, the high and low definite value element action of mother 3 switch phase current, and outlet switch protection output instantaneous overcurrent contact has an action at least, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to outlet switch or protection tripping; cannot excise outlet fault for a long time; the action of outlet switch protection output instantaneous overcurrent contact is not returned in setting-up time; meet failure protection action logic; failure protection action; time delay 4T5 jumps mother 3 switches, and locking backup auto-activating device sends failure protection actuating signal, lights tripping operation lamp and alarm lamp.

Claims (5)

1. 3kV~10kV bus protection and a failure protection method are 3kV~10kV bus protection and the failure protection methods that under the primary connection mode of a kind of Yi of being applicable to road work incoming power, three tunnels and following bus connection switch, single channel power supply or single channel bus connection switch are used as the power plant under this section of bus Power supply mode and transformer station; It is characterized in that: the method is mainly to protect base quantity to form enclosed type overcurrent bus protection and failure protection action basic logic by detection, when bus breaks down, makes corresponding protection action, and bus is protected fast;
Described protection base quantity comprises to be opened into analog quantity, opens into switching value and the amount of outputing, wherein: open the threephase current transformer secondary current, the secondary current of threephase current transformer separately of three road bus connection switches, the bus threephase potential transformer secondary voltage that into analog quantity, comprise a road work incoming power switch; Open into switching value and comprise that the instantaneous locking overcurrent of each outlet contact, bus protection function pressing plate drop into, bus failure protection function pressing plate drops into; The amount of outputing comprises tripping relay contact, the contact of tripping relay separately of Tiao San road bus connection switch, bus protection actuating signal contact, failure protection actuating signal contact, protective device alarm contact, the protective device block signal contact of Tiao Yi road work incoming power switch;
Described bus protection and failure protection action basic logic are: this section of bus is respectively when work incoming power, mother 1,2,3 switch power supply power supply, power supply overcurrent action during bus troubles inside the sample space and outlet be without overcurrent locking, bus protection short time delay action tripping power supply; Power supply overcurrent action during bus external area error and the locking of outlet overcurrent, bus protection is failure to actuate, if during now outlet switch, protection tripping, the malfunctioning action long delay of bus tripping power supply.
2. 3kV~10kV bus protection according to claim 1 and failure protection method, is characterized in that: when work incoming power is during as power supply, bus protection and failure protection action basic logic are:
In bus generating region during busbar short-circuit fault, work service entrance switch phase current high-set setting element and the action of composite voltage element, the low definite value element of Er San road bus connection switch phase current, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate, meet bus protection action logic, short time delay jumping work incoming power switch, locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp;
Mother 1 switch or mother 2 switches or mother 3 switches or while going out specific electric load short trouble outside bus generating region, the high and low definite value element action of work service entrance switch phase current, and the low definite value element action of mother 1 switch or mother 2 switches or mother 3 switches or outlet phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to mother 1 switch or mother 2 switches or mother 3 switches go out specific electric load or protection tripping; cannot excise outlet fault for a long time; mother 1 switch or mother 2 switches or mother 3 switches or go out the action of the low definite value element of specific electric load phase current and do not return in setting-up time; meet failure protection action logic; failure protection action; long delay jumping work incoming power switch, locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
3. 3kV~10kV bus protection according to claim 1 and failure protection method, is characterized in that: when mother 1 switch power supply is during as power supply, bus protection and failure protection action basic logic are:
In bus generating region during busbar short-circuit fault, mother 1 switch phase current high-set setting element and the action of composite voltage element, and work inlet wire, mother 2, the low definite value element of mother 3 switch phase current, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate, meet bus protection action logic, short time delay is jumped mother 1 switch, locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp;
Outside bus generating region, work service entrance switch or mother 2 switches or mother 3 switches or while going out specific electric load short trouble, the high and low definite value element action of mother 1 switch phase current, and the low definite value element action of work service entrance switch or mother 2 switches or mother 3 switches or outlet phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to work service entrance switch or mother 2 switches or mother 3 switches go out specific electric load or protection tripping; cannot excise outlet fault for a long time; work service entrance switch or mother 2 switches or mother 3 switches or go out the action of the low definite value element of specific electric load phase current and do not return in setting-up time; meet failure protection action logic; failure protection action; long delay is jumped mother 1 switch, and locking backup auto-activating device sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
4. 3kV~10kV bus protection according to claim 1 and failure protection method, is characterized in that: when mother 2 switch power supplies are during as power supply, bus protection and failure protection action basic logic are:
In bus generating region during busbar short-circuit fault, mother 2 switch phase current high-set setting elements and the action of composite voltage element, and work inlet wire, mother 1, the low definite value element of mother 3 switch phase current, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate, meet bus protection action logic, short time delay is jumped mother 1 switch, locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp;
Outside bus generating region, work service entrance switch or mother 1 switch or mother 3 switches or while going out specific electric load short trouble, the high and low definite value element action of mother 2 switch phase current, and the low definite value element action of work service entrance switch or mother 1 switch or mother 3 switches or outlet phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to work service entrance switch or mother 1 switch or mother 3 switches go out specific electric load or protection tripping; cannot excise outlet fault for a long time; work service entrance switch or mother 1 switch or mother 3 switches or go out the action of the low definite value element of specific electric load phase current and do not return in setting-up time; meet failure protection action logic; failure protection action; long delay is jumped mother 2 switches, and locking backup auto-activating device sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
5. 3kV~10kV bus protection according to claim 1 and failure protection method, is characterized in that: when mother 3 switch power supplies are during as power supply, bus protection and failure protection action basic logic are:
In bus generating region during busbar short-circuit fault, mother 3 switch phase current high-set setting elements and the action of composite voltage element, and work inlet wire, mother 1, the low definite value element of mother 2 switch phase current, outlet 1 to N switch protection output instantaneous overcurrent contact are all failure to actuate, meet bus protection action logic, short time delay is jumped mother 3 switches, locking backup auto-activating device, sends bus protection actuating signal, lights tripping operation lamp and alarm lamp;
Outside bus generating region, work service entrance switch or mother 1 switch or mother 2 switches or while going out specific electric load short trouble, the high and low definite value element action of mother 3 switch phase current, and the low definite value element action of work service entrance switch or mother 1 switch or mother 2 switches or outlet phase current, do not meet bus protection action logic, locking bus protection in short-term, bus protection is failure to actuate; If now due to work service entrance switch or mother 1 switch or mother 2 switches go out specific electric load or protection tripping; cannot excise outlet fault for a long time; work service entrance switch or mother 1 switch or mother 2 switches or go out the action of the low definite value element of specific electric load phase current and do not return in setting-up time; meet failure protection action logic; failure protection action; long delay is jumped mother 3 switches, and locking backup auto-activating device sends bus protection actuating signal, lights tripping operation lamp and alarm lamp.
CN201410200673.1A 2014-05-13 2014-05-13 3 kV-10 kV bus protection and failure protection method Active CN104009449B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410200673.1A CN104009449B (en) 2014-05-13 2014-05-13 3 kV-10 kV bus protection and failure protection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410200673.1A CN104009449B (en) 2014-05-13 2014-05-13 3 kV-10 kV bus protection and failure protection method

Publications (2)

Publication Number Publication Date
CN104009449A true CN104009449A (en) 2014-08-27
CN104009449B CN104009449B (en) 2017-05-03

Family

ID=51369998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410200673.1A Active CN104009449B (en) 2014-05-13 2014-05-13 3 kV-10 kV bus protection and failure protection method

Country Status (1)

Country Link
CN (1) CN104009449B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104466920A (en) * 2014-11-25 2015-03-25 许继集团有限公司 Circuit breaker failure protection method
CN105811566A (en) * 2016-04-05 2016-07-27 国家电网公司 Station domain protection based intelligent locking logic automatic switching equipment
CN105954626A (en) * 2016-06-22 2016-09-21 国网山东省电力公司莱芜供电公司 Portable microcomputer bus protection apparatus tester
CN110364996A (en) * 2019-07-24 2019-10-22 国家电网有限公司 Improve the protective device of station service power supply reliability
CN111463756A (en) * 2020-05-07 2020-07-28 华电电力科学研究院有限公司 Protection locking joint optimization method based on high-service bus protection and fast switching device
CN111786383A (en) * 2020-07-01 2020-10-16 云南电网有限责任公司曲靖供电局 Spare power automatic switching device and method for realizing mutual backup of multiple power incoming lines

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4286118A (en) * 1979-07-02 1981-08-25 Solid State Systems, Inc. Data distribution system for private automatic branch exchange
CN1243348A (en) * 1998-07-28 2000-02-02 许继电气股份有限公司 Microcomputer type protection method for double-bus system when out of order
CN1256539A (en) * 1999-11-25 2000-06-14 李元龙 Microcomputer bus protection using the integration of multiple element current variables as main parameter of criterion
CN201590657U (en) * 2009-08-07 2010-09-22 云峰发电厂 Microcomputer directional current quick-break bus protection device
CN201639280U (en) * 2010-04-23 2010-11-17 攀钢集团攀枝花钢钒有限公司 Microcomputer bus protector automatically identifying running ways of bus
CN102842897A (en) * 2012-09-07 2012-12-26 北京四方继保自动化股份有限公司 Locked current protection system and locked current protection method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4286118A (en) * 1979-07-02 1981-08-25 Solid State Systems, Inc. Data distribution system for private automatic branch exchange
CN1243348A (en) * 1998-07-28 2000-02-02 许继电气股份有限公司 Microcomputer type protection method for double-bus system when out of order
CN1256539A (en) * 1999-11-25 2000-06-14 李元龙 Microcomputer bus protection using the integration of multiple element current variables as main parameter of criterion
CN201590657U (en) * 2009-08-07 2010-09-22 云峰发电厂 Microcomputer directional current quick-break bus protection device
CN201639280U (en) * 2010-04-23 2010-11-17 攀钢集团攀枝花钢钒有限公司 Microcomputer bus protector automatically identifying running ways of bus
CN102842897A (en) * 2012-09-07 2012-12-26 北京四方继保自动化股份有限公司 Locked current protection system and locked current protection method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104466920A (en) * 2014-11-25 2015-03-25 许继集团有限公司 Circuit breaker failure protection method
CN104466920B (en) * 2014-11-25 2017-10-31 许继集团有限公司 A kind of breaker fail protection method
CN105811566A (en) * 2016-04-05 2016-07-27 国家电网公司 Station domain protection based intelligent locking logic automatic switching equipment
CN105954626A (en) * 2016-06-22 2016-09-21 国网山东省电力公司莱芜供电公司 Portable microcomputer bus protection apparatus tester
CN110364996A (en) * 2019-07-24 2019-10-22 国家电网有限公司 Improve the protective device of station service power supply reliability
CN110364996B (en) * 2019-07-24 2021-08-20 国家电网有限公司 Protection device for improving service power supply reliability
CN111463756A (en) * 2020-05-07 2020-07-28 华电电力科学研究院有限公司 Protection locking joint optimization method based on high-service bus protection and fast switching device
CN111786383A (en) * 2020-07-01 2020-10-16 云南电网有限责任公司曲靖供电局 Spare power automatic switching device and method for realizing mutual backup of multiple power incoming lines
CN111786383B (en) * 2020-07-01 2021-05-25 云南电网有限责任公司曲靖供电局 Spare power automatic switching device and method for realizing mutual backup of multiple power incoming lines

Also Published As

Publication number Publication date
CN104009449B (en) 2017-05-03

Similar Documents

Publication Publication Date Title
CN104009449A (en) 3 kV-10 kV bus protection and failure protection method
Callavik et al. The hybrid HVDC breaker
Sneath et al. Fault detection and interruption in an earthed HVDC grid using ROCOV and hybrid DC breakers
Majumder et al. An alternative method to build DC switchyard with hybrid DC breaker for DC grid
Kontos et al. Optimization of limiting reactors design for DC fault protection of multi-terminal HVDC networks
CN103401225B (en) Ground connection hold concurrently house transformer overcurrent protection setting method and connection jump method to set up
CN104813555A (en) Method of operate is-limiters in ring systems
CN103683225B (en) Nuclear power station low-voltage distribution system full supply district earth-fault protection method
Mitra et al. Comparative analysis of hybrid DC breaker and assembly HVDC breaker
CN106129970B (en) A kind of simple bus bar protecting method for intelligent substation low-voltage bus bar
CN203722250U (en) Photovoltaic device
US9379537B2 (en) Power system including a circuit providing smart zone selective interlocking communication
CN103683227B (en) A kind of method of Substation Station alternating current power supply two sections protection Graded coordination
Liu et al. A topology of the multi-port DC circuit breaker for multi-terminal DC system fault protection
CN103308811B (en) 750kV transformer station subsystem debugging apparatus
CN203674563U (en) TN dual power system transformer ground current detection device
CN104332969A (en) Relay protection method for cascade switching station tie lines
CN104734117B (en) A kind of breaker fail protection method of substation
CN204947582U (en) Loop is distributed in the jumping of 220kV failure protection connection rationally
CN203707773U (en) Power distribution system with three incoming line switches and two interconnection switches
CN202696129U (en) Bus bar differential structure of booster station in electric one-through connection mode
CN104377649A (en) Automatic switching method of transformer neutral grounding knife-switch
CN104836211A (en) Bus fault locking system and locking method
CN204967248U (en) Prevent protection device of high -pressure generating line short circuit
CN205039539U (en) A circuit breaker configuration structure on post for high -pressure overhead wire

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant