CN103683227B - A kind of method of Substation Station alternating current power supply two sections protection Graded coordination - Google Patents

A kind of method of Substation Station alternating current power supply two sections protection Graded coordination Download PDF

Info

Publication number
CN103683227B
CN103683227B CN201310660029.8A CN201310660029A CN103683227B CN 103683227 B CN103683227 B CN 103683227B CN 201310660029 A CN201310660029 A CN 201310660029A CN 103683227 B CN103683227 B CN 103683227B
Authority
CN
China
Prior art keywords
section
protection
stream
protected
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310660029.8A
Other languages
Chinese (zh)
Other versions
CN103683227A (en
Inventor
李洪卫
李艳
黄福全
周永光
李锦强
冷旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Shenzhen Tieon Energy Technology Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Shenzhen Tieon Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd, Shenzhen Tieon Energy Technology Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201310660029.8A priority Critical patent/CN103683227B/en
Publication of CN103683227A publication Critical patent/CN103683227A/en
Application granted granted Critical
Publication of CN103683227B publication Critical patent/CN103683227B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

The present invention provides the method for a kind of Substation Station alternating current power supply two sections protection Graded coordination; including: standing with becoming the overcurrent protection time of alternating current inlet wire switch I section protection and spending stream definite value and the overcurrent protection time of II section protection and cross stream definite value, the overcurrent protection time of the I section protection of described setting and the overcurrent protection time of II section protection are shorter than the guard time that described station becomes higher level's high-voltage switch gear;When there is over current fault, crossing in stream limits if crossing stream what II section was protected, then jumping into wiretap according to the overcurrent protection time delays of the II section protection set;If crossing to flow crosses in stream limits what I section was protected, then jump into wiretap according to the overcurrent protection time delays of the I section protection set;II section protection simultaneously also starts jumps into wiretap, and I section and II section protect successively output, implement the present invention, can effectively prevent switch failure, it is achieved stands and becomes the Graded coordination protection of higher level's high-voltage switch gear with change alternating current inlet wire switch and station.

Description

A kind of method of Substation Station alternating current power supply two sections protection Graded coordination
Technical field
The present invention relates to technical field of electric power, particularly relate to a kind of two sections of protected levels of Substation Station alternating current power supply The method that difference coordinates.
Background technology
In prior art, existing Substation Station alternating current power supply service entrance switch is inverse time-lag protection, has served as stream Multiple do not reach instantaneous trip protection time, it may be necessary to the time of 10 seconds or 100 seconds could section breaker, Now station is with becoming the tripping operation of higher level's high-voltage switch gear definite time protection, and this belongs to trip protection of bypassing the immediate leadership.
Trip protection fault of bypassing the immediate leadership in recent years occurs, such as again and again:
Case 1:2005 220kV transformer station life load earth fault on March 6, exchange feeder line is opened Close, alternating current inlet wire switch does not trips, and change zero-sequencedirectional protection of stand action tripping operation #1 station of bypassing the immediate leadership becomes, and 380V is standby certainly Throwing action switch, because fault still exists, cause #2 station become zero-sequencedirectional protection bypass the immediate leadership action tripping operation.Entirely stand exchange After dead electricity, affect active air-cooled motor, main transformer forced outage, cause large-area power-cuts.
Cause of accident:
Life on-load switch does not configures earth leakage protective, it is impossible to reflection earth fault is isolated;
Change zero-sequencedirectional protection of standing is bypassed the immediate leadership after action tripping operation, and the switching of 380V prepared auto restart expands accident scope.
220kV in July transformer station generation feeder line branch road BN is short-circuit for case 2:2011, and feeder switch is not jumped Lock, stands and does not trips with alternating current inlet wire switch, and 380V prepared auto restart zero-sequencedirectional protection becomes zero sequence mistake because of setting valve with station Stream protection is mismatched and connection principle is that ground protection is not operating, and change zero-sequencedirectional protection of stand action of bypassing the immediate leadership is tripped After, the switching of 380V prepared auto restart expands accident scope, causes Quan Zhanzhan to exchange dead electricity.
Cause of accident:
Switch and do not coordinate with station change protection at phase zero failure after heat magnetic protection act curve, it is impossible to isolate in time Fault;
Change zero-sequencedirectional protection of standing is bypassed the immediate leadership after action tripping operation, and the switching of 380V prepared auto restart expands accident scope.
There is feeder line branch road ABC phase fault in case 3:2012 110kV in January transformer station, feeder line is opened Closing and do not trip, stand and do not trip with alternating current inlet wire switch, change overcurrent protection of stand is bypassed the immediate leadership action, and not locking 380V is standby certainly Throwing action switches, and causes Quan Zhanzhan alternating current power supply dead electricity.
Cause of accident:
(1) switch pyromagnetic protection act curve after ABC phase fault does not coordinate with station change protection, Cannot isolated fault in time;
(2) change overcurrent protection of standing is bypassed the immediate leadership after action tripping operation, and the switching of 380V prepared auto restart expands accident scope.
From above accident, bypass the immediate leadership trip protection action time whole transformer station will be caused all to have a power failure, this meeting Massive losses is brought to whole power system.
Summary of the invention
For solving above-mentioned technical problem, the present invention provides a kind of Substation Station alternating current power supply two sections protection differential The method coordinated, including:
Set and become, with Substation Station, the station change alternating current inlet wire switch I section protection that higher level's high-voltage switch gear matches The overcurrent protection time and cross stream definite value and II section protection the overcurrent protection time and cross stream definite value, described in set It is high that the overcurrent protection time of fixed I section protection and the overcurrent protection time of II section protection become higher level than described station The guard time compressed switch is short;
When a failure occurs it, if crossing stream and crossing in stream limits, then according to the II section set what II section was protected The overcurrent protection time delays of protection jumps into wiretap;
If crossing to flow crosses in stream limits what I section was protected, then time according to the overcurrent protection of the I section protection set Between time delay jump into wiretap;II section protection simultaneously also starts jumps into wiretap, I section and II section protection successively output, Prevent switch failure;
Wherein, cross in stream limits if crossing stream what I section was protected, then flow according to the crossing of I section protection set The step of wiretap is jumped in guard time time delay, including:
Step 1, it is judged that whether I section overcurrent protection control word puts into, if put into, performs step 2;
Step 2: judge whether the maximum of A, B, C three-phase phase current crosses stream definite value more than what I section was protected; If so, continue to judge when whether the overcurrent delay time that I section is protected is more than the overcurrent protection that the I section set is protected Between, the most then perform step 3;
Step 3: overcurrent protection action, switches block signal, and action outputed by relay, and the outside stream of crossing of prompting is sent out Raw, and cross stream locking switching;
Step 4: judge that I section protected stream to jump into whether line traffic control word puts into;If put into, perform step 5;
Step 5: banked relay, 3 pps pulse per second signals, tripping two-way service entrance switch are outputed in remote control.
Wherein, if described crossing stream crossing in stream limits in the protection of II section, then according to the II section protection set Overcurrent protection time delays jump into the step of wiretap, including:
Step 1: judging that whether II section protection overcurrent protection control word puts into, if put into, performing step 2;
Step 2: judge whether the maximum of A, B, C three-phase phase current crosses stream definite value more than what II section was protected; If so, continue to judge whether the overcurrent delay time that II section is protected protected stream to protect more than the II section of described setting Protect the time, the most then perform step 3;
Step 3: overcurrent protection action, switches block signal, and action outputed by relay, and the outside stream of crossing of prompting is sent out Raw, and cross stream locking switching;
Step 4: judge that II section protected stream to jump into whether line traffic control word puts into;If put into, perform step 5;
Step 5: banked relay, 3 pps pulse per second signals, tripping two-way service entrance switch are outputed in remote control.
Implement the method that the present invention provides a kind of Substation Station alternating current power supply two sections protection Graded coordination, pass through Arranging I section and II section definite time protection, setting time and the current ration of two sections of protections are high with becoming higher level with station Compress switch coupling, and the guard time set is shorter than the guard time that higher level switchs setting.When stream event occurred During barrier, flow in II section protection definite value if crossing, then set time delays according to the protection of II section and jump into wiretap; If crossing stream (to comprise II section protection definite value) in I section protection definite value, then set time delays according to the protection of I section Jumping into wiretap, II section protection simultaneously also starts jumps into line, and I section and II section protection successively output prevent switch Tripping.Realize station with becoming alternating current inlet wire switch and the station Graded coordination protection becoming higher level's high-voltage switch gear.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to enforcement In example or description of the prior art, the required accompanying drawing used is briefly described, it should be apparent that, describe below In accompanying drawing be only some embodiments of the present invention, for those of ordinary skill in the art, do not paying On the premise of going out creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 provides the method for a kind of Substation Station alternating current power supply two sections protection Graded coordination to implement for the present invention The schematic flow sheet of example one;
Fig. 2 provides the method for a kind of Substation Station alternating current power supply two sections protection Graded coordination to implement for the present invention The schematic flow sheet of example two;
Fig. 3 provides the method for a kind of Substation Station alternating current power supply two sections protection Graded coordination to implement for the present invention The schematic flow sheet of example three.
Detailed description of the invention
Fig. 1 provides the method for a kind of Substation Station alternating current power supply two sections protection Graded coordination to implement for the present invention The schematic flow sheet of example one;
As it is shown in figure 1, the present invention provides the side of a kind of Substation Station alternating current power supply two sections protection Graded coordination Method, including:
Step 100, sets and becomes, with Substation Station, the station change alternating current inlet wire switch that higher level's high-voltage switch gear matches I section protection the overcurrent protection time and cross stream definite value and II section protection the overcurrent protection time and cross stream definite value, The overcurrent protection time of the I section protection of described setting and the overcurrent protection time of II section protection become than described station The guard time of higher level's high-voltage switch gear is short;
Step 101, when a failure occurs it, crosses in stream limits, then according to setting if crossing stream what II section was protected The overcurrent protection time delays of fixed II section protection jumps into wiretap;
Step 102, crosses in stream limits if crossing stream what I section was protected, then according to the I section protection set Overcurrent protection time delays jumps into wiretap;II section protection simultaneously also starts jumps into wiretap, and I section and II section are protected Protect successively output, prevent switch failure.
Fig. 2 provides the method for a kind of Substation Station alternating current power supply two sections protection Graded coordination to implement for the present invention The schematic flow sheet of example two;
If the present embodiment two is crossed in stream limits, then according to the I section set by describing to cross to flow what I section was protected Protection overcurrent protection time delays jump into wiretap step implement process, including:
Step 200, it is judged that whether I section overcurrent protection control word puts into, if put into, performs step 201; Otherwise, execution step 200 is returned.
Step 201: judge whether the maximum of A, B, C three-phase phase current is determined more than the stream of crossing of I section protection Value;If so, continue to judge whether the overcurrent delay time that I section is protected protects more than the stream of crossing of the I section protection set Protect the time, the most then perform step 202;If it is not, return step 200.
Step 202: overcurrent protection action, switches block signal, and action outputed by relay, and prompting is outside crosses stream Occur, and cross stream locking switching.
Step 203: judge that I section protected stream to jump into whether line traffic control word puts into;If put into, perform step 204;Otherwise, execution step 200 is returned.
Step 204: banked relay, 3 pps pulse per second signals, tripping two-way service entrance switch are outputed in remote control.
Fig. 3 provides the method for a kind of Substation Station alternating current power supply two sections protection Graded coordination to implement for the present invention The schematic flow sheet of example three.
If the present embodiment three is crossed in stream limits, then according to setting by describing described stream of crossing in the protection of II section II section protection overcurrent protection time delays jump into wiretap step realize process, including:
Step 300: judging that whether II section protection overcurrent protection control word puts into, if put into, performing step 301;Otherwise, execution step 300 is returned.
Step 301: judge whether the maximum of A, B, C three-phase phase current is determined more than the stream of crossing of II section protection Value;If so, continue to judge whether the overcurrent delay time that II section is protected was protected more than the II section of described setting Stream guard time, the most then perform step 302;Otherwise, execution step 300 is returned.
Step 302: overcurrent protection action, switches block signal, and action outputed by relay, and prompting is outside crosses stream Occur, and cross stream locking switching;
Step 303: judge that II section protected stream to jump into whether line traffic control word puts into;If put into, perform step Rapid 304;Otherwise, execution step 300 is returned.
Step 304: banked relay, 3 pps pulse per second signals, tripping two-way service entrance switch are outputed in remote control.
Implement the method that the present invention provides a kind of Substation Station alternating current power supply two sections protection Graded coordination, pass through Arranging I section and II section definite time protection, setting time and the current ration of two sections of protections are high with becoming higher level with station Compress switch coupling, and the guard time set is shorter than the guard time that higher level switchs setting.When stream event occurred During barrier, flow in II section protection definite value if crossing, then set time delays according to the protection of II section and jump into wiretap; If crossing stream (to comprise II section protection definite value) in I section protection definite value, then set time delays according to the protection of I section Jumping into wiretap, II section protection simultaneously also starts jumps into line, and I section and II section protection successively output prevent switch Tripping.Realize station with becoming alternating current inlet wire switch and the station Graded coordination protection becoming higher level's high-voltage switch gear.
One of ordinary skill in the art will appreciate that all or part of flow process realizing in above-described embodiment method, Can be by computer program and complete to instruct relevant hardware, described program can be stored in a calculating In machine read/write memory medium, this program is upon execution, it may include such as the flow process of the embodiment of above-mentioned each method. Wherein, described storage medium can be magnetic disc, CD, read-only store-memory body (Read-Only Memory, Or random store-memory body (Random Access Memory, RAM) etc. ROM).
Above content is to combine concrete preferred implementation further description made for the present invention, no Can assert the present invention be embodied as be confined to these explanations.Common for the technical field of the invention For technical staff, without departing from the inventive concept of the premise, it is also possible to make some simple deductions or replace Change, all should be considered as belonging to protection scope of the present invention.

Claims (2)

1. the Substation Station method of alternating current power supply two sections protection Graded coordination, it is characterised in that including:
Set and become, with Substation Station, the station change alternating current inlet wire switch I section protection that higher level's high-voltage switch gear matches The overcurrent protection time and cross stream definite value and II section protection the overcurrent protection time and cross stream definite value, described in set It is high that the overcurrent protection time of fixed I section protection and the overcurrent protection time of II section protection become higher level than described station The guard time compressed switch is short;
When a failure occurs it, crossing in stream limits if crossing stream what II section was protected, protecting according to the II section set The overcurrent protection time delays protected jumps into wiretap;
If crossing to flow crosses in stream limits what I section was protected, according to the overcurrent protection time of the I section protection set Wiretap is jumped in time delay;II section protection simultaneously also starts jumps into wiretap, I section and II section protection successively output, Prevent switch failure;
Wherein, if described crossing stream crossing in stream limits in the protection of I section, then according to the I section protection set Overcurrent protection time delays jumps into the step of wiretap, including:
Step 1, it is judged that whether I section overcurrent protection control word puts into, if put into, performs step 2;
Step 2: judge whether the maximum of A, B, C three-phase phase current crosses stream definite value more than what I section was protected; If so, continue to judge when whether the overcurrent delay time that I section is protected is more than the overcurrent protection that the I section set is protected Between, the most then perform step 3;
Step 3: overcurrent protection action, switches block signal, and action outputed by relay, and the outside stream of crossing of prompting is sent out Raw, and cross stream locking switching;
Step 4: judge that I section protected stream to jump into whether line traffic control word puts into;If put into, perform step 5;
Step 5: banked relay, 3 pps pulse per second signals, tripping two-way service entrance switch are outputed in remote control.
2. the Substation Station as claimed in claim 1 method of alternating current power supply two sections protection Graded coordination, its It is characterised by, crosses stream crossing in stream limits in the protection of II section, then according to the II section protection set if described Overcurrent protection time delays jump into the step of wiretap, including:
Step 1: judging that whether II section protection overcurrent protection control word puts into, if put into, performing step 2;
Step 2: judge whether the maximum of A, B, C three-phase phase current crosses stream definite value more than what II section was protected; If so, continue to judge whether the overcurrent delay time that II section is protected protected stream to protect more than the II section of described setting Protect the time, the most then perform step 3;
Step 3: overcurrent protection action, switches block signal, and action outputed by relay, and the outside stream of crossing of prompting is sent out Raw, and cross stream locking switching;
Step 4: judge that II section protected stream to jump into whether line traffic control word puts into;If put into, perform step 5;
Step 5: banked relay, 3 pps pulse per second signals, tripping two-way service entrance switch are outputed in remote control.
CN201310660029.8A 2013-12-09 2013-12-09 A kind of method of Substation Station alternating current power supply two sections protection Graded coordination Active CN103683227B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310660029.8A CN103683227B (en) 2013-12-09 2013-12-09 A kind of method of Substation Station alternating current power supply two sections protection Graded coordination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310660029.8A CN103683227B (en) 2013-12-09 2013-12-09 A kind of method of Substation Station alternating current power supply two sections protection Graded coordination

Publications (2)

Publication Number Publication Date
CN103683227A CN103683227A (en) 2014-03-26
CN103683227B true CN103683227B (en) 2016-08-17

Family

ID=50319904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310660029.8A Active CN103683227B (en) 2013-12-09 2013-12-09 A kind of method of Substation Station alternating current power supply two sections protection Graded coordination

Country Status (1)

Country Link
CN (1) CN103683227B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107453338A (en) * 2017-09-11 2017-12-08 湖南长高思瑞自动化有限公司 The protection investigating method and system of a kind of photovoltaic plant
CN108493911B (en) * 2018-05-02 2019-07-05 中铁第四勘察设计院集团有限公司 Pressure ring network protection method in a kind of magnetic floating traffic
CN109217270B (en) * 2018-10-08 2020-09-08 南方电网科学研究院有限责任公司 DC line sectional type timing limit overcurrent protection method and device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102832603A (en) * 2012-09-18 2012-12-19 山东电力集团公司济宁供电公司 Quick junctor fault isolation method compatible to low-voltage ride through operation of photovoltaic power station

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02101925A (en) * 1988-10-04 1990-04-13 Togami Electric Mfg Co Ltd Method and apparatus for detecting fine ground occurring section

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102832603A (en) * 2012-09-18 2012-12-19 山东电力集团公司济宁供电公司 Quick junctor fault isolation method compatible to low-voltage ride through operation of photovoltaic power station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
深圳电网继电保护整定方案的优化;王碧等;《硅谷》;20130131(第2期);第56-57页 *

Also Published As

Publication number Publication date
CN103683227A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN102694369B (en) Method for preventing low-voltage protection misoperation of motor caused by PT disconnection
CN106129971B (en) A kind of dual failure fault partition method of busbar protective device breaker and system
Sidhu et al. TCSC impact on communication-aided distance-protection schemes and its mitigation
CN103117532B (en) Zero-sequence voltage trip protection method for low-voltage side of transformers
CN103401226B (en) Substation area differential protection method for intelligent substation
KR20160081716A (en) Dc circuit breaker and method for breaking of dc circuit breaker
CN103746349A (en) Circuit breaker failure protection mechanism of transformer substation and optimal configuration method for circuit breaker protection
CN103412239B (en) Detecting and positioning method of bus coupler flashover fault in subway alternating current power system
CN106505529A (en) A kind of intelligent substation low-voltage bus bar guard method
CN103683227B (en) A kind of method of Substation Station alternating current power supply two sections protection Graded coordination
CN107863765B (en) Improve arc current transfevent AC fault current limiter and current-limiting method
CN104242222B (en) The processing method and system of nuclear power station transformer unit relay protection setting value
CN105529681A (en) Leakage protection circuit for low-voltage ungrounded system and realization method
Reyna et al. Transmission line single-pole tripping: field experience in the western transmission area of Mexico
CN103779843A (en) Substation area protection system and substation area protection method based on differential flexible overlapping division
Perera et al. Application considerations when protecting lines with tapped and in-line transformers
CN103915826B (en) Distribution network failure automatic decision that full chopper ring main unit is powered and the method for control
CN109521332A (en) Fault handling method, apparatus and system
CN110098599A (en) A kind of fault handling method and system of overhead lines combined with cable
CN204947582U (en) Loop is distributed in the jumping of 220kV failure protection connection rationally
CN103840553B (en) Failure starting circuit and method for starting failure circuit
JP7181760B2 (en) Protection control device for AC/DC converter station, protection control system for DC power transmission system, and protection control method for AC/DC converter station
CN106787153A (en) A kind of inlet wire for internal bridge form is for throwing method
CN109217266B (en) Small power station's adaptive direction current protection definite value switching method, device and equipment
CN107769174B (en) It is a kind of suitable for AT subregion protective device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant